1 11/17/ /18/ /19/2011 AFE dated 11/18/ pull tbg out of hole and make a mill run. Run packer on tbg and attempt to reestablish production from Devonian Formation. MIRU Great Basin Pulling Unit (Operator - Baldamar). ND plunger lift equipment. ND Wellhead & install BOP. Dig & line 175 bbl workover pit. Pick up on tubing & had approx 66,000 lbs string weight. SWI & SDON. Prep to POH with tbg in am. DWC - $5600 CWC - $5600 POH with 349 jts of 2 3/8 tbg (tally out). Recovered SN with seating cups off standing valve and tbg stop. Jt below SN had numerous corrosion holes. (1 to 2 in diameter). Unload and assemble 6 1/8 OD string mill and prep to RBIH in am. Close blind rams and SWI. SDON. DWC - $4600 CWC - $10,200 RBIH with 6 1/8 OD string mill. Tag at 4,282. Rotate and work mill thru and continue in hole. Tag again at 4316 and rotate and work mill to Continue RIH unobstructed. Tag up on liner top at 10,992. RU kill truck and reverse circulate 7 casing with 90 bbls 2% KCL wtr (broke circulation after pumping 55 bbls). Did not circulate anything of note out of hole. RD kill truck & POH. Had intermittent drag for the first 1800 off bottom. At 4,337 had drag again and had to work out of hole. At approx 4,282 freed up and continued out of hole without problems. SWI & SDOD. Prep to make another run with mill Monday am and then run PKR & RBP to test casing. DWC - $6150 CWC - $16,350 11/20/2011 SDFWE. 11/21/2011 SDFWE 11/22/2011 RIH with 6 1/8 mill & work area (4,282 4,337 ) again. POOH & PU 6 impression block. RIH & tag at 4,285. POOH & confirmed 7 casing to be 4,285. SI & SDOD. #1_reports.doc 1
2 11/23/ /24/2011 DWC- $6,200 CWC - $22,550 Pick up 4 ½ OD Arrow SET II PKR & RIH on 2 3/8 tbg (one jt of tbg with mule shoe guide below packer & SN above packer). Worked PKR thru tight spot at 4285 with only minor effort. Continue in hole and set PKR at 11,058 with EOT at (10,000 lbs compression on PKR). RU swab, bypass production separator and commence swabbing into fiberglass water tank. IFL = surface. Made 14 swab runs. FFL = 600. Total recovery in 4 hours = 45 bbls wtr. SWI, SDON. Prep to remove BOP & NU wellhead in am and resume swabbing. DWC - $6550 CWC - $29,100 SITP = 45 psig. ND BOPs, NU wellhead. Land tbg on dount with 2,000# tension on 2 3/8 tbg string. Resume swabbing. IFL = 500. Made 26 swab runs, recovering 117 bbls. Total recovery 172 bbls. Checked backside & had no sucking or blowing suggesting PKR holding. FFL = 900. SWI & SD for Thanksgiving Weekend. DWC - $4050 CWC - $33,150 11/25/ SDFWE 11/26/ SDFWE 11/27/ SDFWE 11/28/ SDFWE 11/29/2011 SITP = 0 psig. RIH with swab, 1,800. Made 13 swab runs lifting approximately 1300 each run. 2,000. Daily recovery = 68 BW. Total recovery = 240 BW. SWI, RDPU. Wait on swab unit. Note: recovery = 100% black dirty water. 12/02/2011 DWC - $3025 CWC - $36,175 SITP = 45 psig. MI&RI Hamilton Well Service swab unit. RU flowline & start swabbing. IFL = 2,500, pulled from 4,000 & recovered 100% black water. Made a total of 10 runs & recovered approx 57 BW. EFL = 2,700. PKR is holding good as back side is standing full. SI & SDOD. DWC - $2050 CWC- $38,225 #1_reports.doc 2
3 12/03/2011 SITP = 0 psig. IFL = 2,700, pulled from 4,200 & recovered 100% black water. Made a total of 22 runs & recovered 80 BW. EFL = 3,200. SI & SDOD. DWC - $3000 CWC - $41,225 12/04/2011 SDFWE. 12/05/2011 SDFWE. 12/06/2011 SITP = 0 psig. IFL = Made 21 swab runs, lifting 1,500 on each run. FFL = Recovered 75 BW. 100% black wtr. SWI, SDON. 12/07/ /08/ /09/ /10/2011 DWC - $3550 CWC - $44,775 SITP = 0 psig. IFL = Made 21 swab runs, lifting 1,500 on each run. FFL = Recovered 75 BW. 100% black wtr. SWI, SDON. DWC - $3550 CWC - $48,325 SITP = 0 psig. IFL = Made 23 swab runs, lifting 1,500 on each run. FFL = 4500 FS. Recovered 99 BW. 100% black wtr. SWI, SDON. DWC - $3550 CWC - $51,875 SITP = 0 psig. IFL = 3,800. Made 24 swab runs, lifting 1,500 on each run. FFL = 4,800. Recovered 99 BW. 100% black water. SWI, SDON. Checked annulus and packer is still holding. The casing is standing full and it appears that there is a small water flow. Installed gauge in casing but pressure was TSTM. Will install a smaller gauge in am in attempt to get SICP reading. DWC - $4300 CWC - $56,175 SITP = 0 psig. 4,200. Made 20 swab runs, lifting 1,500 on each run. FFL = Recovered 88 bbls. 100% black water. SWI, SDON. Prep to continue swabbing. Install smaller gauge in attempt to read SICP. (10 psig increments) Still no reading. Prep to continue swabbing Monday DWC - $4300 CWC - $60,475 #1_reports.doc 3
4 12/11/2011 SDFWE. 12/12/2011 SDFWE. 12/13/ SITP = 0 psig. IFL = 4,400. Made 19 swab runs, lifting 1,500 on each run. FFL = 4,800. Recovered 83 bbls. 100% black water. SWI, SDON. Install 60 psig gauge in casing. SICP 10 psig. Note: emptied 500 bbl tank over the weekend. 12/14/ /15/2011 DWC - $5300 CWC - $65,775 SITP = 0 psig. SICP = 10 psig. IFL = 4,600. Made 20 swab runs, lifting 1,500 on each run. FFL = 5,200. Recovered 99 bbls. 100% black water. SWI, SDON. DWC - $2300 CWC - $68,075 SITP = 0 psig. SICP = 10 psig. IFL = 4,800. Made 8 runs lifting 1,500 on each run. FFL = 5,000. Recovered 32 bbls. 100% black water. SWI & RD swab unit. End of work for AFE dated 11/18/2012 (AFE AMOUNT WAS $74,000.00) DWC - $1500 CWC - $69,575 ***************** ******************************************************** 02/11/2012 Start of work for AFE 02/14/2012 (AFE AMOUNT IS $560,000.00) - pull tbg out of hole and run 4-1/2 casing. Run tbg back on the hole, run rods, install pumping unit and put well on pump in Devonian Formation. MIRU Nabors Well Service PU. DWC - $5000 CWC - $5,000 02/12/2012 SDFWE. 02/13/2012 SDFWE. 02/14/ /15/2012 Got late start fog & icy roads. SITP = 0 psig. SICP = 350 psig. Bled CP down & killed with 10# brine. ND WH & NU BOP. SI & SDFD. DWC - $5000 CWC - $10,000 Replaced BOP bolts. Loaded tubing with 10# brine & unset PKR. Pulled PKR up hole 3 and it became stuck. Worked PKR lose & up #1_reports.doc 4
5 02/16/ /17/ /18/2012 hole to 11,020, where it was free going down but would not go up. Left PKR swinging, SI & SDFD. DWC - $10,000 CWC - $20,000 PU power swivel, work PKR out of 4 ½ casing. Continue POOH, had to turn every collar through parted casing (4,300 area). PU RBP, RIH with 20 stands & SDFD. DWC - $10,000 CWC - $30,000 Continue RIH & set 11,060 & capped with 2 sxs of sand. TOOH & SDFD. DWC - $10,000 CWC - $40,000 RU JW Wire Line truck, RIH with CCL & CBL. Log from PBTD to 5,000 (estimated 5,300 ). POOH & RD loggers. PU polish bore mills & RIH to 391. SI & SDFD. DWC - $15,000 CWC - $55,000 02/19/ SDFWE. 02/20/ SDFWE. 02/21/ PU 6 1/8 string mill, continue RIH & tag 4,328 with polish bore mills. Work mill down to 4,338 but could not work any further. POOH and observed that the top polish mill was worn (sent mill in to be redressed). PU 6 1/8 string mill, RIH & 4,323. SI & SDFD. 02/22/ /23/2012 DWC - $15,000 CWC - $70,000 PU power swivel, rotate & work mill past area, 4,255, 4,285, 4,338, & 4,350. Pulled mill up hole and worked through area several times. Continued RIH to 6,200 unobstructed. POOH & LD string mill. PU polish bore mills, RIH to 4,000 & left swinging. Unload, rack, drift, clean & strap 4 ½ casing. SI & SDFD. DWC - $15,000 CWC - $85,000 Continue TIH with polish bore mills, work mills through 4,255 4,350. Tag up on top of 4 ½ liner, dress off and polish liner. POOH #1_reports.doc 5
6 02/24/ /25/2012 & LD mills. SI & SDFD. DWC - $15,000 CWC - $100,000 PU 6 1/8 string mill, RIH and work mill through parted casing to 4,400. POOH & LD mill. RU and change PU over to 6 lines. Set frac tank for cement job and prep rig to run 4 ½ casing. SDFD. DWC - $15,000 CWC - $115,000 ND BOP & WH, NU C Section & BOP. RU Express Casing Crew, PU seal assemble and orifice collar, RIH with 4 ½ P-110 casing. Tagged 4,225 worked down 4,255, 4,295, & 4,300. Unable to work casing down any further. LD 3 jts casing & SDFD. 02/26/2012 DWC - $15,000 CWC - $130, Pull & lay down 4 ½. Found O.D. of seal assembly heavily marked. DWC - $15,000 CWC - $145,000 02/27/2012 SDFWE. Thoughts: In addition to bad & or parted 7 this also may be an area of crooked hole. I recommend we clean the area up again with string mill then run csg inspection log. Then possibly recover 7 & either repair & rerun or dress 7 stub & run 4 ½. 02/28/2012 WOO. RIH with open ended tubing, work tubing past bad 7 to 4,378 where we tagged up. PUH above bad 7 & worked back down 2 more times and were unable to work past 4,378. LD 135 jnts tubing. SI & SDFD. 02/29/2012 DWC - $157,000 (includes cost of 4-1/2 ) CWC - $302,000 SICP = 150 psig, bled off pressure (all water). ND BOP & C section, NU old WH & BOP. RIH & LD tubing with well flowing water, left 72 jnt (2,350 ) kill string in well. SI & SDFD. DWC- $5000 CWC - $307,000 03/01/2012 ND BOP, NU tubing hanger & SI well. RDMO PU. #1_reports.doc 6
7 DWC - $2000 CWC - $309,000 04/20/2012 ( ) MI&RU Hamilton Well Service PU & SDFD. Daily Cost $ 3,000 CWC - $312,000 04/21/2012 ( ) SITP = 60 psig. SICP = 60 psig. Bled pressure off, ND well head & NU BOP. POOH with 72 jts 2 3/8 tubing. PU 4 ¾ tapered mill, 1 jt 2 3/8 tubing, 6 1/8 string mill & RIH on 2 3/8 tubing. Set 4,251. Work mills down to 4,288 & start milling. Mill to 4,299, circulate clean & SDFD. Daily Cost $ 8,000 CWC - $320,000 04/23/2012 ( ) and ( ) SDFWE 04/24/2012 ( ) Opened well - 0 psi. WIH with 6" lead impression block and tagged up at 4218'. POOH with block. Half-moon impression of parted 7" casing on block. WIH with 5.5 OD flat bottom mill. Tagged parted csg at 4218, lowered down and tagged at 4293' parted csg. Rotated through and tagged at 4313'. Pulled up dragging 20K over weight and came free at 4293'. It appears that we are outside casing at 4293'. POOH with 5.5 mill. WIH with used 6-1/8 rock bit, tagged parted csg at 4218' and rotated through. RU Swivel. Tagged at 4293' with 10K down and attempted to rotate into casing. Went down and tagged at 4310, torqueing up and bouncing up and down. Again, appears to be outside casing. Picked up several times and tagged at 4293', but could not rotate inside 7" casing. Kept going outside casing to 4310', dragging 20K to pull up into casing at 4293'. RD Swivel and POOH with 6-1/8 bit. Closed well in for night. 04/25/2012 DWC - $16,800 CWC - $ 336,800 ( ) Opened well 300 psi on 9-5/8 casing. Bled to 0 psi, flowing a little fresh water. ND 11" 5K casing head for 7 casing. RU rotary csg jacks and speared into 7" csg with Weatherford spear grapple. Pulled 200K on spear and 7" csg. Pulled casing free from hanger weighing 120K. Pulled up 5 and sat on slips. RD csg jacks and LD Spear. NU 11" 5K Weatherford Hydril. LD 2 jts of 7" casing. Elevators came open while laying down second jt causing the welder #1_reports.doc 7
8 to jump off the 5 rig floor. Sent the welder to doctor and he is ok. RU Premian Casing crew with tongs and elevator and slips but could not back out csg. RD 7" csg tongs. Shut Well in. Waiting on 10-3/4 high torque tongs. 04/26/ /27/ /28/2012 DWC - $20,100 CWC - $ 356,900 ( ) Opened well - 0 psi and flowing a little fresh water. RU Permian High Torque Tongs. POOH Laying down 7" casing. LD 95 jts of casing, parted at 4219'. Pipe extremely tight and had to cut 10 jts with a cutting torch. Pipe Weight 120K. It also had split collar on bottom jt of casing. Lost 5 bow springs and 1/2 centralizer in hole. Bottom 5 jts are pitted on OD and ID. Closed well in. DWC - $17,300 CWC - $ 374,200 ( ) Opened well - 0 psi. WIH with 4-3/4 OD tapered mill, 1 jt of 2-3/8 tbg, 6-1/8 OD string mill and 2-3/8 tbg. Tagged 7" csg at 4220'. Rotated into csg and tagged at 4285'. RU swivel and stripper and washed down to 4335' and torqueing up and dragging 20K over weight. Seems to be outside csg. POOH with mills. WIH with 7" csg spear with grapple and tagged at 4220'. Stung into csg to 4223' and pulled 2K over weight. POOH with spear and 61' of 7" csg parted 15' below collar. Csg pitted on OD and ID. WIH with same tapered mill and sting mill and 2-3/8 tbg to 3900'. 9-5/8 surface pipe at 3955'. Closed well in DWC - $15,300 CWC - $389,500 ( ) Opened well - 0 psi. WIH with 4-3/4 tapered mill, 1 jt of 2-3/8 tbg and 6-1/8 OD string mill and 2-3/8 tbg. Tagged at top of 7" csg at 4282'. Rotated tagged outside csg at 4335'. Pulled up. RU swivel and tagged at 4282'. Rotated inside. WIH to 4535'. Pulled up to 4250'. WIH and tagged at 4282' but could not get back in csg. POOH with mills. WIH with 7" csg spear with grapple and 2-3/8 tbg. Tagged csg at 4282'. Speared into csg to 4285'. Pulled up to 50K on csg. Speared pulled free. Pulled out of 7" csg and string not parted. POOH with Spear. Bent 2-3/8 tbg above tapered mill. WIH and tagged 7" csg at 4282'. Rotated into csg. WIH, picking up 2-3/8 tbg #1_reports.doc 8
9 to 5500'. Closed well in. DWC - $11,700 CWC - $401,200 04/29-04/30/2012 Shut down for the weekend. 05/01/2012 ( ) Opened well - 0 psi. WIH with 4-3/4 OD tapered mill, 1 bent jt of 2-3/8 tbg, 6-1/8 string mill, picking up 2-3/8 tbg and tagged liner top at 10953'. RU stripper and swivel. Washed and reamed into PBR Liner top to 10963'. Circulated bottoms up. RD swivel and stripper. POOH with 168 stands of 2-3/8 tbg and mills. WIH with 3-3/4 bladed mill, 5-7/32 polishing mill and 5-3/4 tapered mill, bent jt and 2-3/8 tbg. Closed well in. 05/02/ /03/ /04/2012 DWC - $10,000 CWC - $411,200 (5-1-12) Opened well - 0 psi. WIH with polishing mill and 2-3/8 tbg. Tagged parted 7" csg at 4282'. Rotated inside csg. WIH and tagged liner top at 10953'. RU swivel and stripper. Reamed out PBR with mills and circulated out clean. POOH with polishing mills and 168 stands of 2-3/8 Tbg. Unloaded 5-1/4 seal assembly and loaded out mills. Closed well in. DWC - $10,800 CWC - $422,000 (5-2-12) Opened well - 0 psi. RU Permian csg tongs, slips, elevators and moved 4-1/2 csg onto pipe racks with forklift. WIH with 5-1/4 OD Weatherford Seal Assembly, 1 jt of 4-1/2 11.6# P-110 LTC casing and 4-1/2 baffled orifice sub. WIH picking up 4-1/2 casing torqueing up to 2800 ft/lbs. Tagged parted csg at 4282'. Rotated inside csg. WIH to 7050' with 175 jts of 4-1/2 csg. Closed well in. DWC - $14,500 CWC $436,500 (5-3-12) Opened well - 0 psi. WIH picking up 101 jts of 4-1/2 11.6# P-110 LTC csg to 10946' and circulated down 4-1/2 and out 9-5/8 csg. Stung into PBR at 10953' to 10963'. Tested seals to 1000 psi. Bled to 0 psi. Pulled out of PBR to 10950'. Closed well in. DWC - $14,200 CWC - $450,700 05/05/2012 (5-4-12) Opened Well - 0 psi. Spaced out with 10' 4-1/2 LTC 11.6# #1_reports.doc 9
10 P-110 pup jt and loaded BJ Cement Bulk Unit with 1200 sks of Class H cmt. RU BJ Cement Pump Truck and pumped 20 bbls of fresh water spacer. Mixed and pumped 1145 sks of 16.3 cmt, 220 bbls. Dropped wiper plug and pumped bbls of water behind plug. Did not bump wiper plug over displaced.5 bbls. Stung into PBR with 5-1/4 seals with 3500 psi, bled to 0 psi and had no flow back. Pressured up to 1000 psi and closed well in. Stung into PBR at 10,953 to 10,963' with 10K down on seals. DWC - $95,260 CWC - $545,960 05/06-05/07/2012 Shut down for the weekend. 05/08/2012 (5-7-12) Opened well - 0 psi on 4-1/2 csg and 9-5/8 csg. RD BJ Cementers. ND Weatherford 11" 5K Hydril. Set 4-1/2 csg slips with 100K on slips. Cut csg off with welder and beveled with grinder. Installed 11" X 7-1/16 csg head and successfully tested to 5000 psi. NU 7-1/16 dual Graco 5K BOPs. RU floor and tongs. WIH with 3-7/8 4 bladed concaved junk mill and 166 stands of 2-3/8 tbg. Tagged cement at 10895'. Drilled to plug and baffled orifice sub at 10930'. Drilled out of cement at 11025' and washed down to retrievable plug at 11070'. Circulated out rubber, cement and sand off top of plug. Circulated clean. Pulled up to 11030'. Closed well in. 05/09/2012 DWC - $25,000 CWC - $570,960 (5-8-12) Opened well - 0 psi. Tagged plug at 11070'. No fill. RD swivel and stripper. POOH with 169 Stands of 2-3/8 tbg and 3-7/8 bladed mill. WIH with 3-3/4 OD retrieving tool for receivable bridge plug and 169 Stands of 2-3/8 tbg. RU swivel and stripper. Rotated over top of plug and circulated out sand, metal and cement off plug. Latched onto plug, pulled 20K over weight, opened by-pass and well on vacuum. Pulled plug loose, went down to 11090'. RD swivel and stripper. Plug dragging through csg collars. Pulled 15 stands. Closed well in. Loaded up Hydril BOPs and closing unit and sent to Weatherford. DWC - $11,400 CWC - $582,360 05/10/2012 (5-9-12) Opened well - 0 psi. POOH with 169 Stds of 2 3/8 Tbg and #1_reports.doc 10
11 05/11/2012 retrieving tool, and there was no plug. WIH with retrieving tool again and found Plug at 2350'. Latched onto the plug and POOH. WIH with 1 25/32 seat Nipple and 334 Jts.of 2 3/8 Tbg. to 10920'. Closed well in for night. DWC - $12,600 CWC - $594,960 ( ) RD Rig, pump and tank. Sent pump and tank to Graco Rental. Loaded out all Weatherford tools and sent in. Moved rig off location. Frac Tank and Pipe racks left on location. DWC - $66,000 CWC - $601,560 #1_reports.doc 11
D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :
Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.
More informationWellwork Chronological Regulatory Report
Well Name: UNIVERSITY 49 #0808H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern Project AFE: DV02151 AFE's Associated:
More informationENDEAVOR ENERGY RESOURCES
ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA
More informationFORGE Energy UL 21 Freedom 1 API Number:
FORGE Energy UL 21 Freedom 1 API Number: 42-371-39061 07/13/2013 RU E&P WL Open well RIH correlate GR log to get on depth. Run BL found cement to surface. Tag 7566' PBTD. RU Rising Star test lines to 5000
More informationUniversity 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:
Zone: War-Wink Cherry Canyon TD: 7250' Rig: Union Drlg Rig 229 Status: WOC Spud Date: 1/26/2013 RR Date: 2/12/2013 First Sales: AFE: $1,393,293.00 DHC: $761,963.00 WI: Notes: Date Activity 11/14/2012 11/14/12
More informationDaily Drilling Report
Daily Drilling Report Well Name UTL 38-17-1H Report Date 05/05/2014 Field University Lands Supervisor Nate Baxter Report No. 97 Location 990' FNL & 300' FEL Supervisor 2 Kevin Evans DFS 94 County Ward
More informationFORGE Energy UL 21 Pahaska 1H API Number:
FORGE Energy UL 21 Pahaska 1H API Number: 42-495-33740 10/26/2016 07:00 HPJM 07:15 Install 1502 Adapter Flanges to Well Head. RU Pump Truck test lines to 1000 PSI no leaks. Load hole w/ 15 bbls fresh water.
More informationBP SIT Testing Franks Facility Lafayette
BP SIT Testing Franks Facility Lafayette General Information Status: Franks test well Lafayette La. Rig: Franks Test Rig Casing: 13 3/8, 0 to 4,600 Workstring: 4 ½ IF Brine: Fresh Water Directional: Straight
More informationCasing Design. Casing Design. By Dr. Khaled El-shreef
Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for
More informationElevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top
DAYS FROM SPUD: 35 DAYS ON 0 Mar 1 2016 RIG SUPERVISOR: Tyler Clean and prep location, MIRU pulling unit to mill liner top Blade location, set anchors. Bring surface and int CSG valves to surface and fill
More informationZarvona Energy LLC DAILY OPERATIONS
DAYS FROM SPUD: 120 DAYS ON 0 Jun 28 2016 RIG SUPERVISOR: Tyler Dupriest MIRU pulling unit MIRU pulling unit, move in and tally TBG. SDFN RIH with RBP DAYS FROM SPUD: 121 DAYS ON 1 Jun 29 2016 RIG SUPERVISOR:
More informationPROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION
NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow
More informationPHE KE30-A8 WORKOVER PROGRAM
PHE WMO KE30-A8 WORKOVER PROGRAM PHE KE30-A8 WORKOVER PROGRAM Prepared by: Ross Webber. Hendra Wahyudi. Chandra Maulana. George Lattimore Adi Benanjaya Achmad Soendaroe. Tri Wiyono DRILLING ENGINEER SR.
More informationTerrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas
Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas 3-29-13 DAY 1 Previously built location, roads, built and lined reserve pits. Move
More informationAbandonment Program for Paramount Fort Liard F 36
Abandonment Program for Paramount Fort Liard F 36 Well Name: Paramount et al Liard F 36 Area: 60 0 10 N, 123 0 15 W Location: Latitude: 60 0 05 27 Longitude: 123 0 22 00 UWI: 300F366010123150 WID: 1841
More informationWellwork Chronological Regulatory Report
Well Name: UNIVERSITY 09A #1003H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern - ERPBU Project AFE: DV02251
More informationDeepwater Horizon Incident Internal Investigation
Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation
More informationBlowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD
1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,
More informationNorth American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug
North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug The North American Sealing Solutions composite bridge plug, caged ball and ball drop (flow thru) frac plug provide
More informationBridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation
Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation ADVANTAGE composite bridge plug, caged ball and ball drop (flow thru) frac plug provide a means to isolate multiple zones during high pressure
More information6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)
RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for -3/4 PBL -3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes -1/4 & -1/2 also) OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at
More informationH. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas
H. H. HOWELL, INC. Bevans & Wildcat Field Menard County, Texas API #42-327- 31235 RRC Permit # 803460 GAU letter, RRC Letter #GAU-1436 = 245 Ground Elevation GL: 2186 (Rig KB to GL =8 ) Rig KB =2194 Location:
More informationAMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary
AEPB WELL NO. Report End Date: Report Number: 1 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 70 : 0 Planned VS (ft): Current VS (ft): 42383383570000 MIRU MIRU INTEGRITY 3. 70 Longitude Orig
More informationHydro-Mech Bridge Plug
Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with
More informationW I L D W E L L C O N T R O L SNUBBING OPERATIONS
SNUBBING OPERATIONS Snubbing Operations Learning Objectives You will learn - Various activities suitable for snubbing operations. Best practices and techniques for conducting snubbing operations. The types
More information2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM
RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for 2-7/8 Triple Port PBL 1-10-201 2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at Rig site, the
More informationEP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017
1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 37.00 Objective Install Completion Original
More informationOCEAN DRILLING PROGRAM
BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole
More informationNeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:
Please read this entire document. It concerns all 9⅝ Vented Thru-tubing Bridge Plugs Read this document before proceeding to NeoProducts Recommended Best Practices for 9⅝ vented T- TBPs. Whenever running
More informationGreystone Oil & Gas Rig Telephone 832-380-6698 Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 7 4/26/2010
More informationRestoring Fluid Flow in Tubing Strings
Restoring Fluid Flow in Tubing Strings Andrew Roth, Product Manager Fike Corporation Fike Hydraulic Tubing Drains (HTD) for use with deep hole drilling tools, downhole devices and other oil and off shore
More informationPERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary
PRES WELL NO. Report End Date: 5/19/2016 Report Number: 3 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : : 0 Planned VS (ft): Current VS (ft): WOC WOC, CONTACTED TRRC, SPOKE TO ABRAHAM, ADVISED
More informationSCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS
SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS A DIFFERENT KIND OF ENERGY COMPANY Nine Energy Service isn t your typical oilfield services company. Our success stems from a culture driven by performance
More informationModel A Sleeve Valve Cement Retainer
Ret. O.D. Model A Sleeve Valve Cement Retainer DIMENSIONAL DATA A B C D E F G H J K L M N P Q R 3.593 3.593 3.500 2.500 3.531 3.531 1.345 3.375.750.437 2.437 2.187 7.062 2.437 5.312 11.685 20.093 3.937
More information"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations
"Sharing To Be Better Influx through failed cement in shoetrack during completion operations 2 Well status completion operations Seabed @ 364m 7" liner cemented across reservoir Well filled with 1.54 SG
More informationFloat Equipment TYPE 925/926
Type 925 Float Collar Plunger Valve Float Equipment For less demanding well conditions, such as shallower depths or lower pressures, Top- Co offers economical float equipment certified to API RP 10F category
More information1. The well has been shut in on a kick and the kill operation has not started.
Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures
More informationIWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)
IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) 1. Given the volumes below, how much hydraulic fluid will be required to carry out the following operations (no safety margin)?
More informationWELL NO: BJN-8. Lower master valve
WELL NO: BGN-8.; LOC: BGH Well BGN-8 came into production on 9 th Feb. 2009. Initially the FTHP = 4000 psi, CP=2400 psi and 5 1 / 2 9 5 / 8 annulus pressure = 600 psi. The well was produced at Baghjan
More informationSuccessful Deployment of a Long Gun String Via Intelligent Coiled Tubing
Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Parry Hillis: Technical Manager BakerHughes David Ayre: BP Well Perforation Specialist Jim Gilliat: TCP/DST Business Development
More informationI. HANDLING TOOLS 1.1Drill Pipe Elevator
I. HANDLING TOOLS 1.1Drill Pipe Elevator ½ -BJ Model - Air operated ½ -BJ -BJ Type - HGG -BJ Model - Air operated -BJ JOY-WEB WILSON Type - T -BJ Type - MGG Model - air operated Rated capacity [ton] 250
More informationPractice Exam IADC WellSharp Driller and Supervisor
Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.
More informationfloat equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment
Contents 1. GENERAL INFORMATION & RECOMMENDATIONS 1 2. INSTALLATION FLOAT EQUIPMENT 2 2.1 PRE-USE FIELD INSPECTION 2 2.2 POSITION FLOAT ON CASING STRING 3 3. RUNNING OF FLOAT EQUIPMENT 3 3.1 CIRCULATION
More informationZarvona DAILY WORKOVER / COMPLETION REPORT
Lease/Well No: CURRENT WELL TEST: PURPOSE OF WORK: MIRU service companies/start frac PULLING UNIT: KOP 10,429' TD: 15,906' KB ABOVE GL: 30 10,713' PBTD: 15,885' INT CSG: 60 10,998' TVD: 10,950' PROD CSG:
More informationHPHT Annular Casing Packer. Obex Annular Casing Packer
HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration
More informationChapter 5 HORIZONTAL DRILLING
Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working
More informationDB Bridge Plug. Features. Benefits. Applications
DB Bridge Plug The WELLFIRST Premium Cast Iron Bridge Plug designed to run on electric line. Rated between 2000-10000-psi differential, and 300 F from above and below. Features Field Proven Design Constructed
More informationChapter 5 Drilling and Well Testing Practices
Chapter 5 Drilling and Well Testing Practices Drilling and Well Testing Practices Activities in rotary drilling, completing, testing and maintaining a well. Health and safety requirements shall be covered
More informationPasquale Imbò e Marco Pelucchi ENI S.pA;
7th European Gas Well Deliquification Conference Innovative Failsafe Capillary Injection System Resolves Liquid Loading in Gas Well with a Cost- Effective Solution that Maintaining Production and Well-Safety
More informationType 967 Diamond Broaching Type 968 Sidewinder reamer shoe
Type 965 float collar Type 966 float shoe 1. GENERAL INFORMATION & RECOMMENDATIONS Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe Type 969 Sidewinder reamer shoe Float Equipment Top-Co Float
More informationDrilling Morning Report
REPORT DATE 5/0/200 Report # AFE # Casing OD(in) WT(lbs/ft) Grade Btm MD(ft) Btm TVD(ft) DCRB04 TVD: 32 MD: 32 Progress: 32 Planned TD:,500 Current Hole Size: Days From Spud: Spud Date: 5//0 Days on Well:
More informationOn-Off Connector Skirt
On-Off Connector Skirt Retrievable Packers & Accessories The On-Off Connector Skirt is compact, reliable, fully sealing, J-type tubing disconnect device that automatically engages and releases with a small
More informationLive well deployment of long perforating gun system using combined CT technologies
Live well deployment of long perforating gun system using combined CT technologies SPE ICoTA European Well Intervention Conference Aberdeen - 12 November, 2014 Simon Smith, Technical Support Manager Baker
More informationIWCF Equipment Sample Questions (Surface Stack)
IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000
More informationSubsea Safety Systems
Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and
More informationVortexFlow DX (Downhole) Tool Installation Instructions
VortexFlow DX (Downhole) Tool Installation Instructions www.vortextools.com Page 1 of 10 The VortexFLOW tools are based upon Technology that is a result of U.S.A. patents 6,151,751; 6,659,118; 6,749,374;
More informationBorais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures
Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures Slot Recovery Procedures: Slot Recovery Running Procedures 1. Cut And Retrieve Operation: Borais s cut and retrieve equipment: 1.
More informationCoiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study
Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Abstract: Paper Presenter: Ebrahim Rabbani 1 e.rabbani@mehranservices.com Ebrahim Rabbani, Danial Davoodi 2, Fatemeh
More informationPIONEER OIL TOOLS LIMITED
Sir William Smith Road, Kirkton Industrial Estate, Arbroath, Angus, Scotland, UK. DD113RD Tel: +44 (0)1241 877776 Fax: +44 (0)1241 871037 Email: sales@pioneeroiltools.com Website: www.pioneeroiltools.com
More informationW I L D W E L L C O N T R O L AIR DRILLING
AIR DRILLING Air Drilling Learning Objectives You will learn the basics of: Air drilling equipment Types of air drilling Differences between mud and air drilling You will learn how to apply well control
More informationAir and Gas Drilling
Air and Gas Drilling Air and Gas Drilling It is a technique in which the more common drilling fluids, (water or mud) are replaced by highly compressible Air or Natural gas. But Compressibility makes pressure
More informationDAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?
DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to
More informationBANDAR PANJI-1 WELL CONTROL INCIDENT REPORT
BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT EXECUTIVE SUMMARY I was requested by management to review the Banjar Panji-1 drilling operations from the conception of the Integrated Drilling Management approach
More informationA case study : Underground Blowout Control at Well NHK #285
A case study : Underground Blowout Control at Well NHK #285 Author: Dr. K. Saikia, Chief Engineer Drilling - CMT INTRODUCTION The well NHK # 285 (Loc-HBS), a gas well, in the Deohal area of Naharkatia
More informationA Longer Lasting Flowing Gas Well
2018 Artificial Lift Strategies for Unconventional Wells Workshop Cox Convention Center, February 4 7, 2018 A Longer Lasting Flowing Gas Well New Dual-Tubing Flowing Design Paul Edwards, Production Engineer,
More informationWellCAP IADC WELL CONTROL ACCREDITATION PROGRAM
WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WELL SERVICING OPERATIONS (WIRELINE, COILED TUBING & SNUBBING) CORE CURRICULUM AND RELATED FORM WCT-2WSI INTRODUCTORY LEVEL For information on how an course
More informationMOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve
MOCS Multiple Opening Circulation Sub Fluid Bypass Valve 1 Applications BHA Protection o o Pumping LCM Spotting Acid Work-over and completions o o o Well bore cleanout Fluid displacements Bottoms-up circulation
More informationWELL SCAVENGER. Versatile wellbore clean-up tool for the most demanding operations
WELL SCAVENGER Versatile wellbore clean-up tool for the most demanding operations WELL SCAVENGER: A versatile wellbore cleanup tool for flowrestricted applications The inability to recover wellbore debris
More informationW I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL
CIRCULATION & WELL CONTROL Learning Objectives You will learn: The importance of pump rates and pressures during well control operations Pressure relationships Basic calculations necessary in well control
More informationPerformance and Value of the invision System : Offshore in Coiled Tubing Operations
Performance and Value of the invision System : Offshore in Coiled Tubing Operations Case Study #0004 Date November 01 21, 2017 Location Gulf of Mexico, Deep Water Introduction Intelligent Wellhead Systems
More informationWell Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.
Well Control Drill Guide Example Only Drill Guide is the list of drills, questions and attributes that are in DrillPad. This Well Control Drill Guide will be used in conjunction with the rig-specific well
More informationWellCAP IADC WELL CONTROL ACCREDITATION PROGRAM
WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WIRELINE OPERATIONS CORE CURRICULUM AND RELATED FORM WCT-2WLF FUNDAMENTAL LEVEL The purpose of the core curriculum is to identify a body of knowledge and
More informationW I L D W E L L C O N T R O L COMPLICATIONS
COMPLICATIONS Complications Learning Objectives You will learn to detect changes that deviate from established trends. You will learn how to respond to problems such as: Pump problems String problems Hole
More informationTAM Single SeT inflatable
TAM Single SeT inflatable ReTRievAble PAckeRS Sets with pressure only Releases with straight pull or rotate Ideal for horizontal applications Sets in casing or open hole Runs on tubing, coiled tubing,
More informationWILD WELL CONTROL WARNING SIGNS OF KICKS
WARNING SIGNS OF KICKS Warning Signs of Kicks Learning Objectives You will learn the warning signs that indicate the well may be kicking: Warning signs of kicks False kick indicators You will also learn
More informationStandard Operating Procedures
Standard Operating Procedures GlassBore and GlassLine EUE 8RD Tubular Goods Composite Lining Systems Focus on Safety and Quality COMPOSITE LINING SYSTEMS Table of Contents Section 1 page 3 Arrival on Production
More informationInflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer
Inflatable Packer Single & Double Single & Double Packer Dimension Wireline Packer Water Testing Packer (WTP) Packer Packer Working Pressure & Depth Chart Packer Water Hand Pump Packer Air Driven Pump
More informationPerforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP
MENAPS 2013 Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells Kerry Daly, Global BD Manager- DST TCP MENAPS 13-17 WELL FLOW MANAGEMENT TM Scope/ Contents: MENAPS 13-17 Study
More informationMaterial Handling Hose
Novaflex 5000 Slurry King Hose Pure Gum Liner Tough, versatile alternative to inflexible, cumbersome steel tubing. The easy handling and reusable quick-fastening flange system make installation a snap.
More informationInvestigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001
OCS Report MMS 2002-040 Investigation of Loss of Well Control Eugene Island Block 277 OCS-G 10744 Well A-2 Off the Louisiana Coast July 6, 2001 U.S. Department of the Interior Minerals Management Service
More informationEP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017
5/2/27 5:23:5 Report Version: 4..6R9 Generated from data in EDM/Opens/PROFILE Report 29 5/9/27 Company Type WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H 32656 / 4233326.
More informationRAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG
RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 10/13/2015
More informationIntroduction to Through Tubing Rotary Drilling
Introduction to Through Tubing Rotary Drilling By: LEAding Edge Advantage International Ltd Old Stoneywood Church Bankhead Road Bucksburn, Aberdeen AB21 9HQ Tel 44-1224-716969 Fax 44-1224-712333 Email:
More informationFLOAT EQUIPMENT AND CASING ACCESSORIES
FLOAT EQUIPMENT AND CASING ACCESSORIES CONTENTS INTRODUCTION... 2 FLOAT EQUIPMENT... 4 Standard Valve... 4 Differential Valve... 5 SPECIALITY FLOAT EQUIPMENT Double Valve Float Shoes... 6 Float Equipment
More informationDynamic Underbalance (DUB)
Dynamic Underbalance (DUB) Perforating Cam Le Perforating Product Champion Agenda Overview DUB Software Tools Case histories 2011 HALLIBURTON. ALL RIGHTS RESERVED. 2 Dynamic Underbalance Software Dynamic
More informationDisposal/Injection Well Pressure Test Report (H-5)
RAILROAD COMMISSION OF TEXAS Disposal/Injection Well Pressure Test Report (H-5) Lauryn McFarland Engineering Technician Summary When Mechanical Integrity Test (MIT) is required How to file MIT How to perform
More informationHydroPull. Extended-Reach Tool. Applications
Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well
More information1 P a g e 0 3 / 0 8 /
1 P a g e 0 3 / 0 8 / 2 0 1 8 Category Listing # Description List Price Region Tubing: 1 1/2" Prime 431 1 1/2" 2.90# J55 NUE T&C 10RD NEW Surplus (22,000') $2.30 Texas Tubing: 1 1/2" Prime 499 1 1/2" 2.90#
More informationW I L D W E L L C O N T R O L SHUT-IN PROCEDURES
SHUT-IN PROCEDURES Shut-in Procedures Learning Objectives You will learn general shut-in procedures: For surface BOPs. For subsea BOPs. You will learn to interpret shut-in pressures and be able to perform
More informationTOOLS FOR BREAKDOWN ELIMINATION
TOOLS FOR BREAKDOWN ELIMINATION BITTEKHNIKA BITTEKHNIKA company was founded in 1996 and it is still developing dynamically. These are the traditions and innovative technologies in design and production
More informationSUBSEA KILL SHEET EXERCISE No. 5
Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations
More informationIntermittent Gas Lift Utilizing a Pilot Valve
39 th Gas-Lift Workshop Houston, Texas, USA May 16 20, 2016 Intermittent Gas Lift Utilizing a Pilot Valve Matt Young Technical Sales Manager May 16 20, 2016 2015 Gas-Lift Workshop 1 Intermittent Gas Lift
More informationRig Math. Page 1.
Page 1 The Calculator and Main Keyboard Display Numerical 10-key pad used for entering numerical values Trigonometric Functions These keys will be used where wellbore angle is an issue These are the keys
More informationCompletions & Workovers Module 1.9
Completions & Workovers Module 1.9 CAPPA CAPPA Level 1 LAST REVISED March 20, 2013 Completions & Workovers Module Summary Students will learn what is involved in a well completion, how a completion is
More informationSPE Coiled Tubing in High-pressure Wells. Well Control Considerations. Introduction
Society of Petroleum Engineers SPE 24793 Coiled Tubing in High-pressure Wells K.R. Newman and M.G. Allcorn, Dowel1 Schlumberger SPE Members Copyright 1992, Society of Petroleum Engineers Inc. This paper
More informationSUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives
SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives Form WSP-02-DO-SU-WOC-S Revision 0 13 February 2015 DC 2015 COPYRGHT
More informationSUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives
SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives Form WSP-02-DO-SU-WOC-D Revision 0 13 February 2015 DC 2015 COPYRGHT PROTECTED
More informationOffshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper
Offshore Managed Pressure Drilling Experiences in Asia Pacific SPE paper 119875 Authors: Steve Nas, Shaun Toralde, Chad Wuest, SPE, Weatherford Solutions Sdn Bhd, SPE, Weatherford Indonesia SPE, Weatherford
More informationWorked Questions and Answers
Worked Questions and Answers A Learning Document for prospective Candidates For the Rotary Drilling Well Control Test Programme Copyright, IWCF June 2000 Revision No.1, November 2000 IWCF 2000 page 1 of
More informationNiko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent
Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent 26 Feb - 2014 SPE Thailand 1 Outline Drivers for MPD: 1. Safety of personnel in remote operations 2.
More information