February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01
Project Limits US 192 to SR 404 (428753-1) Project Limits (MP 17.552 to MP 26.226) Begin 200 feet north of US 192 (5 th Avenue) End 600 feet north of SR 404 (Pineda Causeway) Approximately 8.7 miles. End Project Municipalities Indiatlantic Melbourne Indian Harbour Beach Satellite Beach Brevard County Begin Project
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Eliminate Auxiliary Lanes 9. Extend Turn Lane
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements HIGHWAY A1A
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements Intersections 1. Grosse Point Avenue 2. Paradise Boulevard 3. Holy Name Way 4. Eau Gallie Boulevard 5. Palm Springs Boulevard 6. Pine Tree Drive 7. DeSoto Parkway 8. Cassia Boulevard 9. Jackson Avenue 10. Scorpion Court 11. Shearwater Parkway 12. Berkley Street 13. Ocean Boulevard
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements Project Wide 1. Improve Curb Ramp (signalized intersections) 2. Add Directional Warning Devices
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements Project Wide 1. Replace Ditches with Pipe 2. Upgrade Inlet Grates to meet ADA Standards 3. Replace Deteriorated Structures 4. Install Railings
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements Project Wide 1. Construct Bus Pads (43 Locations)
Initial Project Elements (2012) 1. Milling and Resurfacing 2. Pedestrian Signal Improvements 3. Curb Ramp Improvements (ADA) 4. Roadside Drainage Improvements 5. Improve Transit Access 6. Minor Sidewalk Improvements Project Wide Connect Isolated Transit Stops
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane Intersections 1. Grosse Point Avenue 2. Paradise Boulevard* 3. Holy Name Way 4. Eau Gallie Boulevard 5. Palm Springs Boulevard* 6. Pine Tree Drive* 7. DeSoto Parkway* 8. Cassia Boulevard* 9. Jackson Avenue* 10. Scorpion Court* 11. Shearwater Parkway* 12. Berkley Street 13. Ocean Boulevard *Upgrade to Mast Arm
*Upgrade to Mast Arm
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings (Beach Access) 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane Nearest Intersection 1. Wallace Avenue* 2. Satellite Avenue 3. Sunrise Avenue 4. Magellan Avenue 5. Royal Palm Boulevard 6. Ellwood Avenue 7. Grant Avenue** *Subject to Approval **Access Change
Typical Mid-Block Crossing COQUINA POINT GOODWILL COMMERCIAL SHOPS SR A1A BUCCANEER BUCCANEER
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane Sidewalk Limits 1. Transit Stop Connectivity 2. Glenwood Avenue to Ellwood Avenue 3. Grant Avenue to Jackson Street 4. Jackson Street to Scorpion Court (west side) 5. Scorpion Court to Shearwater Parkway (west side) 6. Ocean Boulevard to Beach Park (east side)
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane Sodding and Curbing 1. Mid-block Crossing Locations 2. Convert Existing Traffic Separators DeSoto Parkway Intersection Scorpion Court Intersection Shearwater Parkway Intersection 3. Shearwater Parkway to Satellite Beach City Limits
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane Intersections 1. Grosse Point Avenue 2. Paradise Boulevard 3. Holy Name Way 4. Eau Gallie Boulevard 5. Palm Springs Boulevard 6. Pine Tree Drive 7. DeSoto Parkway 8. Cassia Boulevard 9. Jackson Avenue 10. Scorpion Court 11. Shearwater Parkway 12. Berkley Street 13. Ocean Boulevard *Add Northside Crossing to Intersection
Project Improvements Convert Concrete Traffic Separator to Grassed Median Construct Sidewalk To Connect Transit Stop Transit Stop: Construct Bus Pad Improve Curb Ramps SR A1A Improve Curb Ramps Add New Crosswalk Leg Convert Concrete Traffic Separator to Grassed Median Transit Stop: Construct Bus Pad
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane Boarding and Alighting Areas 1. SE 1 st 2. Seaview Plaza (Ocean Blvd)
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane Bicycle Markings
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane Locations 1. Southbound from Sunrise Avenue 2. Southbound from Jackson Street 3. Northbound at Sandpiper Condominiums 4. Northbound Continuous Green at Pineda Causeway
Added Project Elements (2014-2015) 1. Mast Arm Upgrades 2. 7 New Mid-block Crossings 3. New Sidewalk Construction 4. Median Improvements 5. New Cross Walk Locations 6. Improved Transit Stops 7. Marked Bike Lanes 8. Remove Auxiliary Lanes 9. Extend Turn Lane Locations Southbound Right Turn Lane to Scorpion Court
Schedule & Estimated Construction Cost Plans Complete March 2016 Construction Begin Fall 2016 2016 Construction Cost Estimate $10.6M* SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01