1 1, 13 Branchville-Lewisburg Road (CR 628) Lewisburg-Creamery Road (CR 565) 2,3 Asbury-Bloomsbury Road/Asbury- Anderson Road (CR 632) Skid-resistant surface treatment, enhanced signage, pavement markings 2 Corridor Sections: ultra-reflective signage, oversized warning signs, pavement markings, roadway delineators $322, $238,000 4/12/ 4 Byram-Kingwood Road (CR 651) from CR 519 to SR 29 Road segment: Skid resistant surface treatment, reflective striping, raised pavement markers, chevron signs $380,000 Authorization Cedar Lake Road (CR 616) from CR 655 to Ultra-high reflective signage, high-retroreflectivity pavement Route 94 markings, rumble strips 6 Clove Road (CR 653) from SR 206 to New Road Segment: Type III Micro-surfacing skid resistance Mashipacong Road surface treatment, pavement markings, striping, flexible delineators, regulatory warning signs, bicycle safety grates 7 CR 519 from Rt. 46 to CR 521 Road Segment: Replace existing road signs w/ultra high performance reflective sheeting, wet reflective pavement markings, increase roadway edge line from 4 to 6", roadway delineators at curves 8,9,12,19 Deckertown Turnpike (CR 650) Glen Road (CR 620) Rudetown Road (CR 517) Lewisburg-Creamery Road (CR 565) 10 Great Meadows Road (CR 611) from Route 46 CR ,15 High-Bridge Califon Road (CR 513) Main Street (CR 512) Skid-resistant surface treatment, signage, colored pavement, guide rails w/reflectors Ultra-high reflective signage, high-retroreflectivity pavement markings, rumble strips Single Intersection: pavement widening, left-turn lanes, sidewalks, striping, pavement markers 14 Little York Road (CR 614) One intersections, one RR overpass & one curve: Intersection improvement at Pattenburg Road (CR 57) including reflective pavement markings; two over height vehicle detectors and signage at a railroad overpass; curvature improvements including super elevation improvements, shoulder rumble stripes and berm lines $57,275 11/12/ $463, $339,000 7/2/ 2011 $237,642 1/28/ $596,280 12/16/ $223,000 Authorization $300,000 Authorization 2013
2 16 Milford Mt. Pleasant Road (CR 519) Single Corridor: high friction coarse, pavement markings, crosswalks, centerline rumble strips, raised pavement markers, storm water catch basin curb pieces, LED warning beacons 17 New Centre Road (CR 627) from Auten Corridor: high friction surface course, striping, bicycle safety Road to Roycefield Road grates 18 River Road (CR 625) Road segment: Micro-mill roadway surface, safety edge, striping, rumble strips 20 Siloam Road (CR 527) Reconstruction and resurfacing including coarse pavement treatment, pavement markings and advance warning signage $425,000 Authorization $350,000 Authorization $300,000 Authorization 2013 $150,000 6/19/ ,22 Berkshire Valley Road (CR 642) Railroad bridge advanced warning signs and flashers $116,000 11/9/ Bloomfield Avenue (CR 506) at Roseland Intersection s including new traffic signal, $389,265 8/12/ Avenue (CR527) and Westville Avenue modified lane striping, countdown pedestrian signals, left turn lane 24 Broad Street & South Street Single Intersection: New traffic signal, pedestrian countdown signals, curb bulb-outs, striping, signage $500, Central Avenue from Jefferson Avenue to North Street 26 Centre Street (CR 648) and Franklin Avenue (CR 645) 22 Intersection s: Pedestrian countdown signal heads, curb ramps w/detectable warning surfaces, international crosswalks, textured pavement crosswalks, replacement of regulatory, warning and pedestrian; signs. Total project cost: $515 K, supplemented with $38 K City funds Intersection s including new pedestrian signals and timing adjustments for pedestrian intervals $477, $164,069 10/5/ CR 10 (Front Street/River Road) Road Segment: Minor roadway reconstruction to standardized width lanes and turning lanes; drainage improvements, resurfacing for skid resistance, color pavement for crosswalks, handicap ramps, bulb-outs, solarpowered flashing warning beacons, curb extensions, upgrade to traffic signal, upgrades to pavement markings $500,
3 28 CR 29 (a.k.a. Anderson Avenue) at Traffic Signal Upgrade, ped. Signals $125,000 10/23/ Columbia Avenue Intersection 29 CR 39 (a.k.a. Mule Road) 6 intersections including traffic signal upgrades and $300,000 12/19/ pedestrian signals 30 CR 501 (a.k.a. JFK Boulevard) from 67th Pavement markings including crosswalks, centerlines, stop $135,000 7/17/ St. to 91st St. line, cross hatching 31 CR 501 (a.k.a. JFK Boulevard) from Communipaw Avenue to 18th St. (MP ) Pavement markings including crosswalks, centerlines, stop line, cross 32nd St.: left turn lane, traffic signals, pavement markings $265,000 6/19/ ,33 CR 501 (JFK Boulevard) and CR 693 (JFK Boulevard East) 44 Intersection s: Replace existing traffic signals heads to comply with new MUTCD requirements $385,000 6/5/ CR 510 (a.k.a. South Orange Avenue) from Speedway Ave. to Dover Ave. 35 CR 517 from Route 46 to Sussex County line 36 CR 527 (South Main Street) and CR 533 (Main Street) 37 CR 531 (a.k.a. Park Avenue) and CR 601 (a.k.a. 7th Avenue) (MP 8.26; MP 1.57) 10 intersections including new LED traffic signals, ped. signals, ADA ramps, striping, signage, repaving Sign upgrades with high reflective sheeting, retro-reflective pavement markings, shoulder rumble strips 2 Overhead vehicle detector systems w/dynamic signs in advance of 2 railroad overpasses Intersection s including left turn lane, crosswalks, new LED traffic signals, pedestrian signals $2,400,000 7/1/ $325,500 10/30/ $197, $185,000 12/1/ CR 603 (a.k.a. Springfield Avenue) at Civic Square, Lyons Avenue and Sanford Avenue 39 CR 603 (Springfield Avenue) at 40th Street/Florence Avenue 3 intersections including traffic signal upgrades, pedestrian signals, pavement markings including crosswalks, ADA ramps 1 Intersection : New traffic signal system, new pedestrian countdown indications, paving, lane designations, crosswalks, pedestrian and school signage $670,000 11/10/ $450,000 1/23/ CR 622 (a.k.a. Mountain Avenue) at South Street/Glenside Road Dedicated left turn lane, pavement markings, signal upgrades $85,000 5/23/
4 41 Dr. Martin Luther King Jr. Boulevard Intersection s including countdown pedestrian signals, ADA ramps w/detectable warning surfaces, textured pavement crosswalks, warning signs; Total project cost: $953 K, supplemented with $594 K City funds $477, Eagle Rock Avenue (CR 611) at the Essex Countdown ped. signals, crosswalks, signage, left turn bay $236,393 8/4/ County Environmental Center 43 East Broad Street (CR 512) and Summit Avenue (CR 657), Springfield Avenue and Summit Avenue Intersection improvements including upgraded traffic signals, countdown pedestrian signals, aligned left-turn lanes, highvisibility crosswalks $369,639 5/1/ Easton Avenue (CR 527) and Foxwood Drive Single Intersection: dedicated left-turn lane, traffic signal upgrades, pedestrian countdown signals, signage $271,000 Authorization 45 Fair Lawn Avenue Corridor Safety s - 5+ intersection improvements Fairlawn Avenue (CR 76) from River Road (CR 507) to Saddle River Road (CR 79) 46 Hamilton Street (CR 514) and Franklin Boulevard (CR 617) Corridor: Pedestrian countdown signals, curb bump-outs, solar powered pavement crosswalk delineators, pedestrian curb ramps, crosswalk striping, signage, traffic cameras Intersection improvements including opposing left turn lanes, modified signal operations, signal pole relocation, re-paving, ADA curb ramps, pedestrian signals $511,850 Authorization $188,000 6/3/ Intersection s at Prospect (CR 577) and Eagle Rock (CR 611) Avenues Intersection s including double left-turn lanes, new traffic signals and countdown pedestrian signals, signal retiming, striping $407,500 10/1/ JFK Boulevard (CR 501) New LED countdown Ped. Signals at 39 intersections $310,000 4/6/ JFK Boulevard (CR 501) between New LED countdown pedestrian signals $590,000 1/22/ Pamrapo Avenue and 15th Street 50 Kinderkamack Road (CR 503) Corridor between New Milford Avenue and Orchard Street Countdown pedestrian signals, crosswalks with ADA ramps, lighted crosswalk with mounted flashers, painted medians $310,
5 51 North Bridge Street and Cliff Street Single Intersection: new traffic signals, pedestrian countdown signals, striping, signage 52 Park Avenue (CR 658) & 4th Street Single Intersection: high visibility crosswalks, pedestrian countdown signals, dedicated turn lanes, traffic signal upgrades, driveway consolidation, no turn on red and other signage 53 Park Avenue (CR 658) at High Street and Multiple intersections: traffic signal replacement, high Glenwood Avenue visibility crosswalks, pedestrian countdown signals, school crossing signs 54 Park Avenue (CR 658) at North/South Oraton Parkway and at Park Avenue 2 Intersections: new traffic signals, pedestrian countdown signals, signage, crosswalk striping $203,000 Authorization $470, $630, $676,748 Authorization 55 Park Avenue (CR 658) Corridor from High Street (CR 638) to 19th Street 12 Intersection improvements including traffic signal upgrades, high visibility crosswalks, countdown pedestrian signals, school crossing signs, median islands $615,000 12/20/ Patterson Plank Road (CR 681) Traffic delineators and vehicle speed display signs $35,000 6/16/ Shrewsbury Avenue (CR 13) & W. Bergen Single Intersection: traffic signal replacement, high visibility $225, Place crosswalks, ADA compliant curb ramps, signage, striping 58 Springfield Avenue (CR 603) and Ellis Avenue Intersection 59 Stuyvesant Avenue/Chestnut Street (CR 619) and West Chestnut Street (CR 626) Single intersection: Modified lane designations, signage, crosswalk striping, new traffic signal, pedestrian countdown signals Intersection improvements including widening of left turn lane, signal retiming & coordination $441,850 Authorization $250,000 5/1/ Summit Avenue Corridor Safety s Phases I & II - 54 intersections 26 Intersections (improvements vary by location but include): ADA ramps, pedestrian countdown signals, signage, crosswalk striping, textured pavement crosswalks, traffic cameras, traffic signal upgrade, U-post reflective sheeting $1,023,700 Authorization 61 Toms River Bus Terminal Park N Ride Pedestrian Access s $202,000 7/1/ 2009
6 62 Various County roadways (Passaic Wet Reflective Centerline Pavement Markings along 100+ $302,613 11/5/ County) miles of County roadways 63 Various intersections (City of Newark) LED countdown Ped. Signals at 50+ intersections $127,050 7/8/ Various intersections (Hudson County) 27 Intersection improvements including new LED countdown pedestrian signals 65 Various Locations (Ocean County) Upgrade School Crossing & Pedestrian Crossing Signs on Unsignalized Intersections (various locations) 66 Various Locations (Passaic County) Upgrade School Crossing & Pedestrian Crossing Signs on Unsignalized Intersections (various locations) 67 Vauxhall Road (CR 630) and Valley Street Single Intersection: traffic signal upgrades, pedestrian (CR638) countdown signals, crosswalk striping, possible signal retiming (addition of left-turn phases) 68 West Blackwell Street (CR 513) 5 Intersections improvements including with new bi-lingual pedestrian signals, video detection traffic flow sensors $280,000 8/15/ $82,000 3/1/ $157,400 12/1/ $298,608 Authorization $156,585 Substantially complete w/ outstanding ADA compliance issues ,70,71 Wilson Avenue at Lafayette Street, Houston Street, and Avenue L 3 Intersection s: New traffic signal systems, intersection realignment, curb and sidewalk, paving, striping, crosswalks, installation of LED warning signs $500,000 Advertised, bids received, pending contract award 2011
FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationToolbox of Countermeasures and Their Potential Effectiveness to Make Intersections Safer
8 Toolbox of Countermeasures and Their to Make Intersections Safer Introduction Studies included in the NCHRP 17-18 (3), Guidance for Implementation of the AASHTO Strategic Highway Safety Plan, as well
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationPedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team
Impact of the New MUTCD on Pedestrians and Bicyclists Bruce Friedman and Scott Wainwright FHWA MUTCD Team Development of the 2009 MUTCD NPA published in the Federal Register on January 2, 2008 Received
More informationTable 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line
Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving
More informationAcknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division
Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/
More informationCITY OF LANCASTER PROPOSED NEW PROJECTS
CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4
More informationNJDOT Complete Streets Checklist
Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationBroad Street Bicycle Boulevard Design Guidelines
Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified
More informationAppendix A. Knoxville TPO Greenway Signage Guidelines. Appendix A: Knoxville TPO Greenway Signage Guidelines Knox to Oak Ridge Greenway Master Plan
Appendix A Knoxville TPO Greenway Signage Guidelines 75 Overview: Adequate signing and marking are essential on shared-use paths, especially to alert bicyclists to potential conflicts and to convey regulatory
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More information2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number
Michigan Department of Transportation 2004 Traffic and Safety Notes Cross Reference between the Old Note Number and the New Note Number OLD NEW Number Number Title (Prior to 2004) 1.1.1 101-Series General
More informationAPPENDIX E GRADE CROSSING LOCATIONS
APPENDIX E GRADE CROSSING LOCATIONS 1 2 3 Citrus Avenue Riverside County and City Palmyrita Avenue Columbia Avenue MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3 027303M 1. Existing
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationPEDESTRIAN CROSSING SOLUTIONS ANDREA HARTH, PE, PTOE TEC ENGINEERING, INC.
PEDESTRIAN CROSSING SOLUTIONS ANDREA HARTH, PE, PTOE TEC ENGINEERING, INC. Pedestrian Safety 2017 Pedestrian Crashes in Ohio Crash Severity Number % Fatal Crash 141 4.9% Injury Crash 2546 89.1% Property
More informationLynchburg District Update
Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationSCOPE Application, Design, Operations,
SCOPE Application, Design, Operations, Maintenance, etc.: Typical Traffic Control Signals Pedestrian Hybrid Beacons Emergency Vehicle One-Lane/Two-Way Facilities, Freeway Entrance Ramps, and Movable Bridges
More informationChapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT
Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT OVERVIEW This chapter describes a cohesive set of strategies to create a bicycle boulevard, namely to make streets safer and more efficient for bicycle
More informationPEDESTRIAN CROSSING TREATMENTS
PEDESTRIAN CROSSING TREATMENTS BEST PRACTICES Presented by: Doug Enderson, P.E., PTOE Cody Salo, P.E. 1 PRESENTER INTRODUCTIONS Doug Enderson, P.E., PTOE Ped Crossing Experience: ADA Design-Build ADA Inventory
More informationCY2017 Summary of STP applications
CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run
More informationPEDESTRIAN SAFETY STUDY
PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation
More informationROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS
RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON
More informationSan Pablo High Treatment applied incrementally at each N + ++
Transit Improvements T1 Further study options for creation or designation of segregated transit lanes along San Pablo, including options for restrictions during a limited number of peak travel hours and
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationSR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon
SR 53 Corridor Study Final Report Presentation Friday, October 3, 2014 10:00 AM to noon SR 53 Corridor Study Final Report Presentation Study Purpose: Investigate safety improvements along the SR 53 corridor
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationMeeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10
Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Long-Term Study Presentation 8:10-8:40 Table Discussions 8:40-9:00
More informationChapter 5: Crossing the Street
Chapter 5: Crossing the Street Whether walking or bicycling, a student s journey to school will more than likely require crossing one or more streets. Per the Safe Routes to School Guide, maintained by
More informationMilitary Road Safety Improvements
Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More informationCity of Scotts Valley CITY COUNCIL STAFF REPORT
DATE: April 19, 2017 City of Scotts Valley CITY COUNCIL STAFF REPORT AGENDA ITEM 2 DATE: 4-19-2017 TO: FROM: APPROVED: SUBJECT: Honorable Mayor and City Council Scott Hamby, Public Works Director Jenny
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationOhio Department of Transportation Edition of the OMUTCD It s Here!
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2012 Edition of the OMUTCD It s Here! June 6, 2012 Here are reasons why we have a Manual of Uniform Traffic Control Devices
More informationCitywide Sidewalk and Crosswalk Programs
Citywide Sidewalk and Crosswalk Programs Council Meeting October 20, 2015 Presented by Rita Hu and Jamal Mahmoud Program Goals Implement the City s comprehensive plan. Provide pedestrian with safe walking
More informationComplete Streets Funding Program Project Prioritization Plan
Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path
More informationFreeway ramp intersection study
Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate
More informationEngineering Countermeasures for Transportation Safety. Adam Larsen Safety Engineer Federal Highway Administration
Engineering Countermeasures for Transportation Safety Adam Larsen Safety Engineer Federal Highway Administration 360-619-7751 Adam.Larsen@DOT.GOV Countermeasure Selection Resources Manual for Selecting
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationWhat Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety
What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety Adam Larsen Safety Engineer Federal Highway Administration 360-619-7751 Adam.Larsen@DOT.GOV Adam Larsen TTP Safety Engineer
More informationFDOT Treasure Coast Traffic Impact Report
September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance
More information2009 Manual on Uniform Traffic Control Devices
2009 Manual on Uniform Traffic Control Devices Tori Brinkly, PE Highway Safety Engineer WFL-FHWA April 20, 2010 Paragraphs are numbered. Standard Statements are bolded. Guidance statements are italicized.
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationDerby Street. Project Updates. Salem, Massachusetts
Derby Street Project Updates Salem, Massachusetts September 13, 2017 Project Limits Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationCalifornia Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016
California Department of Transportation, District 4 Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 Agenda Welcome and introductions Project overview, history and
More informationICBC invests $738,000 to make Surrey, White Rock and Delta roads safer
For release: Immediately Page: 1 of 5 Date: April 2, 2012 Ref #: 2012-11 Media contacts: Karon Trenaman, 604-527-8766 ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer You ve likely
More informationSign Design Manual (TEM 295-2)
TEMPORARY TRAFFIC CONTROL SIGNS INDEX Regulatory Signs R1-1 R-1 STOP R1-2 R-2 YIELD R1-2a R-2A TO ONCOMING TRAFFIC R4-1 R-33 DO NOT PASS R4-2 R-34 PASS WITH CARE R4-3 R-35 SLOWER TRAFFIC KEEP RIGHT R4-9
More informationBicycle + Pedestrian Connectivity Gap Analysis
Accelerated Bridge Program Bicycle + Pedestrian Connectivity Gap Analysis Tuesday, October 11 Shriners Hospital, Boston 6:30-8:00 PM Thursday, October 13 Community Rowing, Brighton 6:30-8:00 PM Tuesday,
More informationS.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project
Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library
More informationNow Let s Think Systemic
Now Let s Think Systemic Remote Rural County Use of the Highway Safety Improvement Program TRINITY COUNTY DEPARTMENT OF TRANSPORTATION Richard Tippett Director MEET TRINITY COUNTY 3,208 square miles 13,786
More informationItem to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines
Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More informationAppendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD
Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that
More informationCity Avenue Projects
City Avenue Projects City Avenue Special Services District Conceived in the early 1990 s Lita Cohen, Jim Ettelson, Joe Manko, and Michael Nutter Saint Joseph s provided key start-up support. True Public/Private
More informationCity of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY
4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after
More informationMEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy
MEMORANDUM Date: 9/13/2016 Re: Citywide Crosswalk Policy Foreword Through the s Circulation Element and Complete Streets Policy, it is the City s goal to promote walking trips and provide safe facilities
More informationWater Street Promenade Engineering and Design Services
Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project
More informationFebruary 11, 2016 TPO Board Presentation
February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01 Project Limits US 192 to SR 404 (428753-1)
More informationThe 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners. Arizona Department of Transportation
The 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners Arizona Department of Transportation New 2009 MUTCD 9 Parts (down from 10 in 2003) 816 pages (up
More informationChapter 4: Funding and Implementation
Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,
More informationMPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017
MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 RECOMMENDED ACTION: Consider HSIP Candidate Projects for the FY2019-2022 TIP as Being Consistent
More informationRoosevelt Estates Neighborhood Improvements
Roosevelt Estates Neighborhood Improvements Transportation Alternatives Application May 5 th, 2016 Qualifying Activities Construction of on-road and off-road trail facilities for pedestrians, bicyclists,
More informationSR 2108-A12 Forbes Avenue Betterment. March 1, 2018
SR 2108-A12 Forbes Avenue Betterment March 1, 2018 Introductions Project Team PENNDOT Cheryl Moon-Sirianni, PE; District Executive Jason Zang, P.E.; Acting Assistant District Executive-Construction John
More informationRecent U.S. Research on Safety Evaluation of Low-Cost Road Engineering Safety Countermeasures Lessons for Canada
Recent U.S. Research on Safety Evaluation of Low-Cost Road Engineering Safety Countermeasures Lessons for Canada Bhagwant Persaud Department of Civil Engineering, Ryerson University 350 Victoria Street,
More informationTypical Cross Section: DOWNTOWN (Observer Highway - 8th Street)
Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks
More informationNew Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid
New Jersey Department of Transportation Complete Streets Summit 10-24-2017 Shukri Abuhuzeima NJDOT-Local Aid Grant Resources State Funded Programs Funding Levels Funding appropriated for FY 2017 State
More informationFDOT Broward County Traffic Impact Report November 24 through December 1, 2017
FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during
More informationReadington Road (C.R. 637) Construction
Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon
More informationFDOT Treasure Coast Traffic Impact Report
February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance
More informationLincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation
Lincoln Way Multimodal Safety and Operations Study City and University Summary Presentation February 27, 2018 Agenda Introductions Study Overview: Phase 1 - Discovery Phase 2 Improvement Recommendations
More informationSECTION V - CIRCULATION PLAN ELEMENT
1 1 1 1 1 1 0 1 INTRODUCTION SECTION V - CIRCULATION PLAN ELEMENT As a community that is essentially fully-developed, Livingston s transportation improvement opportunities are limited. The primary mode
More informationOn-Street Bicycle Facilities
On-Street Bicycle Facilities A. General 12B-3 Design Manual Chapter 12 - Sidewalks and Bicycle Facilities 12B - Bicycle Facilities Cyclists have similar access and mobility needs as other transportation
More informationHennepin County Transportation Department
Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation
More informationActive Transportation Facility Glossary
Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike
More informationFrom Mile Zero to Target Zero the Dawson Creek Case Study
From Mile Zero to Target Zero the Dawson Creek Case Study Raheem Dilgir, President, TranSafe Consulting Ltd. and Kevin Henderson, Manager of Planning and Development, City of Dawson Creek Paper prepared
More informationincluding shade trees; Recommend minimum 13 ft total sidewalk
Appendix B Projects From Other Plans Location Type of Project Description West. Julian St. Intersection and streetscape along West Julian St. Intersection and scape : Add high visibility side street crosswalks
More informationAppendix C. TRAFFIC CALMING PROGRAM TOOLBOX
Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police
More informationOff-road Trails. Guidance
Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationCity Avenue Projects
City Avenue Projects City Avenue Special Services District Conceived in the early 1990 s Lita Cohen, Jim Ettelson, Joe Manko, and Michael Nutter Saint Joseph s provided key start-up support. True Public/Private
More informationOperations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No
Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationIMPLEMENTATION WORKBOOK
Lawrence Township Bicycle and Pedestrian Planning Assistance Study IMPLEMENTATION WORKBOOK Final Action Plan - Part 2 April 2009 Prepared For: The Township of Lawrence and the New Jersey Department of
More informationArlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016
Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation Thomas Jefferson BLPC / PFRC Meeting July 27, 2016 1.Review of Analysis 2.Key Transportation Issues 3.Recommendations
More informationComplete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)
Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 1 Development of roundabout at the intersection of Front Street
More informationFLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE
More informationPRESS RELEASE San Joaquin Council of Governments
PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 5, 2017 TO: FROM: ACTION TRANSMITTAL No. 2017-04 Transportation Advisory Board TAC Funding & Programming Committee
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationFigure 3B-1. Examples of Two-Lane, Two-Way Marking Applications
Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones
More informationBALBOA AREA: TRANSPORTATION PROJECTS & PLANNING
BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING TRANSPORTATION FOR ALL AGES, ABILITIES & MEANS CHANGING PATTERNS: TRENDING TO WALKING, BIKING, TRANSIT San Francisco s Change in Number of Commuters by Mode
More informationMPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017
MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017 RECOMMENDED ACTION: Update on the NDDOT US Business 2 Project Programmed for 2019 Matter of the NDDOT US Business
More informationAurora Urban Street Standards For Transit Oriented Developments and Urban Centers
Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers I. Purpose These standards will be applied to create a safe, comfortable, pleasant and pedestrian-friendly multi-modal
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North