Pavement Management Report. City Council Meeting of May 21, 2013

Similar documents
City of Davis Pavement Management Program

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.

Pavement Management Program

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

Chapter 4: Funding and Implementation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

City of Madison: 2017 Capital Budget Capital Improvement Plan

Engineering - Bicycle and Pedestrian

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Paving for Progress Municipal Streets Seminar

City of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E.

SECTION 5: PEER CITY REVIEW

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Chapter 3 DESIGN SPECIFICATIONS

Building Great Neighbourhoods STRATHEARN

CITY OF CAMBRIDGE 2015 BICYCLE PLAN TOWARDS A BIKABLE FUTURE

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Active Transportation Infrastructure Investment A Business Case

Value-Based Pavement Prioritization Tool. 11th National Conference on Transportation Asset Management Tim Skeel July 11, 2016

Reserve Study Navigation Options

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

Building Great Neighbourhoods LANSDOWNE

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Bicycle Transportation Budget Plan: Lawrence, KS

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

IMPLEMENTATION STRATEGIES

CITY MANUALS AND STANDARDS REVIEW

Third Street Bridge & Corridor Project

SRTS IMPLEMENTATION COSTS

Street Paving and Sidewalk Policy

CITY OF PORTSMOUTH PLANNING DEPARTMENT

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

ARLINGTON COUNTY, VIRGINIA

Building Great Neighbourhoods QUEEN ALEXANDRA

SECTION 3 STREET DESIGN

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Environment and Public Works Committee Presentation

Perryville TOD and Greenway Plan

Smoothing Out the Bumpy Road Ahead

AGENDA REPORT. Subject: CONSIDERATION OF SANTA MONICA BOULEVARD BLUE RIBBON COMMITTEE RECOMMENDATIONS

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. Halifax Regional Council January 16, 2017

Arterial Transitway Corridors Study. Ave

City Sidewalk Repair and Replacement Program

ITEM 3 ATTACHMENT A RESOLUTION NO

This page intentionally left blank.

Draft Recommended List of Potential Projects

On Monday, December 12, 2011, you will be briefed on Pavement Markings. The material is attached for your review.

Basalt Creek Transportation Refinement Plan Recommendations

2012 Capital Budget Capital Improvement Program

Technical Working Group November 15, 2017

ADA TRANSITION PLAN. For

DRAFT. Lecompton. Table of Contents. Background

Peterborough Council on Aging

DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND

Citywide Sidewalk and Crosswalk Programs

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

C ITY OF B EDFORD H EIGHTS

Knox Street Complete Streets Project

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Chapter 2: Standards for Access, Non-Motorized, and Transit

TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Seaside Greenway Improvements

Tonight is for you. Learn everything you can. Share all your ideas.

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Michael Parmer, Management Aide, City Manager's Office

Community Task Force November 15, 2017

LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

TRANSPORTATION COMMISSION East 19 th St, Harper to O Connell Thursday, March 29, :00 PM City Commission Room, City Hall, 6 E.

2018 ROAD MAINTENANCE PROGRAM

OneBayArea Grant Application

Restoration Requirements

Governance and Priorities Committee Report For the July 2, 2015 Meeting

TOWN OF SHUTESBURY PAVEMENT MANAGEMENT STUDY SCENARIO 2

/ ARLINGTON COUNTY, VIRGINIA

122 Avenue: 107 Street to Fort Road

Building sidewalks on local streets to reduce accessibility barriers

Item No. 14 Town of Atherton

Draft. Lecompton. Table of Contents. Background

Kelowna On the Move. Pedestrian and Bicycle Master Plan

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010

Streets Presentation. Public Works Department. Jill Mercurio, P.E. City Engineer November 19, 2013

DRAFT. Table of Contents. Background

Lynchburg District Update

Building Great Neighbourhoods BONNIE DOON

Township of Springwater

2017 Pavement Management Services Pavement Condition Report Salt Lake City, UT

Transcription:

Pavement Management Report City Council Meeting of May 21, 2013

Previous Meetings Summary In February, we presented the 2012 pavement survey and our consultant presented general pavement management strategies In April, we reviewed existing maintenance funding sources and explored alternative local funding possibilities. Also in April, City Council adopted Guiding Principles for Pavement Maintenance Council requested additional details

Pavement Condition Index (PCI) Method of quantifying pavement condition Score from 0 to 100 o Score of 100 given to a newly paved street or path o Average PCI of Davis streets = 62 o Average PCI of bike paths = 59

Guiding Principles Prioritize key streets of community value at a higher level than local streets. (Streets serving key areas, containing bus routes or having bike lanes.) Staff selected local streets to be treated similar to the way collectors are treated for maintenance purposes. These streets will be referred to as Priority Local Streets. Set average PCI goal for pavement from 70 to the low 60 s. Staff recommends setting separate average PCI goals for street classifications as follows:» Arterials: 68» Collectors: 65» Priority Local Streets (see above): tied to Collectors» Remainder of Local Streets: 60

Guiding Principles Cont d Keep streets in good condition from deteriorating to a poor condition The Decision Tree and the Streetsaver program use this principle in defining street projects. Street projects defined by the Streetsaver program will be further refined by staff. New roads and enhanced corridors shall not create future higher pavement costs for the City unless specific funds are identified for this purpose. New streets are required to be built to a higher traffic index than they had in the past. Bike paths are now required to be constructed of concrete (versus asphalt) and placement and species of trees placed adjacent to new paths are taken into greater consideration.

Guiding Principles Cont d Maintain the condition of bike paths to a comparable, or higher, standard than that of streets. Maintain higher use/value bike path segments to a higher level than lesser used segments. The BAC will be consulted for a list of priority bike paths which will be prioritized for maintenance Defer major investments in the maintenance of bike paths impacted by trees until long-term decisions are made about the trees Each bike path segment will be evaluated for its proximity to damaging tree roots prior to inclusion on a maintenance project. The level of maintenance will depend on the severity of a tree root issue (i.e. existing path with severe tree root damage may only be patched until a solution for dealing with the tree roots can be agreed upon.)

Davis Street and Bike Path System 163 centerline miles of streets (33 million square feet) 34.6 miles of arterials 21% 22.8 miles of collectors 14% 103.9 miles of local streets 64% 52 miles of bike paths (3 million square feet)

Davis Arterials and Collectors

Priority Local Streets Local streets maintained at a higher level than most Local streets that Provide access to schools, parks, or commercial areas Contain striped bike lanes Contain bus routes Treated like collectors

Priority Local Streets

Arterials, Collectors, and Priority Locals

Funding Breakdown Only a portion of the annual funding goes to street paving. The following illustrates estimate breakdowns: 1 FUNDING $15,000,000 $10,000,000 $3,000,000 $2,000,000 $1,000,000 Concrete 2 (5% of street paving) $487,000 $330,000 $106,000 $70,000 $36,000 Corner Ramps (10% of street paving) $975,000 $655,000 $211,000 $145,000 $72,000 Other Funding -$250,000 -$250,000 -$250,000 -$215,000 -$108,000 Contingency (10% of construction cost) $1,250,000 $830,000 $250,000 $165,000 $82,400 Planning/Study $10,000 $10,000 $10,000 $10,000 $10,000 Engineering 3 (5% of construction cost) $625,000 $414,000 $125,000 $83,250 $41,200 Municipal Arts 4 $8,000 $7,000 $2,000 $1,500 $700 Construction Admin (5% of construction cost) $625,000 $414,000 $125,000 $83,250 $41,200 Bike Paths $1,470,000 $990,000 $316,000 $216,000 $107,500 Street Paving $9,800,000 $6,600,000 $2,105,000 $1,441,000 $717,000 1. Numbers are estimates only and have been rounded for example purposes 2. Curb, gutter, sidewalk 3. Assumes City would require outside consultant to perform 4. Municipal Arts component not required for maintenance portion of projects

Pay Now or Pay More Later Pavement Condition (PCI) 100 80 Surface Seal $4.50/sy 50 Thin AC Overlay $20/sy Thick AC Overlay $27/sy 20 Reconstruction $81/sy 0 Time

Why are costs so high? Asphalt Price Index 800 700 600 500 400 300 Failed 200 717 62 565 Pavements are deteriorating rapidly Asphalt prices increased eightfold since 1999 100 71 0

Streets Scenarios Scenario A Maintain Current Backlog and treat Priority Local Streets as Collectors Heavily front-load paving costs with $55M in pavement funding ($83M in gross funding) over first 6 years $22M streets backlog in 2032 Average PCI of 59 in 2032

Streets Scenarios Cont d Scenario B - PCI goals based on street classification Arterials: 68 Collectors (including priority locals): 65 Locals: 60 No front-load of paving costs. $3.4M to $6.2M in paving costs ($4.6M to $8.5M gross funding) in years 1-4 growing to $13.6M paving cost ($18.7M gross funding) in year 20 $120M streets backlog in 2032 Average PCI of 63 in 2032

Streets Scenarios Cont d Scenario B-Mod - PCI goals based on street classification with front-loaded pavement funding Arterials: 68 Collectors (including priority locals): 65 Locals: 60 $9.8M / $6.6M in paving costs first 2 years ($25M gross funds) $110M streets backlog in 2032 Average PCI of 63 in 2032

Streets Scenarios Cont d Scenario C - $25M in years 1 and 2 with $3M funding in outlying years escalated at 3% $9.8M / $6.6M in paving costs first 2 years ($25M gross funds) $2.1M in paving cost ($3M gross) escalated in years 3-20 $172M streets backlog in 2032 Average PCI of 45 in 2032

Gross Funding (Scenarios A C)

Streets Scenarios Cont d Scenario D - $2M gross funding escalated at 3% $1.4M in paving cost ($2M gross) escalated at 3% over all 20 years $370M streets backlog in 2032 Average PCI of 33 in 2032

Streets Scenarios Cont d Scenario E - $1M gross funding escalated at 3% $0.7M in paving cost ($1M gross) escalated at 3% over all 20 years $464M streets backlog in 2032 Average PCI of 26 in 2032

Streets Scenarios Cont d Scenario F - $25M gross in years 1 and 2 with no other funding $16.4M in paving cost ($25M gross) in first 2 years $0 for years 3-20 $325M streets backlog in 2032 (reduction of $45M in backlog from Scenario D) Average PCI of 29 in 2032

PCI in 2032 A (Maintain Backlog) Streets (numbers are for street maintenance ONLY)^ B (PCI Goals) B-Mod (PCI Goals + up-front funding) C ($3M funding escalated) D ($2M Funding) E ($1M Funding) ^ Numbers do not include additional hard and soft costs and do not include bike path maintenance costs F ($25M up front) 59 63 63 45 33 26 29 2014 $18M $6.2M $9.7 $9.8M $1.4M $0.72M $9.8M 2015 $8.5M $3.4M $6.5 $6.6M $1.5M $0.74M $6.6M Avg (Yr 3-20) $4M $8.5M $7.6M $2.7M $2M $0.99M $0 Total $99M $162M $153M $62M $39M $19M $16.4M Backlog in 2032 $21M $120M $110M $172M $370M $464M $325M

Current Street PCIs (2013)

Street PCIs in 2032 No Maintenance

Street PCIs in 2032 Scenario A (Maintain Backlog)

Street PCIs in 2032 Scenario B (PCI Goals)

Street PCIs in 2032 Scenario B (PCI Goals with up-front funding)

Street PCIs in 2032 Scenario C ($25M up front, $3M escalated)

Street PCIs in 2032 Scenario D ($2M funding escalated)

Street PCIs in 2032 Scenario E ($1M funding escalated)

Street PCIs in 2032 Scenario F ($25M up front with no other funding)

Bike Paths (numbers are for bike path maintenance ONLY)^ A (Maintain Backlog) B (Set Funding) D ($2M Escalated) E ($1M Escalated) F ($25M only) PCI in 2032 69 55 44 37 31 2014 $140,000 $1,470,000 $216,000 $108,000 $1,470,000 2015 $230,000 $990,000 $223,000 $111,000 $990,000 Average (Years 3-20) $708,000 $410,000 $298,000 $148,000 $0 Total $13M $9.8M $5.8M $2.9M $2.46M Backlog in 2032 $1.6M $21.4M $33M $44.4M $57M ^ Numbers do not include additional hard and soft costs and do not include street maintenance costs

Bike Path Current PCIs

Bike Path PCIs in 2032 Scenario A (Maintain Backlog)

Bike Path PCIs in 2032 Scenario B (Set Funding)

Bike Path PCIs in 2032 Scenario D ($2M funding escalated)

Bike Path PCIs in 2032 Scenario E ($1M funding escalated)

Bike Path PCIs in 2032 Scenario F ($25M up front with no other funding)

Budget Impacts Regardless of the 20-year maintenance scenario chosen, funding paving up-front will reduce the City s backlog and future expenses. Budget projections have assumed future costs of $2 million to $4 million annually for infrastructure. Incurring $25 million in capital costs over the next two years would translate into $2 million annually in debt payments. Additional annual funds dedicated towards pavement would need to come from growth in existing revenue, new revenue or cutting of other programs.

Recommendations Approve the funding and budgeting strategy for pavement maintenance, in concept, for the multi-year effort, as outlined in this staff report. Direct staff to proceed on the first year of the multi-year effort, planning the project, obtaining a design consultant and a public outreach consultant. Direct staff to return in the fall of 2013 with an update on the long-term pavement maintenance budgeting plan with contracts for Design and Public Outreach Consultants for next fiscal year s Pavement Maintenance project. Approve the pavement management scenario B-Mod, PCI Goals with Front End Loading ($15 million in year 1 and $10 million in year 2).

Questions?