Public Hearing Tarrant County. October 11 th, 2012

Similar documents
DEVELOPING A POLICY TO PLAN AND OPERATE MANAGED LANES IN NORTH CENTRAL TEXAS: LBJ IN DALLAS COUNTY AND AIRPORT FREEWAY IN TARRANT COUNTY

Proposed Project I 35 from Denton to Cooke County Line

I-635 LBJ EAST PROJECT

6/14/2013. Welcome. to the US 75 Corridor Study. Public Meeting. US 75 Corridor Study Area

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities.

Capital Beltway HOT Lanes - Frequently Asked Questions

Washington DC Section of ITE Project Briefing

GENERAL DESCRIPTION. Page 1 of 5

Technology and the Changing Face of Tollways

An Easier Commute. Learn how to use I-77 Express to save you time.

Toll Rate Public Hearing

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

BMO Capital Markets Annual Infrastructure & Utilities Conference 407 International February 8, 2018

Mobility Greater Johnson County Transportation Coalition. May 23, 2018

NCTCOG 16-County Crash and Fatality Data

Report on the Elimination of Toll Roads. HB 2612, 84th Texas Legislature

November 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-105 ExpressLanes Project

Congestion Reducing Activities. Toby Carr GDOT Director of Planning April 10, 2014

WHAT IFS: Over the course of

395 Express Lanes Extension

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Managed Lanes: A National Perspective Managed Lane Strategies

NCTCOG 16-County Crash and Fatality Data

Clackamas County Comprehensive Plan

Charlotte Region Fast Lanes Study Phase III

What are Managed Lanes?

Toll Express Lanes for the Research Triangle region Including discussion of possible applications on I-40

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

Northwest Corridor Project (I-75/I-575) Agenda. Brief Project History. Stakeholder Briefing January 27, Brief Project history

The Future of All Electronic Tolling Brian Patno Raytheon ITS Texas October 26, 2012

Managed Lanes: A Popular and Effective Urban Solution. Ed Regan Presented by Susan Buse

Traffic Congestion in Houston. Presented by Bill King

BICYCLE PROGRAM IMPLEMENTATION UPDATE. Transportation and Trinity River Project Council Committee June 13, 2016

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

405 Express Lanes General Information & Frequently Asked Questions

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

Tolling Study. July 23, 2009

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT DRAFT NEED AND PURPOSE

BASS PRO DRIVE TO: WEST OF FARM-TO-MARKET ROAD (FM)

The I-680 Southbound Express Lane

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Program Update. Relationship: RP, RTIP, Budget, POF. Board of Directors Item 16 February 22, Board of Directors Item 16 Feb 22,

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

Priced Managed Lanes in America. October 2013

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Transportation Master Plan Advisory Task Force

AGENDA. Regional Transportation Council Thursday, April 19, 2018 North Central Texas Council of Governments

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Bicycle and Pedestrian Plans and Improvements

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

NCTCOG 16-County Crash and Fatality Data

MnPASS System Today and the Future

Transportation Advisory Board

1.221J/11.527J/ESD.201J TRANSPORTATION SYSTEMS FALL 2003 FINAL EXAMINATION. 1. Open-book and open-notes, calculators are fine -- no laptops.

DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas

Highway 217 Corridor Study. Phase I Overview Report

I-10 AT SCENIC LOOP RD. Open House

I-395 Express Lanes Northern Extension Project Public Hearings

DRAFT. The HOV/HOT Alternative: Working Paper #3

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

County of Fairfax, Virginia. Department of Transportation

Basalt Creek Transportation Refinement Plan Recommendations

Sketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

I-66 Corridor Improvements Route 15 to I-495. November 2014

Improving Mobility Without Building More Lanes

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

DALLAS FORT WORTH. There are several congested sections of road that do not have a logical big fix solution.

IH 85 EXPRESS LANES ATLANTA, GA USDOT Congestion Reduction Demonstration Program Grant ($110M)

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Overview of 64 Express Lanes. Secretary of Transportation Aubrey Layne April 12, 2017

13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle? What is your primary means of transportation?

Let s Make I-40 Better Action Team. Friday, March 29, 2019 Hosted by RTP Foundation

FM #: ETDM #: 11241

Alternatives Public Workshop

101 Corridor Managed Lanes

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018

95 Express Annual Operations Report: Fiscal Year

I-95 Express Lanes Fredericksburg Extension (Fred Ex) Public Hearing. September 25, 2017

2045 Long Range Transportation Plan. Summary of Draft

SH 68. Meeting with Affected Property Owners September 9, 2014

STUDY LOCATION February 26, 2015

Uptown Houston November 2014

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Public Hearing October 21, 2014 University of North Florida Adam W. Herbert University Center Alumni Drive Jacksonville, FL 32224

Where We Live and Work Today

Transcription:

Public Hearing Tarrant County October 11 th, 2012

Public Hearing Agenda Welcome and Project Overview Ms. Maribel P. Chavez, P.E. District Engineer Texas Department of Transportation Fort Worth District 2

Public Hearing Purpose Describe the North Tarrant Expressway Segment 3A/3B project Provide Financial Information for the Project Provide Opportunity for Public Comment on Financial Information for the Project 3

Public Comments Oral Comments Tonight: A court reporter will be available to document oral comments Mail Written Comments to: Ms. Maribel P. Chavez, P.E. Texas Department of Transportation P.O. Box 6868 Fort Worth, Texas 76115 E-Mail Written Comments through Project Web Page: www.txdot.gov Search keyword: North Tarrant Express ** Written Comments must be received at the TxDOT Fort Worth District Office by 5 p.m. on October 15 th, 2012 Summary and Analysis of Comments to be Posted on Project Web Page 4

General Description of NTE Project - Segments 1-4 3C 3B 3A 1 4 2 The North Tarrant Express (NTE) project is dedicated to improving mobility along IH820, IH 35W, and SH121/SH183 Airport Freeway through a regionally supported managed lane system in partnership with corridor communities, roadway users and other interested parties to accelerate construction. 5

Background In 2009, TxDOT entered into an agreement for a master development plan for Segments 2-4 of the project TxDOT and the Developer have now reached agreement on a draft Facility Agreement for the development of Segments 3A and 3B 6

Segments 3A & 3B Phase 1 (open 2018) Segment Reconstructed GP Lanes per direction New Managed Lanes per direction New & Reconstructed Frontage Lanes per direction* Total Lanes Per direction 3A 2-3 2 2 6-7 3B 2 2 2 6 Interchange 2-3 2 N/A 4-5 * Discontinous frontage roads on Segment 3A 7

Cross Section 8

Cross Section 9

Segment 3A Limits I-30 to North of I-820 (Fossil Creek Blvd) Existing 2 to 3 General Purpose (GP) lanes in each direction 2 (discontinuous) Frontage Road lanes in each direction First Construction Phase (Mandatory Scope) 2 to 3 GP lanes reconstructed in each direction Four concurrent Managed (Toll) Lanes along IH 35W from IH 820 to SH 121; two concurrent Managed (Toll) Lanes from SH 121 to IH 30 Two concurrent Managed (Toll) Lanes along IH 820 through the IH 35W/IH 820 Interchange Direct connectors (2 toll and 8 non-toll) at the IH 35W/IH 820 Interchange Managed (toll) direct connectors at the US 287/IH 35 W Interchange 2 reconstructed and extended (discontinuous) Frontage Road lanes in each direction Reconstruction of the existing cross streets and interchanges at SH183/NE 28 th St., Northside Dr/Yucca Ave., US287/IH 35W, Spur 280, and Cypress St. 10

Segment 3A Limits I-30 to North of I-820 (Fossil Creek Blvd) Ultimate 3 to 4 GP lanes in each direction 2 to 3 Frontage Road lanes in each direction over the UP and T&R Railroad and the Trinity River. Direct connectors at the IH 35W/SH 121 Interchange. Managed (toll) direct connectors to provide access to/from Belknap St/Weatherford St. 4 SH 121 GP lanes reconstructed in each direction. 3 US 287 GP lanes reconstructed in each direction. Reconstruction of the existing cross streets interchanges at Mark IV Pkwy., SH 121/IH 35W, E. 4 th St., US287/IH 35W, Spur 280, Sylvania, Belknap St., and Luella St. 11

Segment 3B Limits North of I-820 (Fossil Creek Blvd) to North Tarrant Parkway Existing 2 to 3 General Purpose (GP) lanes in each direction 2 (discontinuous) Frontage Road lanes in each direction First Construction Phase 2 to 3 GP lanes reconstructed in each direction 1-2 concurrent Managed (Toll) Lanes along IH 35W Direct connectors (toll and non-toll) at the US 287/US 81/IH 35W Interchange 2 reconstructed and extended (discontinuous) Frontage Road lanes in each direction Reconstruction of the existing cross streets and interchanges at North Tarrant Pkwy, US 287/US 81/IH 35W, Basswood Blvd., Western Center Blvd., Sandshell Dr., and Fossil Creek Blvd. 12

Segment 3B Limits North of I-820 (Fossil Creek Blvd) to North Tarrant Parkway Ultimate 2 concurrent Managed (Toll) Lanes along IH 35W (from North Tarrant Pkwy to US 287/US 81/IH 35W Interchange. 3 to 4 GP lanes in each direction 2 to 3 Frontage Road extended lanes in each direction. Additional Direct connector at the US 287/US 81/IH 35W Interchange 13

Types of Lanes on a Highway Frontage roads serves local trips, no demand management General purpose lanes non-tolled freeway lanes open to all, that provide access to major cross roads; serves sub-regional/corridor trips with no demand management Managed lanes a set of lanes where operational strategies, including pricing, are proactively implemented and managed in response to traffic conditions; serves regional trips Frontage Rd. General Purpose Lanes Managed Lanes General Purpose Lanes Mixed Flow HOV & SOV Mixed Flow Non-Toll Toll Non-Toll Frontage Rd. HOV High Occupancy Vehicles Source: NCTCOG SOV Single Occupant Vehicles 14

Managed Lanes Managed on the basis of time of day, vehicle type & occupancy, and pricing/tolls Purposes for managed lanes Provide additional capacity Increase efficiency Congestion free travel Travel time reliability Provide for operational flexibility in response to changing corridor needs Source: NCTCOG 15

Regional Transportation Council Policy Managed Lane Policy Toll rate established to maintain a minimum 50 mph average Managed Lane speed. Toll rate set up to $0.75 per mile during fixed-schedule phase within first six months. Market-based tolls applied during the dynamic-pricing phase after the first six months of operations. Single-occupant vehicles pay full rate. Trucks pay a higher rate. HOV vehicles and publicly-operated vanpools pay full rate in the off-peak period. HOV vehicles and publicly-operated vanpools receive 50% discount during Peak Period (phases out after Air Quality Attainment Maintenance Period) For more information: http://www.nctcog.org/trans/committees/rtc/ 16

NTE Segments 3A & 3B Facility Agreement Throughout the duration of the contract, the NTE project will belong to the state, just as any other state highway facility belongs to the state; the Developer develops, operates and maintains the project in compliance and conformance with the contract The Developer bears risks associated with the project including cost overruns, financial, and traffic levels Exception: TxDOT is responsible for the construction of Segment 3B (but not operations or maintenance). Developer is responsible for operating and maintaining Segment 3B. Taxpayers benefit by leveraging limited dollars to create improved mobility and air quality. 17

Developer (NTE Mobility Partners Segments 3) Team Members Cintra Infraestructuras S.A.* Meridiam Infrastructure North America II 3A/3B LLC* Dallas Police and Fire Pension System* Ferrovial Agroman S.A. AECOM Enterprises Citibank Global Markets, Inc. Professional Services Industries, Inc. Rone Engineering Services, Ltd Aerial Data Service, Inc. * Equity members 18

Contractual General Details Design, Construction, Operations & Maintenance of general purpose lanes, managed lanes & frontage roads until 2061. NTTA provides toll collection services as a subcontractor to Developer Segments 3 Interoperability drivers will be able to use any toll tag currently available for use in Texas At the end of the agreement, road must meet TxDOT predetermined quality performance requirements 19

Contractual Project Financing The total amount of debt proposed by Developer to acquire right of way, relocate utilities, design, construct, operate, and maintain the project is approximately $810 million Debt will be repaid by Developer from Toll Revenues over 38 years from the completion of construction Debt includes PABs, TIFIA and other potential sources The projected amount of interest that will be paid on the debt is currently estimated approximately $1.79 billion (nominal) Managed Lanes will continue to be tolled after the debt has been repaid The current estimated public funds contribution from TxDOT is $24.2 million. The Developer is currently exploring alternate financing methods which would reduce this amount. The North Central Texas Council of Governments has committed approximately $89.5 million for the project, and has identified another $40.5 million for contingencies. TxDOT has the right to exit the contract if certain preconditions are not met prior to the start of construction. 20

Contractual Tolling Policy Maximum rate of $0.75/mile for the first 180 days after opening After the first 180 days the toll rates will be based on traffic demand: If traffic demand is low, such as during off-peak hours, a lower toll rate will be charged If traffic demand is high, such as during peak commute times, a higher toll rate will apply Toll rates will be subject to increase or decrease in not less than five minute intervals depending on average traffic flows or average speeds Goal is to maintain 50 mph minimum operating speed in Managed Lanes Recognized transit agency buses, rubber-wheeled trolleys, and vans used for mass transportation are classified as exempt vehicles HOV and publicly-operated vanpools receive 50% discount during Peak Period (phases out after Air Quality Attainment Maintenance Period) 21

Contractual Tolling Policy Under anticipated operating conditions the estimated cost in tolls to travel per mile in today s dollars are: Opening year (2015) Final year (2061) High toll: $0.36 $0.94 Low toll: $0.10 $0.10 22

Termination Provisions TxDOT has the right to terminate the Facility Agreement at any time Reasons include changes in environmental approvals, changes in financing plan or capital markets conditions, performance failure by the Developer, etc. If the Developer is not in default at time of termination, TxDOT must compensate it with a payment based on various elements: Outstanding debt balances Forgone dividends plus a pre-established markup Incidental costs Cash balances If TxDOT elects to terminate for convenience, compensation amounts are capped under a pre-established formula (in accordance with applicable law) 23

Next Steps TxDOT prepares summary and analysis of comments received; summary and analysis will be posted on internet site and made available upon request Review of Facility Agreement by: FHWA Attorney General Legislative Budget Board Execute Facility Agreement by early 2013 Estimated start of construction by end of 2013 24

For more information about the project, the contract, and the Developer s proposal and technical drawings visit: www.txdot.gov Search keyword: North Tarrant Express 25

Public Comment Period Oral Comments Tonight: Court reporters available to document oral comments Mail Written Comments to: Ms. Maribel P. Chavez, P.E. Texas Department of Transportation P.O. Box 6868 Fort Worth, Texas 76115 E-Mail Written Comments through Project Web Page: www.txdot.gov Search keyword: North Tarrant Express ** Written Comments must be received at the TxDOT Fort Worth District Office by 5 p.m. on October 15 th, 2012 Summary and Analysis of Comments to be Posted on Project Web Page 26