Installation, Operation, & Maintenance Manual NX Seal Cooler

Similar documents
Installation Operation Maintenance

Installation Instructions

Installation Instructions

Installation Instructions

Installation Instructions

Mechanical Seal Piping Plans

Installation Instructions

Mechanical Seal Piping Plans

Installation Instructions

USER INSTRUCTIONS. NAF Duball DL Ball Valves. Installation Operation Maintenance. Experience In Motion. flowserve.com

Installation Instructions

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

English. Introduction. Safety Instructions. All Products. Inspection and Maintenance Schedules. Parts Ordering. Specifications WARNING WARNING

MEGR-1627 Instruction Manual

WHEATLEY Series 500 Swing Check Valve

Type ACE97. Introduction. Installation. P.E.D. Categories. Specifications. Overpressure Protection. Installation Guide English May 2002

FLANGED TWO-PIECE BALL VALVES

TECHNICAL DATA Q= C. Table 1 - Specifications

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1

RD(H)20/25 Pressure-Reducing Regulator User Manual

FLANGED TWO-PIECE BALL VALVES

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

TYPE 3710 CARTRIDGE SPLIT SEAL Technical Specification

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

FT16 Ball Float Steam Trap Installation and Maintenance Instructions

Installation & Operation Manual Proven Quality since 1892

API Piping Plan 62: A Reliable Quench System

GREIG FILTERS, INC. OPERATION MANUAL

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

INDUSTRIAL VALVES MODELS: C62-A; C62-D. INSTRUCTION MANUAL Installation Operation Parts Service DIAPHRAGM BYPASS PRESSURE REGULATING VALVES

TECHNICAL DATA. Table 1 - Specifications

Design DSA Steam-Atomized Desuperheater

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

Mooney * Noise Controller Installation, Operation, and Maintenance Manual

Edward Valves Equiwedge Forged Gate Valve

WATER HEATER THERMAL EXPANSION TANKS Owner s Manual. Safety Instructions Installation Maintenance Warranty. Models: 2-5 Gallon Capacity

CARTRIDGE FILTERS TECHNICAL MANUAL MT 080. Installation, commissioning and maintenance instructions. 08/02 Edition

Improved Mean Time Between Planned Maintenance (MTBPM) for Mechanical Seals in Process Pumps

Type 1367 High-Pressure Instrument Supply System with Overpressure Protection

Installation, Operation and Maintenance Manual for Back Pressure Regulator

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

WHEATLEY Series 822/820 Swing Check Valve

Reduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections

LRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.

Manual Actuated Boiler Blowdown Valves

FLANGED MULTI-PORT BALL VALVES

Installation and Service Manual

1 DRIVE INDUSTRIAL IMPACT WRENCH

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

Operating Instructions in compliance with Pressure Equipment Directive 2014/68/EU. FAS Brass Check Valve RDL

DC5A. Cyclone Separator Trap for Air. Copyright 2015 by TLV Co., Ltd. All rights reserved ISO 9001/ ISO MA-03 (DC5A) 19 June 2015

LRS(H)4 Pressure-Reducing Regulator User Manual

TITAN FLOW CONTROL, INC.

INSTALLATION, OPERATION and MAINTENANCE MANUAL

OPERATION MANUAL NTF-15

Bermad Pressure Reducing. Model: 42T

2 Sentry MCL Installation, Operation & Maintenance

Model Series 62 Constant Differential Relay

Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual

SCA Series Inverted Bucket Steam Traps

TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL

97C COMPRESSOR KIT 12V PART NO C COMPRESSOR KIT 24V PART NO C COMPRESSOR KIT PART NO

PV4 and PV6 Piston Valves

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS

61 Series Pilots for Pilot-Operated Pressure Reducing Regulators

CA16 and CA16S-14 Air and Gas trap Installation and Maintenance Instructions

Oxygen Usage Best Practice Guide

Bulletin TCR-104 & 109 Filling and adding to the Glycol pressure system

SDS -Series 4C-D201/-D202 Supplemental Drying System User s Manual

Reduce pressure zone device suitable for high and medium hazard rated applications Flanged end connections

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL

Mounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25

AIR-OPERATED DOUBLE DIAPHRAGM PUMP USER S MANUAL

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors

AVM7 Stainless Steel Thermostatic Air Vent

Type R622 Pressure Reducing Regulator

CA10S, CA14 and CA14S Air and Gas Traps

HORIZONTAL BLADDER TANK

TriPod Safety Coupler Installation & Operating Instructions for Models TP4, TP5, TP6, and TP7

RS(H)20, 25 USER MANUAL

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

1305 Series Pressure Reducing Regulators

Transcription:

Installation, Operation, & Maintenance Manual NX Seal Cooler 1

1. INTRODUCTION 1.1 About this Manual This manual is intended to ensure a safe installation and operation of the NX sealcooler. All involved personnel shall be noticed of this instruction. Note: Pressure equipment shall be operated with caution. Due to changed or unforeseen circumstances and conditions, dangerous/ hazardous events can occur. Before installation the following shall be checked: Any possible damage due to transport or storage Cleanliness, required before operation Existence of the nameplate with correct inspection markings and design/ test conditions 1.2 How to Use this Manual Only trained and qualified personnel should use this manual. Refer to section 2.3. Inexperienced personnel should only work on this system under the supervision of a qualified person. Before using this manual, make sure you have fully read and understood the safety section. If you are new to the system, pay particular attention to section 5, which describes the system in detail. When maintaining the system, always make sure you follow the maintenance procedures. Pay particular attention to the alerts and icons. 1.3 Other Supplied Documentation The Appendix contains the assembly drawings. 1.4 Conformity with Standards and Directives The information in this manual conforms to the following standards and directives: PED 2014/68/EU 2

1.5 Use of Alerts and Icons This manual uses Notes, Cautions, and Warnings to alert you of important information and/or hazardous situations. CAUTION The equipment, product or surrounding area can be damaged if the caution is not obeyed. Personnel can be (seriously) injured, or the equipment can be seriously damaged if the warning is not obeyed. The above icons are the general icons that are used for Cautions and Warnings. More specific icons are also used, depending on the type of hazard. 2. SAFETY 2.1 Hazards associated with the NX seal cooler The following hazards can be present in the system: High pressure Dangerous chemicals Temperature (hot surfaces) Dangerous moving parts (during installation) Notes: The cooler maximum surface temperature may comply with the ATEX temperature class when applicable. Supply of cooling water shall be guaranteed for heat removal of hot products. HIGH PRESSURE: The cooling water line of the system is not protected against overpressure. If the return line is closed, a water line could burst. Make sure a pressure relief valve is installed in the cooling water line. If the system has any external leaks, you must stop the system immediately and repair the leak. 3

2.2 General Safety When installing, operating and maintaining this system, pay particular attention to safety: Obey all applicable safety laws and regulations. Obey all Plant regulations. Make sure that only trained and qualified personnel work on the system. Refer to section 2.3. Read and understand each part of this manual. Follow the installation, operation, and maintenance procedures exactly. Wear the relevant Personal Protective Equipment (PPE). Refer to section 2.4. Never work alone if there is a possibility of an accident. Make sure that adequate safety equipment is installed in and around the work area: first aid kits, safety showers (if applicable), fire extinguishers, escape routes, shut off valves, etc. Make sure that personnel are fully trained on how to use the safety equipment. A qualified first aid specialist must always be available for each shift. Read the Plant requirements for handling hazardous materials 2.3 Trained and Qualified Personnel Qualified personnel are people who have been authorized by those responsible for the safety of the Plant to perform the necessary work, and who can recognize and avoid possible dangers. The following aspects determine the qualification of personnel: Appropriate training Relevant experience Knowledge of relevant standards and specifications Knowledge of accident prevention regulations Knowledge of plant regulations and operating conditions 2.4 Personal Protective Equipment (PPE) When operating or maintaining this system, make sure you wear the appropriate Personal Protective Equipment (PPE): protective clothing, gloves, safety glasses, etc. HOT SURFACES: The system and surrounding surfaces might be hot. Take care when touching components. Wear the appropriate Personnel Protection Equipment (PPE), according to plant regulations 4

3. ENVIRONMENTAL CONSIDERATIONS CAUTION You are required by law to dispose of waste products and end of life equipment, according to local regulations. 3.1 Disposing of Waste Products Any waste products resulting from the use or maintenance of the system must be disposed of according to local environment laws and regulations. 3.2 End of Life Equipment DANGER CHEMICALS: Dangerous chemical might be released during removal of the system. Wear Personal Protective Equipment (PPE). Follow all safety regulations and Plant regulations. HIGH PRESSURE: High pressure might be stored in the system. Before removing or re-installing the system, make sure the entire system has been de-pressurized (and drained if required). Note: End of life equipment must be disposed of according to local environment laws and regulations. 4. TRANSPORTATION AND STORAGE REQUIREMENTS The following requirements apply to the NX seal cooler and all related equipment: Transport and storage criteria Transportation Suspect damaged during transportation Warehouse requirements Long-term storage Preserving installed systems Requirements The system must be transported and stored in the unopened, original shipping box. Systems that have been dropped, or have been subjected to heavy impacts, during transport must not be installed. An inspection in that case is strongly recommended. The warehouse must be dry and dust free. The system should not be exposed to: large temperature fluctuations, high humidity, or radiation After a storage period of 1 year, the system must be inspected for its as new properties. The preserving medium must not damage the installed system, for example by fouling or attacking the components and mechanical seal. If you are not sure which preserving medium to use, contact Flowserve. 5

5. DESIGN OVERVIEW 5.1 Description The Flowserve NX seal cooler is a shell and tube system used with single or dual mechanical seals. It utilizes a counter flow pattern to enhance cooling efficiencies. The objective of the seal cooler is to lower the temperature of process or barrier fluid passing through the coil while cooling water passes through the case. It is designed for installations close to the seal where space is limited. Fittings Mounting Plate Coil End Plate (Top) Body (Inner Casing) Coil Separator Body (Outer Casing) Vent/Drain Shell Out tube in End Plate (Bottom) Vent/Drain BODY (OUTER CASING) Figure 1: Vertical Cross Sectional View Tube Out Shell In Vent/Drain 6 Figure 2: Top View Note: The images of parts shown in these instructions may differ visually from the actual parts due to manufacturing processes that do not affect the part function or quality.

6. INSTALLATION Before installing the system, inspect all components for damage. If any of the components are damaged, you should report this to your local Flowserve representative. Position the NX seal cooler as close to the seal as possible. Make sure there is sufficient room for: Evacuation of the Plant in case of an emergency (do not block walkways and emergency exits). Safe operation and maintenance of the system. CRUSH HAZARD. Possible injury and/or trapped limbs. Take care to avoid being trapped or crushed between heavy, moving objects. 6.1 Primary API Piping Plans API Plan 21 provides cooling to the seal by flowing pump discharge fluid through a control orifice and into the seal cooler before entering the seal chamber. This piping plan is targeted for clean high temperature fluids and hot water above 176 F (80 C) to improve vapor margins, meet secondary seal element temperature limits, reduce coking, and improve fluid lubricity. API Plan 23 cools the seal chamber fluid by using a pumping device to circulate the seal chamber fluid through a seal cooler and back to the seal chamber. The circulated fluid is isolated from the pump impeller area by a throat bushing so that the seal cooler needs to cool only a small volume of fluid in the seal chamber heated by the seal faces and heat soak from the process side. This piping arrangement is the plan of choice for clean hot water services, particularly above 176 F (80 C) where water has low lubricity, and many clean hot hydrocarbons to improve vapor margins. 7

Figure 3: API Plan 21 Configuration Figure 4: API Plan 23 Configuration 6.2 Mounting Positions The seal cooler can be mounted vertically or horizontally, and as close to the seal as possible. Vertical mounting is preferred for any closed loop system for venting purposes. In a horizontal position It is difficult to vent gas/air from a horizontal installation because the gas/air can become trapped within the upper turns of the cooling coil. A series of flush and bleed steps might be necessary in order to remove these trapped gases. See figure 5 below. The presence of trapped gas/air is more critical when using a Plan 23 seal flush or any closed loop system. Trapped gases that are entrained in the sealing fluid can collect in the seal cavity thus impede flow to the seal cooler. This can ultimately cause the seal to overheat and fail due to a lack of lubrication. It is strongly recommended that the seal cooler be mounted in a vertical position with process fluid connections on top whenever possible to ensure thorough venting and promote cooling efficiencies. Liquid Gas/Air Entrapment Process Inlet Process Outlet 8

7. OPERATION Only operate the NX cooler within the temperature and pressure limits shown on the assembly drawing When installing, ensure that the seal cooler, piping, and vent locations provide complete venting of gas/air from both the coil and case systems. This requires the vents to be located at the highest point in each system. Before start-up, ensure that all piping is properly attached to the appropriate connections for both the coil and case systems to prevent fluid leaks and achieve expected cooler efficiencies. Before start-up, ensure that all the gas/air is vented from both the coil and shell systems to provide the system efficiencies expected and prevent a vapor lock condition. At start-up, ensure that the flush fluid flow and coolant fluid flow are set and stabilized at the prescribed flow rates determined for the application. Do not allow the case system coolant fluid flow rate to be operated below minimum flow rates. Lower flow rates will encourage fouling which reduces the seal cooler heat transfer capabilities. See table below for minimum required case side flow rate Cooler size.500.625.750 Minimum Coolant Flow 2.5 GPM [9.5 LPM] 3 GPM [11.4 LPM] Table 1: Minimum Case Side Flow Rate. 6.5 GPM [24.6 LPM] Seal cooler performance should be monitored periodically. Baseline temperatures should be gathered soon after equipment commissioning. Target case side base line temperature differential should be 11 C (20 F) or lower. Exceeding this differential temperature could result in a reduction of heat transfer and shell side fouling. Note: For pressure and temperature limits, see the drawing included with the NX seal cooler. Periodically, shell and tube side temperature differential should be monitored. With no change in process temperature and flow rate, coil side outlet temperature should not exceed 5.5-11 C (10-20 F) rise from base line. With no change in cooling fluid temperature and flow rate, case side differential temperature should not vary significantly from base line reading. A variation of 5.5-11 C (10-20 F) from base line indicates loss of heat transfer. Case side fouling could be a cause and cooler cleaning should be considered. 9

8. MAINTENANCE The NX seal cooler may only be disconnected by qualified personnel, in accordance with national regulations, the safety standards of the user and in accordance with the users operating procedures. Before disconnecting the equipment, verify that: The equipment is at ambient temperature The equipment is not pressurized The equipment is drained Process fluid may remain in tubes, Removal of remaining fluid to adhere to site policy. DANGER CHEMICALS: Dangerous chemical might be released during removal of the system. Wear Personal Protective Equipment (PPE). Follow all safety regulations and Plant regulations. 8.1 Remove the seal cooler from service. 8.2 Remove all end fittings connected to the lengths of tubing protruding from the top of the cooler. Fitting ferrules and nuts cannot be removed from the primary lengths of protruding coil and should be remain in place. Do not remove the fittings directly adjacent to the top end plate. Be sure to retain all fittings and mark them appropriately. This will minimize the likelihood of fitting leaks upon reassembly. 8.3 Remove the center bolt. 8.4 Carefully pry each end plate from the main cooler body. A 5/16 eye bolt can be inserted into each end plate to offer an adequate amount of leverage. Take care not to use too much force, which can result in coil stretch. The outer and inner cases can now be removed, which will expose the coiled tubing. 8.5 Clean the case and coils taking care not to damage either. 8.6 Inspect all components for damage or corrosion and replace as needed. Secondary sealing components such as O-rings should always be replaced. 8.7 Reassemble the unit in reverse of disassembly. Center bolt torque required is 110 lbf-ft (149 N-m) for 3/4" bolt and 250 lbf-ft (338 N-m) for 1 bolt. All fittings should be reassembled to the manufacturer s specifications. 10

8.8 Leak testing is recommended after assembly. Refer to end user specifications or procedures. Alternately, individual units can be returned to Flowserve for refurbishment and testing. 8.9 The inspection should include the following hold points as a minimum: Visual inspection of the interior and exterior of the system on corrosion, erosion, damages and cracking Random check of the wall thickness and verification against the design thickness Random checking of coating (when applicable) Maintenance of the seal cooler shall be limited to touch-up of coating and cleaning methods that do not affect the mechanical integrity of the system. Under no circumstances should the seal cooler be opened while it still contains any hazardous materials or when the internal pressure is above the local atmospheric pressure. The equipment must be brought to atmospheric pressure by venting it to a safe location, before opening. 9. APPENDIX Cooler Drawing Number BOM 0.500 inch Standard NX0500SA-STD NX0500SA 0.625 inch Standard NX0625SA-STD NX0625SA 0.750 inch Standard NX0750SA-STD NX0750SA 0.750 inch PED NX0750SA-PED NX0750SA-P 11

FIS233eng REV 10/18 Printed in USA To find your local Flowserve representative and find out more about Flowserve Corporation, visit www.flowserve.com Flowserve Corporation has established industry leadership in the design and manufacture of its products. When properly selected, this Flowserve product is designed to perform its intended function safely during its useful life. However, the purchaser or user of Flowserve products should be aware that Flowserve products might be used in numerous applications under a wide variety of industrial service conditions. Although Flowserve can provide general guidelines, it cannot provide specific data and warnings for all possible applications. The purchaser/user must therefore assume the ultimate responsibility for the proper sizing and selection, installation, operation, and maintenance of Flowserve products. The purchaser/user should read and understand the Installation Instructions included with the product, and train its employees and contractors in the safe use of Flowserve products in connection with the specific application. While the information and specifications contained in this literature are believed to be accurate, they are supplied for informative purposes only and should not be considered certified or as a guarantee of satisfactory results by reliance thereon. Nothing contained herein is to be construed as a warranty or guarantee, express or implied, regarding any matter with respect to this product. Because Flowserve is continually improving and upgrading its product design, the specifications, dimensions and information contained herein are subject to change without notice. Should any question arise concerning these provisions, the purchaser/user should contact Flowserve Corporation at any one of its worldwide operations or offices. USA and Canada Kalamazoo, Michigan USA Telephone: 1 269 381 2650 Telefax: 1 269 382 8726 Europe, Middle East, Africa Etten-Leur, the Netherlands Telephone: 31 765 028 200 Telefax: 31 765 028 487 Asia Pacific Singapore Telephone: 65 6544 6800 Telefax: 65 6214 0541 Latin America Mexico City Telephone: 52 55 5567 7170 Telefax: 52 55 5567 4224 flowserve.com 12