Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

Similar documents
SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

RAPID THERMAL PROCESSOR (Annealsys AS-ONE 150) Lab Manual

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

Arizona State University NanoFab XACTIX ETCHER. Rev A

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE

Standard Operating Manual

Birck Nanotechnology Center

5890II GC Standard Operating Procedure 9/2/2005

OXFORD PLASMALAB 80PLUS (CLOEY)

Birck Nanotechnology Center

Edge Isolation Tool. Standard Operating Procedure. Version 1.1. Date: Prepared by, Sandeep S S. Department of Electrical Engineering

Xactix XeF2 OPERATION MANUAL

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

Usage Policies Notebook for Xenon Difluoride (XeF 2 ) Isotropic Si Etch

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

Arizona State University NanoFab PLASMATHERM 790 RIE. Version A

Standard Operating Manual

Cambridge NanoTech: Savannah S100. Table of Contents

University of Minnesota Nano Center Standard Operating Procedure

The MRL Furnaces USED FOR THIS MANUAL COVERS

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

March CS-1701F Reactive Ion Etcher

Standard Operating Manual

Usage Policies Notebook for Trion RIE / ICP Dry Etch

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager.

Unaxis PECVD. SiH4 (5% in He)

User Manual for the Mars Calibration Bench

AX5000 Operational Manual

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

Oerlikon Sputtering Evaporator SOP

Equipment Operating Procedure Glove Box

Usage Policies Notebook for STS DRIE System

SPLIT HOPKINSON PRESSURE BAR OPERATIONS MANUAL 5/9/2014

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

Thermcraft Tube Furnace General Use

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

Armfield Distillation Column Operation Guidelines

Revised: June 7, 2017

University of MN, Minnesota Nano Center Standard Operating Procedure

FAULT CODE TROUBLESHOOTING INDEX

Xactix Xenon Difluoride Etcher

Superconducting Susceptometer (MPMS-5S) Quantum Design Room 296 (MPMS)

LEO SEM SOP Page 1 of 9 Revision 1.4 LEO 440 SEM SOP. Leica Leo Stereoscan 440i

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

SPUTTER STATION STANDARD OPERATING PROCEDURE

Karl Suss MA6 Mask Aligner SOP

Standard Operating Manual

Standard Operating Procedure. For. PVD E-Beam

Operating Procedures for Metal Evaporator I

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

THERMAL EVAPORATION UNIT (for Al evaporation)

Warnings: Notes: Revised: January 8,

Standard Operating Manual

Technical

BIOGAS COMBUSTION PLANT MAINTENANCE MANUAL

Operating Procedures for the. SAMCO ICP RIE System

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator

WATER CONTROL SYSTEM QUICK START

School of Chemistry SOP For Operation Of Glove Boxes

Standard Operating Manual

Usage Policies Notebook for Karl Suss MA6 Mid / Deep UV Mask Aligner

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

STS DRIE User SOP Location: NRF Cleanroon, Dry Etch Bay

SCS Field Revision No. 1.0 June 2001 STANDARD OPERATING PROCEDURE (SOP) FOR FIELD OPERATION OF THE SEQUENTIAL CYCLONE SAMPLER (SCS)

ACV-10 Automatic Control Valve

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure

HPICAL Operation & Data Logging Procedures. Click spacebar to advance through slides 1

Warnings: Notes: Revised: October 5, 2015

Usage Policies Notebook for Thermco Atmospheric Diffusion Furnace system

MJB-3 Mask Aligner Property of TAU MNCF August 2012

CLEANLINESS STANDARD NCPRE tool contamination classification

BEST KNOWN METHODS. Transpector XPR3 Gas Analysis System. 1 of 6 DESCRIPTION XPR3 APPLICATIONS PHYSICAL INSTALLATION

ASE SOLVENT CONTROLLER INSTALLATION INSTRUCTIONS Dionex Corporation

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

PerkinElmer Aanalyst100

STS ICP-RIE. Scott Munro (2-4826,

Cover Page for Lab Report Group Portion. Flow Visualization in a Water Channel

Plasma Asher: March PX-500 User guide (May-30, 2017)

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

CC Burst Test System

CircuFlow Quick Setup Guide

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

Hydro-Control V User Guide

AKTA ION EXCHANGE CHROMATOGRAPHY SOP Date: 2/02/05 Author: A DeGiovanni Edited by: C. Huang Reviewed by:

OFI MODEL 20 CONSTANT SPEED BLENDER INSTRUCTIONAL MANUAL

University of Minnesota Nano Fabrication Center Standard Operating Procedure

3 GALLON, OILLESS PANCAKE COMPRESSOR INSTRUCTIONS. Item #31289

Standard Operating Procedure

Cover Page for Lab Report Group Portion. Boundary Layer Measurements

Transcription:

Title: Heat Pulse 610 Operating Procedure Page 1 of 7 Table of Contents 1.0 Purpose/Scope... 2 2.0 Reference Documents... 2 2.1 Heat Pulse Operations Manual... 2 2.2 Solaris software Operations Manual... 2 3.0 Equipment/Supplies/Material... 2 3.1 Plastic or Teflon-coated tweezers... 2 3.2 Susceptor... 2 4.0 Safety... 2 4.1 Follow all safety procedures outlined in the CSSER Rules and Procedures Handbook. The handbook can be found at http://www.fulton.asu.edu/fulton/csser/safety.php... 2 5.0 Set Up Procedures... 2 5.1 Log Book... 2 5.2 Chiller Start Up... 2 5.3 Front panel switches... 2 5.4 Purge Gas Selection... 3 5.5 Launch Heat Pulse software.... 3 5.6 Create a new recipe.... 3 6.0 Procedures... 4 6.1 Pre Anneal... 4 6.2 Anneal Sample... 5 6.3 Shut Down... 5 7.0 Tables... 6 7.1 Heat Pulse Log Sheet... 6 7.2 Calibration Files... 7 8.0 Figures... 7 8.1 None... 7

Title: Heat Pulse 610 Operating Procedure Page 2 of 7 1.0 Purpose/Scope 1.1 This document covers the procedure that should be followed for normal operation of the AGA Heat Pulse RTP. This tool is only used with III-V semiconductors such as Gallium Nitride (GaN) and Gallium Arsenide (GaAs). 2.0 Reference Documents 2.1 Heat Pulse Operations Manual 2.2 Solaris software Operations Manual 3.0 Equipment/Supplies/Material 3.1 Plastic or Teflon-coated tweezers 3.2 Susceptor 4.0 Safety 4.1 Follow all safety procedures outlined in the CSSER Rules and Procedures Handbook. The handbook can be found at http://www.fulton.asu.edu/fulton/csser/safety.php 5.0 Set Up Procedures 5.1 Log Book 5.1.1 Fill in date, name, and time. 5.2 Chiller Start Up 5.2.1 Verify that the white Neslab chiller is ON by verifying that the green LED on the front panel is on. Verify the thermometer is 15 ± 1 degrees C. Verify that water level is between two horizontal markings inside the reservoir. 5.2.2 Toggle the dark blue Neslab chiller to ON and push START button on the front panel. The minimum water level is one inch from the top. 5.2.3 Use DI water from any solvent sink to fill the chiller reservoirs when needed. 5.3 Front panel switches CAUTION: Power Switch = ON Emissivity Dial = 50 Meter Select Knob = Temp Temp Mon Switch = Pyro Lamp Control Switch = Auto Manual Lamp Intensity Knobs (inner and outer) = fully counter-clockwise Purge Flow Meter = 2.0 Excessive flow can cause an explosive failure. DO NOT EXCEED 2.0 ON FLOW METER.

Title: Heat Pulse 610 Operating Procedure Page 3 of 7 5.4 Purge Gas Selection 5.4.1 When the system is idle, the chamber is being purged with nitrogen. When a recipe is started, the system switches to a user selected gas. The purge gas choices are argon, forming gas or nitrogen. 5.4.2 Verify that the Process Gas Inlet valve is open and the Process Gas Bypass valves are closed. These valves are located on the front panel below the tool. 5.4.3 Argon Purge: Turn valve #1 to the ENABLE VALVE #2 position. Turn valve #2 to the ARGON position. 5.4.4 Forming Gas Purge: Turn valve #1 to the ENABLE VALVE #2 position. Turn valve #2 to the FORMING GAS position. 5.4.5 Nitrogen purge: Turn valve #1 to NITROGEN position. The position of valve #2 does not matter. 5.5 Launch Heat Pulse software. 5.5.1 Ensure computer is turned on. 5.5.2 Double click on the HEAT PULSE icon. 5.5.3 Click on RTP CONTROL PAGES button. 5.5.4 If a new recipe is desired, then jump to paragraph 5.6 5.5.5 Click on RUN PROCESS button. 5.5.6 Select the appropriate recipe from the SELECT RECIPE NAME menu. 5.5.7 Select the appropriate file from the PYROMETER CALIBRATION FILE menu. Refer to table 7.2 for the guidelines on which file to use. 5.5.8 Ensure that PYRO is selected under the CONTROL TEMPERATURE button. 5.5.9 The graph display has scales that are variable. The minimum and maximum limits for time and temperature can be selected by the user. 5.5.10 Enter a value into the OVERTEMP SET POINT box. That value is typically 200º above the highest set point in the recipe used. Example: if recipe = 500º than the Over Temp set point = 700º. 5.5.11 Proceed to paragraph 6.1 5.6 Create a new recipe. 5.6.1 From SOLARIS RTP CONTROLLER MENU PAGE select the EDIT RECIPES button. 5.6.2 Select the YES button. 5.6.3 Select the CREATE NEW FILE button. 5.6.4 Enter a file name and click on ACCEPT button. Example=JTE_500 5.6.5 No password needed, just click on the OK button. 5.6.6 The RTP RECIPE EDITING PAGE will come up. NOTE: Maximum temperature=800 C, Maximum hold time=120 seconds. If your process needs require a higher temperature or longer time, contact CSSER staff for approval.

Title: Heat Pulse 610 Operating Procedure Page 4 of 7 6.0 Procedures 6.1 Pre Anneal 5.6.6.1 Step 0 is a step that is not used. Select PYROMETER from CONTROL DEVICE drop down menu. Ensure that there is no other information entered into this step. 5.6.6.2 Step 1 needs to be a purge step. Enter 1 into the STEP # box. Select PURGE from the OPERATION TYPE drop down menu. Enter 10; a value of 10 will give you a purge time of 10 seconds. Any value can be used, into the STEP TIME FOR HOLD STEP box. Residual atmosphere in the chamber could cause problems with oxidations, especially at higher temps. To remedy that, use longer purge times. Select PYROMETER from CONTROL DEVICE drop down menu. 5.6.6.3 Step 2 is a ramp up step. Enter 2 into the STEP # box. Select RAMP UP from the OPERATION TYPE drop down menu. Enter desired temperature into the CONTROL TEMPERATUE. Enter desired ramp rate into the RAMP RATE FOR RAMP STEP box. Select PYROMETER from CONTROL DEVICE drop down menu. 5.6.6.4 Step 3 is a hold step. Enter 3 into the STEP # box. Select HOLD from the OPERATION TYPE drop down menu. Enter desired temperature into the CONTROL TEMPERATUE. Enter desired time (in seconds) into the STEP TIME FOR HOLD STEP box. Select PYROMETER from CONTROL DEVICE drop down menu. 5.6.6.5 Step 4 is a mandatory cool down step. Enter 4 into the STEP # box. Select RAMP DOWN from the OPERATION TYPE drop down menu. Enter 275 into the CONTROL TEMPERATURE. Enter a ramp rate of 100 for the fastest cool down time. A lower value can be entered to control ramp down as needed. Select PYROMETER from CONTROL DEVICE drop down menu. 5.6.6.6 Step 5 is typically an end step. Enter 5 into the STEP # box. Select FINISH from the OPERATION TYPE drop down menu. Enter 0 into the CONTROL TEMPERATURE box and STEP TIME FOR HOLD STEP. Select PYROMETER from CONTROL DEVICE drop down menu. 5.6.6.7 After the recipe is complete, click on the STORE RECIPE button. 5.6.6.8 Jump to paragraph 5.5.5 6.1.1 Ensure controller is displaying the RTP PROCESS PAGE. 6.1.2 Verify that the pyrometer display value is 250 +/- 20. If the value is out of range, there is a problem. Stop processing and contact a CSSER staff member for assistance. The pyrometer reading at room temperature is approximately 250 6.1.3 Turn the nitrogen cooling to 8 SCFM on the flow meter. This flow meter is located on the front panel below the oven. Adjust the valve so that the bottom edge of the float is on 8 SCFM.

Title: Heat Pulse 610 Operating Procedure Page 5 of 7 NOTE: The chamber will be at room temperature and will need a warm-up run before any sample is loaded into the chamber. 6.1.4 Click the INITIAL LEARN ON button to turn the learn mode on. NOTE: The learn mode needs to be turned ON for a new recipe. Also, if the temperature set point is changed. The recipe cannot control the temperature correctly without running the learn mode ON. 6.1.5 Click on the START button. 6.1.6 Ensure that the cooling water flow is a minimum of 2.0 GPM. If the water flow is too low then immediately click the STOP button. Contact a CSSER staff member for assistance. 6.1.7 The recipe will start a cycle. If some issue arises, the STOP button can be clicked at any time. When the STOP button is pushed, the recipe is halted and the lamps are turned off. 6.1.8 When the recipe is finished, a window opens up and states NEXT WAFER or STORE DATA. 6.1.9 If you click on NEXT WAFER, the software will go to the RUN PROCESS page. 6.1.10 If you click on STORE DATA, the software will let you save the graph data in a separate file. 6.1.11 Before opening the chamber, check that the pyrometer display is around 250 and the right side of the oven is cool to the touch. 6.2 Anneal Sample NOTE: It is helpful to place the spare susceptor on the top cover of the oven. This provides a place to put the susceptor lid while loading samples into the susceptor. 6.2.1 Carefully open the chamber door. 6.2.2 Use the vacuum wand and remove the susceptor lid. 6.2.3 Place the sample on the susceptor using plastic tweezers. 6.2.4 Replace the lid and carefully close the chamber door. 6.2.5 Process each sample by repeating steps 6.1.4 to 6.1.10. 6.2.6 Continue to process all samples. It is suggested to run one sample and inspect it before continuing processing. 6.3 Shut Down 6.3.1 Ensure that the cooling N2 and the dark blue chiller are powered off. 6.3.2 Enter the lamp hours, end time and number of process runs into the log book. 6.3.3 Exit the Solaris software by clicking on RETURN TO MENU, EXIT TO START PAGE and EXIT CONTROLLER.

Title: Heat Pulse 610 Operating Procedure Page 6 of 7 7.0 Tables 7.1 Heat Pulse Log Sheet Name Date Time in Time Out Temp/Time Material Lamp Hours

Title: Heat Pulse 610 Operating Procedure Page 7 of 7 7.2 Calibration Files Susceptor Temperature Calibration file yes 350-1000 2-Piece Lid yes 350-1000 4 Susceptor no 400-500 Wafer Cal_400-500 no 501-1000 Wafer Cal_501-1000 8.0 Figures 8.1 None Effective Date Originator DESCRIPTION OF REVISION Issue Todd Eller Original Release O Todd Eller Update after vendor calibration was complete. A 11/05/07 Todd Eller Updated minor procedure errors B 9/03/08 Todd Eller Updated minor procedures C 1/07/09 Todd Eller Added procedure to process without susceptor D 8/4/11 Todd Eller Added warning notes E