Field Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work.

Similar documents
Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work

Field Instruction. Covers laid for mechanical protection of cables must always be removed by hand.

SAFE WORK METHOD STATEMENT FOR: Maintlink PTY LTD

Kennecott Utah Copper Corporation Safety and Health Standards

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS

Field Instruction. The purpose of this instruction is to provide the minimum requirements for managing bush fire risk during Bush Fire Season.

Document Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE

Fume Hood User Guidelines

Field Instruction. Specific requirements from the Local Shire Council for the district in which the work is being undertaken.

SPARC Match Rules v1.2

Hot Work Policy and Procedures

Crane Mechanic (Limited Scope, Non-Commercial Lift) Competency Checklist and Employer Sign-off

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE

Safety in Physical Education Guidance - updated January 2016

Revision: 05/20/15. To provide procedures for the safe and effective use of technical rope rescue equipment during emergency operations.

Swim Around Lido Key Saturday, April 22, 2017 Race and Safety Plan

Disinfection and decontamination

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

Kennecott Utah Copper Corporation Safety and Health Standards

THE FOOTBALL ASSOCIATION DISCIPLINE PROCESS FOR SMALL-SIDED FOOTBALL

ANC Foster Pty Ltd Safety Management System

Red Bus Driver Job Description

CITY OF SACRAMENTO. Regulatory Compliance Program

SPI-SAF-40 Flammable Gas Procedure

Come Back to Ground! 1. Introduction

Kennecott Utah Copper Corporation Safety and Health Standards

HAZWOPER AND HAZWOPER RCRA

GALENA FIRE DEPARTMENT Standard Operating Guideline ICE AND WATER RESCUE. Fire Chief Signature

E25 FATIGUE MANAGEMENT

Exposure Control Plan

Student Name: Application for Employment-Based Field Practicum. DEPARTMENT of SOCIAL WORK

INSTALLATION INSTRUCTIONS

Construction Design and Management

Method Statement January 2018 Service Works

Topic Sheet No. 5 Safe rigging of rope access equipment

Policy Document. Water Safety Policy

2. LIKELIHOOD How likely is it to be that bad? Unlikely Could happen, but very rarely. Very unlikely Could happen, but probably never will

Bus Driver Job Description

TRENCH PERMIT RIDER Pursuant to G.L. cs. 81, 21 and 82A 1, 720 CMR and 520 CMR 7.00 et seq

IRATA Safety Bulletin No. 45

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013

MECHANICS & TECHNIQUES 3PO

Confined Space Entry

VERIFICATION OF COMPETENCY (VOC) Frequently Asked Questions for Individuals

Protecting Trains ANPR 720. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015.

A Guide to Relocating Hazardous Materials

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work.

Safe Storage of Hazardous Chemicals


U00306: Maintain a safe and secure working environment

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

Note: Other Divisions (ex: Research Operations) may have additional or more stringent requirements in addition to this procedure.

URGENT MEDICAL DEVICE RECALL : /29/ C Z

TAS. Emergency Management Services. Workplace Emergency Response WARDEN. Training and Assessment Strategy

NC Sturgeon Safety Management System

Visit Leader Emergency Action Card

Method statement for the erection of temporary inflatable structures that do not require a Temporary Structure Licence

OFFICIAL RULES FIELD:

Winter Youth Indoor League Rules

OPERATING GUIDELINES Registration Scheduling Pre-season In-season 8:00am on Thursday of the week before Instructional Draft Procedures

Brook Cricket Club Pirrie Hall, Haslemere Road, Brook, Surrey, GU8 5UJ

Positive Handling Policy

Code of practice for commercial kangaroo harvesting in NSW

Process Safety Management Program for Contractors

PRE-FILL INSPECTION OF CUSTOMER OWNED CYLINDERS

CONFINED SPACE PROGRAM UNIVERSITY OF TORONTO Revised July 2017 CONFINED SPACES PROGRAM

Handler Skills Is the handler adequately attired and equipped? Did the handler develop the appropriate strategy based on information acquired?

2. Don t Forget Your. Introduction. Activities. Equipment. Setup. A look at the personal and group equipment teams carry for safety and rescue.

Badminton New Zealand Sanctioned Events Information and Time-lines

SAFETY MANAGEMENT SYSTEM

GROVE SCHOOL BIRMINGHAM CITY COUNCIL E-SAFETY POLICY FOR SCHOOLS

Down and Out Mount Assembly & Installation Directions

CONTRACTORS WORKPLACE HEALTH & SAFETY INDUCTION PACK

WORK HEALTH AND SAFETY POLICY

Guidelines for Underground Soft Rock Miner Program # Common Core and Specialty Modules

CWLOA - POSSESSION CLOCK SITUATIONS MECHANICS

STATEMENT OF SAFETY & HEALTH RESPONSIBILITIES Administrative Practice

Espa Pumps (UK) Ltd Riverside Avenue West Lawford, Manningtree Essex CO11 1UN

Prevention Strategies for Concussions PREVENTION: Minimizing the Risk of Concusssions prior during

ESF #5 Emergency Management Annex (1.0)

Contingency Planning: planning for any event that might happen. Consult event Risk Assessment Form:

ASHE ESWP ASCE. Softball Hat Tournament Rules GENERAL TEAMS WAIVER OF LIABILITY SPORTSMANSHIP WEATHER POLICY

ELEVATED WORK PLATFORMS

Side 1 (14) Siste versjon av dokumentet finnes i Simpli. Tittel Attachment to EHS requirements for Contractors Dokumenttype Mal

Guidelines for Handling of Nuclear Gauges

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3

Northern Illinois Food Bank

Demonstrate the adequacy of vehicles, equipment, procedures, and personnel for transporting contaminated, injured, or exposed individuals.

East Sussex Highways Highway Asset Inspection Guidance Document

KYA Baseball Playing Rules Updated 5/8/2017

SETTING UP A CLUB. Westmorland County Football Association Limited. Contacts. Chief Executive Peter Ducksbury

NC Sturgeon Safety Management System

Recreational Sports Racquetball Rules

Fundamentals of Successful Pole Vaulting Anthony Bertoli University of Northern Iowa

Support and management of this policy. Ensure policy is adhered to by all employees.

NORTH-EAST WALES NETBALL ASSOCIATION LEAGUE RULES

PLEASE REVIEW ALL INFORMATION CAREFULLY!

All Students MUST fly with the assistance of a Club approved Instructor until such time as he/she has passed his/her Wings Test.

Transcription:

Field Instructin 10.3 Specialised Insulated Plant fr Vegetatin Management Purpse This instructin utlines the minimum requirements and safe apprach distances (SADs) fr specialised insulated plant peratrs ding vegetatin management wrk. Scpe This field instructin is designed t prtect vegetatin management wrkers using specialised insulated plant frm electric shcks due t step-and-tuch ptentials and shrt-circuits. This is achieved by specifying the SADs and minimum requirements when wrking near pwer lines up t 132 kv. Safety Befre cmmencement f wrk, a risk assessment must be carried ut using the Risk Analysis Prcedure (OSH-3.6-1-02), t identify and dcument the hazards and risks assciated with the task and ensure apprpriate cntrl measures are implemented. It is imprtant that, apprpriate cntrl measures must be identified, dcumented and implemented t lessen r cntrl the identified hazards. Refer t General Safety Requirements in FI 10.6 Vegetatin Management Wrk. Persnal Prtective Equipment (PPE) When undertaking vegetatin management wrk near live r de-energised verhead pwer lines, all vegetatin management wrkers must wear the apprpriate PPE, see (Sectin 2 Safety Field Instructins 2.1, 2.2, 2.5 and FI 2.6 Wrksite Clthing / PPE Requirements) in this manual. Training The minimum requirements t perate a specialised insulated plant are: Trained as a high vltage (HV) vegetatin management wrker, as defined by the Cde f Practice fr Persnnel Electrical Safety fr Vegetatin Cntrl Wrk Near Live Pwer Lines. (July 2012) T be assessed as a cmpetent peratr Cmpetent Operatr An peratr that has nt been recgnised by Hrizn Pwer as cmpetent must be cnsidered as a trainee, and wrk t clearances utside the SADs until assessed as a cmpetent peratr. T be cnsidered as a cmpetent peratr n specialised insulated mbile plant, all f the fllwing requirements must have been achieved. 150 hurs f n-the-jb training while supervised by an experienced and qualified cmpetent peratr the hurs must be lgged and signed by the supervisr must be experienced wrking n relevant vltages levels, wind cnditins, structure cnfiguratin, bay lengths and cnductr spacing CS10 # 2245100 FI 10.3 Specialised Insulated Plant fr Vegetatin Management Page 1 f 6

Field Instructin Pssess written dcumentatin that an independent n-the-jb assessment has been cnducted by an apprved registered training rganisatin (RTO) as a cmpetent peratr n the specialised insulated plant Updated Netwrk authrity Card by Hrizn Pwer shwing cmpetency authrisatin Once an peratr is assessed as cmpetent, they are allwed t wrk t the SADs Hrizn Pwer Permits Permits are required t d vegetatin wrk in sme situatins. T wrk under a permit, a Recipient in Charge (RIC) must be nsite. Ensure that the wrk area Pick ID crrespnds t the permit The permit must be kept nsite in the supprt vehicle r specialised insulated plant fr the duratin f the wrk Mre than ne permit may be issued at any time fr different sectins f the netwrk Recipient in Charge (RIC) An RIC is a persn wh has been assessed as being cmpetent and has been authrised t receive permits The RIC must be able t be cntacted directly by the relevant Operatins Cntrl Centre fr the duratin f the wrk The RIC must ensure vegetatin management wrkers understand and cmply with all requirements f the permit Vicinity Authrity (VA) A VA is required when vegetatin is, r is likely t be, within: the vegetatin clearances as described in Table 1 This is a Hrizn Pwer requirement, and is acknwledged t exceed the requirements described in the Vegetatin Cde f Practice, sectin 6.6. The VA must be cancelled upn cmpletin f the wrk. Where SADs cannt be maintained, wrk must stp and alternative arrangements made, such as scheduling an Electrical Access Permit (see belw). Electrical Access Permit (EAP) When vegetatin management wrk is required within the SAD, an EAP must be issued frm HPCC. The vegetatin management RIC must sign n t the EAP. CS10 # 2245100 FI 10.3 Specialised Insulated Plant fr Vegetatin Management Page 2 f 6

Field Instructin Specialised Insulated Plant Key Safety Pints Field instructin FI 2.7 Safety Requirements when wrking frm a EWP in this manual cvers many pints that are relevant t specialised insulated plant. Specialised insulated mbile plant must nly be used n vltages equal t r less than the bm insulatin rating indicated n the test certificate The specialised insulated plant must be earthed as indicated All persns must maintain the grund apprach distance (GAD) at all times whenever any part f the specialised insulated plant is within duble the SAD (e.g. fr 1 33 kv pwer lines this wuld be 2 x 400 mm = 800 mm) The peratr and safety bserver must be trained and cmpetent in the use f the relevant emergency retrieval systems Safety Observer In additin t the requirements described in FI 2.27 Safety Observer Rle, safety bservers must: maintain effective cmmunicatin with the specialised insulated plant peratr at all times bserve the peratr s blind spts at all times be able t bserve the drp zne at all times Testing prevent access t the drp zne unless access t the zne is prevented by sme ther methd, e.g. a fence, wall r ther effective barrier Specialised insulated mbile plant must: Be electrically tested every six (6) mnths Display a current electrical test sticker r carry an electrical test certificate If the plant des nt meet these requirements, it must nt be used and cnsidered uninsulated. The mbile plant must be withdrawn frm the wrk site if the bm has been subjected t abnrmal mechanical r electrical stresses. Befre it can be returned t service, the mbile plant must: Be mechanically and structurally inspected Be repaired Pass a new electrical test CS10 # 2245100 FI 10.3 Specialised Insulated Plant fr Vegetatin Management Page 3 f 6

Field Instructin Instructin Preparatin Prir t Vegetatin Management Wrk The bm must be cleaned befre use accrding t the manufacturer s specificatins Take special nte f stay wires that may be a hazard when mving the plant nsite r cutting branches Befre starting vegetatin wrk, visually inspect the wrk area and cnductrs fr hazards, e.g. lse wires, hanging wires, burn marks, presence f LV spreaders between cnductrs, lse cnductrs sagging at different heights Wrk Clearances fr Specialised Insulated Plant In rder t minimise the risks f wrking with vegetatin near pwer lines, SADs must be strictly fllwed. In additin, the distance between the vegetatin and the pwer line must als be taken int accunt. Maintain a n cntact wrk methd, i.e. n intentinal cntact between an EWP r branches and the live cnductrs. All cntact must be avided at all times Specialised insulated plant must be perated utside the SADs specified in Table 1 (SADs and vegetatin clearance specialised insulated plant), belw Table 1 SADs and Vegetatin Clearances Under a VA Specialised Insulated Plant Nminal phase t phase ac vltage Specialised insulated mbile plant SADs (mm) Vegetatin within these clearances requires a VA Overhanging, belw and beside the pwerline (mm) (B) (A) LV Physical clearance 700 1-33 kv 400 700 66 kv 600 3000 132 kv* 800 3000 220-330 kv Nt permitted Wrk Methds * Seek permissin frm HPCC befre planning 132 kv wrk The bm must be parked at least twice the SAD distance frm the line if the peratr needs t leave the machine. The peratr s cab dr must be clsed when the bm is being mved r the cutting tl is in mtin, t prtect the peratr frm falling vegetatin and machine malfunctins The specialised insulated plant must nt be: mved while the bm is elevated between cnductrs f the pwer line perated during the hurs between sunset and sunrise CS10 # 2245100 FI 10.3 Specialised Insulated Plant fr Vegetatin Management Page 4 f 6

Field Instructin When the cutting tl is rtating, it is nt permitted t be clser t a live cnductr than the distances stated in Table 1, clumn (A), abve Specialised insulated mbile plant is permitted t cut beside, belw, abve r between live cnductrs When cutting vegetatin verhanging the pwer line: the length f vegetatin cut abve cnductrs is subject t a risk assessment, t ensure the cuttings will nt shrt ut r make cntact with multiple cnductrs. the preferred methd f cutting is in lengths n lnger than 200 mm. Where this is nt pssible due t clearances, cut at lengths n greater than the shrtest distance between cnductrs. the bm may nly be extended thrugh cnductrs t cut vegetatin where: - the cnductr separatin is greater than 1200 mm in any directin. - SADs are maintained by the bm and cutting tl, as indicated in Table 1, clumn (A), abve. The cutting tl must be cmpletely statinary and in a vertical psitin befre passing between pwer lines Wrking thrugh LV and HV at the same time is prhibited Vegetatin hanging n cnductrs may be remved using the machine, but nly when: the peratr and bserver agree that it is safe. the cutting tl is statinary. All wrk must be suspended under the fllwing cnditins Unplanned events when wind causes the vegetatin t fall unpredictably and pssibly cllide with the cnductrs r apparatus when the bm mvements cannt be cntrlled and are greater than 300 mm in any directin during an electrical strm r in the presence f rain, mist, fg, snw r sleet. when the wind speed is abve 40 km/h in lw light cnditins Any uncntrlled cntact between vegetatin, bm r cutting tl with live cnductrs must be immediately reprted, including the time and lcatin f cntact t the issuing fficer, because a feeder may have tripped and/r cnductr damage may have ccurred. If the specialised insulated plant becmes inperable when in an extended psitin between r thrugh cnductrs, the peratr shuld initiate the plant s recvery prcedure. If this is nt pssible, then the peratr must: shut the mbile plant ff, leaving the bm as it is remain in the peratr s cabin f the plant until the bm is mved utside f the SAD r the line has been declared safe by HPCC CS10 # 2245100 FI 10.3 Specialised Insulated Plant fr Vegetatin Management Page 5 f 6

Field Instructin nt attempt t make any unauthrised repairs t the plant keep all persns at least three metres away frm the plant and the RIC must infrm the issuing fficer f the situatin Cutting must be stpped immediately if a persn r animal enters the wrk, cutting r drp znes. Wrk may nly recmmence when they have been remved If a cnductr has been damaged, all wrk must be stpped. All persns in the vicinity f the wrksite must remain at least three metres away frm any damaged cnductr Cuttings HPCC must be infrmed immediately f the situatin and advised f the lcatin and time f ccurrence Cuttings must nt be left in a place that culd cause a hazardus cnditin fr the general public r ther wrkers Cuttings must be remved as the wrk prgresses Cuttings must nt be allwed t accumulate n ther branches as they culd fall r be heavy enugh t break a tree r branch References Department f Cmmerce, Energy Safety: Cde f Practice fr Persnnel Electrical Safety fr Vegetatin Cntrl Wrk near Live Pwer lines, July 2012. Nte: Specialised insulated mbile plant means all-terrain tree trimming machines which are perated frm the grund. References Occupatinal Safety & Heath Act 1984 Occupatinal Safety & Health Regulatins 1996 SHMS OSH-3.6-1-02 Jb Risk Analysis (JRA) Prcedure SHMS OSH-3.6-1-26 Persnal Prtective Equipment SHMS OSH-3.6-1-03 Mbile Plant and Equipment Field Instructin 2.6 Wrksite Clthing / Persnal Prtective Equipment Requirements Field Instructin 2.7 Safety Requirements when Wrking frm an EWP Field Instructin 2.17 Safe Apprach Distances Field Instructin 2.23 Jb Hazard and Risk Management (JRA) Field Instructin 2.27 Safety Observer Rle Persnnel Electrical Safety fr Vegetatin Cntrl Wrk near Live Pwer lines, July 2012. Field Instructin 8.21 Wrk Permits Vegetatin Cde f Practice, sectin 6.6 CS10 # 2245100 FI 10.3 Specialised Insulated Plant fr Vegetatin Management Page 6 f 6