PFC Lightweight Composite Push Up Mast. Operating Manual

Similar documents
HD Mast Series. Installation & Operation Manual

TPM. Telescopic Mast. Operators Manual. Hilomast LLC 402 Chairman Court Debary FL32713 USA Issue 1 Tel: +1 (386)

MLV Mast Series Sectional Tripod Mast, 10-34m (32-110ft)

Type 73 Mast System TELESCOPIC & SECTIONAL MAST SYSTEMS

eye level to high level

USE AND MAINTENANCE LIGHT TOWER

SOLO TRIPOD SERIES Operator s Manual

7m 3 Single Mast RolaCage System User Guide

Cobham Mast Systems. Cobham Mast Systems is the leading manufacturer and supplier of lightweight telescopic composite masts

3, 4 & 5m 3 Single Mast Systems User Guide

Tripod Series OPERATOR S MANUAL

3, 4, 5 & 7m 3 Single Mast Systems User Guide

OPERATOR S MANUAL. The Will-Burt Company 169 S. Main Street Orrville, OH 44667

Repair instructions. Pivot bushing replacement. XL-AS10001RM-en-DE Rev B

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

SETTING THE HANDLE HEIGHT ON THE ROLLATOR

LIGHTWEIGHT TRIWALKER OWNER S HANDBOOK

WEATHERIZING INSTRUCTIONS

INSTALLATION AND USAGE HANDBOOK

3.5m TEAM Lightweight Range Extender ( MHz) User Guide

Cobham Mast Systems. Cobham Mast Systems is the world leader in high performance composite telescopic masts

Installation and Training Manual

User Instructions 1789 Parapet Wall Anchor

Fisher Lever Lock Handlever Actuators for POSI SEAL A81 Rotary Valves

Floor Mount Socket. T: +44 (0) F: +44 (0)

INTRODUCTION BILL OF MATERIALS SPECIFICATIONS & TOOLS PROCEDURES OPERATION OF SEATPOST GIANT LIMITED WARRANTY

DISASSEMBLING & REASSEMBLING CARTRIDGE INSTALLING SEATPOST ON BIKE

Wellhead Mast. Installation and Operation Guide. Nanometrics Inc. Kanata, Ontario Canada

ATS430 turbidity sensor Retractable insertion assembly

Fisher Lever-Lock Handlever Actuators for POSI-SEAL A81 Rotary Valves

WIRE ROPE PULLING MACHINE

k valve 2 (50)HF 2½ (65)SF installation guide aylesbury For valve sizes (DN): tel fax

INSTALLATION INSTRUCTIONS

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

MODEL SWH10 1,000 LB CAPACITY SWIVEL HOIST

1. Product Name. 2. Product Code. 3. Colour. 4. Brief Description. 5. Contents. Itinerant Frame. Likely to be as shown

Assembly, Installation and operating. instructions for. Söll-Xenon anchorage device

ROLLATOR (R6 and R8) OWNER S HANDBOOK

Instruction Manual. PE-25/32/37 Tapping Machines. POLYTAPP Valves

Model No.: SFC-ED Torque Tool Serial No.: SFC Ref No.:

INSTALLATION INSTRUCTIONS PUSH BAR PULLMAN PANIC BOLT DEVICE TO EN 1125 : 2008

contents introduction

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

3.5m Squad IAM (30-300MHz) Range Extender User Guide

AYLESBURY 'KB' TYPE FLOAT VALVES

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Thank you for purchasing a Porta-Dock product! *Please read and follow these instructions step by step*

Model: 5100 OmniSteel Volleyball System

QUALITY IN DESIGN AND MANUFACTURE

GENUINE CARGO NET INSTALLATION AND USER S INSTRUCTIONS

RO LLATO R (R6 and R8) O W NER S HANDBO O K

KAX VALVE ¾ (20) 1 (25) 1¼ (32) 1½ (40)HF 2 (50)SF INSTALLATION GUIDE AYLESBURY FOR VALVE SIZES (DN):

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

MoveRoll Conveyor Operating and Maintenance Manual

PF30 Inspection & Maintenance Manual

Manual winch MANISTOR 100 and 200

Models: C62/63/64-A/D

INDUSTRIAL VALVES MODELS: C62-A; C62-D. INSTRUCTION MANUAL Installation Operation Parts Service DIAPHRAGM BYPASS PRESSURE REGULATING VALVES

10m-130mm Tubular Tower. Technical Specifications

INSTALLATION INSTRUCTIONS. Parts List. Tools Required. Before You Begin. Installation. Customer Information BICYCLE ATTACHMENT JUL.

Mounting and Operating Instructions EB 8546 EN. Supply Pressure Regulator Type Fig. 1 Supply pressure regulators

TRAVSMART permanent single-cable horizontal lifeline system

THE BP-690 SERIES. Operating and Service Manual. Series includes all variants of BP-LF/MF-690/691

USER GUIDE ROLLING WALKERS INSTRUCTIONS FOR USE JANUARY, Maximum User Weight: 170kg (Do not exceed this weight)

Pressure Relief Valve DHV 718

Specifications Testing & Adjusting Disassembly & Assembly

FRONT DERAILLEUR - CURRENT RANGE

RCW-3001 & RCWINCH Please read this document carefully, it gives instructions for the correct use of this product

MSA Confined Space Entry Equipment

Model Copyright 2012 by General Machine Products (KT), LLC

Auto-Rewind Hose Reels INSTRUCTION MANUAL FOR OXY-LPG MODEL

FRONT DERAILLEUR 10/11x3

USER MANUAL. Beach volleyball posts BEACH CHAMP ID:

DO NOT use any Alien Flier Zip Line Products or Accessories until you read and understand these SAFETY WARNINGS!

User Guide. Tripod. flowtech 75 / 100 Tripod. Part No. S S

INSTRUCTIONS FOR CHAIN LINK INSTALLATION

8MAY15 US RACK, Inc Falcon Drive, Madera, CA

Tripod Setup Guide (M-TPx)

User Instruction Manual

DP Spare parts list. Demolition pulverizer. DP 2800 s/n DEQ Construction Tools GmbH No

MSA Latchways Ladder System

SPINNER RIDE GETTING STARTED GUIDE. Welcome to a personalized fitness experience for your members

Trilogy Theory of Operation

k valve ½ (15) ¾ (20) 1 (25) 1¼ (32) 1½ (40)HF 2 (50)SF installation guide aylesbury For valve sizes (DN):

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

SERIES 2 RAMP OWNER S MANUAL TOOLS REQUIRED: BEFORE YOU BEGIN... Read and understand these instructions before beginning a ramp setup.

Universal Elevator Mount Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

Model: 7200 Collegiate Volleyball System

Parts List. 7. Handlebars 8. Grips 9. Handlebar Stem 10. Front Brake 11. Front Wheel 12. Crank 13. Chain

3. Align ratchet drive with female insert on assembly, and raise ratchet handle until the ratchet drive is firmly seated into the assembly.

Assembly Instructions

Mounting and Operating Instructions EB EN. Type Supply Pressure Regulator. with increased air capacity

HITCH MOUNT TWO-ARM BIKE CARRIER

DelVal Flow Controls Private limited

cricket Premier Portable Cage Winch System Heavy Duty Parks Parks Cages Wooden Bays Stumps Netting Sundries cricket

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Nautique Triton Clamping Board Rack V2

AREA VALVE SERVICE UNITS

LSA-BAWMBL. Wall-Mounted Boom Arm INSTRUCTIONS

Transcription:

PFC Lightweight Composite Push Up Mast Operating Manual South Midlands Communications Ltd SM House, School Close Chandlers Ford Industrial Estate Eastleigh, Hampshire SO53 4BY United Kingdom Tel: +44 (0)23 8024 6200 Email: sales@smc-comms.com Web: www.smc-comms.com

Preface SMC - South Midlands Communications Ltd was established in 1958 and initially specialized in antenna support masts, towers and HF antennas. SMC is now recognized globally as a specialist communications company. Over the last 50 years the SMC product range has grown to include pneumatic telescopic masts, aluminium lattice masts, high-level photography solutions, Mil specification antenna positioner s and two way radio products including GPS, AVLS and data transfer. SMC are able to advise, design, supply and install mobile communications systems, from the simple to more complex and integrated networks. Although every care is taken in the production of this publication it may contain technical inaccuracies or typographical errors. SMC may make improvements and or changes in the product detailed in this manual at any time without notice. Correspondence regarding this publication should be addressed to: South Midlands Communications Ltd SM House, School Close Chandlers Ford Industrial Estate Eastleigh, Hampshire SO53 4BY United Kingdom Tel: +44 (0)23 8024 6200 Fax: +44 (0)23 8024 6206 Email: sales@smc-comms.com Web: www.smc-comms.com

Contents Safety Information... 2 Product Information... 4 Long Duration Storage... 4 PFC Specification... 5 Options & Accessories... 6 Set-Up... 6 Guy Assembly... 6 PFC Guy Radii... 7 Base Guy Assembly... 7 Middle & Top Guy Assembly... 7 Installation... 8 Locking Collars... 9 Operating Instructions... 10 Raising the Mast... 10 Lowering the Mast... 10 Maintenance... 11 Notes... 12 Tables Table.1: PFC Specification... 5 Table.2: PFC Guy Radii... 7 Figures Fig.1: Mast Headload & Wind Speed... 5 Fig.2: Guy Assemblies... 6 Fig.3: PFC Guy Radii... 7 Fig.4: Stake Angle... 8 Fig.5: Guy Installation... 8 Fig.6: Locking Collar Spacing... 9 1

Safety Information Always follow the Operating Instructions. PFC Telescopic Masts are considered to be temporary structures and should not be expected to withstand all weather conditions indefinitely. For wind speeds in excess of those stated it is essential for the life of the mast and the safety of the operating personnel, to retract the mast. DO NOT operate the mast in weather conditions that may cause danger to the operators, any personnel or equipment. Do NOT exceed the MAXIMUM weather conditions stated. DO NOT operate the mast outside of the operating temperature range -30 C to +70 C and at wind speeds or head loads in excess of those recommended. Installation must only be carried out by authorised personnel. Ensure the area in which the mast raised is free of any obstructions and power lines. Ensure that the headload is securely mounted to the mast. If Mast Guys are used, once in position they can become a potential trip hazard. Ensure they are either clearly marked with a visual indicator or an exclusion zone around the mast is set up. DO NOT attempt to rotate the mast when the mast guys are in position. Since telescopic masts are essentially composed of sliding sections, care should be taken to keep them clean. Please refer to the Maintenance section. Precautions should be taken to prevent lighting strikes to the mast and equipment installed on it. 2

The warranty will be invalidated in the event that: Recommended service intervals are not maintained.. The mast is operated within a moving vehicle or trailer. Maximum head load or wind load are exceeded. The mast is operated at temperature outside the recommended range. Non-accredited installation, or service work is undertaken. SMC or Hilomast LLC supplied spares are not used. The installation and operating instructions are not adhered to. The locking collar is over tightened. Failure to observe any of the warnings in this manual may result in personal injury, death, or equipment damage. South Midlands Communications Ltd. (SMC)/Hilomast LLC do not accept responsibility or liability for unauthorised use or actions outside of those recommended. 3

Product Information The PFC series of the telescopic masts have a base section diameter of 88.7mm and are operated by hand. The mast sections are made of a fibreglass/carbon fibre sandwich that gives a very lightweight, durable mast. Each section has a locking collar and dampening valves that control the speed at which the mast is lowered. The mast is designed for portable applications such as mobile communication equipment. Long Duration Storage If possible, store in an upright position. 4

PFC Specification Model PFC 7.5 PFC 9 PFC 12 A B Extended Height Retracted Height Max Vertical Load Max Wind Guyed Max Sail Area m 7.3 9.03 12.4 ft 23.9 29.6 40.4 m 1.92 2 2.1 ft 6.3 6.6 6.9 kg 12 10 9 Ib 26.5 22 19.8 kmph 120 100 85 mph 74.6 62.1 52.8 cm2 1400 1400 1400 in2 217 217 217 Table.1: PFC Specification Fig.1: Mast Headload & Wind Speed NOTE: The specification shows the maximum vertical head load the mast will support the maximum operational wind speed. The wind speeds shown are based on rectangular square plate with a drag coefficient of 1.2 and a side surface area of 1400cm 2 217in 2. 5

Options & Accessories Nato Spigots are available, for interfacing between the mast and antenna. U-bolts and clamps are available to fasten antennas directly to the top section of the mast. Halyard Kits are also an option. DO NOT over tighten clamps as this can damage the mast. Set-Up For erecting masts on open ground, Base Guy Assemblies are available as they are the strongest / best suited for field mounting. Base guys are the minimum mounting arrangement available for the installation of the PFC mast series however, middle and top guys are provided for use in inclement weather conditions and to add directional stability. Guy Assembly The kit is complete with mast fittings, three guys (base, middle and top), adjusters, base plate, ground stakes and pegs. Ensure the Guy Ropes are kept under constant tension at all times and that the Guy Stakes are securely inserted into the ground. For continued deployment CHECK regularly. The Guy Ropes can become a potential hazard when the mast is being raised and lowered, care should be taken to prevent the Guy Ropes snagging or striking any obstructions or personnel. Particular care should be taken in adverse weather conditions. When the Guy Ropes are in position they could be a potential trip hazard. Ensure they are either marked with a visual indicator or set up an exclusion zone around the mast. Fig.2: Guy Assemblies 6

PFC Guy Radii Mast Metres Feet PFC 7.5 3.5 11.5 PFC 9 4.5 14.7 PFC 12 6 19.7 Table.2: PFC Guy Radii 120º Fig.3: PFC Guy Radii Base Guy Assembly The Base Plate incorporates a PTFE disk to permit rotation of Mast and thumbscrew for locking in any azimuth direction. NOTE: The mast cannot be rotated with the guys attached The Base Guy Assembly comprises of a base guy collar that is supplied in two halves. The assembly also comprises of three pre-stretched polyester ropes, fitted with guy ropes, grips and three carbine hooks. Middle & Top Guy Assembly The Middle and Top Guy assemblies comprise the same parts as the Base Guy Assembly, but the rope lengths are different. NOTE: The different guy kits are identifiable by different coloured markers: Top - Red Middle - Blue Base - Black / Natural NOTE: When setting up the mast the guy collars should be set as close the top collar on the base and intermediate tubes and the top of the top tube as practical and when setting up on open ground the ground stakes should be set at radius R1, shown in Table.2. 7

Installation Securely insert the Guy Stakes into the ground at a 60-45 angle (See Fig.4) around the mast at R1 (See Table.2) at an angle of 120 between Guy Ropes. Fig.4: Stake Angle Using the base guy rope assemblies attach one end of the rope to the stake, once all three guys are attached to the stakes, position the mast into the base plate and attach the base guys. Lock the mast into the base plate using the thumbscrew. Top Middle Retaining Screw Base Guy Ring Fig.5: Guy Installation Tension the guy ropes. Attach the mid and top guy ropes to the mast first and then onto the stakes. Ensuring that the above stages were completed correctly, the mast is now ready to be raised. 8

Locking Collars The Locking Collars are used to lock each of the Mast Sections in position as the Mast is being raised. Each Locking Collar is fitted and clamped by means of a Thumbscrew. These Thumbscrews are fitted on alternate sides of the Mast to give maximum operational clearance (See Fig.6). For conditions where the Thumbscrews are considered to be an obstruction for the feeder cables, it is possible for these Thumbscrews to be replaced with socket head cap screws. These can be tightened with a 6mm Allen key. The locking collars are adjusted during assembly. However, if any locking collar is not clamping the section securely when fully tightened, it should be released and the socket screw or thumbscrews adjusted until the clamping action is sufficient. As a guide the gap should be equal when the locking collar has been tightened. If one side is closed too much, the mast section may not release properly. Equal on both sides Fig.6: Locking Collar Spacing DO NOT over tighten socket screw or thumbscrew. A torque of no more than 2Nm is recommended 9

Operating Instructions Ensure the mast fixings i.e. mast base plate and the base guy ropes are secure before raising the mast. Raising the Mast All locking collars with the exception of the top one should be securely tightened by turning the thumbscrew in a clockwise direction. Attach the middle and top guys (if required) Raise the top section by hand. When the top section is fully extended tighten the thumbscrew. Release the thumbscrew on the next section down and push up the next section. When that section is fully extended tighten the thumbscrew. DO NOT over tighten socket screw or thumbscrew. A torque of no more than 2Nm is recommended Repeat these stages until the mast is fully extended. Once the mast is fully extended attach the middle and top guy ropes to the ground stakes and tension the guy ropes. Lowering the Mast Un-clip the middle and top guys from the ground stake (if used) Release the thumbscrew on the lowest collar, the section above will retract. Tighten the thumbscrew to secure section. Release the thumbscrew on the next section, the section above that will retract. Tighten the thumbscrew to secure section. Repeat these stages until the mast is fully retracted. NOTE: The rate of retraction cannot be increased. When lowering the mast take care to keep hands clear of collars and thumbscrews. 10

Maintenance Inspect the mast sections at four-week intervals or every 200 operations, whichever occurs first. If the mast has been used in a dusty environment resulting in a build up of contaminants on the surface of the tubes, then this must be removed. Wiping each section with a cloth can do this. If any other maintenance is required, return the mast and guy kit to SMC. 11

Notes 12