CAMPO 2040 Regional Transportation Plan

Similar documents
CAMPO 2040 Regional Transportation Plan

CAMPO 2040 Regional Transportation Plan

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road.

Capital Area Metropolitan Planning Organization Project Call

DRAFT INVESTMENT CORRIDORS

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

Proposed Action, Purpose and Need Technical Memorandum

Short and Long Term Needs

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

TECHNICAL ADVISORY COMMITTEE MEETING Monday, March 26, 2018 University Park, Suite N. IH 35, Austin, Texas :00 p.m.

NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

APPENDIX D COST SUMMARY TABLES

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

RM 620 FEASIBILITY STUDY

City of Buda. Transportation Master Plan Update. June 2012

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

2016 MOBILITY BOND PROGRAM

Bluffdale/ UDOT South High-T Intersection Project Type Operations

"Mobility 2040" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Project Fact Sheet. August 1,

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St

AVAILABLE AVAILABILITY OVERVIEW

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028

2012 PRIORITY TRANSPORTATION PROJECTS

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

Safety. Rural. District. Strategic Projects $4,150, to Maple Streett $6,117,000. west of Conway BNSF railroad. Georgia Street $549,080

2017 Austin Middle School Rankings

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

a 20 year period. separate phases of development with staggered years)

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

FY 2006 TRANSPORTATION CAPITAL PROGRAM

AVAILABLE AVAILABILITY OVERVIEW

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Proposed Project I 35 from Denton to Cooke County Line

July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007

I also hope you can maintain easy access to my property through the construction process.

Regional Goals. Goal 1: Reduce congestion and impact of incidents on I-81 and I-64.

TXDOT LAUNCHES PEDESTRIAN SAFETY CAMPAIGN TO ADDRESS PEDESTRIAN FATALITIES AND INJURIES IN AUSTIN

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

183 North Mobility Project Community Survey Report

Section 1 - North Lamar: Tech Ridge to US 183

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

FDOT Treasure Coast Traffic Impact Report

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 3: Draft List of Facilities.

CITY OF LANCASTER PROPOSED NEW PROJECTS

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Bridges and Arizona Crossings

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

RM 620 FEASIBILITY STUDY SURVEY RESPONSES

Chapter 5 Future Transportation

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

PLEASE BE ADVISED THAT SOME OF THE INFORMATION IN THIS PRESENTATION IS OUTDATED SO IT IS ABLE TO SHOW CHANGES IN THE PLAN OVER TIME.

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FDOT Treasure Coast Traffic Report

TRASBURG RANSPORTATION

FDOT Treasure Coast Traffic Report

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

APPENDIX L: COST ESTIMATING TOOLS

February 26, 2013 Presentation Overview of Proposed Roadway Network and Intersection Improvements Bond Program

2007 UNSCHEDULED PROJECTS LIST PRIORITIES / RANKINGS / 6YP SEPTEMBER 2007 PURCHASE

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

Access Routes from US 101 to the Richmond San Rafael Bridge

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

GENERAL DESCRIPTION. Page 1 of 5

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

Agenda Item No. 6C ATTACHMENT 1

INDEX. Geometric Design Guide for Canadian Roads INDEX

Duwamish Way-finding and CTR Report

Pedestrian Improvements Kemp Blvd Wichita Falls (Midwestern Pkwy to Southwest Pkwy)

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

Classification Criteria

Regional Transportation Committee (RTC) 10-Year Project Milestone Policy. Transportation and Trinity River Project Committee October 26, 2015

MPO PROPOSITION 1/CATEGORY 2 PROJECTS (METROPOLITAN CORRIDORS)

State Route 160 (Blue Diamond Highway)

FY Regional Transportation Improvement Program

5 CIRCULATION AND STREET DESIGN

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

2019 Federal Transportation Improvement Program

FDOT Treasure Coast Traffic Impact Report

2040 Long Range Plan Projects Draft October 2011

connections 2040 the waco metropolitan transportation plan amendment 2

Welcome to the Sellwood Bridge Project Open House!

Bay to Bay Boulevard Complete Streets Project

Transcription:

11-00001-00 TxDOT Bastrop US 290 1 Mile East of FM 696 8.864 Miles East of FM 696 Widen to a 4-lane divided. 2018 $50,303,707.00 11-00002-00 TxDOT Bastrop FM 2571 SH 304 SH 95 Full Depth, Level-up and seal coat. 2017 $1,441,999.00 11-00003-00 TxDOT Bastrop US 290 FM 2104 Lee County Line Widen to 4-Lane Divided 2018 $29,872,318.00 11-00005-00 TxDOT Bastrop SH 21 1.187 MI W of SH 95.668 MI W of SH 95 Construct Frontage Roads and Bridge. 2019 $37,660,345.76 11-00006-00 City of Smithville Bastrop SH 95 Smithville High School LP 230 at Fawcett Street Widen SH 95. 2019 $3,800,000.00 11-00007-00 Bastrop County Bastrop SH 21 SH 71 Caldwell County Line Construct MAD-4 or Super 2 2023 $5,646,000.00 11-00008-00 TxDOT Bastrop SH 71 west of Colorado River east of Loop 150 E Construct 4-lane freeway with 3-lane frontage roads 2015 $45,400,000.00 11-00009-00 Smithville Bastrop SH 95 Loop 230 Smithville High School Add continuous turn lane and sidewalks (both sides) 2015 $4,200,000.00

11-00010-00 Elgin Bastrop FM 1100 Travis County Line SH 95 Construct MAD-4 2040 $24,200,000.00 11-00011-00 City of Bastrop Bastrop Blakely Lane Extension Blakely Lane Jessica Place Plan alignment and construct extension of Blakely Lane east of Burleson Crossing to connect to Jessica Place in Riverside Grove between Hawthorne Street and Cedar Street as a curb and 11-00012-00 City of Bastrop Bastrop Hasler Boulevard Marie Street Hwy 304. Plan alignment and construct extension of Hasler Boulevard west of Marie Street to connect to Hwy 304 at Hunters Point Drive. Curb and gutter roadway with sidewalk. Collector 11-00013-00 City of Bastrop Bastrop Mesquite Street Mesquite Street Reids Bend (CR 41) Re-construct Mesquite Street west to connect to Reids Bend (CR 41) 2021 $1,200,000.00 2019 $2,900,000.00 2025 $2,900,000.00 11-00014-00 Bastrop County Bastrop Arterial Street Improvement Program. - $5,100,000.00 11-00015-00 City of Bastrop Bastrop Arterial Street Improvement Program. - $25,900,000.00 11-00016-00 Smithville Bastrop Arterial Street Improvement Program. - $4,600,000.00 11-00017-00 TxDOT Bastrop SH 71 Intersection at FM 1209 Construct overpass. 2024 $26,000,000.00

11-00018-00 TxDOT Bastrop SH 71 Intersection at Pope Bend Road Construct overpass. 2024 $26,000,000.00 11-00019-00 TxDOT Bastrop FM 812 Travis County Line SH 21 Improve 2-lane roadway to MAD-4. 2025 $10,000,000.00 11-00020-00 TxDOT Bastrop SH 71 Intersection at Tucker Hill Lane Construct overpass. 2021 $24,000,000.00 11-00021-00 Bastrop County Bastrop FM 1704 FM 969 TX 71 Extend FM 1704 south of FM 969 and connect to Colorado Dr. via a new bridge across the Colorado River; upgrade Colorado Dr. to an arterial from bridge to SH 71 2040 $20,433,000.00 11-00022-00 Bastrop County/City of Bastrop Bastrop SH 304 SH 304 at Shiloh Rd. Lovers Lane 0.3 Miles South of SH 71 Construct new road connecting SH 304/ Shiloh Rd intersection with Lovers Lane via a new bridge across the Colorado River - includes a connection to Margie's Way. 2040 $8,400,000.00 11-00023-00 Bastrop County Bastop Old Lexington Road/ FM 3000 0.365 Miles West of Racoon Road FM 696 Realign Old Lexington Rd. and upgrade to minor arterial; extend Old Lexington Rd. to FM 696 to the east 2040 $3,406,000.00 11-00024-00 Bastrop County Bastrop New Road 2.267 Miles East of Wolf Lane SH 71 0.277 Miles West of SH 304 Construct a new arterial road connecting SH 71 to Pearce Lane/FM 535 2040 $9,111,000.00 11-00025-00 Bastrop County/City of Bastrop Bastrop Shiloh Rd SH 20 SH 304 Upgrade Shiloh Rd. to a collector from SH 20 to SH 304 2040 $1,382,000.00

11-00026-00 TxDOT Bastrop SH 21 Caldwell County Line SH 71 PROVIDE SUPER 2 PASSING LANES 2018 $4,656,528.00 11-00027-00 TxDOT Bastrop US 290 1.0 Miles East of FM 696 8.864 Miles East of FM 696 Reconstruct existing 4-Lane undivided roadway to a 4-Lane divided roadway 2019 $44,456,558.53 11-00028-00 TxDOT Bastrop US 290 FM 2104 Lee C/L Reconstruct existing 4-Lane undivided roadway to a 4-Lane divided roadway 2019 $29,000,875.67 11-00029-00 TxDOT Bastrop US 290 8.864 Miles East of FM 696 9.12 Miles East of FM 696 Reconstruct existing 4-Lane undivided roadway to a 4-Lane divided roadway 2019 $2,119,101.19 11-00030-00 TxDOT Bastrop SH 71 At FM 1209 Construct 2-Lane Overpass 2021 $46,381,883.25 11-00031-00 TxDOT Bastrop SH 71 At Pope Bend Rd. Construct 2-Lane Overpass 2020 $33,293,974.25 11-00032-00 TxDOT Bastrop SH 71 Travis / Bastrop County Line.65 Miles East of Tucker Hill Lane Construct Overpass and Add 2 Lane One-Way Eastbound And Westbound Frontage Roads 2020 $24,535,803.38 11-00033-00 TxDOT Bastrop SH 21 1.187 Miles West of SH 95 0.668 Miles West of SH 95 Convert Existing 2-Lane 2-Way Frontage Roads To 2-Lane One-Way Frontage Roads Over Colorado River 2019 $30,179,771.11

11-00034-00 TxDOT Bastrop SH 21 0.668 Miles West of SH 95 0.268 Miles West of SH 95 Convert Existing 2-Lane Two-Way Frontage Roads To 2-Lane One Way Frontage Roads 2019 $17,475,675.12 11-00035-00 City of Bastrop Bastrop CS Bastrop State Park Chestnut Street at Loop 150 Construct Multi-Use Path 2020 $1,628,302.97 11-00036-00 TxDOT Bastrop SH 95 LP 230 FM 535 Upgrade from a 2-lane rural to a 3- lane urban roadway with continuous left-turn lane 2021 $8,985,397.00 12-00000-00 City of Smithville Bastrop SL 230 SH 95 to Olive Street Bluebonnet Circle to Webb Street ADA sidewalks. 2018 $591,093.00 12-00001-00 City of Bastrop Bastrop CS Bastrop State Park LP 150 at Chestnut Street Construct multi-use path. 2019 $1,450,000.00 12-00002-00 City of Bastrop Bastop VA Old Austin Highway Walnut Street Complete 1.8 mile ''River Loop'' shared-use path along Loop 150, SH 71, Water St, and Main St 2019 $812,000.00 21-00001-00 TxDOT Burnet US 281 RM 2147 East.466 Mi North of SH 71 Add Center Left Turn Lane and Shoulders 2018 $9,502,732.00 21-00002-00 Burnet County Burnet Arterial Street Improvement Program. - $87,700,000.00

21-00003-00 City of Burnet Burnet Arterial Street Improvement Program. - $11,800,000.00 21-00004-00 Marble Falls Burnet Arterial Street Improvement Program. - $12,000,000.00 21-00005-00 TxDOT Burnet US 281 Intersection at SH 71 Reconstruct interchange. 2025 $55,000,000.00 21-00006-00 Burnet County Burnet SH 29 RM 243 North Williamson County Line Reconstruct from 4-lane to four 11- foot lanes, 12-foot continuous turn lane and 5-foot shoulders 2021 $5,184,000.00 21-00007-00 Burnet County Burnet US 281 SH 71 Blanco County Line Reconstruct from 4-lane to four 12- foot lanes, 14-foot continuous turn lane and 10-foot shoulders 2021 $5,616,000.00 21-00008-00 Burnet County Burnet US 281 Nature Heights Drive Lantana Drive Construct curb and gutter, sidewalks and shoulders 2021 $1,430,000.00 21-00009-00 Burnet County Burnet Wirtz Dam Road RM 1431 RM 2147 Engineering and Design of Bridge and Approaches 2019 $2,981,250.00 21-00010-00 Burnet County Burnet SH 71 Spur 191 Blanco County Line Reconstruct from 4-lane to four 12- foot lanes, 14-foot continuous turn lane and 10-foot shoulders 2021 $9,720,000.00

31-00001-00 Hays County Caldwell SH 80 CR 266.215 Mi E of CR 266 Install left turn lane 2019 $932,226.00 31-00002-00 Caldwell County Caldwell CS SH 142 Clear Fork Street Engineering for a 4-lane roadway. 2019 $200,000.00 31-00003-00 TxDOT Caldwell SH 80 SH 21 FM 1984 Complete gap in shoulder for bicycle travel. 2019 $5,400,000.00 31-00004-00 Caldwell Caldwell SH 21 Hays County Line SH 130 Widen to 4 lanes 2025 $12,500,000.00 31-00005-00 Caldwell Caldwell SH 80 FM 1979 SH 130 Widen to 4 lanes 2025 $55,900,000.00 31-00006-00 Caldwell Caldwell SH 80 County Line Road FM 1979 Widen to 6 lanes with raised median 2035 $100,400,000.00 31-00007-00 Caldwell Caldwell SH 142 SH 80 Yarrington Road Extension Widen to 4 lanes 2025 $8,800,000.00 31-00008-00 Caldwell Caldwell SH 142 Yarrington Road Extension FM 150 Extension Widen to 4 lanes 2025 $40,300,000.00

31-00009-00 Caldwell Caldwell SH 142 FM 150 Extension SH 130 MAD 4 2025 $104,000,000.00 31-00010-00 Lockhart Caldwell FM 2001 Expansion / Silent Valley Rd.14 Miles south of SH 142 Silent Valley Rd Northward extension of City Line Road from a point.14 miles south of SH 142 to intersect Silent Valley Road 2040 $1,200,000.00 31-00011-00 Lockhart Caldwell City Line Road Extend City Line Rd from Clear Fork St FM 20 Construct new roadway 2035 $7,800,000.00 31-00012-00 Lockhart Caldwell City Line Road Extend City Line Rd south and southeast from FM 20 to and along MLK Jr Industrial Blvd US 183 Construct new 4-lane arterial 2035 $5,600,000.00 31-00013-00 Lockhart Caldwell City Line Road SH 142 Clear Fork Rd Rehab and widen to 4 lanes 2035 $3,600,000.00 31-00014-00 Lockhart Caldwell CR 214 / Graham Road Connect CR 215 US 183 via CR 214 Alternate to New Roadway 85 2035 $5,600,000.00 31-00015-00 Lockhart Caldwell E MLK Jr Industrial Blvd Extend E MLK Jr Industrial Blvd FM1322 New MAU-4 2040 $2,200,000.00 31-00016-00 Lockhart Caldwell N Mockingbird Lane Extend Mockingbird Ln Silent Valley Rd. New MAU-4 2040 $10,800,000.00

31-00017-00 Lockhart Caldwell New Roadway 30 US 183 flood events Proposed alternative to FM 1322 2035 $11,700,000.00 31-00018-00 Lockhart Caldwell New Roadway 34 FM 1322 CR 203. Construct new roadway 2035 $3,800,000.00 31-00019-00 Lockhart Caldwell New Roadway 46 CR 215 CR 213/Robin Ranch Rd Construct new roadway 2035 $3,500,000.00 31-00020-00 Lockhart Caldwell New Roadway 47 CR 221 SH 130 at Plum Creek U- turn bridge Construct new roadway 2035 $10,900,000.00 31-00021-00 Lockhart Caldwell San Jacinto Street FM 20 MLK Jr Industrial Blvd Construct new roadway 2035 $7,700,000.00 31-00023-00 Caldwell Caldwell Arterial Street Improvement Program. - $8,900,000.00 31-00024-00 Lockhart Caldwell Arterial Street Improvement Program. - $6,600,000.00 31-00025-00 TxDOT Caldwell SH 21 Hays County Line Bastrop County Line Provide super 2 passing lanes. 2022 $14,900,000.00

31-00026-00 TxDOT Caldwell SH 21 Hays County Line Bastrop County Line PROVIDE SUPER 2 PASSING LANES 2018 $4,889,356.00 31-00028-00 Hays County, TxDOT Caldwell FM 110 SH 80 SH 21 Construct Two Lanes And Shoulders 2019 $29,964,711.47 31-00030-00 Hays County, TxDOT Caldwell FM 110 Hays County Line SH 80 Construct Two Lanes And Shoulders 2019 $7,903,525.37 31-00033-00 Caldwell County Caldwell FM 150/Yarrington Road SH 21 (Hays) SH 130 (Caldwell) Design and Engineering for 7-Mile Extension of FM 150, 10-mile Extension of Yarrington Road 2019 $121,933,935.00 35-00001-00 Caldwell County Caldwell US 183 US 183 North of Luling US 183/SH 80 South of Luling Alternatives analysis for relief route. 2017 $225,000.00 41-00001-00 Travis Travis IH 35 Yarrington Road RM 150 Mill, Seal, and TOM 2017 $1,811,693.00 41-00002-00 Hays County Hays IH 35.741 Miles N. of Posey Road Comal County Line Replace Bridges and Approaches 2020 $34,205,103.00 41-00003-00 TxDOT Hays IH 35 River Ridge Parkway FM 150 Mill, Seal, and Tom 2017 $1,403,384.00

41-00005-00 City of Wimberley/Hays County Hays RM 12.13 Miles North of RM 3237.12 Miles South of RM 3237 Engineering, design, and ROW purchase to add turn lanes and pedestrian crossing. 2019 $246,167.00 41-00006-00 Hays County Hays SH 80.215 Mi W of CR 266 CR 266 Install left turn lane 2019 $932,226.00 41-00007-00 TxDOT Hays SH 21.114 Mi West of FM 2001 Caldwell County Line Repair, Level-up, Widen and Overlay 2017 $5,387,294.00 41-00008-00 City of Wimberley/Hays County Hays RM 3237 RM 12.22 Miles East of RM 12 Engineering, Design, and ROW purchase to add turn lanes and ped crossing 2019 $246,167.00 41-00009-00 City of San Marcos Hays CS LP 82 Commanche Street Intersection, signal, and bicycle and pedestrian improvements. 2017 $2,603,345.00 41-00011-00 Hays County Hays FM 2770.955 Miles South of SL 4 1.414 Miles South of SL 4 Add left turn lane and shoulders. 2019 $1,138,023.00 41-00012-00 CTRMA/TxDOT Hays SH 45 Travis County Line FM 1626 Construction of a 4-lane tolled freeway (Project may be phased) 2017 $41,500,000.00 41-00013-00 Hays County Hays FM 2001 IH 35 SH 21 Widen to a 4-lane divided roadway by add two lanes and shoulders. 2017 $34,626,340.00

41-00014-00 TxDOT Hays SH 123 IH 35 DeZavalla Construct Sidewalks 2018 $815,000.00 41-00015-00 City of San Marcos Hays CS Hopkins Street from Moore Street Bishop Street Reconstruct Hopkins Street from Bishop Street to Moore Street per the City's Complete Streets Policy. 2018 $3,050,000.00 41-00016-00 City of San Marcos Hays CS Hopkins Street from CM Allen Pkwy Thorpe Road Design and construct multi-use bike/ped facility that connects existing Crosstown hike and bike trails to existing facility. 2020 $2,800,000.00 41-00017-00 City of Kyle Hays Dorman Lane At FM 1626 Feasibility study for proposed improvements at the intersection. 2017 $150,000.00 41-00018-00 TxDOT Hays IH-35 - Hays County SH 45 SE Posey Rd. IH-35 Improvement Projects 2020 $1,500,000,000.00 41-00019-00 Buda Hays IH-35 / OSR Connector Old San Antonio Rd IH-35 New 2-lane undivided 2018 $100,000.00 41-00020-00 Hays Hays US 290 W Blanco County Line RM 165 MAD-4 2030 $25,900,000.00 41-00021-00 Hays Hays US 290 W RM 165 NF 2. MAD-4 2030 $25,900,000.00

41-00022-00 Hays Hays US 290 W RM 12 Nutty Brown Rd MAD-6 2035 $21,800,000.00 41-00023-00 San Marcos Hays Loop 82 LBJ Dr IH-35 (Two way) MAD-4 2035 $1,200,000.00 41-00024-00 San Marcos Hays Loop 82 (Phase 1) Guadalupe St/Grove St LBJ Dr (One way) MAD-4 2035 $200,000.00 41-00025-00 San Marcos Hays Loop 82 / Aquarena Springs Dr IH-35 Sessom Dr. MAD-4 2035 $5,100,000.00 41-00026-00 San Marcos Hays Loop 82 / Guadalupe University Dr Grove St (One way SB) MAD-4 2035 $3,800,000.00 41-00027-00 San Marcos Hays Loop 82 / LBJ University Dr Grove St (One way NB) MAD-4 2035 $2,400,000.00 41-00028-00 San Marcos Hays Loop 82 / University Dr Sessom Dr Guadalupe St. MAD-4 2035 $2,000,000.00 41-00029-00 Hays Hays SH 21 Caldwell County Line CR 159 (Yarrington) MAD-6 2030 $40,400,000.00

41-00030-00 Hays Hays SH 21 CR 159 (Yarrington) SH 80 MAD-6 2030 $32,200,000.00 41-00032-00 Hays Hays SH 80 SH 21 Caldwell County Line MAD-6 2030 $2,100,000.00 41-00033-00 San Marcos Hays SH 80 IH-35 SH 21. MAD-4 2035 $3,600,000.00 41-00034-00 San Marcos Hays SH 80 / E Hopkins Moore St Loop 82. MAD-4 2035 $1,200,000.00 41-00035-00 San Marcos Hays SH 80 / E Hopkins Loop 82 CM Allen. MAD-4 2035 $500,000.00 41-00036-00 San Marcos Hays SH 80 / E Hopkins CM Allen IH-35. MAD-4 2035 $3,800,000.00 41-00037-00 San Marcos Hays SH 80 / Old RR 12 RM 12/Wonder World Dr Holland St MAD-4 2035 $7,200,000.00 41-00038-00 San Marcos Hays SH 80 / Old RR 12 Holland St Lindsey. MAD-4 2035 $2,200,000.00

41-00039-00 San Marcos Hays SH 80 / Old RR 12 / Moore St Lindsey Hopkins. MAD-4 2035 $700,000.00 41-00040-00 Hays Hays SH 80 at Old Bastrop Hwy (CR 266) East of Old Bastrop Hwy (CR 266) East of Old Bastrop Hwy (CR 266) Construct center left-turn lanes 2016 $1,500,000.00 41-00041-00 Hays Hays SH 123 Wonder World Dr Guadalupe County Line MAD-6 2025 $10,000,000.00 41-00042-00 San Marcos Hays SH 123 IH-35 FM 621. MAD-6 2025 $6,600,000.00 41-00043-00 San Marcos Hays SH 123 FM 621 Wonder World Dr MAD-6 2030 $700,000.00 41-00044-00 Hays Hays FM 110 E - Phase 1 Interim IH-35 N SH 123. MAD-2 2015 $61,500,000.00 41-00045-00 Hays Hays FM 110 E - Phase 2 Ultimate IH-35 N Turnersville Rd Extension (NF 1) MAD-4 2030 $4,500,000.00 41-00046-00 Hays Hays FM 110 E - Phase 2 Ultimate Turnersville Rd Extension (NF1) SH 123 MAD-4 2030 $26,600,000.00

41-00047-00 Hays Hays FM 150 Extension / NF 17 (Kyle) FM 150 Kyle Loop. MAD-4 2025 $10,400,000.00 41-00048-00 Hays Hays FM 150 W RM 12 RM 1826. MAD-4 2025 $5,700,000.00 41-00049-00 Hays Hays FM 150 W RM 1826 FM 3237. MAD-4 2025 $15,600,000.00 41-00050-00 Hays Hays FM 150 W FM 3237 Kyle Loop SW MAD-4 2025 $12,500,000.00 41-00051-00 Hays Hays FM 150 W Kyle Loop SW FM 2770 MAD-4 2025 $3,100,000.00 41-00052-00 Kyle Hays FM 150 W / Center St Rebel Dr IH-35. MAD-2 2025 $11,000,000.00 41-00054-00 Hays Hays FM 165 US 290 Blanco County Line MAU-2 2030 $23,100,000.00 41-00055-00 Hays Hays FM 621 / Staples Rd SH 123 Guadalupe Line. MAU-2 2025 $14,800,000.00

41-00056-00 Hays Hays FM 967 FM 1626 Main St. MAD-2 2020 $13,800,000.00 41-00057-00 Hays Hays FM 967 FM 1826 FM 1626. MAU-4 2025 $17,400,000.00 41-00058-00 Hays Hays FM 967 / S. Loop 4 / S. Main St Main St W Goforth. MAU-4 2020 $1,700,000.00 41-00059-00 Hays Hays FM 967 / S. Loop 4 / S. Main St W Goforth IH-35. MAU-4 2020 $700,000.00 41-00060-00 Buda Hays FM 1626 0 FM 967 Widen to 4-lane divided 2013 $49,300,000.00 41-00061-00 Hays Hays FM 1626 FM 967 FM 2770. MAD-4 2015 $40,000,000.00 41-00062-00 Hays Hays FM 1626 SH 45 SW IH-35. MAD-6 2030 $49,800,000.00 41-00063-00 Hays Hays FM 2439 / Hunter Rd Bishop RM 12/Wonder World Dr MAD-2 2020 $3,600,000.00

41-00064-00 San Marcos Hays FM 2439 / Hunter Rd SH 80 Bishop. MNR-2 2020 $4,400,000.00 41-00065-00 Hays Hays FM 2439 / Hunter Rd Centerpoint Rd Comal County Line MAD-4 2025 $5,200,000.00 41-00066-00 Buda Hays FM 2770 FM 1626 Main St. Widen to 4-lane undivided 2024 $20,400,000.00 41-00067-00 Kyle Hays FM 2770 FM 1626 FM 150. MAD-4 2025 $20,500,000.00 41-00068-00 Hays Hays RM 12 FM 150 W Winters Mill Pkwy MAD-2 2025 $61,000,000.00 41-00069-00 Hays Hays RM 12 FM 3237 RM 32. MAD-2 2025 $24,500,000.00 41-00070-00 Hays Hays RM 12 Fitzhugh Rd FM 150 W MAD-4 2025 $5,800,000.00 41-00071-00 Hays Hays RM 12 FM 2439/Hunter Rd SH 123 MAD-6 2025 $4,500,000.00

41-00072-00 Hays Hays RM 12 Winters Mill FM 3237. MAD-2; designate as BR 12 2025 $11,700,000.00 41-00073-00 Hays Hays RM 12 RM 32 Old RR 12/SH 80 PKWY-4 2025 $96,200,000.00 41-00074-00 Wimberley Hays RM 12 and FM 3237 Intersection Improvement RM 12 - north and south of FM 3237 - FM 3237 east of RM 12 Engineering, design and right-of-way purchase to add turn lanes and pedestrian crossings 2016 $400,000.00 41-00075-00 Hays Hays RM 32 Comal County Line RM 12 MAD-2 2030 $25,900,000.00 41-00076-00 Buda Hays RM 967 Goforth Rd IH-35. Widen to 4-lane undivided 2017 $17,300,000.00 41-00077-00 Hays Hays RM 1826* SH 45 SW Nutty Brown Rd Improve to MAD-4 2025 $13,600,000.00 41-00078-00 Hays Hays RM 1826 Nutty Brown Darden Hill. MAD-4 2025 $5,800,000.00 41-00079-00 Hays Hays RM 1826 Darden Hill Rd FM 150 (W) MAD-4 2025 $5,800,000.00

41-00080-00 Hays Hays RM 2325 Blanco County Jacob's Well. MAD-2 2025 $39,600,000.00 41-00081-00 Hays Hays RM 2325 Jacob's Well Wimberley City Limits MAD-2 2025 $12,100,000.00 41-00082-00 Hays Hays RM 3237 RM 12 Flite Acres Rd MAD-2 2025 $2,800,000.00 41-00083-00 Hays Hays RM 3237 Flite Acres Winters Mill. MAD-2 2025 $3,100,000.00 41-00084-00 Hays Hays RM 3237 Winters Mill FM 150. MAD-2 2025 $2,100,000.00 41-00085-00 Hays Hays Bebee Rd IH-35 SH 21 Improve to MAD-2 2025 $36,600,000.00 41-00086-00 Kyle Hays Bunton/Goforth Road IH-35 Frontage Road Lehman Road Construct 3-lane road with continuous left turn lane up to 900' west of Brandi Circle. From 900' west of Brandi Circle transition to existing 2- lane roadway. Sidewalk along one 2015 $5,000,000.00 41-00087-00 Kyle Hays Burleson Road Miller Street IH-35 Frontage at new connecting location Construct 3-lane road with continuous left turn lane. Sidewalk along one side of the road. 2016 $8,800,000.00

41-00088-00 Buda Hays Cabela's Dr Main St Manchaca Springs Rd New 2-lane undivided 2024 $4,000,000.00 41-00089-00 Kyle Hays Center St Old Stagecoach FM 150. Widen to 4 lanes 2035 $7,900,000.00 41-00090-00 Hays Hays Centerpoint Rd RM 12 FM 2439. New MAD-4 2025 $14,500,000.00 41-00091-00 Hays Hays Centerpoint Rd / CR 234 IH-35 Old Bastrop Hwy. Improve to MAD-4 2025 $3,500,000.00 41-00092-00 Hays Hays Centerpoint Rd / CR 234 FM 2439 IH-35. Improve to MAD-4, dedicate right-ofway for railroad overpass 2025 $2,900,000.00 41-00093-00 Hays Hays Centerpoint Rd / CR 234 Old Bastrop Beback Inn Rd MAD-4 2025 $2,700,000.00 41-00094-00 Hays Hays Craddock Ave / NF 8 N LBJ Dr. Lime Kiln/River Ridge MAU-4 2025 $9,800,000.00 41-00095-00 Buda Hays Dacy Ln Hillside Terrace Bebee Rd. MAU-4 2025 $11,400,000.00

41-00096-00 Hays Hays Dacy Ln / Goforth Rd Bebee IH-35. MAU-4 2025 $11,400,000.00 41-00097-00 Hays Hays Darden Hill Rd / CR 162 FM 150 FM 1826. Improve to MAD-2 2025 $24,800,000.00 41-00098-00 San Marcos Hays E River Ridge Pkwy IH-35 SH 21. MAD-4 2035 $16,800,000.00 41-00099-00 Hays Hays Elder Hill Rd / CR 170 RM 12 FM 150. Improve to MAU-2 2025 $7,800,000.00 41-00100-00 Hays Hays Fitzhugh Rd / CR 101 RM 12 Travis County Line Improve to MAU-4 2025 $5,500,000.00 41-00101-00 Buda Hays Garison Road Main St. Manchaca Springs Rd. Reconstruct/extend 2-lane undivided with sidewalks 2025 $6,500,000.00 41-00102-00 Buda Hays Garlic Creek Dr (new N/S) SH 45 RM 967. New 4-lane divided 2025 $26,800,000.00 41-00103-00 Kyle Hays Goforth Road Brent Boulevard Bunton Creek Road Construct 4-lane road. Sidewalk along one side of the road. 2016 $10,100,000.00

41-00104-00 Kyle Hays Goforth Road IH-35 Frontage Road Brent Boulevard Construct 3-lane road with continuous left turn lane. Sidewalk along one side of the road. 2016 $10,100,000.00 41-00105-00 Buda Hays Hillside Terrace IH-35 Old Goforth Rd.. Widen to 4-lane divided, add sidewalks 2020 $3,600,000.00 41-00106-00 Buda Hays Hillside Terrace Old Goforth Rd FM 2001 Widen to 4-lane divided, add sidewalks 2020 $6,400,000.00 41-00108-00 San Marcos Hays Hopkins Street Reconstruction Moore Street Bishop Street. Reconstruct Hopkins Street from Moore Street to Bishop Street to the City's Complete Street policy. Reconstruct the street, multi-use path, sidewalks, curb and gutter. The project will connect $9,000,000.00 41-00109-00 Hays Hays Jacobs Well Rd / NF 25 FM 2325 Wayside Dr. New MAU-2 2025 $13,800,000.00 41-00110-00 Hays Hays Kohlers Xing FM 2770 IH-35. New MAD-4 2025 $5,500,000.00 41-00111-00 Hays Hays Kyle Loop W NF 17 Old Stagecoach Rd MAD-4 2025 $15,500,000.00 41-00112-00 Hays Hays Kyle Loop W Old Stagecoach Rd IH-35. MAD-4 2025 $4,100,000.00

41-00113-00 Hays Hays Kyle Loop W FM 1626 NF 17. MAD 5 2025 $10,000,000.00 41-00114-00 Kyle Hays Kyle Marketplace North Burleson Street, east Frontage Road Reliever of the Union Pacific RR City Lights Drive Construct 3-lane road. Sidewalk along one side of the road. 2016 $4,100,000.00 41-00115-00 Hays Hays Kyle Parkway IH-35 at FM 1626 SH 21 MAD-4 2030 $15,800,000.00 41-00116-00 Kyle Hays Lehman Road E RM 150 Goforth Road Construct 2-lane road with dedicated left turn lanes at cross streets and widen to 4 lanes at the Goforth Rd. intersection. Sidewalk along one side of the road. 41-00117-00 Buda Hays Main St Sequoyah St Sequoyah St. Traffic signal warrant and potential signal 2016 $8,300,000.00 2018 $100,000.00 41-00118-00 Buda Hays Main St IH-35 Turnersville Rd. New 4-lane divided 2020 $2,400,000.00 41-00119-00 Buda Hays Main St IH-35 Firecracker Dr. Widen to 6-lane divided 2025 $31,700,000.00 41-00120-00 Buda Hays Main St Cabela's Dr IH-35. Widen to 6-lane divided 2027 $1,200,000.00

41-00121-00 Buda Hays Manchaca Springs Rd RM 967 IH-35 at Turnersville New 4-lane divided 2025 $61,100,000.00 41-00122-00 Hays Hays Marketplace Ave FM 967 IH-35 at Burleson Rd New MAD-4 2025 $6,500,000.00 41-00123-00 Hays Hays McCarty Ln / CR 233 FM 2439/Hunter Rd IH 35 Improve to MAD-4 2035 $2,300,000.00 41-00124-00 Hays Hays NF 2 (Dripping Springs) US 290 W US 290 Bypass MAU-4 2025 $8,300,000.00 41-00125-00 Hays Hays NF 6 (San Marcos) RM 12 FM 1102. New MAD-4 2025 $18,300,000.00 41-00126-00 Hays Hays NF 10 (Dripping Springs) RM 12 US 290 SE Bypass MAU-4 2025 $3,000,000.00 41-00127-00 Hays Hays NF 12 (Driftwood) Elder Hill Rd FM 150 at RM 1826 New MAD-2 2025 $15,300,000.00 41-00128-00 Hays Hays NF 18 / Roger Hanks Ext. US 290 W RM 12 New MAD-2 2025 $5,100,000.00

41-00129-00 Hays Hays Nutty Brown Rd / CR 163 US 290 RM 1826. Improve to MAD-4 2025 $8,600,000.00 41-00130-00 Buda Hays Old FM 2001 FM 2001 Old Goforth Rd. Reconstruct with TWLTL and sidewalks 2018 $1,800,000.00 41-00131-00 Kyle Hays Old Stagecoach Post Rd FM 150. MAU-2 2025 $13,700,000.00 41-00132-00 Hays Hays Posey Rd / CR 235 FM 2439 IH-35. Improve to MAD-4 2025 $1,500,000.00 41-00133-00 Hays Hays Posey Rd / CR 235 IH-35 Old Bastrop Hwy. Improve to MAD-4 2025 $2,500,000.00 41-00134-00 Hays Hays Post Rd / CR 140 IH-35 Aquarena Springs Rd. Improve to MAU-4 2035 $17,400,000.00 41-00135-00 San Marcos Hays River Ridge Pkwy Lime Kiln Rd Post Rd MAU-2 2025 $10,200,000.00 41-00136-00 San Marcos Hays River Ridge Pkwy Post Rd IH-35. MAD-4 2025 $8,600,000.00

41-00137-00 San Marcos Hays River Road RR Overpass & Road Wal-Mart Aquarena Springs Dr. Construct RR overpass to replace existing underpass and construct 4- lane section 2015 $14,000,000.00 41-00138-00 Buda Hays Robert Light Blvd FM 2770 Main St/FM 967 New 4-lane divided with railroad overpass 2015 $16,800,000.00 41-00139-00 Buda Hays Robert Light Blvd FM 1626 FM 2770. New 4-lane divided 2018 $27,100,000.00 41-00140-00 Hays Hays Robert S. Light Blvd. Phase 1 Interim FM 1626 FM 967. Construct new MAD-2 with RR overpass 2020 $13,100,000.00 41-00141-00 Hays Hays Robert S. Light Blvd. Phase 2 Ultimate FM 1626 FM 967. MAD-4 2025 $18,800,000.00 41-00142-00 Hays Hays Sawyer Ranch Rd / CR 164 US 290 Darden Hill Rd Improve to MAD-4 2025 $36,000,000.00 41-00143-00 Hays Hays Shadow Creek Blvd Hillside Terrace Bebee Rd. New MAD-2 2035 $35,900,000.00 41-00144-00 Hays Hays Turnersville Rd Extension SH 45 SE FM 2001 New MAD-4 2025 $11,300,000.00

41-00145-00 Hays Hays Turnersville Rd Extension FM 2001 FM 110. MAD-6 2025 $15,500,000.00 41-00146-00 Hays Hays Windy Hill Rd IH-35 Turnersville Rd extension. Improve to MAD-2 2025 $24,100,000.00 41-00147-00 Hays Hays Winter's Mill Parkway RM 12 FM 3237. MAU-4 2025 $3,900,000.00 41-00148-00 Hays Hays Yarrington Rd / CR 159 FM 110 SH 21. Improve to MAD-4 2025 $7,900,000.00 41-00149-00 Buda Hays Arterial Street Improvement Program. - $700,000.00 41-00150-00 Hays Hays Arterial Street Improvement Program. - $13,600,000.00 41-00151-00 Kyle Hays Arterial Street Improvement Program. - $23,700,000.00 41-00152-00 San Marcos Hays Arterial Street Improvement Program. - $677,200,000.00

41-00153-00 TxDOT Hays RM 150 IH 35 RM 150 at Arroyo Ranch Road Realign Roadway (MAD-4) on new location. 2025 $200,000,000.00 41-00154-00 TxDOT Hays SH 21 Caldwell County Line SH 71 Provide super 2 passing lanes. 2022 $5,377,000.00 41-00155-00 TxDOT Hays SH 21 SH 80 Caldwell County Line Provide super 2 passing lanes. 2022 $185,900,000.00 41-00156-00 City of Kyle Hays Blanco-Nance Bridge Cypress Road Hillard Road Multi-lane span bridge with pedestrian/bike lane, starting at the elevated western Blanco River bank to a new road connecting to Hilliard Road. 41-00157-00 TxDOT Hays IH 35 At SH 123 ADD SHLDS, AUX LNS, RAMP IMPRVMTS, PVMT REHAB, FRTG RD INTER SECT IMPROVMT, BIKE & PED IMPRVMTS 2025 $30,000,000.00 2018 $99,874,153.00 41-00158-00 TxDOT Hays SH 21 SH 80 Caldwell County Line PROVIDE SUPER 2 PASSING LANES 2018 $8,265,337.00 41-00161-00 TxDOT Hays IH 35 Loop 82 South of Loop 82 Reconstruct Ramps 2020 $2,011,599.37 41-00162-00 TxDOT Hays IH 35 South of SH 80 North of RM 12 Add Shoulders, Aux Lns, Ramp Imprvmts, Pvmt Rehab, Frtg Rd Inter 2021 $96,504,925.13

41-00163-00 TxDOT, Hays County Hays RM 967 0.130 Miles North of Robert S Light 0.141 Miles South of Robert S Light Add Left Turn Lane And Shoulders 2019 $709,752.08 41-00164-00 TxDOT Hays SH 123 IH 35 Dezavalla Dr Construct Sidewalks 2020 $87,677.85 41-00165-00 TxDOT, Hays County Hays CR RM 967 at Robert S. Light Blvd. FM 1626 Construct A Single-Lane Two Way Roadway And A Grade-Separated Crossing With The Union Pacific Railroad 2019 $18,763,724.78 41-00166-00 City of San Marcos Hays CS Moore Street Bishop Street Reconstuct Roadway With Multi-Use Path, Sidewalks, And Curb And Gutter 2019 $11,912,885.48 41-00167-00 City of San Marcos Hays CS CM Allen Parkway Thorpe Rd. Construct Multi-Use Bike/Ped. Facility 2020 $2,513,939.73 41-00168-00 City of San Marcos Hays VA Nine Intersections On_Guadalupe, Hopkins, Gary & LBJ Streets Downtown San Marcos Pedestrian Improvements 2019 $209,069.25 41-00169-00 City of San Marcos Hays VA East of Hopkins St. West of IH 35 SBFR San Marcos River Shared Use Path 2019 $2,739,313.89 41-00170-00 City of Dripping Springs Hays CS US 290 Mighty Tiger Trl. Construct 6-foot sidewalk on Sportsplex Drive 2019 $440,129.42

41-00171-00 Hays County, TxDOT Hays FM 2001 IH 35 SH 21 Widen To 4-Lane Divided Roadway By Adding Two Lanes And Shoulders 2019 $48,410,281.76 41-00172-00 Hays County, TxDOT Hays FM 110 SH 21 800' East Of Ih 35 Nbfr Construct Two Lanes And Shoulders 2019 $28,562,480.00 41-00173-00 Hays County, TxDOT Hays FM 110 SH 123 CR 245 (Redwood Road) Construct Two Lanes And Shoulders 2019 $10,981,789.31 41-00174-00 Hays County, TxDOT Hays FM 110 FM 621 Caldwell County Line Construct Two Lanes And Shoulders 2019 $13,922,512.62 41-00175-00 Hays County, TxDOT Hays FM 110 CR 245 (Redwood Road) FM 621 Construct Two Lanes And Shoulders 2019 $3,894,057.82 41-00187-00 City of Buda Hays RM 967 (Main St.) Austin St. China/Ash St Intersection improvements 2019 $2,260,000.00 41-00188-00 City of Buda Hays FM 2001 Overpass Road/FM 2001 FM 119/Old Goforth Road Construct a 10-foot wide multi-use path for pedestrian and bicycle traffic along the east side of FM 2001 and Overpass Road 2020 $500,000.00 41-00189-00 Hays County Hays Lime Kiln Road Post Road Hilliard Road Realignment and Intersection Improvements at Windermere Road 2019 $7,555,500.00

41-00190-00 Hays County Hays RM 967 FM 1626 Oak Forest Drive Widen roadway with center turn lane and shoulder enhancements 2019 $7,274,000.00 41-00191-00 Hays County Hays US 290 Intersection at Trautwein Rd. Intersection improvements 2019 $1,952,250.00 41-00192-00 Hays County Hays FM 110 East of SH 123 East of I-35 at Yarrington Construct new two-lane roadway 2019 $118,380,000.00 41-00193-00 Hays County Hays FM 110 Intersection at SH 123 New Grade Seperated Overpass 2019 $7,279,000.00 41-00194-00 Hays County Hays FM 621 De Zavala Drive CR 266/ Old Bastrop Hwy Widen 2-Lane Roadway to Include a Center Turn Lane and Shoulder Enhancements 2019 $6,872,000.00 41-00195-00 Hays County Hays FM 2001 Sun Bright Blvd. FM 2001 Upgrade from a 2-Lane to a 4-Lane Divided Roadway with New Traffic Signals and Bicycle/Pedestrian Improvements 2019 $11,278,000.00 41-00196-00 City of Kyle Hays VA Burleson Street Kohlers Crossing Center Street Rail Siding Relocation 2020 $15,209,034.00 42-00001-00 City of San Marcos Hays CS San Marcos Visitors Center Aquarena Spring Drive Reconstruct an existing pedestrian path into a shared use path to accommodate bicycles. 2017 $2,793,655.00

51-00001-01 CTRMA Travis SL 1 US 183 RM 2222 Add direct connectors with transitions 2019 $167,385,494.00 51-00001-02 TxDOT/CTRMA Travis US 183 N Williamson County Line SL 1 Widen from 3 to 4 general purposes lanes 2019 $69,262,963.00 51-00001-03 CTRMA Travis US 183 N Williamson County Line SL 1 Add two express lanes in each direction 2019 $135,639,969.00 51-00004-00 TxDOT Travis IH 35 At Wells Branch Pkwy Operational improvements-interchange 2020 $38,273,484.00 51-00005-00 TxDOT Travis IH 35 At Williams Drive Reconstruct interchange 2020 $61,853,480.00 51-00006-00 TxDOT Travis SH 71 At Ross Road & At Kellam Road Construct overpass 2020 $64,034,594.00 51-00007-00 TxDOT Travis SH 130 US 290 SH 71 Add one lane in each direction 2018 $121,537,069.00 51-00008-00 TxDOT Travis SH 130 SH 45 US 290 Add one lane in each direction 2018 $90,576,967.00

51-00009-00 TxDOT Travis SL 1 North of Slaughter South of LaCrosse Grade Separation of Main Lanes with 2 through-lanes in each direction. 2019 $77,897,229.00 51-00010-00 TxDOT Travis IH 35 South of Holly Street North of Oltorf Add CDs, Aux Lanes, ramp improvements, pavement rehab 2018 $204,605,169.00 51-00011-00 TxDOT Travis IH 35 At Parmer Lane Reconstruct intersection. 2018 $38,768,253.00 51-00012-00 TxDOT Travis IH 35 Rundberg Lane US 183 Add shoulders, auxiliary lanes, ramp improvements 2017 $187,176,718.00 51-00013-00 TxDOT Travis IH 35 US 183 US 290 East Operational Improvements to Ramps and Direct Connectors 2017 $86,798,275.00 51-00014-00 CTRMA/TxDOT Travis VA Various Locations in MPO Area Operation of the Highway Emergency Response Operator (HERO) patrol service 2017 $5,750,000.00 51-00015-00 City of Elgin Travis VA Various Locations in the City of Elgin in Travis and Bastrop Counties Construct Sidewalks 2017 $1,498,944.00 51-00016-00 City of Rollingwood Travis VA Various streets in Rollingwood Add bike striping and construct walking trail 2017 $150,256.00

51-00017-00 City of Austin Travis CS North Lamar at Palmer Lane US 183 Construct sidewalks 2017 $1,770,000.00 51-00018-00 City of Austin Travis CS East 7th Street East 4th Street Construct Sabine Street Pedestrian and Bicycle Promenade 2017 $3,370,000.00 51-00019-00 City of Austin Travis CS 200' South of East 12th Street MLK Station Widen trail, install new bridge, and improve crossing for bikes and pedestrians. 2017 $1,490,877.00 51-00020-00 City of Lago Vista Travis VA Bar K Ranch Road at FM 1431 Frontier Cove Construct sidewalks and traffic calming. 2019 $558,959.00 51-00021-00 City of Austin Travis VA Various Locations Install pedestrian safety devices citywide. 2017 $2,997,061.00 51-00022-00 Travis County Travis FM 969 FM 3177 FM 973 Widen FM 969, an existing 4-lane undivided arterial, to provide for a continuous left-turn lane, shoulders, and a sidewalk on one side of the roadway. 51-00022-01 Travis County Travis FM 969 FM 973 Hunters Bend Road Widen FM 969, an existing 2-lane undivided arterial, to provide for two additional travel lanes, a continuous left turn lane, shoulders, and a sidewalk on one side of the roadway 51-00023-00 CTRMA/TxDOT Travis SH 45 Hays County Line Loop 1 Construction of a 4-lane tolled freeway (Project may be phased) 2019 $18,128,600.00 2019 $10,917,185.00 2017 $67,420,000.00

51-00024-00 CTRMA/TxDOT Travis US 183 At Colorado River Construct a bicycle and pedestrian path. 2018 $4,800,000.00 51-00025-00 CARTS Travis VA Travis-Hays County Purchase of 6 heavy duty 30-foot buses. 2018 $2,100,000.00 51-00026-00 TxDOT Travis FM 969 Tannehill Lane FM 3177/Decker Lane Pedestrian facility. 2018 $1,034,149.00 51-00028-00 TxDOT Travis FM 974 Samsung Blvd..02 Miles East of Harris Ranch Reconstruct Roadway 2018 $5,978,085.00 51-00029-00 Travis County Travis VA Various Locations Construct new sidewalk on both sides of Elroy Road within SH 130 right-ofway and a shared use path on FM 973 from Moores Bridge Road to Elroy Road. 2019 $1,278,570.00 51-00030-00 City of Austin Travis CS Northern Walnut Creek Trail West of Lamar Blvd. to IH 35 Construct bike/ped trail. 2019 $2,466,009.00 51-00031-00 Travis County Travis VA Proposed Wildhorse Connector Travis County East Metro Park Construct Shared Use Path. 2019 $3,176,784.00 51-00032-00 City of Pflugerville Travis Rowe Lane SH 130 Martin Lane Widen existing two-lane roadway to include turn lanes, additional shoulders, and drainage improvements. 2017 $0.00

51-00033-00 City of Pflugerville Travis Weiss Lane Cele Road Cameron Road Reconstruct from MUD2 to MAD4 from Cele Road to Wilbarger Creek. South of Wilbarger Creek will be improved MUD2. 2017 $542,000.00 51-00034-00 Travis County Travis FM 2304 FM 1626 Ravencroft Drive Construct four-lane, divided arterial with bicycle lanes and sidewalks. 2018 $12,000,000.00 51-00035-00 CTRMA Travis US 290 At SH 130 Develop and construct two tolled direct connectors at the US 290/SH 130 interchange 2018 $88,900,000.00 51-00035-01 TxDOT Travis US 290 At SH 130 Develop and construct one Central Texas Turnpike System direct connector at the US 290/SH 130 Interchange 2018 $41,100,000.00 51-00036-00 TxDOT Travis IH-35 - Travis County SH 45 N SH 45 SE IH-35 Improvement Projects 2020 $1,940,000,000.00 51-00037-00 CTRMA Travis US 183 N Loop 1 N RM 620 2 Express Lanes in each direction 2019 $225,700,000.00 51-00038-00 CTRMA Travis US 183 S US 290 Boggy Creek. 6 tolled mainlanes and 4 to 6 continuous, non-tolled access road lanes, project may be phased. 2016 $332,300,000.00 51-00039-00 CTRMA Travis US 183 S Boggy Creek SH 71. 6 tolled mainlanes and 4 to 6 continuous, non-tolled access road lanes and operational improvements on SH 71. 2018 $319,700,000.00

51-00040-00 TxDOT Travis US 290 W West of RM 1826 Loop 1 Construct six-lane controlled access highway and frontage roads 2019 $461,576,000.00 51-00041-00 Travis Travis US 290 W RM 1826 Nutty Brown Rd Widen to MAD-6 2040 $17,500,000.00 51-00042-00 CTRMA Travis Loop 1 Cesar Chavez Slaughter. 2 Express Lanes in each direction - MoPac South 2020 $352,800,000.00 51-00043-00 TxDOT Travis SH 71 W US 290 W Silvermine Dr. Construct four-lane divided highway with direct connects 2019 $83,727,000.00 51-00044-00 Travis Travis FM 812 FM 973 N Maha Loop Rd Improve to MAD-4 2038 $28,000,000.00 51-00045-00 Travis Travis FM 812 Maha Loop Rd Travis County Line Widen to MAD-4 2040 $11,300,000.00 51-00046-00 Travis Travis FM 969 FM 3177 Hunters Bend. Improve to MAD-4 2017 $18,000,000.00 51-00047-00 Travis Travis FM 969 Hunters Bend Webberville City Limit Improve to MAD-4 2038 $49,700,000.00

51-00048-00 Travis Travis FM 973 FM 973 Relocation SH 71 E Widen to MAD-4 2040 $61,200,000.00 51-00049-00 Travis Travis FM 973 SH 71 E FM 812 Widen to MAD-4 2040 $26,500,000.00 51-00050-00 Travis Travis FM 973 FM 812 US 183. Widen to MAD-4 2040 $16,200,000.00 51-00051-00 Travis Travis FM 973 Relocation US 290 FM 973. New MAD-4/Improve to MAD-4 2020 $20,500,000.00 51-00052-00 Travis Travis FM 973 to Blake Manor Rd. Connector FM 973 Blake Manor Rd New MAD-4 2020 $12,000,000.00 51-00053-00 Travis Travis FM 1626 Manchaca Rd 0.2 miles south of Brodie Ln Improve to MAD-4 2018 $12,200,000.00 51-00054-00 Travis Travis FM 1626 IH-35 Manchaca Road. Widen to MAD-4 2040 $15,300,000.00 51-00055-00 Travis Travis FM 3238 (Hamilton Pool Rd) east side of Pedernales River RM 12 Improve to MAD-2 2018 $23,100,000.00

51-00056-00 Travis Travis FM 3238 (Hamilton Pool Rd) RM 12 SH 71 W Improve to MAD-2 2025 $40,000,000.00 51-00057-00 Travis Travis RM 620 Anderson Mill Rd. SH 71 W Widen to MAD-6 2025 $52,000,000.00 51-00058-00 Travis Travis RM 620 Bypass 620 RR 2222. 3 lanes, 2-lane west, 1 east 2020 $8,000,000.00 51-00059-00 Travis Travis RM 1826 US 290 W Slaughter Lane Improve to MAD-4 2022 $7,900,000.00 51-00060-00 Travis Travis RM 1826* Slaughter Lane SH 45 SW Improve to MAD-4 2040 $17,200,000.00 51-00061-00 Travis Travis RM 2222 McNeil 620 Bypass. Widen to MAD-6 2020 $12,000,000.00 51-00062-00 Travis Travis RM 2244 Walsh Tarlton Redbud Trail. Widen to MAD-4 2020 $6,000,000.00 51-00063-00 Austin Travis Arterial A US 290 Samsung Blvd. New MAD-4, new alignment 2020 $25,500,000.00

51-00064-00 Travis Travis Arterial B FM 969 Harold Green Rd New 2-lane minor arterial 2022 $11,400,000.00 51-00065-00 Travis Travis Arterial C FM 969 Deaf Smith Blvd New 2-lane minor arterial 2022 $7,100,000.00 51-00066-00 Travis Travis Bee Creek Rd Highlands Blvd SH 71 Improve to MAD-4 2015 $9,500,000.00 51-00067-00 Austin Travis Berkman Dr 51st St E Manor Rd New MND-2 and Widen to MND-2 2020 $2,900,000.00 51-00068-00 Travis Travis Blake-Manor Rd FM 973 Taylor Ln. Improve to MAD-4 2018 $13,800,000.00 51-00069-00 Travis Travis Blake-Manor Rd Taylor Ln Burleson-Manor Rd Improve to MAD-4 2030 $13,500,000.00 51-00070-00 Travis Travis Braker Ln FM 973 Taylor Ln New MAD-4 2018 $20,000,000.00 51-00071-00 Travis Travis Braker Ln FM 3177 SH 130 New MAD-4 2025 $36,000,000.00

51-00072-00 Travis Travis Braker Ln 1 mile east of Dessau Rd Harris Branch Pkwy New MAD-4 / Improve Blue Goose to MAD-4 2030 $20,800,000.00 51-00073-00 Travis Travis Braker Ln Taylor Ln Burleson-Manor Rd. New MAD-4 2030 $12,300,000.00 51-00074-00 Travis Travis Burleson-Manor Rd Blake-Manor Rd FM 969 Widen to 4 lanes 2038 $25,500,000.00 51-00075-00 Travis Travis Burleson-Manor Rd FM 969 SH 71 New 2-lane minor arterial undivided 2038 $53,200,000.00 51-00076-00 Travis Travis Cameron Rd Gregg-Manor Rd Gregg Ln. New MAD-4 / Improve to MAD-4 2017 $18,400,000.00 51-00077-00 Travis Travis Cameron Rd Pflugerville East Rd Gregg-Manor Rd Widen to 4 lanes 2018 $17,600,000.00 51-00078-00 Austin Travis Congress Ave North Bluff Dr South Boggy Creek Improve to MAD-4 2019 $12,600,000.00 51-00079-00 Travis Travis CR 137 / Arterial A (Pflugerville) CR 138 Rowe Ln. Widen to 4 lanes 2030 $9,700,000.00

51-00080-00 Travis Travis Deaf Smith Blvd Arterial C Northbound frontage of SH 130 New 2-lane minor arterial 2023 $9,500,000.00 51-00081-00 Travis Travis Decker Ln Williamson County Line Pecan St Widen to MAD-4 2040 $39,800,000.00 51-00082-00 Travis Travis Decker Ln Pecan St. Wells Branch Pkwy Widen to MAD-4 2040 $6,800,000.00 51-00083-00 Travis Travis Decker Ln Wells Branch Pkwy Gregg Manor Rd New MAD-4 and Widen to MAD-4 2040 $10,600,000.00 51-00084-00 Travis Travis Dessau Rd Northtown/Wells Branch FM 734. Widen to 6 lanes 2038 $30,800,000.00 51-00085-00 Travis Travis Dunlap Rd. FM 969 S Dunlap Road Improve to MAD-2 2023 $9,600,000.00 51-00086-00 Pflugerville Travis E Pflugerville Pkwy Colorado Sand Weiss Ln, SH 130 underpass 2 lane minor arterial undivided 2017 $7,300,000.00 51-00087-00 Travis Travis Elroy Rd Ross Rd Fagerquist Rd. Improve to MAD-4 2017 $17,500,000.00

51-00088-00 Travis Travis Fagerquist Rd Elroy Rd Four Daughters Rd Improve to MAD-4 2030 $13,100,000.00 51-00089-00 Travis Travis Ferguson Ln Rundberg Ln Arterial A. New MAD-4 / Improve to MAD-4 2022 $16,800,000.00 51-00090-00 Travis Travis Fitzhugh Rd US 290 W County Line Improve to MAD-2 2030 $12,200,000.00 51-00091-00 Travis Travis Flint Rock Road City of Lakeway Jack Nicklaus Drive Widen to MAD-4 2016 $2,500,000.00 51-00092-00 Travis Travis Flint Rock Road Jack Nicklaus Drive Serene Hills Drive Expand roadway to meet county 2016 $5,100,000.00 standards for MNR-2 51-00093-00 Travis Travis Four Daughters Road SH 71 E FM 812 New MAD-4 2030 $66,000,000.00 51-00094-00 Travis Travis Frate Barker Rd Brodie Ln Manchaca Rd. Widen to MAD-4 2020 $8,500,000.00 51-00095-00 Travis Travis Grand Ave Pkwy Greenlawn Blvd Bratton Lane. New MAD-4 / Improve to MAD-4 2030 $4,500,000.00

51-00096-00 Travis Travis Greenlawn Blvd IH-35 N Anderson Mill Rd New MAD-4 and widen to MAD-4 2040 $5,400,000.00 51-00097-00 Travis Travis Gregg-Manor Rd SH 130 US 290 E New MAD-4 / improve to MAD-4 2030 $24,900,000.00 51-00098-00 Austin Travis Grove Blvd Montopolis Hogan Ave. New MAD-4 2019 $7,600,000.00 51-00099-00 Pflugerville Travis Heatherwilde Blvd / Wilke Ln SH 45 Wilke Ln. MAD-4 2014 $8,300,000.00 51-00100-00 Travis Travis Hewitt Ln Frate Barker Rd FM 1626 Improve to MNR-4 2020 $5,500,000.00 51-00101-00 Travis Travis Hidden Lake Blvd Kelly Ln Pflugerville Rd. New MAD-4 2025 $18,100,000.00 51-00102-00 Travis Travis Hodde Ln Rowe Ln Cele Rd. Improve to MAD-4 2038 $18,700,000.00 51-00103-00 Travis Travis Howard Ln Cameron Rd SH 130. New MAD-4 2016 $19,000,000.00

51-00104-00 Austin Travis Howard Ln McNeil Rd Loop 1 N Improve to MAD-6 2030 $18,600,000.00 51-00105-00 Travis Travis Jake's Hill Rd Rowe Ln Kelly Ln. New MAD-4 2030 $15,700,000.00 51-00106-00 Travis Travis Jesse Bohls Rd Weiss Ln Cameron Rd. New MAD-4 / Improve to MAD-4 2023 $23,900,000.00 51-00107-00 Pflugerville Travis Kelly Ln Moorlynch Ave Weiss Ln. Widen to 4-lane divided major arterial with bicycle and pedestrian accommodations 2015 $7,700,000.00 51-00108-00 Travis Travis Kelly Ln Weiss Lane FM 973. New MAD-4 and Widen to MAD-4 2040 $25,100,000.00 51-00109-00 Travis Travis Lohman Ford Rd FM 1431 Sylvester Ford Rd Widen to MAD-4 2040 $28,500,000.00 51-00110-00 Travis Travis Lohman Ford Rd Sylvester Ford Rd Point Venture Widen to MNR-4 2040 $16,600,000.00 51-00111-00 Travis Travis Maha Loop Rd SH 71 Pearce Ln (Phase 1) New MAD-2 2016 $15,000,000.00

51-00112-00 Travis Travis Maha Loop Rd SH 71 Pearce Ln (Phase 2) Improve to MAD-4 2025 $12,000,000.00 51-00113-00 Travis Travis Maha Loop Rd Pearce Ln FM 812. New MAD-4/Improve to MAD-4 2030 $37,600,000.00 51-00114-00 Travis Travis Maha Loop Rd FM 812 Slaughter Ln (Moore Rd) New MAD-4 and Widen to MAD-4 2040 $7,100,000.00 51-00115-00 Travis Travis Maha Loop Rd Slaughter Ln (Moore Rd) Maha Loop Rd New MAD-4 and Widen to MAD-4 2040 $15,100,000.00 51-00116-00 Travis Travis McKinney Falls Pkwy William Cannon Dr Slaughter Ln New MAD-4 and widen to MAD-4 2020 $5,900,000.00 51-00117-00 Travis Travis McKinney Falls Pkwy (Palmer Rd) SH 45 Turnersville Rd. Widen to MAD-4 2030 $4,000,000.00 51-00118-00 Austin Travis McNeil Dr US 183 Howard Ln. Widen to 6 lanes 2030 $29,300,000.00 51-00119-00 Austin Travis McNeil Rd 700' north of SH 45 McNeil Dr/Howard Ln Improve to MAD-6 2030 $26,100,000.00

51-00120-00 Travis Travis Melber Ln Kelly Ln Cameron Rd. New MAD-4 2038 $33,700,000.00 51-00121-00 Travis Travis Moore Rd (Slaughter) FM 973 Maha Loop Rd Improve to MAD-4 2030 $25,000,000.00 51-00122-00 Travis Travis Old Kimbro Rd US 290 E Littig Rd Improve to MAD-4 2021 $12,800,000.00 51-00123-00 Travis Travis Palmer Rd FM 1327 SH 45. Improve to MAD-4 2030 $5,200,000.00 51-00124-00 Travis Travis Parmer Lane US 290 E Braker. New MAD-4 2016 $14,700,000.00 51-00125-00 Travis Travis Parsons Rd Littig Rd Lockwood Rd. New MAD-4 / Improve to MAD-4 2021 $18,700,000.00 51-00126-00 Travis Travis Pearce Ln FM 973 Maha Loop Rd Improve to MAD-4 2024 $28,990,000.00 51-00127-00 Travis Travis Pearce Ln Maha Loop Rd Wolf Ln Improve to MAD-4 2030 $28,880,000.00

51-00128-00 Pflugerville Travis Pflugerville East Rd (Pecan Street) SH 130 Weiss Ln. MAD-2 2015 $4,600,000.00 51-00129-00 Travis Travis Pflugerville Rd Weiss Ln Cameron Rd. Widen to 4 lanes 2023 $3,200,000.00 51-00130-00 Austin Travis Pleasant Valley Rd Onion Creek Dr CR 105/Turnersville Rd New MAD-4 / Improve to MAD-4 2030 $46,700,000.00 51-00131-00 Austin Travis Pleasant Valley Rd Existing Pleasant Valley Rd SH 71 New MAD-4 2030 $4,000,000.00 51-00132-00 Travis Travis Puryear Rd 1 mile west of IH-35 IH-35 New MAD-6 2038 $10,500,000.00 51-00133-00 Travis Travis Reimers Peacock SH 71 Hamilton Pool Rd New 2-lane minor arterial undivided 2019 $10,000,000.00 51-00134-00 Travis Travis Ross Rd SH 71 Elroy Rd. Widen to 4 lanes 2038 $29,700,000.00 51-00135-00 Travis Travis Ross Rd Elroy Rd McAngus. New 2-lane minor arterial divided 2038 $5,500,000.00

51-00136-00 Pflugerville Travis Rowe Ln SH 130 CR 137. 2 lane minor arterial undivided 2017 $2,100,000.00 51-00137-00 Travis Travis Rowe Ln City of Pflugerville Hodde Ln Widen to MAD-4 2040 $15,200,000.00 51-00138-00 Travis Travis Rowe Ln Hodde Ln Decker Ln. New MAD-4 and Widen to MAD-4 2040 $1,300,000.00 51-00139-00 Austin Travis Rundberg Ln FM 1325 Metric Blvd. New MAD-2 2021 $27,000,000.00 51-00140-00 Travis Travis Slaughter Ln Pleasant Valley Rd McKinney Falls Pkwy New MAD-4 2020 $16,100,000.00 51-00141-00 Travis Travis Slaughter Ln McKinney Falls Pkwy FM 973 New MAD-4 2030 $32,500,000.00 51-00142-00 Travis Travis Taylor Ln Lockwood Rd FM 969. Improve to MAD-4 2038 $39,200,000.00 51-00143-00 Travis Travis Thaxton Rd Slaughter Lane FM 1327. Improve to MAD-4 2025 $36,500,000.00

51-00144-00 Pflugerville Travis Weiss Lane Cele Road Kelly Ln. 2 lane minor arterial undivided 2017 $3,700,000.00 51-00145-00 Travis Travis Weiss Lane Cele Road Cameron Rd. New MAD-4 / Improve to MAD-4 2030 $36,700,000.00 51-00146-00 Travis Travis Wells Branch Pkwy Immanuel Cameron. New MAD-4 / Improve to MAD-4 2020 $10,000,000.00 51-00147-00 Travis Travis Wells Branch Pkwy Cameron SH 130. New MAD-4 2023 $7,400,000.00 51-00148-00 Travis Travis Wells Branch Pkwy SH 130 Fuchs Grove Rd New MAD-4 2030 $17,800,000.00 51-00149-00 Austin Travis Westgate Blvd Cohoba Dr Cameron Loop. New MAD-4 2020 $4,000,000.00 51-00150-00 Travis Travis Wild Horse Connector FM 973 Parmer LN. New MAD-4 2019 $16,000,000.00 51-00151-00 Austin Travis William Cannon Dr Running Water Dr McKinney Falls Pkwy Improve to MAD-4 2018 $7,400,000.00

51-00152-00 Travis Travis William Cannon Dr McKinney Falls Pkwy US 183 S New MAD-4 2018 $9,500,000.00 51-00153-00 Austin Travis William Cannon Dr Pleasant Valley Rd.5 miles east Widen to MAD-6 2020 $8,600,000.00 51-00154-00 Travis Travis William Cannon Dr / FM 812 US 183 S FM 812 New MAD-4 2038 $15,800,000.00 51-00155-00 Austin Travis Arterial Street Improvement Program. - $2,647,400,000.00 51-00156-00 Bee Cave Travis Arterial Street Improvement Program. - $4,500,000.00 51-00157-00 Lakeway Travis Arterial Street Improvement Program. - $14,600,000.00 51-00158-00 Manor Travis Arterial Street Improvement Program. - $7,900,000.00 51-00159-00 Pflugerville Travis Arterial Street Improvement Program. - $216,400,000.00

51-00160-00 Travis Travis Arterial Street Improvement Program. - $95,900,000.00 51-00161-00 Westlake Hills Travis Arterial Street Improvement Program. - $20,500,000.00 51-00162-00 Travis County Travis FM 1625 McKenzie Road Intersection with 183 Realign Roadway and Relocate Highway Intersection. 2017 $1,000,000.00 51-00163-00 TxDOT Travis SH 130 SH 71 SH 45 SE Operational improvements. 2025 $10,000,000.00 51-00164-00 Travis County Travis SH 71 Intersection at Navarro Creek Extend Westbound Left Turn Lane. 2017 $190,000.00 51-00165-00 TxDOT Travis SH 71 Ross Road Kellam Road Construct overpass. 2021 $64,000,000.00 51-00166-00 TxDOT Travis IH 35 Onion Creek Parkway SH 45 E Ramp Reversal 2019 $7,665,756.00 51-00181-00 CARTS Travis Eastside Bus Plaza At 101 Shady Lane, Austin TX Design and construction of Eastside Bus Plaza 2019 $5,000,000.00

51-00182-00 TxDOT Travis IH 35 Grand Ave Parkway SH 45N Reverse NB Ramps and Add Auxilary Lanes 2020 $8,867,049.82 51-00183-00 TxDOT Travis IH 35 At Wells Branch Pkwy Operational Improvements-Interchange 2020 $45,693,659.49 51-00184-00 TxDOT Travis IH 35 At Parmer Lane Reconstruct Intersection 2019 $30,371,592.40 51-00186-00 TxDOT Travis SH 71 East of Riverside Dr. US 183 Construct Frontage Road And Ramp 2022 $3,741,188.94 51-00187-00 TxDOT, City of Austin Travis SL 360 At Westlake Drive Grade Separate Intersection 2022 $66,804,217.60 51-00188-00 TxDOT, City of Austin Travis SL 360 At Spicewood Springs Road Grade Separate Intersection 2022 $62,628,954.01 51-00189-00 TxDOT Travis US 183 Williamson County Line SL 1 Widen From 3 To 4 General Purpose Lanes 2019 $72,346,219.04 51-00190-00 CTRMA, TxDOT Travis US 183 Williamson County Line SL 1 Add 2 Express Lanes In Each Direction 2019 $141,678,012.28