Case History. Kinetics Controls & Innovation Ltd

Similar documents
Case History. North Sea Platform Wellhead Isolation Tubing Hanger Body Seals Locking Device 20-3/4 x 13-3/8 Mandrel Neck Seal

Captain Wellhead & Tree

BRINGING A NEW DIMENSION TO PIPELINE PIGGING. By: David Aitken, Aubin Group, UK

Copyright, 2005 GPM Hydraulic Consulting, Inc.

GAS COMPRESSION SYSTEM

Platelets & Plasma The Management of Unplanned Flow

SECTION P4 SEPARATION SYSTEMS

ACCU-PULSE Installation and Operation Instructions

SECTION PRESSURE TESTING OF PIPING

TECHNICAL DATA. Q = C v P S

TROUBLESHOOTING GUIDELINES

Winter Shut Down Procedure

SECTION P4 SEPARATION SYSTEMS

SAFETY MANUAL PURGING, VENTING & DRAINING PROCEDURE TABLE OF CONTENTS 1. INTRODUCTION SCOPE DEFINITIONS PROCEDURE...

2 I All-Flo Pump Co.

SEPARATION SYSTEMS. Separator (MBD-1600) or the Wet Oil Tank, (ABJ-1800). Water is

TECHNICAL DATA. Q= Cv S

EMERGENCY PIPELINE REPAIR SYSTEMS DEVELOPED TO FACILITATE PIPELINE REPAIR OF UNPIGGABLE DEFECTS. By: Dale Millward, STATS Group, United Kingdom

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

DAV - P. Product Catalogue DAV - P. Air release & Vacuum Break Valves. (Plastic Air Valves) DAV - P. Edition 2012

NORMAL OPERATING PROCEDURES Operating Parameter Information

2 I All-Flo Pump Co.

COMPRESSOR REPLACEMENT PROCEDURE (R-134A)

The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times

Exhibit #5. X-670 Recirculated Cooling Water (RCW) Cooling Tower and associated piping to X- 710 and X-300

Hydrostatic Pressure Testing

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

HYDROSTATIC LEAK TEST PROCEDURE

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

OBSOLETE. Wet pipe low flow manifold system

Jacuzzi. J-CQ420 Cartridge Filter Installation and Operating Instructions

Corrosion Protection in Dry-Pipe Systems Article and photos by Gregory Havel, except where noted. May 21, 2018

CHEMICAL TANKER MANUAL CH. 09 MAINTAINENCE OF CARGO EQUIPMENT. Rev. No. 1 Date 15-Apr-16 Page Page 1 of MAINTAINENCE OF CARGO EQUIPMENT

Digester Processes. 1. Raw Sludge Pumping System

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

Wet pipe low flow foam/water system

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

Pressure Reducing Valve for Steam Type 2333 A

PNEUMATIC STOPPERS OPERATING MANUAL. Type F G H - FOG

M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions

HYDRAULIC CYLINDER TEST

TECHNICAL DATA. Q = C v P S

CALEFFI. Reduced pressure zone backflow preventer. 574 series 01022/18 NA D E C F B D E. Function

OVERVIEW pg 3. Major Points to Consider pg 3 Minor Points to Consider pg 3. INSTRUCTIONS pg 4

OWNER S TECHNICAL MANUAL

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

English. Introduction. Safety Instructions. All Products. Inspection and Maintenance Schedules. Parts Ordering. Specifications WARNING WARNING

THERMAL POLITERM WALL AND POLITERM WALL FIX APPLICATION MANUAL. POLITERM WALL / POLITERM WALL FIX. Insulation & Chemicals Division

AIR-OPERATED DOUBLE DIAPHRAGM PUMP USER S MANUAL

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

PROCESS ROTATING EQUIPMENT (CENTRIFUGAL PUMPS )

Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel

WPB 5 / 7 / 10 INSTALLATION, OPERATION, & MAINTENANCE

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate

MANUAL GAS MANIFOLDS

HAYWARD FLOW CONTROL Series PBV Back Pressure Valve and Series RPV Pressure Relief Valve INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS

Air Amplifiers & SYSTEMS

OPERATION AND MAINTENANCE MANUAL

Compressors. Basic Classification and design overview

TECHNICAL DATA. than the water inlet pressure to the concentrate

Moving Fluids Concept and Theory

50L ENGINE DRIVEN AIR COMPRESSOR MODEL NO: XPPV11 & XPP15 RANGE

17. Flare header gas sampler at atmospheric pressure. Ole-John Melkevik, Specialist O&M Statoil Kårstø Gas Processing Plant Norway

Installation, Operation and Maintenance Instructions for Electronically Controlled Pressurisation Units

LAKOS Waterworks. PWC Series Sand Separators. Installation & Operation Manual LS-829 (10/12)

SEMEM3-73 Maintaining medical gas pipeline systems and equipment

Product Catalogue DAV - P DAV - P. Air release & Vacuum Break Valves. (Plastic Air Valves) DAV - P

DESIGN DATA OBSOLETE. C. Inspections - It is imperative that the system be inspected and tested on a regular basis. See Inspection

COSASCO 3600 PSI SINGLE SERVICE VALVE MAINTENANCE

Hi-Force Limited Prospect Way Daventry Northants NN11 8PL United Kingdom Tel: +44(0) : Fax: +44(0) : Website:

SEMPEO SQA Unit Code FP2P 04 Maintaining fluid power equipment

Bulletin /06/2012 Supersedes 10/23/00. Installation of John Crane Type 73 Inflatable Mechanical Seal. Page 01 of 10

IFS NUVENT SERIES IWF FOR POTABLE WATER ANTI SLAM AIR RELEASE AND VACUUM BREAK AIR VALVES

TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS

Sizing Pulsation Dampeners Is Critical to Effectiveness

TECHNICAL DATA. Q = C v P S

SECTION 25 TESTING AND DISINFECTING WATER MAINS General

TECHNICAL DATA Q= C. Table 1 - Specifications

GAS LIFT IN NEW FIELDS

Technical Service Bulletin March 2015 TSB142.01

Fluid Sealing Association

CHE Well Testing Package/Service:

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

AIR GAP (AG) Low Hazard High Hazard

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Installation, Operation and Maintenance Instructions Buffer Vessel OM006

TECHNICAL DATA. Q = C v P S

MULTI-DIAMETER, BI-DIRECTIONAL PIGGING FOR PIPELINE PRE-COMMISSIONING

FRYSAFE COOKING OIL FILTRATION I&O MANUAL

Pipeline Flooding, Dewatering and Venting Dr Aidan O'Donoghue, Pipeline Research Limited, Glasgow, Scotland

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

INSTALLATION INSTRUCTIONS Non-Pressurized Tank. Non-Pressurized Tank Part Number: AFCG1PT

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

PTF4 Pivotrol Pump (patented) version Dual Mechanism - Pressure Powered Pump

DW Module 8: Distribution Answer Key

GUIDELINES. Systems. Pressure. Guidelines for Competent Person In-service examination of pressure systems pipework

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

Transcription:

Case History The Operations Team for Customer have a requirement to place temporary isolations on an 18 spool piece on K-3110 1 st stage compressor pipe work and a vertical 12 spool on 1 discharge Header to create a double barrier for construction work. The spool pieces are located on the compressor mezzanine and level 2 mezzanine decks. 1 st Stage compressor Suction Scrubber 18 Pipe work showing spool piece Short Method Overview 1. valves V31079 and V31080 2. Connect the deployment manifold to ¾ drain valve VL31083 3. test with product against closed valve VL31083. 4. Mix and deploy 330 litres of IS (Extended formula) 5. PU will be recorded when IS hits the leak paths 6. sample will be taken to gauge curing time and sealant structure 7. Once isolation in place Talisman procedure for integrity test. Page 1

Objectives: To safely inject IS compound into designated spool pieces to create a temporary Mechanical barrier for future maintenance projects to take place. 1 Discharge Header and Short Method Overview: 1. Connect the deployment manifold to the ¾ tap flange double block & leed valves 2. test with product against closed valves. 3. Close lower Valve V31103 4. Open upper valve 10% V31104 5. Mix and deploy 120litres of IS (Standard formula) 6. Close the upper valve V31104 7. Leave a sample to gauge curing time and seal structure. 8. llow sealant allotted time to cure 9. Once isolation in place Talisman procedure for integrity test. Page 2

Scope of Operations The task for KCI will be to establish an isolation by pumping IS into the spool pieces between V31079 and V31080 through ¾ drain valve VL31083. The 1 discharge Header V31103 and V31104 through ¾ double isolation valves VL31005 and VL31006. The IS will be pumped into the spool piece using KCI barrel pumps. It will be pumped in dry due to the gas pipeline. balanced pressure will need to be achieved during pumping operations and during IS curing time (subject to sample taken). The IS will be prepared in 60 litre batches due to the potential wastage if operations stop due to unplanned equipment problems and to reduce the likelihood of contamination of the base product. When deployed the IS will build up and fill the cavity to eventually cure to a solid flexible isolation. Once 120 and 330 litres respectively of IS has been deployed and the IS has started to cure, a balanced pressure has to be maintained throughout the curing process. It would take approximately 3 to 4 hrs and 7 to 8 hrs to deploy the IS into the separate spool pieces. Contingency Operations In the event that the first application has not rectified the leak completely or filled the spool Piece completely an additional amount of IS can be added and pumped into the spool to boost the initial application. The additional IS Will bond with the original application to Improve and add to its sealing capabilities. reaker Contingency Operations Further breaker solution can be added at P3105 if it is deemed necessary to aid the flow from the suction scrubber. Flushing Operations The pumps and the hose lines will be flushed with potable water after each application to keep the system in good order. The flushing and discharge must be put through to closed drains or pumped into an environmental receptacle. Page 3

V31080 V31079 V31080 Location Reference R-S31-P-PI 20225.01 Rev Z6: Page 5

V31103 V31104 Location Reference R-S31-P-PI 20228.01 Rev Z6: Page 6

First Stage Suction Scrubber 18 Horizontal Isolation etween all Method Review- IS Deployment alanced (No Flow) V31079 V31080 1 alance & ccess 330litrs alanced (No Flow) 2 The IS is formulated to a high viscosity to provide displacement towards both ball valves. ccess IS 06 Deployment Fluid Condition Note: Leave a sample at the application to confirm the IS condition prior to pressure testing. Direction to scrubber 3 Testing: Flow test against closed valves when IS has cured. IS 06 Deployed and cured Page 7 leed off upstream of V31080 To confirm isolation is holding.

First Stage Suction Scrubber 18 Horizontal Isolation etween all Method Review- IS Removal (reaker) alanced (No Flow) V31079 V31080 The IS will compress internally allowing the IS reaker to establish and maintain a small PU (pressure uild Up) within the spool and gel pig structure. 1 llow 6 hours for the breaker to dilute a portion of the solid IS under fluid compression. ccess 80litrs KCI IS reaker V31079 V31080 Open Valve (V31080) 10% to allow the exhausted breaker to flow through towards the scrubber. The valve will retain the remaining solid IS. 2 ccess 80litrs KCI Exhausted IS reaker Closed valve (V31080) and maintain the balanced pressure if possible. This operation will be required to be completed a number of times to reduce the solid IS with an increased volume of breaker on each application. V31079 V31080 s above. 3 ccess 200litrs KCI Exhausted IS reaker 4 V31079 V31080 Open both all Valve, i.e. -V31079 and -V 31080 and flush / drain to the suction scrubber. Total volume of IS reaker 330Litres ccess 50litrs KCI Exhausted IS reaker Page 8

First Stage Suction Scrubber 12 Vertical Isolation etween all Method Review- IS Deployment alance & 1 alanced 45bar (No Flow) V31104 alance & 2 alanced 45bar (No Flow) V31104 ccess The IS will be deposited on top of Valve and will fill the void between both valve. ccess IS 01 Deployment Fluid Condition V31103 V31103 alance & 3 alanced 45bar (No Flow) V31104 alance & 4 V31104 Leave a sample at the application to confirm the IS condition prior to pressure testing. ccess test both ways if required or inflow test. ccess IS 01 Deployment Cured Condition V31103 Page 9 V31103

K I C alance & 1 V31104 The IS will compress internally allowing the IS reaker to establish and maintain a small PU (pressure uild Up) within the balanced structure. llow 6 hour for the breaker to dilute a portion of the solid IS. IS 01 Deployment Cured Condition First Stage Suction Scrubber 12 Vertical Isolation etween all Method Review- IS Deployment IS reaker Deployment alance & 2 V31104 ccess ccess V31103 V31103 3 4 V31104 Open Valve (V31103) 10% to allow the exhausted breaker to drain through to words the Header. The valve will retain the remaining solid IS. V31104 Closed valve (V31103) and maintain the balanced pressure if possible. This operation will be required to be completed a number of times to reduce the solid IS with an increased volume of breaker on each application. ccess Talisman Operations to start compressor. On successful start of compressor open V31103 and then slowly open V31104 to flow towards the header. ccess oth valves open V31104 & V 31103 To flush & drain. V31103 Total volume of IS reaker 120Litres Page 10 V31103