State Street Transit and Traffic Operational Plan June Æa «44 «55. Installation of Bus Bays. Land Use Activities

Similar documents
Northwest Foothills Transportation Study Update

State Highway 44/State Street High Capacity Corridor

Northwest Foothills Transportation Study Update

State Street and Pierce Park Lane Intersection Concept Report

ACHD COMMISSION DECISION

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Garden City State Street Corridor Existing Conditions October 2012

Classification Criteria

Geary Corridor Bus Rapid Transit

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

Northwest Boise NEIGHBORHOOD WALKING AND BIKING PLAN

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Committed to Service

Review and Comment ACHD s FY Five Year Work Program Draft for Adoption

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!

Re: Boise s Annual Transportation Requests Reviewing the List of Projects and Listening to Public Input

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Roadways. Roadways III.

What is the Congestion Management Process? What is Congestion? Growth in the Treasure Valley Development and Congestion

Omaha s Complete Streets Policy

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

KEARNY MESA COMMUNITY PLAN UPDATE

Front and Myrtle Improvement Project

Overview of Pulse BRT and transit network redesign

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

5. RUNNINGWAY GUIDELINES

5.0 Roadway System Plan

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

State Street Corridor Study Final Report. Table of Contents

FY Regional Transportation Improvement Program

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

DRAFT INVESTMENT CORRIDORS

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

Services Department A September 18, 2006 Region of Durham Recommended Arterial Corridor All Wards Guidelines Study

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

S T A T I O N A R E A P L A N

Thank you for attending

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

COMPLETE STREETS PLANNER S PORTFOLIO

Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008

Executive Summary Route 30 Corridor Master Plan

Chapter 6 1 Future Transportation System Priorities and Needs

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Chapter 3 BUS IMPROVEMENT CONCEPTS

TPA Committee Meetings May 2018

Public Works and Infrastructure Committee. General Manager, Transportation Services

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Presentation Starts at 5:30 PM

Transportation Improvement Plan SECTION2

RZC Appendix 8A Marymoor Subarea Street Requirements

US 278 Corridor Concept Presentation. Avondale Estates Intersection Improvement/Roundabout and Road Diet Feasibility Study March 19, 2015

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

Cincinnati Dayton Rd Widening

Proposed White Flint Separated Bike Lane Network September 2015

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Hospital Link Project Project Update September 2017

Vision. Goals and Objectives. Walking

Washington DC Section of ITE Project Briefing

Sixth Line Development - Transit Facilities Plan

Welcome to the Quebec Alternatives Analysis Public Meeting

FOLSOM-HOWARD STREETSCAPE OVERVIEW

Base Information. 1. Project Title Erie Parkway and WCR 7 Traffic Signal Project

Executive Summary. September 3, 2014

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

ARGYLE TRAFFIC STUDY Summary of Recommendations

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

Project Description Form 6V

3.0 PROJECT DESCRIPTION

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

Broadway Complete Streets Project

BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update

Highway 111 Corridor Study

FINAL REPORT DECEMBER 2011

Frequently Asked Questions

2.0 LANE WIDTHS GUIDELINE

Lawrence Avenue Streetscape Concepts August 30, 2011

Fairview Avenue Corridor Management Strategy

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

Rhode Island Bus Stop Design Guide

San Pablo High Treatment applied incrementally at each N + ++

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

Transcription:

State Street Transit and Traffic Operational Plan June 2011 FLOATING FEATHER RD $+ «16 PALMER LN Intersection Expansions SH 16 Extension Roadway Improvements èé Signalized Intersection $+ Intersection Project Roadway Project Sidewalk Project ITS Traffic Project LINDER RD Route 44 Service Increase to 30-Minute Frequency Peak) $+ PARK LN èé STATE ST «44 «44 EAGLE RD «55 PLAZA DR 20 26 20 26 Completion and Adoption of Land Use Master Plan Transit Improvements ^_ Bus Bays BALLANTYNE LN Ballantyne Lane Realignment Improvement/Expansion of Existing Park & Ride Downtown Boise Multimodal Center ITS Transit Project Transit Signal Priority at Intersections) Transit Routes Route 9 15-minute Frequency - All Day) Route 44 30-minute Frequency - Peak) EDGEWOOD RD Æa Land Use Activities Æa «55 HORSESHOE BEND RD Æa «44 BOGART LN Installation of Bus Bays Park & Ride Land Use Master Plan Study Area TOD Planning TOD Infrastructure Initial Stages of TOD Infrastructure New Park & Rides èé GARY LN GLENWOOD ST Æa PIERCE PARK LN TOD Planning All Hollow Circles) STATE ST COLLISTER DR VETERANS MEMORIAL PARKWAY 30th Street Extension Route 9 Service Increase to 15-Minute Frequency with All Day Service HILL RD 36TH ST Installation of Bus Bays 30TH ST 184 èé 23RD ST STATE ST Future Downtown Boise Multimodal Center ^_ N NO SCALE) Pedestrian Improvements on State Street Glenwood Street to Veterans Memorial Parkway) 9TH ST KEY RECOMMENDED NEAR-TERM IMPROVEMENTS ADA COUNTY, IDAHO FIGURE 22

State Street Transit and Traffic Operational Plan June 2011 FLOATING FEATHER RD Æa $+ «16 New Park & Ride «16 PALMER LN $+ PARK LN èé STATE ST «44 «44 LINDER RD SH 44 Widened to Four Lanes with Median See Figure 24 for Cross-Section) Roadway Improvements èé New Signalized Intersection $+ Intersection Project Roadway Project Sidewalk Project ITS Traffic Project Note: Gray lines and symbols indicate improvements that were made in previous phase. Two New Routes BALLANTYNE LN Implementation of Queue Jumps EAGLE RD ) «55 PLAZA DR 20 26 20 26 Transit Improvements! New Bus Stop ) ^_ Bus Bays Queue Jumps Downtown Boise Multimodal Center ITS Transit Project Transit Signal Priority at Intersections) Transit Routes Route 9 15-minute Frequency - All Day) Route 44 30-minute Frequency - Peak) New Routes 15-minute Frequency - Peak, 30-minute Frequency - Off-Peak) Æa New Park & Ride EDGEWOOD RD Land Use Activities Æa «55 HORSESHOE BEND RD ) Æa TOD Planning All Hollow Circles) Park & Ride TOD Planning TOD Infrastructure «44 Continued TOD Infrastructure Continued TOD Infrastructure Expansion of Park & Ride BOGART LN ) èé! GARY LN GLENWOOD ST Extension of Route 9 Service to Downtown Eagle PIERCE PARK LN Æa HILL RD STATE ST Bus Bays on Widened Section and Consolidation of Bus Stops State Street Widened to Seven Lanes with Curbside HOV Lanes See Figure 24 for Cross-Section) COLLISTER DR $+ $+ VETERANS MEMORIAL PARKWAY 36TH ST 184 Initial Stages of TOD Infrastructure All Purple Circles) 30TH ST èé 23RD ST STATE ST Æa ^_ N NO SCALE) 9TH ST Note: Gray lines and symbols indicate improvements that were made in previous phase. Note: Additional north/south transit routes in Eagle and Meridian i.e., via SH 16, Linder Road, Eagle Road) would connect with the State Street corridor, as shown in Figure 9. Accommodation of Park & Ride at Multimodal Center KEY RECOMMENDED MEDIUM-TERM IMPROVEMENTS ADA COUNTY, IDAHO FIGURE 23

State Street Transit and Traffic Operational Plan June 2011 STATE STREET WIDENED TO SEVEN LANES WITH CURBSIDE HOV LANES 23RD STREET TO GLENWOOD STREET) SH 44 WIDENED TO FOUR LANES WITH MEDIAN BALLANTYNE LANE TO SH 16) RECOMMENDED CROSS-SECTIONS FOR STATE STREET AND SH 44 ADA COUNTY, IDAHO FIGURE 24

State Street Transit and Traffic Operational Plan June 2011 FLOATING FEATHER RD «16 «16 PALMER LN èé!! $+ $+ ) ) Æa ) kj! New Route «Extension of Route 9 Service to SH 16 Roadway Improvements èé Signalized Intersection $+ Intersection Project Roadway Project Sidewalk Project ITS Traffic Project Note: Gray lines and symbols indicate improvements that were made in previous phases. LINDER RD PARK LN BALLANTYNE LN STATE ST 44 «44 # Implementation of Queue Jumps 20 26 Transit Improvements! New Bus Stop kj High Capacity Transit Station ) ^_ Bus Bays Queue Jumps Downtown Boise Multimodal Center ITS Transit Project High Capacity Transit Implementation # Transit Routes Route 9 15-minute Frequency - All Day) Route 44 30-minute Frequency - Peak) New Routes 15-minute Frequency - Peak, 30-minute Frequency - Off-Peak) Note: Gray lines and symbols indicate improvements that were made in previous phases. EAGLE RD ) $+ «55 # PLAZA DR Æa kj EDGEWOOD RD Land Use Activities «55 HORSESHOE BEND RD ) ÆaÆa kj «44 State Street Widened to Seven Lanes with Curbside HOV Lanes See Figure 24 for Cross-Section) BOGART LN ) èé kj GARY LN $+ Æa kj Note: Additional north/south transit routes in Eagle and Meridian i.e., via SH 16, Linder Road, Eagle Road) would connect with the State Street corridor, as shown in Figure 9. Æa Park & Ride TOD Planning TOD Infrastructure Continued TOD Infrastructure GLENWOOD ST High Capacity Transit Station PIERCE PARK LN kj HILL RD STATE ST Initial Stages of TOD Infrastructure All Purple Circles) COLLISTER DR $+ kj $+ kj VETERANS MEMORIAL PARKWAY 36TH ST Implementation of High Capacity Transit between Eagle Road and Downtown Boise Multimodal Center 30TH ST èé kj 184 23RD ST kj # STATE ST kj 9TH ST Æa ^_ kj N NO SCALE) Continued TOD Infrastructure All Gray Circles) KEY RECOMMENDED LONG-TERM IMPROVEMENTS ADA COUNTY, IDAHO FIGURE 25

Table 1

Table 2

Table 3