Similar documents
REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.

***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Tabulation of Bids. Counties: Project(s):

Riverside County Transportation Department Summary of Bids

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT U / HSIP-U054(101) Project(s): Min: Max:

Summary of Findings Concerning Longitudinal Cracking on 16' Wide Ramps

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

Kansas Department of Transportation DISTRICT 1. Project(s): Max: Min:

Kansas Department of Transportation. Tabulation of Bids

Tabulation of Bids. Counties:

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

IL Route 71 Construction Update

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

The first lift, mainline, shall be placed using a spray paver.

Riverside County Transportation Department Summary of Bids Project BOS Approval: July 25, 2017 (Agenda Item No. 3.60)

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE. February 2nd, 2015 Volume 2, Issue 107.

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

Tabulation of Bids. Counties:

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

Replace sanitary manhole casting (CITY to furnish casting); complete as specified Each $ $23,600.00

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

Taylor Road Resurfacing Project

Rock Road Transit. Northwest Plaza. Charles Rock Rd. Shopping Center Woodson & St. Center

Highway Construction

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

Cincinnati Dayton Rd Widening

Page 1 of KA

General Notes. Project No /15/2018 Page 1 of 1

2 Months of road works in Port of Antwerp Severe traffic disruption expected

General Notes. Project No /15/2018 Page 1 of 1

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY

Page 1 of KA

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

Township of Springwater

DISTRICT CONSTRUCTION PROGRAM

B741 TEMPORARY CONCRETE BARRIERS - OPSS 741

Use of Roller Compacted Concrete By GDOT. Presented By: Joe W. Sheffield, PE Georgia Department of Transportation District Engineer, Tifton, GA

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

ODOT AND LOCAL NORTHWEST OHIO MAJOR PROJECTS 2018 AND BEYOND

City of Beverly Hills North Santa Monica Blvd Reconstruction. Community Meeting Presentation September 30 and October 1, 2015

Tack Coat Effect on Field Performance. February 3rd, 2015 NCAUPG/ICT Joint Meeting

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

SPECIAL SPECIFICATION 7581 Performance Based Vegetation Management

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

(PLANT MIXED ASPHALT PAVEMENT (MSCR)). REVISED 02/03/17 DO NOT REMOVE THIS. IT NEEDS TO STAY IN FOR THE CONTRACTORS.

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

Inspector MUST Sign and Date Each Inspection

CITY OF WESTERVILLE STREET LIGHTING POLE AND TRAFFIC SIGNAL POLE PAINTING PROJECT Project No (WED)

ASPHALT PAVING LEVEL 1

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Agenda. NTTA Network of Roadways. Emergency Procurement Caught on Video: Real Life Emergency Response Presented to: APWA

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE

"Emul Asph (SS-1HP) Tack".

APPENDIX D COST SUMMARY TABLES

Pavement Markings: Past, Present, and Future. TxDOT Short Course October 2016

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

WARRINGTON TOWNSHIP BOARD OF SUPERVISORS. April 14, 2015 Regular Meeting

Manual Of Standard Traffic Signs And Pavement Markings Alberta

Legislative Update Williamsburg Residency

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Tabulation of Bids. ATLANTIC, BURLINGTON, CAMDEN, CAPE MAY, CUMBERLAND, GLOUCESTER, SALEM Letting Date: Counties:

Name Roads Station Distance Miles

900 BICYCLE FACILITIES Traffic Engineering Manual

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer

FOR LOOP RAMPS-TAPERED DECELERATION LANE

Restoration Requirements

INTERSECTION WITH RIGHT TURN TAPER

Challenges of Tack Coat

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

B741 - TEMPORARY CONCRETE BARRIERS - OPSS 741

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:


BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

City of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers.

FY 2006 TRANSPORTATION CAPITAL PROGRAM

Highway Committee MINUTES OF MEETING August 22, 2016

PAT Meeting #2 Future Alternatives Meeting Agenda

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

ACCELERATED CONSTRUCTION STRATEGIES. Selection and Impact

Lithuanian Roads. LITHUANIA in Europe. Territory km 2 Population LITHUANIAN ROAD ADMINISTRATION

Mile Marker Signs and the. David DiNocco Transportation Planner Massachusetts Department of Transportation

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

DESIGN PUBLIC HEARING SEPTEMBER 26, 2017 PULASKI ELEMENTARY SCHOOL NEW BEDFORD, MASSACHUSETTS 6:00 PM FOR THE PROPOSED

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018:

Transcription:

General Info Number: Description: Deadline: PROJECT NO. 59-18-04 (RE-BID) PAVEMENT REPAIRS EASTBOUND AND WESTBOUND ROADWAYS MILEPOST 80.50 TO MILEPOST 86.15 OTTAWA AND SANDUSKY COUNTIES, OHIO JULY 3, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $410,000.00) Bids Business Bid Total Burton Scot Contractors, LLC $265,306.13 Shelly Company - Northwest $293,133.66 Gerken Paving, Inc. $394,578.96 Kokosing Construction Company, Inc. $660,046.19

BURTON SCOT CONTRACTORS, LLC 1.00 LUMP $3,000.00 $3,000.00 2 254 PAVEMENT PLANING, ASPHALT CONCRETE (W=4') 2,995.78 SQ.YD. $9.00 $26,962.02 3 254 PAVEMENT PLANING, ASPHALT CONCRETE (W=12') 4,676.53 SQ.YD. $7.00 $32,735.71 426.24 CU.YD. $270.00 $115,084.80 5 SP 404A JOINT SEALER 20,901.00 FOOT $0.50 $10,450.50 6 407 NON-TRACKING TACK COAT 614.00 GALLON $3.00 $1,842.00 7 SP 614 MAINTAINING TRAFFIC, AS PER PLAN 1.00 LUMP $20,000.00 $20,000.00 8 621 RAISED PAVEMENT MARKERS REMOVED 113.00 EACH $15.00 $1,695.00 10 SP 623 CONSTRUCTION LAYOUT SURVEY 1.00 LUMP $3,000.00 $3,000.00 11 624 MOBILIZATION 1.00 LUMP $35,000.00 $35,000.00 12 642 6" WHITE LANE LINE, TYPE 1 9.30 MILE $862.00 $8,016.60 Total: $265,306.13 CREDIT >> A Temporary Access Deduct Alternate Proposal is included in the Bid Amount of CREDIT (must be a positive number)::

SHELLY COMPANY - NORTHWEST 1.00 LUMP $1,500.00 $1,500.00 2 254 PAVEMENT PLANING, ASPHALT CONCRETE (W=4') 2,995.78 SQ.YD. $12.00 $35,949.36 3 254 PAVEMENT PLANING, ASPHALT CONCRETE (W=12') 4,676.53 SQ.YD. $10.00 $46,765.30 426.24 CU.YD. $300.00 $127,872.00 5 SP 404A JOINT SEALER 20,901.00 FOOT $0.50 $10,450.50 6 407 NON-TRACKING TACK COAT 614.00 GALLON $2.00 $1,228.00 7 SP 614 MAINTAINING TRAFFIC, AS PER PLAN 1.00 LUMP $35,000.00 $35,000.00 8 621 RAISED PAVEMENT MARKERS REMOVED 113.00 EACH $3.00 $339.00 10 SP 623 CONSTRUCTION LAYOUT SURVEY 1.00 LUMP $4,000.00 $4,000.00 11 624 MOBILIZATION 1.00 LUMP $16,000.00 $16,000.00 Total: $293,133.66 CREDIT >> A Temporary Access Deduct Alternate Proposal is included in the Bid Amount of CREDIT (must be a positive number)::

GERKEN PAVING, INC. IB. ART.6 PREMIUM FOR CONTRACT PERFORMANCE BOND 1.00 LUMP $2,300.00 $2,300.00 1 2 254 PAVEMENT PLANING, ASPHALT CONCRETE (W=4') 2,995.78 SQ.YD. $10.50 $31,455.69 3 254 PAVEMENT PLANING, ASPHALT CONCRETE (W=12') 4,676.53 SQ.YD. $7.75 $36,243.11 4 SP 404 ASPHALT CONCRETE SURFACE COURSE, USING 426.24 CU.YD. $400.00 $170,496.00 5 SP 404A JOINT SEALER 20,901.00 FOOT $0.86 $17,974.86 6 407 NON-TRACKING TACK COAT 614.00 GALLON $1.95 $1,197.30 7 SP 614 MAINTAINING TRAFFIC, AS PER PLAN 1.00 LUMP $96,500.00 $96,500.00 8 621 RAISED PAVEMENT MARKERS REMOVED 113.00 EACH $2.50 $282.50 10 SP 623 CONSTRUCTION LAYOUT SURVEY 1.00 LUMP $14,000.00 $14,000.00 11 624 MOBILIZATION 1.00 LUMP $10,000.00 $10,000.00 13 642 6" YELLOW EDGE LINE, TYPE 1 2.00 MILE $900.00 $1,800.00 Total: $394,578.96 CREDIT >> A Temporary Access Deduct Alternate Proposal is included in the Bid Amount of CREDIT (must be a positive number)::

KOKOSING CONSTRUCTION COMPANY 1.00 LUMP $5,000.00 $5,000.00 2 254 PAVEMENT PLANING, ASPHALT CONCRETE (W=4') 2,995.78 SQ.YD. $19.00 $56,919.82 3 254 PAVEMENT PLANING, ASPHALT CONCRETE (W=12') 4,676.53 SQ.YD. $19.00 $88,854.07 426.24 CU.YD. $525.00 $223,776.00 5 SP 404A JOINT SEALER 20,901.00 FOOT $0.80 $16,720.80 6 407 NON-TRACKING TACK COAT 614.00 GALLON $3.00 $1,842.00 7 SP 614 MAINTAINING TRAFFIC, AS PER PLAN 1.00 LUMP $210,000.00 $210,000.00 8 621 RAISED PAVEMENT MARKERS REMOVED 113.00 EACH $8.00 $904.00 10 SP 623 CONSTRUCTION LAYOUT SURVEY 1.00 LUMP $2,000.00 $2,000.00 11 624 MOBILIZATION 1.00 LUMP $40,000.00 $40,000.00 Total: $660,046.19 CREDIT >> A Temporary Access Deduct Alternate Proposal is included in the Bid Amount of CREDIT (must be a positive number)::