This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. Project Central MeetBike (3CE343P2)

Similar documents
REPORT. 1 st Steering Group Meeting (output ) Brno, 10 th October Project Central MeetBike (3CE343P2)

This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. Project Central MeetBike (3CE343P2)

Cycling is Central: Transnational Ideas, Projects, and Experiences. Local Bicycle promotion

This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. Project Central MeetBike (3CE343P2)

Project Central MeetBike (3CE343P2) This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF.

Cycling Strategy: Initiative of the Charter of Uherske. cyclists)

THE PEP Partnership on Cycling

Part I: BYPAD the method Part II: Example: Basel, Switzerland

THE PEP Partnership on Cycling Pan-European Master Plan for Cycling

Tartu, 18th September Rafal Ejsmont PSWE

Report of the third meeting of THE PEP Partnership on Cycling Promotion

BYPAD. Bicycle Policy Audit CITY OF GENT March Summary. Tim Asperges Liesbeth Reekmans. Langzaam Verkeer

Public Transportation and Bicycle & Pedestrian Stakeholder Webinar. April 11, :30 PM

Polish-Nordic Road Forum/3rd 26/10/2017 Vilnius

Jozef Zuallaert. MobiMind ebvba

July 2016 JD No 6 Post No 6 JOB DESCRIPTION

The Pan-European Masterplan for Cycling Promotion - A framework for starter, climber and champion countries

Reporting on progress made since 2009 on the attainment of the Amsterdam Goals

A bicycle map depicts the local bicycle lane network. It also gives recommendations for routes,

Call for Papers. European Conference on Bicycle Transport and Networking. Dresden (Germany) City Hall

Questionnaire for reporting on progress made on the attainment of the Paris Goals

Questionnaire for reporting on progress made since 2009 on the attainment of the Amsterdam Goals

Tallinn Region Sustainable Urban Mobility Plan 2035

Introduction. You may find detailed information about the network from the EuroVelo website: Page 1/5

Juni 2013 DI Bernhard Engleder,

The Florida Bicycle and Pedestrian Partnership Council

DEPARTMENT OF TRANSPORT

Welcome. Pre-conference Workshop WALK21, The Hague, 16 November Measuring Walking (part IV): Data Collection Methods

Section 2 Strategic Alignment. Contents

Sue Shikaze Health Promoter, HKPR District Health Unit Chair, Haliburton County Communities in Action Committee

CYCLING FOR GROWTH: USING EUROPEAN FUNDS FOR CYCLING

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Agenda : Self-assessment : Coffee break : Action plan

INTERREG IVC. CycleCities Project (1307R4) Priority 2: Environment and risk prevention Sub-Theme: Energy and sustainable transport

Target Group The target groups were cyclists, as well as representatives of creative arts and other members of the public.

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

Metropolises on the move ALLIANCE FOR CYCLING

Service Business Plan

Ride your bike! National Cycling Plan 2002 to Measures to promote cycling in Germany. Report by the Federal Government.

Active Travel Strategy Dumfries and Galloway

partner logo WP5 Safe road users WP-Responsible: ERDF PP6 - AMZS Branka Leskovšek, Robert Štaba

Aalborg. T51.1 Cycle Motorway in Aalborg

ROSEE Road safety in Sout East European regions: Safe Road Infrastructure

NATIONAL POLICIES TO PROMOTE CYCLING

EUROPEAN MOBILITY WEEK September 2015

All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU)

Comprehensive Transport Planning for Smart Mobility in German Towns. Prof. Dr. Axel Ahrens, Vancouver,

Welcome Pre-conference Workshop Walk21, Vienna, 20 October 2015

Sustainable Urban Mobility Plan for Aberdeen, Scotland. Louise Napier Senior Planner Aberdeen City Council

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

Planning for tennis in your Local Government Area. A resource from Tennis Australia

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

BIKE PLAN CONTENTS GATEWAY

LEEDS BECKETT UNIVERSITY. Transport Strategy

Education and Sport: Dual Careers Perspective of European Commission Bart Ooijen. 10 September 2009, Arhus - Denmark

GD 0043/18 ACTIVE TRAVEL STRATEGY

Czech Republic. The Workshop is organized in the framework of the Transport, Health and Environment Pan European Programme (THE PEP)

Integrated Urban Mobility

Policy factsheet 2 MOBILITY MANAGEMENT MEASURES FOR SCHOOLS.

Conclusions. on effective waterway infrastructure rehabilitation and maintenance on the Danube and its navigable tributaries. Danube Ministers Meeting

Masterplan Bicycle Traffic in Munich

Local Government Road Safety Summit - 9 April 2018

Bike sharing in 10 European countries report. Module 3: Czech Republic

Certificate programme European Handball Manager

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

Bicycle policy in Europe BYPAD a European quality standard for cycling policy?

Government Accelerators

G u i d e l i n e C Y C L I N G C O S T - E F F E C T I V E M E A S U R E S Version: November 2015

Eugene s Strategic Pedestrian and Bicycle Plan

Report Title. City Name. Population: 280,000. Area (km2): 120 km 2. Take-up level: the improvement of the cycling infrastructure and.

Final Plan 20 December 2016

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

DRAFT for a State Policy for Healthy Spaces and Places

ROSEE RSA/RSI Introduction courses ROSEE Speed Management courses

Project Name: Smart Choice for commuters - BIKE2WORK Contract N : IEE/13/585/SI Duration: 36 months

AGENDA. Stakeholder Workshop

What s the issue for transport in Cardiff?

Reporting on progress made since 2009 on the attainment of the Amsterdam Goals

University of Leeds Travel Plan

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

TRANSPORTATION TOMORROW SURVEY

Can PRT overcome the conflicts between public transport and cycling?

European Commission Policy, Promotion & Funding for Cycling Madeleine Kelly-Tychtl Directorate-General for Mobility & Transport

Attractive, Sustainable and Healthy Mobility

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Action plan to promote local mobility in North Rhine-Westphalia (Germany)

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Public Space Public Life studies the foundation for people first design

PROJECT BACKGROUND/DESCRIPTION

Soft measures affect traffic in Lund effects from two years work with a sustainable transport system in Lund

-Current Get On Board initiative: Existing LTC program to help make LTC accessible, informative, and encourage use of public transit

INTERREG IVC - CYCLECITIES (1307R4)

The German Spatial Data Strategy

POINTS = SINGLE POINTS OF CONTACT SPORTS INTEGRITY

Sustainable Transportation Initiatives and Plans in Caledon

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

National Road Safety Campaign / Road Safety Audit. International Road Federation (IRF) India Chapter

Setting Regional and National Road Safety Targets

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

Transcription:

This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. Project Central MeetBike (3CE343P2) 1 st Working Group Meeting WP3 (output 3.3.10.) Brno, 10 th 11 th October 2011 WP3 - Cycling strategies & analysis, action plans, recommendations REPORT FINAL VERSION 1 31.10.2011

Meeting Discussion & Decisions Welcome Ute Kabitzke (PP2) welcomed the attendees to the meeting. Leader WP3: TUD Presentation: CMB Kick-Off WP 3 Strategy Speaker: Gerd-Axel AHRENS (TUD), Ute KABITZKE (TUD) Introduction to WP3: Objectives of WP3 including the relevance of integrated, sustainable transport planning Overview of the activities of WP3 Tasks and short description of outputs: Action 3.1 Comparison and problem analysis of partner cities and countries 1) BYPAD - outputs: 3.1.1. 3.1.5. Analysis of present status (BYPAD) Introduction of structure and objectives if bicycle audits with the focus on the system of BYPAD It is important that the audits of all cities are comparable. BYPAD provides a trustworthy methodology that ensures comparability of the results Presentation of the methodology of BYPAD (spiral of development, ladder of development, BYPAD-procedure) Presentation of BYPAD in the Czech Republic (LP) CDV will start this output in November In preparation of BYPAD activities a specific fact was found: The city of Pardubice will have worse results than scoring in 2004, when this audit was implemented for the first time. This is because when the individual modules were assessed previously, it was on the basis of information available from 2004. So, for example, when the quality of infrastructure was assessed, in 2004 it was rated the highest grade "4". Now it will be much lower mark. The same applies to campaigns, etc. Therefore, I have a supplementary question, whether in the case of the BYPAD method there are any comparable indicators by which the individual questions might be considered. Next, we ask whether it would be possible to send the last set of questions of the BYPAD audit, presentations or even news. Presentation of BYPAD in Germany (PP2) Presentation of results and experience of BYPAD in Leipzig: Leipzig has already conducted BYPAD in 2008-2009; the result was a total score of 2,2; best rating were achieved in the categories user needs, policy on paper, and personnel and means ; room for improvement was stated in the category promotion and partnership ; a second BYPAD will be conducted within CMB in the end of the project

Presentation of the state of preparation of BYPAD in Dresden: BYPAD will be conducted in 2010/11; the schedule for the BYPAD-process is available; invitation letters have already been sent to the evaluation group; the first meeting will be in November 2011 Presentation of BYPAD in Poland (PP4) Presentation of BYPAD results in Gdansk and Tczew 2) SURVEY - outputs: 3.1.7. 3.1.12. Travel behavior surveys and Modal splits analysispresentation of the objectives and use of the household survey Statistical data of mobility behaviour is the basis of traffic modelling and transport planning Implementation of the same survey methodology in different places allows benchmarking the city s performance Time series of statistical data allow for monitoring the development of mobility behaviour If conducted with a stable method, household surveys provide high quality data for monitoring Resilient data is important if a measure of transport planning is submitted to court Allocation of the survey within the project Central MeetBike The household survey can be found as activities 3.1.7.-12 in the Application Form, which includes 1 survey in the beginning of the project CMB in the cities in Poland, Czech and Slovakia The German cities have already been conducting a survey in 2008; the next one will be in 2013, but it is not part of the project CMB. Anyway, the data of the German survey will be available for analysis within CMB Description of the process of the CMB-survey The process includes the following steps: establishing the survey method, preparation of the survey, tendering the field work, random sampling, announcement of the survey, interviews, data input, and evaluation of the data Schedule of the survey The field time of the survey was projected for October 2011; due to the difficulties with starting the project, it was not feasible due to compliance with the national rules of procedure (2 month tendering of the field time is required in some countries). Therefore, in a separate skype meeting it was agreed to postpone the field time to March-May 2012. It can be ensured that no other activities will be affected by this shift. The only exception is the city of Presov; in Presov the field time (interviews) is October 2011, evaluation will be available in February 2012 All other cities agreed on a field time between March and May 2012, evaluation will be available in August 2012 Methodology of the CMB-survey Since March 2011 TUD has been cooperating with the cities to establish a joint survey methodology for the project CMB. Main objective was to ensure comparability of the results. Due to different conditions in the cities, the methodology varies

A first draft of the methodology has already been presented during the kickoff meeting in Presov (June 2011). Some adjustments had to be made afterwards. The final methodology can be seen in the table below city sampling announce ment Interview technique Uherske Hradiste Register of residents Letter Pardubice Register of addresses Letter Zilina Register of addresses Letter Presov Random Route Poster, TV, Radio Tczew Register of residents Letter Gdansk Register of residents Letter Short presentation of the progress of the survey in Presov (PP8) The field time of the survey has already started in Presov So far the response is good, but it is expected to extend the field time in order to achieve a sample of 1.000 persons Difficulties during the preparation of the survey included the search for interviewers Test Survey (PP2, Ute Kabitzke) In order to avoid misunderstandings regarding the survey procedure and obstacles during the implementation, it was decided to conduct a test survey. Questions and difficulties might not come up during planning but during implementation. Therefore, all participants of the workshop were encouraged to experience the survey by filling out a questionnaire themselves A short version of the CMB-questionnaire was prepared in Czech and Polish language; the Slovakian partners filled in the Czech questionnaire and the Germans were asked face-to-face (personal interview) Experiencing the survey helped the partners to raise understanding of the process of the survey, questions regarding the questionnaires and other parts of the survey could be answered. This way, it is expected to have less obstacles during implementation The results were presented on the last day of the meeting including sociodemographic structure, employment, motorization, daily trips per person and modal split. The results showed impressively the importance of a representative sample. It could be easily seen how the number of daily trips and modal split was affected by the uniform age- and employment structure of the participants

3) NATIONAL ANALYSIS - outputs: 3.1.13. 3.1.15. Analysis of deficiencies, lack of knowledge for strategy documents in Czech Republic, Slovakia and Poland Warning - approaching deadlines for submission Core Outputs: 3.1.13. Analysis of deficiencies, lack of knowledge (local, regional, national) in integrated bicycle planning, legislation, bike&ride, cycle parking etc.in the Czech Republic 3.1.14. Analysis of deficiencies, lack of knowledge (local, regional, national) in integrated bicycle planning, legislation, bike&ride, cycle parking etc.in Slovakia 3.1.15. Analysis of deficiencies, lack of knowledge (local, regional, national) in integrated bicycle planning, legislation, bike&ride, cycle parking etc.in Poland Presentation of TUD s approach to develop recommendations for strategies (Action 3.2-4.): Ute Kabitzke (PP2) Definition of strategy : TUD suggests the following definition of strategy: A strategy is an action plan that is designed to achieve a particular goal and a coordination instrument for isolated actions, programs, measures, and project Participants agree to use that definition within the project CMB Objectives of strategies The strategies are an essential part of the planning process and form the base of all CMB-activities The CMB-strategy will aim an integrated approach: it means that cycling is promoted as a part of the mobility coalition (walking, cycling, and public transport); aim is to increase the share of the coalition. German experience shows that without the integrated strategy cycling share increased on the costs of public transport and car use increased as well. Switching to an integrated approach did successfully lead to an increase of the mobility coalition on the cost of car use. The development could have been shown by the survey Mobility in Towns- SrV in 2008. It is very important that the measures are incorporated in a cycling strategy and that the cycling strategy is incorporated in other strategic planning (transport master plan, spatial planning etc.) An integrated transport planning includes: sectoral integreation, horizontal and vertical integratuion, modal integration, integral consideration of mobility, spatial integration, and integration of all persons concerned Allocation of strategies within the project CMB The household survey can be found as activities 3.2.-4. in the Application Form (AF); it includes strategies for the national, regional, and local level According to the AF recommendations for strategy documents will be developed until February 2012, will be tested during the project, and the experience of the testing phase will be incorporated into the final strategies until February 2014 Presentation of TUD s approach

TUD has started the analysis of the partner countries by expert interviews and questionnaires (the results will be available for the LP and PP4 to be used for the outputs 3.1.13-15.) TUD aims to develop the recommendation for strategies in close cooperation with the partners TUD has already developed first ideas, which are presented during the meeting and partners have the possibility to give feedback. Afterwards a workshop session encourages partner to contribute own ideas Feedback and those ideas will be incorporated in the recommendations and a first draft will be sent to partners First recommendations will be finished in February 2012 according to the Application Form First suggestions for the structure of strategy documents Suggestion TUD: There could be 2 levels: 1. Level of strategies, and 2. Level of measures Example German National Cycling Plan Example PRESTO-project: The structure of PRESTO is similar to the structure of CMB; TUD suggests to add a level of strategies The partners are asked to tell TUD the opinion on the suggestions Definitions: TUD suggests the following definitions Hard measures: Physical facilities that facilitate transportation systems (IT technology, information included) Soft measures: Activities, services, information, and messages to educate and inform the public. Strategies and projects to increase knowledge and understanding for a more efficient and sustainable transport system with a focus on the mobility coalition of walking, cycling, and using public transport in cities. Management and finance: Efforts to operate and to control the system and to create funds, budgets, income for financing measures and options Workshop session to collect ideas of participants Objective of the workshop session is to encourage the participants of the conference to take part in the process of developing the strategies. After the presentations on TUD s ideas for the strategies each partner gets the opportunity to contribute his/her opinions and ideas Each partner is asked to write his/her ideas regarding strategies on cards and post it on the wall Afterwards, the cards are presented and the ideas are discussed with participants The results of the workshop-session can be summarized as follows: GOALS: o Increase the number of cyclists/share of cycling o Define goals and objectives (concrete) o Change of lifestyles, increase quality of life and of the environment o Increase safety o Inspire politicians, define responsibilities o Define problems in legislation and solve it o Design a continuous network

o Rise acceptance and awareness of cycling National strategies: o Provide infrastructure and possibilities for networking o Provide best practice examples o Control focus on University education and research activities o Provide guidelines and regulations o Create conditions for cycling atmosphere o Prepare rules for cycling policies o Provide budget Regional strategies: o Support cycling between cities o Support ideas and activities of bigger cities and the region o Interconnect planning on regional level o Define sources (financial, human etc.) for cycling Local strategies: o Create safe infrastructure o Create high quality public spaces for the community o Provide training and education (rise awareness for cycling, tell about benefits of cycling, make it accepted) o Encourage social dialogue between all road users (car user, cyclists, walking people) o Promotion, e.g. by involving popular persons o Provide budget for cycling o Encourage dialogue between all responsible departments

Action 3.2 Development CMB Strategy Plea for TUD: let's connect the our outputs. we have already started work on the Cycling Strategy and will be happy to help for specific TUD. 3.2.1. Creation of the first framework of the national masterplan on cycling transport in the self-governing region 3.2.2. Improving of the National Cycling Strategy in the Czech Republic and other recommendations for the National Cycling Strategy Additional measures: TUD please create a common frame for this analysis. It is necessary to create a common image of the materials. Action 3.3 Transnationally developed local and regional action plans and policies

Getting started with measure of TUD, to be finished by February 2012-3.3.1.Creation of the first framework of the local masterplan on cycling transport Action 3.4. Evaluation all strategies Recommendations for TUD. The core output is to be implemented at the end of the project, but I feel that interim results should be known earlier. 3.4.1. Strategy document developed - Creation of the framework for a local masterplan for cycling transport - update the first version, incorporation of experience from the partners (3.3.1.) 3.4.3. Strategy document developed - Creation of the framework of the regional masterplan for cycling transport in the self-governing region - update the first version (3.2.1.) Even now we need to consider how to operate with the results of our joint work. We can build on the report Implementing sustainable urban travel policie: National Policies to Promote Cycling. This study provides an overview of policies at the national level for promoting cycling, which is increasingly recognised as a clean, sustainable mode of transport in urban areas. The report is based on information obtained from 21 ECMT Member and Associate Member countries in 2002 and 2003. The report was presented on the CEMT Ministers at the their Ljubljana Council in 2004. It was the first time that CEMT Ministers were asked to consider a spercific role fot the national level in promoting cycling in urban areas. At the Council, Ministers agreed a Declaration on National Cycling Policie. While regional and local authorities bera the primary responsibility for detailed planning and implementation of cycling policie, national level commitment is important in setting the right legal, regulatory and financial framework so that successful implemenation of cycling initiativies can také place. List of Advisory Boards; Working Group WP3 Members NAME Function Project Partner # Mr Gerd Axel AHRENS Chairman PP2 Mr Jaroslav MARTINEK Deputy Chairman LP Ms Sona SESTAKOVA Member PP3 Mr Piotr KUROPATWINSKI Member PP4 Mr Radim SUPKA Member PP5

Mr Vojtech JIRSA Member PP6 Mr Marian GOGOLA Member PP7 Ms Vierka STUPAKOVA Member PP8 Ms Martyna LINK Member PP9 Mr Grzegorz KRAJEWSKI Member PP10 Mr Andre ZSCHOGE Member PP11 Mr Torben HEINEMANN Member PP12 L