[needs to be discussed with faculty if any new material to be done]

Similar documents
LEO SEM SOP Page 1 of 9 Revision 1.4 LEO 440 SEM SOP. Leica Leo Stereoscan 440i

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager.

SEM LEO 1550 MANUAL. I. Introduction. Generality

TYPICAL OPERATION PROCEDURES

Nordiko Metal Sputtering System Standard Operating Procedure

THERMAL EVAPORATION UNIT (for Al evaporation)

R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

Scanning Electron Microscope JEOL JSM F

Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date:

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

Operating Procedures for Metal Evaporator I

Thermo K-Alpha XPS Standard Operating Procedure

Oerlikon Sputtering Evaporator SOP

Revised: June 7, 2017

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

OPERATION OF THE DIMPLER

Usage Policies Notebook for AMST Molecular Vapor Deposition System MVD 100

SSI Solaris 150 RTA Revision /27/2016 Page 1 of 9. SSI Solaris 150 RTA

DART-Bruker Vapur Interface Manual SI-410-A-R Rev 1-3

ADDENDUM IMPORTANT DOCUMENT INVITATION TO BID ADDENDUM. OPENING DATE & TIME: January 3, 2018 at 3:00PM

KARL SUSS MJB3 UV400 Mask Aligner Standard Operating Procedure

Cryo-Evaporator Operation

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

1)! DO NOT PROCEED BEYOND THIS MARK

Approved by Principal Investigator Date: Approved by Super User: Date:

Basic ICP Operating Procedures

COMELEC C-30-S Parylene Coating System

Standard Operating Procedure Inductively Coupled Plasma Optical Emission Spectrometer (ICP-OES) - Thermo Scientific icap 6300

Warnings: Notes: Revised: October 5, 2015

RAPID THERMAL PROCESSOR (Annealsys AS-ONE 150) Lab Manual

PLASMA ENHANCED CHEMICAL VAPOR DEPOSITION (PECVD) SOP OXFORD PLASMALAB SYSTEM 100

University of Minnesota, MN Nano Center Standard Operating Procedure

Savannah S100 ALD at SCIF, UC Merced Standard operating Procedure

Standard Operating Procedure

Angstrom Dielectric Sputterer Operation Manual

Cambridge NanoTech: Savannah S100. Table of Contents

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

SPUTTER STATION STANDARD OPERATING PROCEDURE

2 Switching off ECRIS 3. 4 Acquire Beam Spectrum 4. 6 Vent Instrument Chamber 5. 7 Pump down Chamber 5. 8 Baking out Chamber 5.

Standard Operating Manual

Standard Operating Procedure I PHI 5000 VersaProbe II XPS/UPS

BASIC Z-STACK AND TIME SERIES SCAN ON THE ZEISS LIGHTSHEET Z. 1

Usage Policies Notebook for Trion RIE / ICP Dry Etch

Approved by Principal Investigator Date: Approved by Super User: Date:

EXPERIMENT XI. Careful!! Improper handling of the vacuum line may result in the release of SO 2 which is an irritating and suffocating gas.

March CS-1701F Reactive Ion Etcher

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

Edge Isolation Tool. Standard Operating Procedure. Version 1.1. Date: Prepared by, Sandeep S S. Department of Electrical Engineering

Operation of the Perkin Elmer TGA-GC/MS

Pneumatic high-pressure controller Model CPC7000

Usage Policies Notebook for Parylene Coating System

Unaxis PECVD. SiH4 (5% in He)

Photolithography. Operating Instructions

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

STS ICP-RIE. Scott Munro (2-4826,

Standard Operating Procedure. For. PVD E-Beam

[USING THE VITROBOT April 9, Using the Vitrobot

Armfield Distillation Column Operation Guidelines

Usage Policies Notebook for Karl Suss MA6 Mid / Deep UV Mask Aligner

Glove Box Installation Manual

MP15 Jockey Pump Controller

Standard Operating Manual

Standard Operating Manual

Read this first. Zetasizer nano series Self installation and Quick start guide MRK825-02

MIMS PROCEDURES. Updated 10 Sept 2008

Operation of the contact mask aligner Canon PPC 210 Projection Print Camera

Usage Policies Notebook for HITACHI S Field Emission Scanning Electron Microscope System

STANDARD OPERATING PROCEDURE

Pneumatic high-pressure controller Model CPC7000

Xactix XeF2 OPERATION MANUAL

UltraLo 1800 Alpha Particle Counter

OXFORD PLASMALAB 80PLUS (CLOEY)

5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

Standard Operating Manual

Usage Policies Notebook for STS DRIE System

r β tr t t s t r s t s tr tt r t r t r r r tt r e s tt e tt r e s tt r e r r e r 2 t ö t t r s s t t r r r ts r rr t

Standard Operating Manual

CLEANLINESS STANDARD NCPRE tool contamination classification

UNIVERSITY OF ROCHESTER MEDICAL CENTER

BVIS Beach Volleyball Information System

Approved by Principal Investigator Date: Approved by Super User: Date:

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel

SCS Field Revision No. 1.0 June 2001 STANDARD OPERATING PROCEDURE (SOP) FOR FIELD OPERATION OF THE SEQUENTIAL CYCLONE SAMPLER (SCS)

COBILT CA-800 Mask Aligner Equipment Operation

Title: Standard Operating Procedure for Dasibi Model 5008 Gas Dilution Calibrator

LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY)

Warnings: Notes: Revised: January 8,

QUORUM TECH 150RES THE FIRST AND THIRD WEEK WILL BE SET UP FOR CARBON COATING THE SECOND AND LAST WEEK WILL BE SET UP FOR GOLD COATING

The SPI Sputter Coater Handbook

ATL R/V Atlantis AUXILIARY PLANT OPERATION APPENDIX OPERATING PROCEDURES

AKTA ION EXCHANGE CHROMATOGRAPHY SOP Date: 2/02/05 Author: A DeGiovanni Edited by: C. Huang Reviewed by:

MINIBRUTE ANNEAL TUBE STANDARD OPERATION PROCEDURE

Mass Spec will not Autotune

JASCO 810 CD SPECTROPLOARIMETER STANDARD OPERATING PROCEDURE

BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility.

Transcription:

Tool Name: EVO 18 Version 1 Authorized Users: Gayatri, Vishnu kant Materials Used: Sample holder has facility to mount 9 stubs: Si, Glass, Materials allowed : [needs to be discussed with faculty if any new material to be done] Powdered samples on case by case basis, Copper, Sample preparation having Na+, K+ ion content At present we have maintained GPS general purpose stubs for such samples. Sample Size: (2 mm x 2 mm x Z ) to (10 mm x 10 mm x Z) [ for surface imaging] (4 mm x 4 mm x Z ) to (8 mm x 8 mm x Z) [ for cross sectional imaging] where Z is the variable substrate thickness (it can vary from 200 microns to 2 mm,depending on the substrate type like: Si / glass substrates. But it should not be more than this range; if it is, consult with SO before loading the samples. Training Procedure: 1. Please send a mail for training as per the format mentioned on the CEN website 2. Please bring the Training log sheet along with you for each session and get it filled from the AU training you. 3. One theory + demo session (complete system is demonstrated along with the facilities) 1 demo sessions 1. Student observes the User handling the system 2. User gives instruction of handling the system practically 1 hands on sessions Student handles the system under AUser s guidance 1 practice sessions Student handles the system under AUser s supervision 1 Written test Depending on the performance of written test it will be decided whether to take another written test or to proceed to next level. 1 Practical test + viva Depending on the performance it will be decided whether the student needs more practice sessions or can be authorized to use the system independently or not eligible for independent handling (authorization) Please submit the training log sheet to the SO conducting your Test

1 2 days to complete all the tests. Violation policy: 1. If there is any mishandling of the system by the AU and it is not reported to the SO on time by the user : he/she will be barred from using the system for 3 weeks and he/she has to attend 2 consecutive cleaning sessions plus one day to assist the facility team in their work. 2. If one fails to attend 2 3 cleaning sessions consecutively that too without informing your cleaning partner or SO, one has to attend back to back cleaning sessions for the next two weeks 3. If the logbook entry is missed, it will be reported to CENIITB as voilation. Re Authorization policy: If there has been a gap of one month or more for system usage, re authorization needs to be done. The user needs to give a demo to the SO. As per the user s performance, SO decides, if the User needs to undergo any practice sessions and then conduct a Practical test + viva. Cleaning Protocol EVO 18 1. Use lint free cloth and IPA only. 2. Clean the instrument body, working table with IPA soaked cloth. (To be done carefully) 3. Top cover of the tool should be cleaned by the cleaner with a lint free cloth under authorised user s supervision. Once he is done with the top cleaning please ask him to keep the stool out of the lab. 4. Clean all the tweezers, holder and stubs.. Please take help of cleaners wherever necessary. Please take care of the cables and boxes while the cleaner is cleaning the system and the area nearby. N2 Cylinder Change If the pressure is less than 10 kg/cm 2 inform the facility team member to replace it After replacement set the line pressure to 4 6 kg/cm 2 and 2.5 5 psi (N2 gas regulator) Then start your process. Common Errors observed while using the system: Yet to been observed If any problem arises in the system while you are working: Urgently call either of the system owners and inform them about the same. Please Make a note of it in the logbook. Place a note near the system. Inform the users who have booked the next slots (mail/phone) Please do not try anything to rectify the problem unless you are with an experienced AU or SO / or you have been instructed by the SO to do so.

If there is a sudden power cut off, then stop the imaging, switch off the beam and turn off the system as usual. SOP 1. To check all the facilities required by the system a. Status of the UPS b. N 2 cylinder: Switch on the N 2 supply to the system using cylinder key and check: i. Cylinder pressure (> 10 kg/cm2) ii. Line pressure (4 6 kg/cm 2 ) and 2.5 5 psi (N 2 gas regulator) c. AC is on and set at 22 degree C. 2. Check for any notice about the system present for the next user. 3. Switch on the circuit breaker/ main switch on the connection board. 4. Check if the vibration isolator is properly connected. 5. Press the yellow standby button the vacuum pumps turn on. 6. wait for 2 min 7. Press the green button the system turns on. 8. Start the Smart SEM Software by double clicking on the smart sem logo icon and put your login username /password required. 9. wear gloves, hair net. 10. Take a clean lint free cloth and place it on the working table 11. Take the sample holder from the box and place it on the lint free cloth and load samples on the appropriate stubs of the sample holder as per the observations to be done i.e. surface/cross section. 12. Sample height/ area should be under specified range otherwise it can hit the the beam column and the BSD detector and severely damage the system during z height change/ rotate/tilt operations. 13. After mounting the samples on the stubs, vent the chamber using the software command and wait for some time to have the gap between the door and the chamber wall. Slowly pull out the chamber door and load the sample holder. 14. Place the holder on the stage, taking care of the stopper and orientation of the holder such that numbers 1,9, 8 are facing towards the user. 15. After loading the sample holder close the door and pump the chamber using pump command. 16. Wait for chamber vacuum ready to reach to the specified vacuum level.

17. Chamber vacuum level:it should be around * x 10-5 mbar ( before switching on electron beam) 18. Meanwhile change the Z (stage height) and position of the sample using the sample stage navigator/ software control as per the observations to be done. 19. Z height/working distance(wd):wd ~ 7.5 mm (for surface imaging), for cross sectional imaging it should be chosen according to the sample height. 20. Check the EHT voltage (kv) and set it to a value required for Imaging. 21. After reaching the proper chamber vacuum level, switch on electron Beam and don t do anything while beam is being switched on. 22. Make the entry of the start time and chamber vacuum in the log book. 23. Go to SEM mode. 24. Adjust the brightness to 50% and adjust the contrast if the image is too bright/dark 25. Use the stage navigation/joystick for aerial movement across the sample surface. 26. Adjust the Z height (WD) always using the TV mode to prevent the sample hitting the BSD detector. 27. Observe the sample at lower magnification (50X /100X) in pixel avg mode of scanning and locate a particle on the sample, try to focus the particle. 28. Adjust the required scanning speed. 29. Later try to focus the particle at a higher magnification (2kX/5kX/..) 30. On achieving maximum focus possible, do the Astigmation correction and Aperture alignment using focus wobble. 31. If there is a need to change the EHT voltage (kv), change it in smaller steps (0.5 kv/step) otherwise there is a chance of filament damage. 32. Do the SEM imaging as per the requirement (magnification/ location). 33. While taking an image, scan the image in line integration mode and at the scan speed 6. After complete scanning, image will automatically freeze. So save the image using save as option to the desired folder with the desired name. 34. Iff there is a need of tilting the sample, then first go to TV mode and increase/adjust the gap between sample holder and the BSD detector so that it should not collide during the tilt/rotate operation. 35. After completion of the imaging turn off the beam. 36. Wait for at least 5 min after switching off the beam to vent the chamber and unload the samples. 37. Switching off of the beam should be done before venting the chamber. It s a very important point to remember. 38. Meanwhile you can do other works like: data collection, making the stage at its home position (tilt=0, rotation=0), place the lint free cloth on the working table for placing the sample holder etc. 39. After venting the chamber take the sample holder out and place it on lint free cloth. 40. Now immediately close the chamber door and start pumping it.

41. Remove the samples from the sample holder and put the sample holder in its box. 42. Make the entry of the values of remaining parameters in the log book. 43. After reaching the sufficient chamber vacuum level (sufficient to switch on the electron Beam), close the EM server and exit the programme (software) 44. Log off SEM s/w > Shutdown the system and put the system in the standby mode by pressing the yellow button on the front of the system panel. 45. Wait for 2 min and switch off the system using red button on the front of the panel. 46. Switch off the circuit breaker/ main switch on the connection board. 47. Switch off the N 2 supply to the system using cylinder key. 48. Switch off the tube lights and close door of the room.