Similar documents
D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

ENDEAVOR ENERGY RESOURCES

Drilling Morning Report

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

FORGE Energy UL 21 Freedom 1 API Number:

FORGE Energy UL 21 Pahaska 1H API Number:

Wellwork Chronological Regulatory Report

Daily Drilling Report

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

Zarvona DAILY WORKOVER / COMPLETION REPORT

Wellwork Chronological Regulatory Report

Zarvona Energy LLC DAILY OPERATIONS

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

Abandonment Program for Paramount Fort Liard F 36

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

BP SIT Testing Franks Facility Lafayette

Oil Well Potential Test, Completion or Recompletion Report, and Log

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary

Practice Exam IADC WellSharp Driller and Supervisor

Oil Well Potential Test, Completion or Recompletion Report, and Log

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

PHE KE30-A8 WORKOVER PROGRAM

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Oil Well Potential Test, Completion or Recompletion Report, and Log

WELL NO: BJN-8. Lower master valve

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

BLACK HILLS PLATEAU PRODUCTION COMPANY

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

EP WELLS DAILY OPERATIONS REPORT Report 1 02/02/2017

Chapter 5 HORIZONTAL DRILLING

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

Casing Design. Casing Design. By Dr. Khaled El-shreef

Deepwater Horizon Incident Internal Investigation

SUBSEA KILL SHEET EXERCISE No. 5

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

HydroPull. Extended-Reach Tool. Applications

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Extended leak off testing

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

Rig Math. Page 1.

OCEAN DRILLING PROGRAM

Post Job Summary Cement Intermediate Casing

W I L D W E L L C O N T R O L FLUIDS

Dynamic Underbalance (DUB)

A Longer Lasting Flowing Gas Well

and and Norton J. Lapeyrouse CONTENTS

EP WELLS DAILY OPERATIONS REPORT Report 29 04/21/2017

Hydro-Mech Bridge Plug

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Pasquale Imbò e Marco Pelucchi ENI S.pA;

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

Study Guide IADC WellSharp Driller and Supervisor

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Completions & Workovers Module 1.9

Understanding pressure and pressure

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

W I L D W E L L C O N T R O L AIR DRILLING

HPHT Annular Casing Packer. Obex Annular Casing Packer

Colorado Oil and Gas Conservation Commission

Air and Gas Drilling

RPSEA UDW Forum June 22 & 23, Secure Energy for America

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

EP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016

RIH intermediate section casing in Bazian-1 exploration oil well

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

SPE MS. Copyright 2015, Society of Petroleum Engineers

5k Slickline Lightweight Pressure Control Equipment 4 ID

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

Monte Besler Consultant FracN8R Consulting LLC UNITED STATES

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

DB Bridge Plug. Features. Benefits. Applications

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

1. The well has been shut in on a kick and the kill operation has not started.

Optimising Hydraulic Energy to Dramatically Improve Lateral Reach

Live well deployment of long perforating gun system using combined CT technologies

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

Pump Fillage Problem Overview. Jim McCoy. 9 th Annual Sucker Rod Pumping Workshop. Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013

APPENDIX A1 - Drilling and completion work programme

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

Horizontal Marmaton Wells in Beaver County, OK

Coal Bed Methane (CBM) Permeability Testing

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures

Perforation Design for Well Stimulation. R. D. Barree Barree & Associates LLC

FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs

Transcription:

Greystone Oil & Gas Rig Telephone 832-380-6698 Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 7 4/26/2010 3022 3022 Gary Crownover Category Field ABS Footage Hours ROP WOB Daily Cost Cum Cost Toolpusher oil Emma 877 23 38 15 Joe Bordayo County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft $14,365 $227,576 Contractor Andrews Texas Daily Mud Felderhoff Bros. Proposed MD Proposed TVD Hrs Rotate Cum Hrs Hrs Slide Cum Hrs Rig Telephone 4,700 4,700 #25 Casing Information Type OD ID Weight Grade Connection Top MD Conductor 16 15.5 weld SURFACE 8 5/8 8.097 15.5 J-55 STC 0 Intermediate Drlg Liner Production Top TVD Bot MD Bot TVD Shoe Test 40' 1805 Daily Activity Information Present Operation @ 0600 Hrs DRILLING @ 3022 From To Hrs. 0600 0630 0.5 RIG SERVICE 0:00 0:00 8.5 DRLG F/2145 TO 2524 DRLG @ 45 FT/HR W/15K WT, 80 RPM, 110 SPM @ 400 GPM, 1000 PSI PP 1500 1530 0.5 DEVATION SURVEY @ 2493-1.25 DEGREES 1530 0600 14.5 DRLG F/2524 TO 3022 24 HR. FORWARD PLAN: DRILL 7 7/8 HOLE Total Hours 24.0 Diesel Received Diesel Total 1,540 Diesel Used 715 Diesel Left 825 Directional Survey Information MD ANGLE Azimuth TVD 501 1 991 1 1499.75 1987.5 2493 1.25 V S +N / -S +E / -W Closure Dist Closure Dir R + / L- Dlg Sev Current MT. CURRENT Previous Qty Item OD ID Conn Length REPORT # TIME 5:00 Bit No 1 1 BIT Date 4/26/2010 Size 12.25 1 SS 8 2.75 6 5/8 REG 14.63 Temperature Make VAREL 1 DC 8.12 2.87 6 5/8 REG 30.16 TVD 3000 Serial 251777 1 RMR 9 2 13/16 6 5/8 REG 6.00 Weight 10.0 Type HEO4J 1 DC 8.25 2.87 6 5/8 REG 30.51 Viscosity 29 Nozzles 14 14 14 14 1 RMR 8.12 2.87 6 5/8 REG 7.09 PV Depth Out 1 DC 8 2.93 6 5/8 REG 29.35 YP Depth In 1805 Gels 0 0 0 Footage 1217 Filtrate 30 min N/C Hours 32.5 HTHP ROP 37 Cake 0 WOB 15 %Solids 0 Rot RPM 80 %Oil TFA 0.90000 %Water MM RPM %Sand Torque PH 9 Grade BHA Hrs 32.5 Total BHA 705.62 MBT Pump & Hydraulics Information Mud Log Information BOP Test Pm COMBO Pump #1 Pump #2 Bg Gas 18-35 Last Test 4/23/2010 Pf Type TRI Con Gas 35 Next Test Mf Liner 6 Tr Gas Test PSI Chloride 198000 Stroke 10 MAX 38 Safety Topic Calcium 4400 %Eff 600 RPM Gal/Strk 3.70 Lithology NO 300 RPM Bbl/Strk SPM 110 Est PP 95 ECD 0.0880 %Shale 10% %LGS Gal/Min 390.00 %Sand Contractor System bbls Pressure 1000 %Lime 10% Service Co Mud Loss AV DP %Other 80% Co-Rep Cum Mud Loss AV DC DEPTH 3000 Totals Accident Personnel

Greystone Oil & Gas Rig Telephone 832-380-6698 Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 9 4/28/2010 4207 4207 Gary Crownover Category Field ABS Footage Hours ROP WOB Daily Cost Cum Cost Toolpusher oil Emma 445 23 20 30 Joe Bordayo County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft $14,103 $262,541 Contractor Andrews Texas Daily Mud Felderhoff Bros. Proposed MD Proposed TVD Hrs Rotate Cum Hrs Hrs Slide Cum Hrs Rig Telephone 4,700 4,700 $6,884 #25 Casing Information Type OD ID Weight Grade Conductor 16 15.5 SURFACE 8 5/8 8.097 15.5 J-55 Intermediate Drlg Liner Production Connection Top MD Top TVD Bot MD Bot TVD Shoe Test weld 40' STC 0 1805 Daily Activity Information Present Operation @ 0600 Hrs DRILLING 7 7/8" HOLE TO TD From To Hrs. 0600 0900 3.0 DRLG F/3762 TO 3826 0:00 0:00 0.5 RIG SERVICE 0930 1800 8.5 DRLG F/3826 TO 4049 1800 1830 0.5 DEVATION SURVEY @ 4017' - 3/4 DEGREE 1830 0600 11.5 DRLG F/4049TO 4207 DRLG W/30K,65 RPM, 112 SPM, 400 GPM, 1250 PSI PP. 24 HR FORWARD PLAN: POOH 5 JTS, REPLACE HYDRAULIC MOTOR AND CONTINUE DRLG 7 7/8 HOLE TO TD Total Hours 24.0 Diesel Received 2,501 Diesel Total 3,325 Diesel Used 935 Diesel Left 1,485 Directional Survey Information MD ANGLE Azimuth TVD V S +N / -S +E / -W Closure Dist Closure Dir R + / L- Dlg Sev 4017.75 Current MT. CURRENT Previous Qty Item OD ID Conn Length REPORT # TIME 0:00 Bit No 1 1 BIT Date 4/28/2010 Size 12.25 1 SS 8 2.75 6 5/8 REG 14.63 Temperature Make VAREL 1 DC 8.12 2.87 6 5/8 REG 30.16 TVD 4090 Serial 251777 1 RMR 9 2 13/16 6 5/8 REG 6.00 Weight 10.0 Type HEO4J 1 DC 8.25 2.87 6 5/8 REG 30.51 Viscosity 29 Nozzles 14 14 14 14 1 RMR 8.12 2.87 6 5/8 REG 7.09 PV Depth Out 1 DC 8 2.93 6 5/8 REG 29.35 YP Depth In 1805 Gels 0 0 0 Footage 2402 Filtrate 30 min N/C Hours 77.5 HTHP ROP 31 Cake 0 WOB 30 %Solids 0 Rot RPM 65 %Oil TFA 0.90000 %Water MM RPM %Sand Torque PH 10.0 Grade BHA Hrs 77.5 Total BHA 624.63 MBT Pump & Hydraulics Information Mud Log Information BOP Test Pm.1 COMBO Pump #1 Pump #2 Bg Gas 19-Feb Last Test 4/23/2010 Pf.1 Type TRI Con Gas 0 Next Test Mf.3 Liner 6 Tr Gas Test PSI Chloride 198000 Stroke 10 MAX 50 Safety Topic SPM 112 Est PP COMMUNICATION Calcium 4400 %Eff 95 ECD Accident 600 RPM Gal/Strk 3.70 Lithology NO 300 RPM Bbl/Strk 0.0880 %Shale 60% Personnel %LGS Gal/Min 395.00 %Sand Contractor 10 System bbls Pressure 1100 %DOLO 30% Service Co 2 Mud Loss AV DP 225 % LIME 10% Co-Rep 1 Cum Mud Loss AV DC 361 DEPTH 4206 Totals 13

Greystone Oil & Gas Rig Telephone 832-380-6698 Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 10 4/29/2010 4711 4711 Gary Crownover Category Field ABS Footage Hours ROP WOB Daily Cost Cum Cost Toolpusher oil Emma 504 16 32 25 Joe Bordayo County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft $15,889 $278,431 Contractor Andrews Texas Daily Mud Felderhoff Bros. Proposed MD Proposed TVD Hrs Rotate Cum Hrs Hrs Slide Cum Hrs Rig Telephone 4,700 4,700 $4,920 $11,804 #25 Casing Information Type OD ID Weight Grade Connection Top MD Top TVD Bot MD Bot TVD Shoe Test Conductor 16 15.5 weld 40' SURFACE 8 5/8 8.097 15.5 J-55 STC 0 1805 Intermediate Drlg Liner Production Daily Activity Information Present Operation @ 0600 Hrs DRLG 7 7/8 HOLE From To Hrs. 0600 0730 1.5 DRLG F/4207 TO 4230 0:00 0:00 7.5 RIG REPAIR- CHANGE OUT HYDROLIC PUMP & 2 HYDROLIC MOTORS ON TOP DRIVE 1500 0030 9.5 DRLG F/4230 TO 4523 W/25K WT., 80 RPM, 112 SPM @ 400 GPM, 1100 PSI PP 0030 0100 0.5 DEVATION SURVEY @ 4491-1/2 DEGREE 0100 0600 5.0 DRLG F/4523 TO 4711 START MUD UP @ 4600 24 HR FORWARD PLAN: DRILL TO TD (4737) CIRC & CONDITION MUD, TOH, LOG. Total Hours 24.0 Diesel Received 2,501 Diesel Total 3,325 Diesel Used 770 Diesel Left 715 Directional Survey Information MD ANGLE Azimuth TVD V S 4017.75 4491.5 +N / -S +E / -W Closure Dist Closure Dir R + / L- Dlg Sev Current MT. CURRENT Previous Qty Item OD ID Conn Length REPORT # TIME 0:00 Bit No 2 1 BIT Date 4/29/2010 Size 7 7/8 1 SS 8 2.75 6 5/8 REG 14.63 Temperature Make VAREL 1 DC 8.12 2.87 6 5/8 REG 30.16 TVD Serial 4001358 1 RMR 9 2 13/16 6 5/8 REG 6.00 Weight 10.0 Type VTD616X 1 DC 8.25 2.87 6 5/8 REG 30.51 Viscosity 38 Nozzles 14 14 14 14 1 RMR 8.12 2.87 6 5/8 REG 7.09 PV Depth Out 1 DC 8 2.93 6 5/8 REG 29.35 YP Depth In 1805 Gels Footage 2906 Filtrate 30 min Hours 93 HTHP ROP 31 Cake WOB 25 %Solids Rot RPM 80 %Oil TFA 0.90000 %Water MM RPM %Sand Torque PH 10 Grade BHA Hrs 93 Pf Total BHA 624.63 MBT Pump & Hydraulics Information Mud Log Information BOP Test Pm Mf COMBO Type Pump #1 Pump #2 Bg Gas Last Test 4/23/2010 TRI Liner 6 SPM Con Gas 56 Next Test Test PSI Chloride 198000 Stroke 10 MAX 140 Safety Topic Calcium 4400 %Eff 95 Tr Gas 112 Est PP 600 RPM Gal/Strk 3.70 Lithology 300 RPM Bbl/Strk 0.0880 %Shale 10% ECD PPE Accident %LGS Gal/Min 395.00 %Sand Contractor 10 System bbls Pressure 1100 %DOLO 80% Service Co NO Personnel Mud Loss AV DP 225 % LIME 10% Co-Rep 1 Cum Mud Loss AV DC 361 DEPTH 4700 Totals 19 8

Greystone Oil & Gas Rig Telephone 832-380-6698 Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 11 4/30/2010 4737 4737 Gary Crownover Category Field ABS Footage Hours ROP WOB Daily Cost Cum Cost Toolpusher oil Emma 26 0.5 52 25 WES DAVIS County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft $92,020 $370,451 Contractor Andrews Texas Daily Mud Felderhoff Bros. Proposed MD Proposed TVD Hrs Rotate Cum Hrs Hrs Slide Cum Hrs Rig Telephone 4,700 4,700 $7,228 $19,032 #25 Casing Information Type OD ID Weight Grade Connection Top MD Top TVD Bot MD Bot TVD Shoe Test Conductor 16 15.5 weld 40' SURFACE 8 5/8 8.097 24 J-55 STC 0 1805 Intermediate Drlg Liner Production 5 1/2 4.950 15.5 J-55 LTC 0 4737 Daily Activity Information Present Operation @ 0600 Hrs CIRCULATING 5 1/2 CSG From To Hrs. 0600 0630 0.5 DRLG F/4711 TO 4737 TD W/20K WT, 80 RPM, 112 SPM @ 400 GPM, 1100 PSI PP 0:00 0:00 4.0 CIRC AND CONDITION MUD, PUMP HIGH VIS SWEEP, SPOT 50 BBLS HIGH VIS PILL ON BOTTOM 1030 1530 5.0 TOH, LDDP & BHA 1530 2200 6.5 RIG UP HOWCO WL, RUN SONIC, DUAL LATEROLOG, DENSITY, DUAL SPACED NEUTRON, & GR LOGS FROM 4733 WLTD TO 1800 W/NEUTRON & GR TO SURFACE 2200 0030 2.5 RIG DOWN LOGGERS, RIG UP CSG CREWS 0030 0500 4.5 RUN AND LAND 105 JTS. (4737.55') 5 1/2 15.5# J-55 LTC CSG W/SHOE @ 4736, FC @ 4689 0500 0600 1.0 CIRCULATE CSG, RIG UP HOWCO CMTERS. 24 HR FORWARD PLAN: CMT. CSG, NIPPLE DOWN BOP, SET SLIPS, JET PITS Total Hours 24.0 Diesel Received 2,501 Diesel Total 2,575 Diesel Used 725 Diesel Left 1,850 Directional Survey Information MD ANGLE Azimuth TVD V S 4491.5 +N / -S +E / -W Closure Dist Closure Dir R + / L- Dlg Sev Current MT. CURRENT Previous Qty Item OD ID Conn Length REPORT # TIME 0:00 Bit No 2 Viscosity 36 Nozzles 14 14 14 14 1 RMR 8.12 2.87 6 5/8 REG 7.09 Gels 5 7 Footage 2932 1 BIT Date 4/29/2010 Size 7 7/8 1 SS 8 2.75 6 5/8 REG 14.63 Temperature Make VAREL 1 DC 8.12 2.87 6 5/8 REG 30.16 TVD 4737 Serial 4001358 1 RMR 9 2 13/16 6 5/8 REG 6.00 Weight 10.1 Type VTD616X 1 DC 8.25 2.87 6 5/8 REG 30.51 PV 6 Depth Out 4737 1 DC 8 2.93 6 5/8 REG 29.35 YP 16 Depth In 1805 Filtrate 30 min 8.0 Hours 93.5 HTHP ROP 31 Cake 1 WOB 25 %Solids 13 Rot RPM 80 %Oil TFA 0.90000 %Water 87 MM RPM %Sand 1 Torque PH 10.0 Grade BHA Hrs Pf.1 Total BHA 624.63 MBT 12 Pump & Hydraulics Information Mud Log Information BOP Test Pm.1 COMBO Mf Type Pump #1 Pump #2 Bg Gas Last Test 4/23/2010 TRI 4 Liner 6 SPM Con Gas Next Test Test PSI Chloride 198000 Stroke 10 MAX Safety Topic Calcium 5200 %Eff 95 Tr Gas 112 Est PP 600 RPM Gal/Strk 3.70 Lithology 300 RPM Bbl/Strk 0.0880 %Shale ECD MIXING CHEMICALS Accident %LGS Gal/Min 395.00 %Sand Contractor 10 System bbls Pressure 1100 %DOLO Service Co NO Personnel Mud Loss AV DP 217 % LIME Co-Rep 1 Cum Mud Loss AV DC 348 DEPTH Totals 26 15

Greystone Oil & Gas Rig Telephone 832-380-6698 Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 12 5/1/2010 4737 4737 Gary Crownover Category Field ABS Footage Hours ROP WOB Daily Cost Cum Cost Toolpusher oil Emma 0 0 0 0 Joe Bordayo County/Parish State Ftg Rotate Cum Ftg Ft Slide Cum Ft $11,697 $382,148 Contractor Andrews Texas Daily Mud Felderhoff Bros. Proposed MD Proposed TVD Hrs Rotate Cum Hrs Hrs Slide Cum Hrs Rig Telephone 4,700 4,700 #25 Casing Information Type OD ID Weight Grade Connection Top MD Top TVD Bot MD Bot TVD Shoe Test Conductor 16 15.5 weld 40' SURFACE 8 5/8 8.097 24 J-55 STC 0 1805 Intermediate Drlg Liner Production 7 7/8 4.950 15.5 J-55 LTC 0 4737 Daily Activity Information Present Operation @ 0600 Hrs From To Hrs. 0600 0800 2.0 CMT 5 1/2" CSG W/375 SKS ECONOCEM-C MIXED @ 11.9 PPG, 2.47 YLD, FB 250 SKS VERSACEM-C +.5% LAP-1.3% CFR-3,.25 #/SK D-AIR 3000, MIXED @ 14.4 PPG, 1.24 YLD, DISPLACED @ 8 BPM & 250-1090 PSI, DISPLACED W/112 BFW, BUMP PLUG TO 1700 PSI, FLTS HELD, W/FULL RETURNS THRU OUT JOB, RECIPRICATED 25' 0800 0900 0.5 RIG DOWN CMTERS 0900 1000 1.0 NIPPLE DOWN BOP 1000 1200 2.0 SET SLIPS W/70K WT, CUT OFF CSG 1200 NU B SECTION W/ABANDAMENT CAP JET & CLEAN PITS RIG RELEASED @ 1300, 4/30/2010 RDMO RT NOTIFIED CINDY W/TRRC OF PRODUCTION CSG @ 8:15 AM 4/29/2010 Total Hours 5.5 Diesel Received 2,501 Diesel Total 3,325 Diesel Used 935 Diesel Left 1,485 Directional Survey Information MD ANGLE Azimuth TVD V S 4017.75 +N / -S +E / -W Closure Dist Closure Dir R + / L- Dlg Sev Current MT. CURRENT Previous Qty Item OD ID Conn Length REPORT # TIME 0:00 Bit No 2 1 BIT Date Size 7 7/8 1 SS 8 2.75 6 5/8 REG 14.63 Temperature Make VAREL 1 DC 8.12 2.87 6 5/8 REG 30.16 TVD Serial 4001358 1 RMR 9 2 13/16 6 5/8 REG 6.00 Weight Type VTD616X 1 DC 8.25 2.87 6 5/8 REG 30.51 Viscosity Nozzles 14 14 14 14 1 RMR 8.12 2.87 6 5/8 REG 7.09 PV Depth Out 1 DC 8 2.93 6 5/8 REG 29.35 YP Depth In 1805 Gels Filtrate 30 min HTHP Footage Hours ROP Cake WOB %Solids Rot RPM %Oil TFA 0.90000 %Water MM RPM %Sand Torque PH Grade BHA Hrs Pf Total BHA 624.63 MBT Pump & Hydraulics Information Mud Log Information BOP Test Pm Mf COMBO Type Pump #1 Pump #2 Bg Gas Last Test 4/23/2010 TRI Liner 6 SPM Con Gas Next Test Test PSI Chloride Stroke 10 MAX Safety Topic Calcium %Eff 95 Tr Gas 112 Est PP 600 RPM Gal/Strk 3.70 Lithology 300 RPM Bbl/Strk 0.0880 %Shale ECD Accident Personnel %LGS Gal/Min 395.00 %Sand Contractor 10 System bbls Pressure 1100 %DOLO Service Co Mud Loss AV DP 225 % LIME Co-Rep 1 Cum Mud Loss AV DC 361 DEPTH Totals 13 2

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/13/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days County ANDREWS 830-08 Mud, Chemicals and Fluids $12,075 $12,075 Location NW ODESSA 35 M 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $1,750 $1,750 Surf Csg 8.625 1805' 830-11 Cementing Int Csg 830-14 Trucking Liner 830-15 Perforation and Wireline $9,596 $9,596 Prod Csg 5.50" 4736' 830-16 Acidizing and Fracturing Tubing 830-17 Engineering Supervision $1,000 $1,000 Tot. Jts on Loc 830-18 Contract Labor $1,420 $1,420 830-21 FRAC TANKS $4,480 $4,480 TD 4736' 840-30 Production Casing PBTD 4661' 840-31 Tubing 840-32 Wellhead $6,925 $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor 840-37 Lift Equipment, packers, hangers Rig Number 840-38 Equipment Construction Labor Pusher 840-39 Tanks Operator Co. Rep. A.E. VICKERY Total $37,246 Cumulative Work Summary ND 11" 3K# X 7 1/16" 3K# TBG. HEAD. NU 11" 3K# X 7 1/16" 5K# TBG. HEAD. CAMERON PRESS. TEST TO 2800#. 10 MIN. OK. NU 7 1/16" 5K# FRAC VALVE. PRESS. TEST 5.50" CSG. TO 1000#. OK. MIRU APOLLO PERFORATORS INC. RAN GUAGE RING & JUNK BASKET F/ 4600-0' + RAN GAMMA RAY COLLAR LOG F/ 4600-2600'. APOLLO PERF. 5.50" CSG. IN THE SAN ANDRES FORM. 1 JS/FT. W/ A 120 DEGREE PHASED 3 1/18" CSG. GUN AS FOLLOWS: 4158-4162' ( 5 HOLES ) 4184-4188' ( 5 ) 4246-4250' ( 5 ) 4268-4272' ( 5 ) 4328-4332' ( 5 ) 4350-4353' ( 5 ) TOTAL OF 30 HOLES. RIGGED DOWN APOLLO WIRELINE. J.C. @ 1830 HRS. 5-13-10. LOGGERS PBTD=4661'. CISDFN. SET 6 FRAC TANKS & NOW FILLING W/ 10# BRINE. 24 HR. PLAN: NU GOAT HEAD & ACIDIZE SAN ANDRES PERFS. 4158-4354'. $37,246

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/14/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days County ANDREWS 830-08 Mud, Chemicals and Fluids $12,075 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $70 $1,820 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 Trucking Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $8,712 $8,712 Tubing 830-17 Engineering Supervision $1,000 $2,000 Tot. Jts on Loc 830-18 Contract Labor $600 $2,020 830-21 FRAC TANKS $245 $4,725 TD 4736' 840-30 Production Casing PBTD 4661' 840-31 Tubing 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor 840-37 Lift Equipment, packers, hangers Rig Number 840-38 Equipment Construction Labor Pusher 840-39 Tanks Operator Co. Rep. A.E. VICKERY Total $10,627 Cumulative $47,873 Work Summary NU 7 1/16" 5K# GOAT HEAD. PRESS. TEST LINES TO 4500#. OK. BJ ACIDIZE SAN ANDRES PERFS. 4158-4354' DOWN 5.50" CSG. W/ 2500 GALS. 15% NEFE HCL ACID + 50 RCNBS & FLUSHED W/ 113 BBLS. 10# BRINE. FORMATION BROKE @ 1924#. AVG. TCP=800# @ 6 BPM MAX TCP=3600# @ 6 BPM. BALLED OFF @ 3600#. FTCP=1450 @ 6 BPM ISICP=135# 5 MIN.=87# 10 MIN.=77# 15 MIN.=68# 60 MIN.=47#. SURGE BALLS OFF & SHUT IN. CISDFN, SAT, SUN, MON & TUES. ( -276 BLW LEFT TO REC. ) J.C. @ 1000 HRS. 5-14-10 24 HR. PLAN: CONTINUE HAULING WTR. FOR FRAC JOB. WATING ON FRAC CREW: WILL FRAC @ 0800 HRS. 5-19-10

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/18/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days County ANDREWS 830-08 Mud, Chemicals and Fluids $12,075 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $700 $2,520 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 Trucking Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $8,712 Tubing 830-17 Engineering Supervision $1,000 $3,000 Tot. Jts on Loc 830-18 Contract Labor $2,020 830-21 FRAC TANKS $780 $5,505 TD 4736' 840-30 SLICKLINE $1,190 $1,190 PBTD 4661' 840-31 Tubing 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor 840-37 Lift Equipment, packers, hangers Rig Number 840-38 Equipment Construction Labor Pusher 840-39 Tanks Operator Co. Rep. A.E. VICKERY Total Cumulative Work Summary 95 HR. SICP=0# STRONG VACUUM. MIRU ARC PRESSURE DATA ARC RAN 4.57" GUAGE RING TO 4500'. POH W/ THE SAME. RIG DOWN ARC PRESSURE DATA. NU FLOW BACK MANIFOLD & LINES. CISDFN. ( -276 BLW LEFT TO RECOVER ) $3,670 $51,543 24 HR. PLAN: BJ WTR. & SAND FRAC SANDRES PERFS. 4158-4354' DOWN 5.50" CSG. @ 0800 HRS. 5-19-10

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/19/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days County ANDREWS 830-08 Mud, Chemicals and Fluids $12,075 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $70 $2,590 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,400 $1,400 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $69,445 $78,157 Tubing 830-17 Engineering Supervision $1,000 $4,000 Tot. Jts on Loc 830-18 Contract Labor $2,020 830-21 FRAC TANKS $450 $5,955 TD 4736' 840-30 SLICKLINE $1,190 PBTD 4661' 840-31 Tubing 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor 840-37 Lift Equipment, packers, hangers Rig Number 840-38 Equipment Construction Labor Pusher 840-39 Tanks Operator Co. Rep. A.E. VICKERY Total $72,365 Cumulative $123,908 Work Summary 10 HR. SICP=0# VACUUM. MIRU BJ SERVICES 0930 HRS. BJ SAND & WTR. FRAC SAN ANDRES PERFS. 4158-4354' DOWN 5.50" CSG W/ 121,926 GALS. 10# BRINE + 1500# 20/40 BROWN PROP +16000# 14/30 125 C LITE PROP. PRO TECHNICS TAGGED PROP W/ 3 MCI IRIDIUM 192 + 8 MCI SCANDIUM 46 + 3 MCI ANTIMONY 124. AVG. TCP=2706# @ 54.8 BPM MAX TCP=2980# @ 54.8 BPM. ISICP=256# 5 MIN.=165# 10 MIN.=147# 15 MIN.=135#. J.C. @ 1045 HRS. 5-19-10. ( -3179 BLW LFET TO REC. ) RIGGED DOWN BJ SERVICES. 1 HR. AFTER FRAC SICP=110#. FLOWED 141 BLW IN 6.5 HRS. ON VARIOUS SIZE CHOKES FCP=110-0# & DIED. LEFT OPEN TO TEST TANK 12 HRS. NO RECOVERY.( -3038 BLW LEFT TO REC.) 24 HR. PLAN: MIRU DD UNIT. RUN SINKER BAR & CHECK PBTD. RIH W/ PKR. ON 2.375" TBG. SET PKR. @ 4050' +-. SWAB TEST SAN ANDRES PERFS. 4158-4354' NOTE: WILL RUN AFTER FRAC LOG @ 0800 HRS. 5-21-10

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/20/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $3,200 $3,200 County ANDREWS 830-08 Mud, Chemicals and Fluids $465 $12,540 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $3,750 $6,340 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $350 $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,000 $5,000 Tot. Jts on Loc 830-18 Contract Labor $2,020 830-21 FRAC TANKS $100 $6,055 TD 4736' 840-30 SLICKLINE $1,000 $2,190 PBTD 4661' 840-31 Tubing $23,000 $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor CC FORBES 840-37 Lift Equipment, packers, hangers Rig Number 111 840-38 Equipment Construction Labor Pusher MANNI 840-39 Tanks Operator LUIS Co. Rep. A.E. VICKERY Total $32,865 Cumulative $156,773 Work Summary ARC PRESS. DATA RAN 2.50" GUAGE RING TO 4650' & TAG BTM. POH W/ THE SAME & RIG DOWN. MIRU CC FORBES DD UNIT #111 ND FRAC VALVE & NU 7 1/16" 3K# MANUAL BOP. UNLOAD & RACK 148 JTS. 2.375" J55 8RT TBG. TIH W/ HALLIBURTON 5.50" RTTS PKR. + 2.375" SN + 126 JTS..2.375" J55 TBG. TO 4060'. PUMPED 20 BBLS.10# BRINE DOWN 2.375" TBG. NO BLOW ON CSG. PUMPED 75 BBLS. 10# BRINE DOWN 5.50" CSG. SET HALLIBURTON 5.50" RTTS PKR. @ 4055' IN 12K# COMPRESSION. PRESS. TEST PKR. & 5.50" CSG. TO 500#. 10 MIN. OK. RIGGED UP SWAB. UNABLE TO NU FLOW TO PUMPING TEE. DID NOT HAVE X-OVER. CISDFN. ( -3133 BLW LEFT TO RECOVER ) 24 HR. PLAN: RUN AFTER FRAC LOG. FIN. NU FLOW-LINE & SWAB TEST SAN ANDRES PERFS.

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/21/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $1,100 $4,300 County ANDREWS 830-08 Mud, Chemicals and Fluids $12,540 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $150 $6,490 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,000 $6,000 Tot. Jts on Loc 830-18 Contract Labor $2,020 830-21 FRAC TANKS $100 $6,155 TD 4736' 840-30 SLICKLINE $2,190 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor CC FORBES 840-37 Lift Equipment, packers, hangers Rig Number 111 840-38 Equipment Construction Labor Pusher MANNI 840-39 Tanks Operator LUIS Co. Rep. A.E. VICKERY Total Cumulative Work Summary 14 HR. SITP=0#. SICP 150#, BLED TO 0# IMMED. ALL AIR. WAIT ON ARC PRESS. DATA 2 HRS. MIRU ARC PRESS. DATA. & PROTECHNICS. DD UNIT DOWN FOR REPAIRS. WON'T START. HAVE SHORT. WAIT ON MECHANIC MECHANIC WORK ON UNIT. & CALL FOR ANOTHER MECHANIC. CISDFN. DOWN FOR RIG REPAIRS. ( -3133 BLW LEFT TO REC. ) $2,350 $159,123 24 HR. PLAN: REPAIR DD UNIT. RUN AFTER FRAC LOG. SWAB TEST SAN ANDRES PERFS.

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/22/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $2,860 $7,160 County ANDREWS 830-08 Mud, Chemicals and Fluids $12,540 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $150 $6,640 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,000 $7,000 Tot. Jts on Loc 830-18 Contract Labor $2,020 830-21 FRAC TANKS $100 $6,255 TD 4736' 840-30 SLICKLINE + AFTER FRAC LOG $9,775 $11,965 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor CC FORBES 840-37 Lift Equipment, packers, hangers Rig Number 111 840-38 Equipment Construction Labor Pusher MANNI 840-39 Tanks Operator LUIS Co. Rep. A.E. VICKERY Total Cumulative Work Summary 16 HR. SITP=0#. SICP 0#, FIN. RIG UP ARC PRESS. DATA. PROTECHNICS DOWNLOAD TOOL. ARC PRESSURE DATA RAN AFTER FRAC LOG FROM 4650-4055'. DOWN LOAD TOOL. RIG DOWN ARC PRESSURE DATA. J.C. @ 1100 HRS. 5-22-10. RIG UP SWAB. SWABBED 96 BLW IN 5 HRS. IFL=250' FFL=400'. MADE 18 RUNS W/ SWAB. LAST HR. SWABBED 20 BLW FL=400'. NO SHOW OF OIL OR GAS. CISDFN & SUNDAY ( -3037 BLW LEFT TO REC. ). 24 HR. PLAN: CONTINUE TO SWAB TEST SAN ANDRES PERFS. 4158-4354'. $13,885 $173,008

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/24/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $3,200 $10,360 County ANDREWS 830-08 Mud, Chemicals and Fluids $12,540 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $300 $6,940 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,000 $8,000 Tot. Jts on Loc 830-18 Contract Labor $2,020 830-21 FRAC TANKS $200 $6,455 TD 4736' 840-30 SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor CC FORBES 840-37 Lift Equipment, packers, hangers Rig Number 111 840-38 Equipment Construction Labor Pusher MANNI 840-39 Tanks Operator LUIS Co. Rep. A.E. VICKERY Total $4,700 Cumulative Work Summary 40 HR. SITP=0#. SICP 0#, SWABBED 241 BLW IN 10 HRS. IFL=250' FFL-450'. LAST HR. SWABBED 24 BLW. FL=450'. NO SHOW OF OIL. HAVE SMALL SHOW OF GAS. CISDFN. ( -2796 BLW LEFT TO REC. ) $177,708 24 HR. PLAN: CONTINUE TO SWAB TEST SAN ANDRES PERFS. 4158-4354'.

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 5/25/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $3,640 $14,000 County ANDREWS 830-08 Mud, Chemicals and Fluids $12,540 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $4,515 $11,455 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,000 $9,000 Tot. Jts on Loc 830-18 Contract Labor $445 $2,465 830-21 FRAC TANKS $100 $6,555 TD 4736' 840-30 SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor CC FORBES 840-37 Lift Equipment, packers, hangers Rig Number 111 840-38 Equipment Construction Labor Pusher MANNI 840-39 Tanks Operator LUIS Co. Rep. A.E. VICKERY Total $9,700 Cumulative $187,408 Work Summary 14 HR. SITP=0#. SICP 0#, SWABBED 93 BLW IN 4 HRS. IFL=250' FFL=350' NO SHOW OF OIL. SMALL SHOW OF GAS. LAST HR. SWABBED 20 BLW FL=350'. RIGGED DOWN SWAB & RELEASED 5.50" RTTS PKR. TOH W/ HALLIBURTON 5.50" RTTS PKR. RIH W/ BP + 2-JTS. 2.375" TBG. + 4' PERF. SUB ON SAND LINE & TAG BTM. @ 4661'. POH W/ SAME TIH W/ 2.375" X 32' BPMA JT. ( 4155-4123' ) + 2.375" X 4' PERF. SUB ( 4123-4119' ) + 5.50" X 2.375" X 3' TAC ( 4119-4116' ) + 2.375" X 1' SN ( 4116-4115' ) + 128 JTS. 2.375" 4.7#/FT. J55 8RT. TBG. ( 4115-0' ). ND BOP. SET 5.50" TAC @ 4116' IN 10K# TENSION. NU TBG. FLANGE & PUMPING TEE. ND PUMPING TEE. PUMPING TEE THREADS IMPROPERLY CUT. DAMAGED JT. OF TBG. REL. TAC. LAY DOWN BAD JT. RIH W/ 1 JT. RESET 5.50" TAC @ 4116 IN 10K# TENSION. NU TBG. FLANGE. CISDFN. ( -2703 BLW LEFT TO REC. ). NOTE: PUMP JACK SET & READY TO GO. 24 HR. PLAN: NU PUMPING TEE. RUN PRODUCTION PUMP & RODS. HANG WELL ON & RIG DOWN.

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 6/14/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $1,000 $18,120 County ANDREWS 830-08 Mud, Chemicals and Fluids $850 $13,390 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $450 $12,055 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,000 $11,000 Tot. Jts on Loc 830-18 Contract Labor $2,465 830-21 FRAC TANKS $6,655 TD 4736' 840-30 SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor CC FORBES 840-37 Lift Equipment, packers, hangers Rig Number 111 840-38 Equipment Construction Labor Pusher MANNI 840-39 Tanks Operator Co. Rep. LUIS A.E. VICKERY MIRU CC FORBES DD UNIT #106 LAYED DOWN POLISH ROD & 20' OF 7/8" ROD SUBS. EVALUATED RIG CREW. PICKED UP & MADE UP POLISH ROD. Total Cumulative Work Summary $3,300 $195,078 CLOSED WELL IN & RELEASED RIG CREW. WILL HAVE NEW CREW 0700 HRS. 6-15-10 24 HR. PLAN: TOH W/ PRODUCTION RODS. ND PUMPING TEE. RELEASE 5.50" TAC. NU BOP. TOH W/ 2.375" PRODUCTION TBG. TAG BTM W/ BP + 2- JTS. 2.375" TBG. + SPLIT BULL PLUG ON SAND LINE & CHECK PBTD. TIH W/ 2.375" BPMA + 2.375" PERF. SUB + 5.50" HALLIBURTON PKR. + 2.375" SN + 134 JTS. 2.375" TBG. ND BOP. SET PKR. @ 4310' NU PUMPING TEE. RUN PRODUCTION RODS.

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 6/25/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $3,120 $25,140 County ANDREWS 830-08 Mud, Chemicals and Fluids $16,390 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $120 $16,175 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,400 $13,400 Tot. Jts on Loc 830-18 Contract Labor $1,200 $3,665 830-21 FRAC TANKS $6,655 TD 4736' 840-30 SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor CC FORBES 840-37 Lift Equipment, packers, hangers $2,500 $2,500 Rig Number 111 840-38 Equipment Construction Labor Pusher George 840-39 Tanks Operator TONY Co. Rep. D. Bulman Total $8,340 Cumulative $215,318 Work Summary 13 hours. Road rig to location, MIRU CC Forbes #111, Unhang horses head, unseat pump, POOH with 60 7/8" rods, 102 3/4" rods, 8 Kbars and pump, pump was full of fluid, fluid level in tbg was high, water pulling thru surface valves after each triple pulled. ND WH, NU BOP, release BV pkr and TOOH, first 14 jts pulled had clean OD, remainder of pipe had light scale coating, LD pkr and BPMA, RIH with % 1/2" RBP and pkr, set RBP at 4311', had trouble getting RBP to set, set pkr at 4285', attempt to test RBP, tools would not test, reset pkr at 4291', tools would not test, pumping by tools at 300 psi at 1 bpm, SWI, SDON

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 6/26/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $3,000 $25,020 County ANDREWS 830-08 Mud, Chemicals and Fluids $16,390 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $120 $16,175 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,400 $13,400 Tot. Jts on Loc 830-18 Contract Labor $700 $3,165 830-21 FRAC TANKS $6,655 TD 4736' 840-30 SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor CC FORBES 840-37 Lift Equipment, packers, hangers $2,500 $2,500 Rig Number 111 840-38 Equipment Construction Labor Pusher George 840-39 Tanks Operator TONY Co. Rep. D. Bulman Total $7,720 Cumulative $214,698 Work Summary 11 hours. Crew to location, release pkr and RBP, reset RBP at 4320', pkr at 4313', attempt to test RBP, would not test, release tools and POOH, tools covered in iron sulfide, RIH with new 5 1/2" RBP and pkr, set RBP at 4311', pkr at 4294', test RBP to 600 psi for 15 minutes ok. Release pkr and POOH. RIH with 2 3/8" BPMA, 4' x 2 3/8" perf sub, manual collar loacator, 5 1/2" BV tension pkr and 131 jts 2 3/8" tbg, loacte csg collar 15' above pkr setting depth, ND BOP, set BV pkr in 15 pts tension, NU WH, RU flowline SWI, SDFWE EOT at 4255', pkr at 4216', s.n. at 4209' 24 hr plan, Will run pump and rods Monday

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 7/7/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $500 $27,020 County ANDREWS 830-08 Mud, Chemicals and Fluids $16,390 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $400 $16,575 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,400 $16,200 Tot. Jts on Loc 830-18 Contract Labor $3,165 830-21 FRAC TANKS $6,655 TD 4736' 840-30 SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor ANIMAS 840-37 Lift Equipment, packers, hangers $1,200 $4,900 Rig Number 1 840-38 Equipment Construction Labor Pusher MIKE 840-39 Tanks Operator joe Co. Rep. LEWIS Total Cumulative Work Summary ROAD RIG AND CREW TO LOCATION,MIRU ANIMAS WELL SERVICE $3,500 $222,298

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 7/8/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $27,020 County ANDREWS 830-08 Mud, Chemicals and Fluids $16,390 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $300 $16,875 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,400 $17,600 Tot. Jts on Loc 830-18 Contract Labor $800 $3,965 830-21 FRAC TANKS $6,655 TD 4736' 840-30 SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor ANIMAS 840-37 Lift Equipment, packers, hangers $1,200 $6,100 Rig Number 1 840-38 Equipment Construction Labor Pusher MIKE 840-39 Tanks Operator joe Co. Rep. LEWIS Total $3,700 Cumulative $225,998 Work Summary CREW ROAD TO LOCATION AND ATTEMPT TO OPERATE RIG,UNABLE TO FUNCTION THE GEAR SHIFT ON DRAWORKS,INSTALLED NEW RELIEF VALVE AND GEARS WORKED,UNIT MOTOR DIED AND WERE UNABLE TO GET IT TO STAY STARTED,MECHANIC CALLED TO REPAIR AND FUNCTION TEST RIG SISDFN WAITING ON RIG REPAIRS

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 7/9/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $1,800 $28,820 County ANDREWS 830-08 Mud, Chemicals and Fluids $16,390 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $16,875 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,400 $19,000 Tot. Jts on Loc 830-18 Contract Labor $800 $4,765 830-21 FRAC TANKS $6,655 TD 4736' 840-30 SLICKLINE + AFTER FRAC LOG $11,965 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor ANIMAS 840-37 Lift Equipment, packers, hangers $6,100 Rig Number 1 840-38 Equipment Construction Labor Pusher MIKE 840-39 Tanks Operator Co. Rep. joe LEWIS Total $4,000 Cumulative $229,998 Work Summary ROAD CREW TO LOCATION,SHOWED UP AT 0900,NEW CREW,POOH WITH RODS AND PUMP,SEND PUMP TO ANDREWS PUMP SERV,NDWH AND NUBOP,UNSET PKR AND POOH WITH PKR,LAY PKR DOWN AND TIH WITH RETRIEVE TOOL FOR RBP,LATCH ONTO RBP AND POOH,LOST RBP ON TRIP OUT OF HOLE,RERUN RETRIEVE TOOL IN HOLE ON 25 STANDS 23/8" TBG.SISDFN PLAN IS TO RIH AND CATCH RBP AND POOH,APOLLO SET UP TO RUN CBL MONDAY MORN,CAUGHT SAMPLES FROM MUD ANCHOR AND PLACED ON STEPS TO TANK BATTERY FOR CHEMICAL SERVICE

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 7/12/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $3,000 $31,820 County ANDREWS 830-08 Mud, Chemicals and Fluids $1,000 $17,390 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $1,200 $18,075 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,400 $20,400 Tot. Jts on Loc 830-18 Contract Labor $4,765 830-21 FRAC TANKS $6,655 TD 4736' 840-30 SLICKLINE + AFTER FRAC LOG $6,600 $18,565 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor ANIMAS 840-37 Lift Equipment, packers, hangers $6,100 Rig Number 1 840-38 Equipment Construction Labor Pusher MIKE 840-39 Tanks Operator Co. Rep. joe LEWIS Total $13,200 Cumulative $243,198 Work Summary SITP:0 SICP:0 TIH AND ENGAGE RBP AT 4244' UNSET AND TOH WITH RBP AND ON OFF TOOL. MIRU APOLLOW WIRELINE AND RUN CEMENT BOND LOG FROM 4644' TO 1800' (TOP OF CEMENT). BOND LOG SHOWED GOOD BOND THROUGH OUT TREATED INTERVAL AND QUALITY CEMENT TO 1800'. RU RUN RBP TO 4244' SET PKR ABOVE RBP AND TEST TO 500 PSI. PICK UP AND SPACE OUT SETTING PKR AT 4088' AND HANG OFF TUBING ND BOP AND NU WELL HEAD. FORWARD PLAN: TIH WITH RODS AND PUMP, SPACE OUT, HANG OFF AND RETURN TO PRODUCTION.

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 7/13/2010 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $2,000 $33,820 County ANDREWS 830-08 Mud, Chemicals and Fluids $17,390 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $18,075 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,400 $21,800 Tot. Jts on Loc 830-18 Contract Labor $4,765 830-21 FRAC TANKS $6,655 TD 4736' 840-30 SLICKLINE + AFTER FRAC LOG $18,565 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 4244 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor ANIMAS 840-37 Lift Equipment, packers, hangers $6,100 Rig Number 1 840-38 Equipment Construction Labor Pusher MIKE 840-39 Tanks Operator Co. Rep. joe LEWIS Total Cumulative $3,400 $246,598 ROAD TO LOCTION, SITP O#,SICP 0#,RIG UP AND RIH WITH 1 X 8' GAS ANCHOR,2" X 1.5" X 16 PUMP,8 SINKER BARS,96 X 3/4",56 X 7/8",8,6,4' SUBS,22' PR,12' PR LINER,HANG WELL ON UNIT AND SPACE OU CHECK PUMP ACTION,SHUT DOWN TO RIG DOWN UNIT,TURN WELL TO PRODUCTION TBG TENSION PKR SET WITH 18,000# PKR DEPTH 4088',132 JTS 23/8" J55,SN ON TOP OF PKR IRON SULFIDE SAMPLES CARRIED TO BAKER 1300 HR 7/13/2010

GREYSTONE OIL & GAS LLP UNIVERSITY "AZ" #1 WORKOVER/COMPLETION REPORT Date 8-2-210 Completion Cost Daily Cum Well Name UNIVERSITY AZ #1 830-03 Road, Location and Damages State Texas 830-04 Completion Rig Days $3,600 $37,420 County ANDREWS 830-08 Mud, Chemicals and Fluids $17,390 Location NW ODESSA 35 MI 830-09 Fuels & Lubricants Size Depth 830-10 Rental Equipment $18,075 Surf Csg 8.625" 1805' 830-11 Cementing Int Csg 830-14 TESTER $1,750 Liner 830-15 Perforation and Wireline $9,596 Prod Csg 5.5 4736' 830-16 Acidizing and Fracturing $78,157 Tubing 830-17 Engineering Supervision $1,400 $23,200 Tot. Jts on Loc 830-18 Contract Labor $4,765 830-21 FRAC TANKS $6,655 TD 4736' 840-30 SLICKLINE + AFTER FRAC LOG $18,565 PBTD 4661' 840-31 Tubing $23,000 840-32 Wellhead $6,925 CIBP 840-33 Production Unit/Heater Treater Ret. BP 4303 840-34 Flow Lines Formation SAN ANDRES 840-35 Buildings Perfed Intvl 4158-4354 840-36 Other Surface Equipment Contractor CCFORBES 840-37 Lift Equipment, packers, hangers $6,100 Rig Number 840-38 Equipment Construction Labor Pusher JORGE 840-39 Tanks Operator Co. Rep. John Duncan Total Cumulative $5,000 $251,598 CHECK WELL TBG PRESSURE 15 PSI CSG PRESSURE 0 PSI OPEN TBG TO PIT RIG UP TO PULL RODS L/D POLISH ROD AND PONY RODS RACK BACK 56 7/8 RODS AND 96 3/4 RODS 8 SINKER BARS. WELL STILL FLOWING UN SET PACKER, NIPPLE UP BOP'S PUMP 37 BBLS DOWN TBG WELL WENT ON VACCUM P.O.O.H WITH 132 JTS 2-3/8 TBG AND HALLIBURTON BV PACKER L/D PACKER MAKE UP HALLIBURTON BP RETREVING TOOL T.I.H WITH 78 JTS 2-3/8 TBG SHUT WELL IN FOR NIGHT

Well Name: University AZ #1 State Texas Daily Operations 8/5/2010 06:00-8/6/2010 06:00 Operations at Report Time Acidize & swab back Current Perfs/ Intervals 4425' - 4436' (O/A GR) County / Parish Andrews Casing Pressure (psi) Completion Daily Report Report # 37.0 8/5/2010 Field Name Emma, N. (Yates) Tubing Pressure (psi) 0.0 Greystone Oil & Gas LLP Time Log Start Time Dur (hr) End Time Cum Dur (hr) Com 06:00 24.00 06:00 24.00 SITP=0#. SICP=0#. MIRU Rising Star acid eqpt. Loaded csg w/ 1.5 BFW. Press tested lines to 3700# - OK. Released press. Pumped 16.8 bbls 15% NeFe acid down 2-3/8" tbg. BDF @ 3190#. EIR 1 BPM @ 1900#. Increased rate to 2.1 BPM @ 1960# and then to 2.8 BPM @ 1800#. Pumped total of 19 bbls acid. Pumped displacement wtr 2.8 BPM @ 1800#. Press cont'd to drop to 1190# while displacing w/ total of 25 bbls wtr. SD pump. ISIP=460#. 5 min SITP=220#. 10 min = 160#. 15 min = 140#. RDMO Rising Star. RU swab and commenced swabbing per attached. Recovered 73.5 bbls to SN in 13 swab runs. IFL @ 800'. Recovered some oil on 13th run. Sent water & oil samples to Baker Treat-O-Lite for analysis. Left well open to oil tank for night. Logs Date Type Top (ftkb) Btm (ftkb) Cased? 0.0 Supervisor on Site Job Contact: John Duncan www.brammer.com Phone Office: Page 1/1 Comp Daily Cost Drill Daily Cost Cost To Date Cum Completion 201,021 Cum Drilling 565,888 382,148 1,002,053 13- Completion

Swabs Well Name: University AZ #1 API/UWI 003-00806 Ground Elevation (ft) Total Depth (ftkb) Date 8/5/2010 Zone Wellbore Original Hole Swab # Start Time Swab Time (hr) Fdl Lvl (KB) Pull Depth (ftkb) P Cas (psi) Vol Recov (bbl) Vol Recov Cum (bbl) 1 00:00 0.0 1,500.0 8.0 8.0 load wtr 2 00:00 800.0 2,300.0 5.6 13.6 same 3 00:00 1,700.0 3,200.0 7.0 20.6 same 4 00:00 2,400.0 3,400.0 7.0 27.6 load wtr & spent acid 5 00:00 2,400.0 3,500.0 5.0 32.6 spent acid & wtr 6 00:00 2,400.0 3,500.0 4.5 37.1 same 7 00:00 2,800.0 4,000.0 6.0 43.1 same 8 00:00 3,000.0 4,370.0 6.4 49.5 black wtr 9 00:00 1,800.0 3,300.0 5.6 55.1 same 10 00:00 2,400.0 3,400.0 4.8 59.9 same 11 00:00 3,000.0 4,370.0 6.4 66.3 same 12 00:00 3,000.0 4,370.0 2.4 68.7 black wtr; wait 1 hr 13 00:00 800.0 2,000.0 4.8 73.5 Oil & wtr Swab Company Job Total Volume Recovered (bbl) 73.5 Com www.brammer.com Page 1/1

Well Name: University AZ #1 State Texas Daily Operations 8/6/2010 06:00-8/7/2010 06:00 Operations at Report Time Swab Test Middle Perfs Current Perfs/ Intervals 4425' - 4436' (O/A GR) County / Parish Andrews Casing Pressure (psi) Completion Daily Report Report # 38.0 8/6/2010 Field Name Emma, N. (Yates) Tubing Pressure (psi) Greystone Oil & Gas LLP Time Log Start Time Dur (hr) End Time Cum Dur (hr) Com 06:00 24.00 06:00 24.00 Well flowed 8 bbls to tank over night w/ trace amt of oil. RU swab. 1st swab run - tagged FL @ surface. Pulled from 1400'. Swab line kinked on 2nd run. POOH. Well made small amts of fluid while repairing line. Made a total of 12 swab runs & recovered 51.2 bbls of fluid. SWI. SDFN. Logs Date Type Top (ftkb) Btm (ftkb) Cased? Supervisor on Site Job Contact: John Duncan www.brammer.com Phone Office: Page 1/1 Comp Daily Cost Drill Daily Cost Cost To Date Cum Completion 4,400 570,288 Cum Drilling 382,148 1,006,453 13- Completion

Well Name: University AZ #1 State Texas Daily Operations 8/7/2010 06:00-8/8/2010 06:00 Operations at Report Time No activity. Current Perfs/ Intervals 4425' - 4436' (O/A GR) County / Parish Andrews Casing Pressure (psi) Completion Daily Report Report # 39.0 8/7/2010 Time Log Start Time Dur (hr) End Time Cum Dur (hr) Com 06:00 24.00 06:00 24.00 No activity. Logs Field Name Emma, N. (Yates) Tubing Pressure (psi) Greystone Oil & Gas LLP Date Type Top (ftkb) Btm (ftkb) Cased? Supervisor on Site Job Contact: John Duncan www.brammer.com Phone Office: Page 1/1 Comp Daily Cost Drill Daily Cost Cost To Date Cum Completion 570,288 Cum Drilling 382,148 1,006,453 13- Completion

Well Name: University AZ #1 State Texas Daily Operations 8/8/2010 06:00-8/9/2010 06:00 Operations at Report Time No activity. Current Perfs/ Intervals 4425' - 4436' (O/A GR) County / Parish Andrews Casing Pressure (psi) Completion Daily Report Report # 40.0 8/8/2010 Time Log Start Time Dur (hr) End Time Cum Dur (hr) Com 06:00 24.00 06:00 24.00 No activity. Logs Field Name Emma, N. (Yates) Tubing Pressure (psi) Greystone Oil & Gas LLP Date Type Top (ftkb) Btm (ftkb) Cased? Supervisor on Site Job Contact: John Duncan www.brammer.com Phone Office: Page 1/1 Comp Daily Cost Drill Daily Cost Cost To Date Cum Completion 570,288 Cum Drilling 382,148 1,006,453 13- Completion

Well Name: University AZ #1 State Texas Daily Operations 8/9/2010 06:00-8/10/2010 06:00 Operations at Report Time Swab Test Middle Perfs Current Perfs/ Intervals 4425' - 4436' (O/A GR) County / Parish Andrews Casing Pressure (psi) Completion Daily Report Report # 41.0 8/9/2010 Field Name Emma, N. (Yates) Tubing Pressure (psi) 20.0 Greystone Oil & Gas LLP Time Log Start Time Dur (hr) End Time Cum Dur (hr) Com 06:00 24.00 06:00 24.00 SITP=15#. SICP=20#. Opened well to production tank. Well flowed 100% oil for 5 mins and then 100% black wtr for 10 mins. Well died. RU swab and commenced swabbing per attached. 15.0 Logs Recovered 74 bbls in 14 swab runs. Total recovered fluid to date = 209 bbls. SWI. SDFN. Date Type Top (ftkb) Btm (ftkb) Cased? Supervisor on Site Job Contact: John Duncan www.brammer.com Phone Office: Page 1/1 Comp Daily Cost Drill Daily Cost Cost To Date Cum Completion 4,400 574,688 Cum Drilling 382,148 1,010,853 13- Completion

Swabs Well Name: University AZ #1 API/UWI 003-00806 Ground Elevation (ft) Total Depth (ftkb) Date 8/9/2010 Zone Wellbore Original Hole Swab # Start Time Swab Time (hr) Fdl Lvl (KB) Pull Depth (ftkb) P Cas (psi) Vol Recov (bbl) Vol Recov Cum (bbl) 1 00:00 0.0 1,500.0 4.8 4.8 100% black wtr w/ emulsion 2 00:00 1,300.0 3,500.0 8.0 12.8 same 3 00:00 2,500.0 4,000.0 4.8 17.6 same 4 00:00 3,500.0 4,370.0 1.6 19.2 same 5 00:00 200.0 3,500.0 8.0 27.2 same 6 00:00 3,000.0 4,370.0 4.8 32.0 same 7 00:00 1,500.0 3,000.0 4.8 36.8 same 8 00:00 2,500.0 3,500.0 4.8 41.6 same 9 00:00 1,400.0 3,000.0 4.8 46.4 same 10 00:00 3,000.0 4,370.0 1.6 48.0 same 11 00:00 1,800.0 3,300.0 6.4 54.4 same 12 00:00 3,300.0 4,370.0 5.6 60.0 same 13 00:00 3,700.0 4,370.0 6.4 66.4 same 14 00:00 1,700.0 3,000.0 8.0 74.4 same Swab Company Job Total Volume Recovered (bbl) 74.4 Com www.brammer.com Page 1/1

Well Name: University AZ #1 State Texas Daily Operations 8/10/2010 06:00-8/11/2010 06:00 Operations at Report Time Swab Test Middle Perfs Current Perfs/ Intervals 4425' - 4436' (O/A GR) County / Parish Andrews Casing Pressure (psi) Completion Daily Report Report # 42.0 8/10/2010 Field Name Emma, N. (Yates) Tubing Pressure (psi) 20.0 Greystone Oil & Gas LLP Time Log Start Time Dur (hr) End Time Cum Dur (hr) Com 06:00 24.00 06:00 24.00 SITP=35#. SICP=20#. Opened well to rig tank. Well flowed 3.1 bbls. RU swab & commenced swabbing per attached. 35.0 Logs Recovered 49.1 bbls of black wtr w/ emulsion in 11 swab runs. Total fluid recovered to date = 261 bbls. SWI. SDFN. Date Type Top (ftkb) Btm (ftkb) Cased? Supervisor on Site Job Contact: John Duncan www.brammer.com Phone Office: Page 1/1 Comp Daily Cost Drill Daily Cost Cost To Date Cum Completion 4,400 579,088 Cum Drilling 382,148 1,015,253 13- Completion