ENDEAVOR ENERGY RESOURCES

Similar documents
FORGE Energy UL 21 Freedom 1 API Number:

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

Wellwork Chronological Regulatory Report

FORGE Energy UL 21 Pahaska 1H API Number:

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Drilling Morning Report

Dynamic Underbalance (DUB)

PHE KE30-A8 WORKOVER PROGRAM

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

Pasquale Imbò e Marco Pelucchi ENI S.pA;

Daily Drilling Report

Wellwork Chronological Regulatory Report

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

Zarvona Energy LLC DAILY OPERATIONS

VortexFlow DX (Downhole) Tool Installation Instructions

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

SUBSEA KILL SHEET EXERCISE No. 5

Oil Well Potential Test, Completion or Recompletion Report, and Log

Rig Math. Page 1.

Oil Well Potential Test, Completion or Recompletion Report, and Log

SPE MS. Copyright 2015, Society of Petroleum Engineers

BP SIT Testing Franks Facility Lafayette

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

Abandonment Program for Paramount Fort Liard F 36

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Casing Design. Casing Design. By Dr. Khaled El-shreef

Deepwater Horizon Incident Internal Investigation

HydroPull. Extended-Reach Tool. Applications

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

1. The well has been shut in on a kick and the kill operation has not started.

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

H. H. HOWELL, INC. Inland Ocean Bevans #1 Bevans & Wildcat Field Menard County, Texas

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

Oil Well Potential Test, Completion or Recompletion Report, and Log

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells

Zarvona DAILY WORKOVER / COMPLETION REPORT

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

WELL NO: BJN-8. Lower master valve

Practice Exam IADC WellSharp Driller and Supervisor

Air and Gas Drilling

Casing and Cementing Requirements

Study Guide IADC WellSharp Driller and Supervisor

On-Off Connector Skirt

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

Why Do Not Disturb Is a Safety Message for Well Integrity

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Hydro-Mech Bridge Plug


HPHT Annular Casing Packer. Obex Annular Casing Packer

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011

BLACK HILLS PLATEAU PRODUCTION COMPANY

OCEAN DRILLING PROGRAM

A case study : Underground Blowout Control at Well NHK #285

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

Live well deployment of long perforating gun system using combined CT technologies

5k Slickline Lightweight Pressure Control Equipment 4 ID

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

IWCF Equipment Sample Questions (Surface Stack)

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

RIH intermediate section casing in Bazian-1 exploration oil well

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

A Longer Lasting Flowing Gas Well

Disposal/Injection Well Pressure Test Report (H-5)

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

NORSOK Standard D-010 Rev 4, August 2012

Multi-Stage Plunger Lift: Case Histories

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution!

E NGINEERED C EMENTING S OLUTIONS

Jim McCoy. Tubing Anchor Effect on Pump Fillage. Lynn Rowlan Tony Podio Ken Skinner. Gas Well Deliquification Workshop.

Downhole Gas Separator Selection

FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Restoring Fluid Flow in Tubing Strings

APPENDIX A1 - Drilling and completion work programme

Downhole Gas Separator Selection

PIONEER OIL TOOLS LIMITED

EP WELLS DAILY OPERATIONS REPORT Report 1 08/03/2016

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Supervisors Core Curriculum and Related Learning Objectives

FREQUENTLY ASKED QUESTIONS

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

DB Bridge Plug. Features. Benefits. Applications

W I L D W E L L C O N T R O L AIR DRILLING

SUPPLEMENT Well Control for Drilling Operations Workover & Completion for Drillers Core Curriculum and Related Learning Objectives

Perforation Techniques in brown fields for Production optimization.

Gas Well De-Liquification Workshop. Denver, Colorado February 27 - March 1, Multi-Staging Wells. Chandler Frost Production Control Services

Transcription:

ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA CASING DATA VOLUMES WEIGHT (PPG) PV PIPE SIZE Csg wt/ grade CASING ID TBG VOLUME (BBLS) TOP OF FISH DAYS ON LOCATION PREVIOUS (CPS) $000 1 DAILY TYPE FLUID YP (#/100FT2) MAX PULL (70%) MAX PULL (100%) CASING BURST (100%)ANN VOLUME (BBLS) PREVIOUS TOF PROJECT DAYS LEFT CUMM $000 VIS (SEC) OIL (%) RKB-TH CORR RKB-TH CORR YEAR DRILLED TOT HOLE VOL (BBLS FISH LENGTH TARGET DAY COMP PROJECTED AMOUNT BHA (FT) BHA DESCRIPTION : LONG STRING (AM) SHORT STRING (AM) CASING (AM) DEPTH OVERPULL LENGTH FISH DESCRIPTION : LONG STRING (PM) SHORT STRING (PM) CASING (PM) PROJECT OBJECTIVE: Drill plugs and clean out to PBTDw/ Coil Tubing Unit BEG LOAD TODAY REC TOTAL REC LOAD REMAIN TIME DEPTH Fluid Rate ANNULUS 9:00 12:10 14:30 15:30 17:00 17:15 18:40 0 05 100 20:47 6000 25 500 22:35 14240 25 500 22:40 14230 25 500 1:00 0 0 0 DETAIL REPORT OF OPERATIONS AOL Wait On Well Head Valve Valve On Location RUCU Put On BHA Surface Test BHA SIH Weight Check - Raise Fluid Rate Tag Float Callor - Pick Up 10Ft POOH At Surface - Shut In/ Done For Day BEGINNING REPORT DATA TIME & DATE : ENDING REPORT DATA TIME & DATE :

ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/03/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA CASING DATA VOLUMES WEIGHT (PPG) PV PIPE SIZE Csg wt/ grade CASING ID TBG VOLUME (BBLS) TOP OF FISH DAYS ON LOCATION PREVIOUS (CPS) $000 2 DAILY TYPE FLUID YP (#/100FT2) MAX PULL (70%) MAX PULL (100%) CASING BURST (100%)ANN VOLUME (BBLS) PREVIOUS TOF PROJECT DAYS LEFT CUMM $000 VIS (SEC) OIL (%) RKB-TH CORR RKB-TH CORR YEAR DRILLED TOT HOLE VOL (BBLS FISH LENGTH TARGET DAY COMP PROJECTED AMOUNT BHA (FT) BHA DESCRIPTION : LONG STRING (AM) SHORT STRING (AM) CASING (AM) DEPTH OVERPULL LENGTH FISH DESCRIPTION : LONG STRING (PM) SHORT STRING (PM) CASING (PM) PROJECT OBJECTIVE: Drill plugs and clean out to PBTDw/ Coil Tubing Unit BEG LOAD TODAY REC TOTAL REC LOAD REMAIN TIME DEPTH Fluid Rate ANNULUS 8:30 9:50 10:36 0 05 0 11:23 6000 05 0 12:40 14215 1 0 12:50 14150 0 0 12:57 14086 0 0 13:05 14215 25 0 13:27 14215 25 0 13:40 14086 0 0 15:30 0 0 0 DETAIL REPORT OF OPERATIONS TCP Guns On Location/Rig Up Tool Assembly Regin Coil Unit - Stand By SIH Weight Check - Raise Fluid Rate Shut In Back Side/Raise Rate to 1bpm/Guns fire Guns Fire Guns Fire Start Pumping Acid Spot Acid on Formation Shut Pump Down/POOH At Surface - Shut In - Rig Down BEGINNING REPORT DATA TIME & DATE : ENDING REPORT DATA TIME & DATE :

University 5-20-21 #1H Joe Harrison 08/29/13 Thursday TOP OF FISH DAYS ON LOCATIONPREVIOUS $000 5 1/2" 17# DAILY $7,01500 TYPE FLUID YP (#/100FT2MAX PULL (70%AX PULL (100ASING BURST (100ANN VOLUME (BBL PREVIOUS TOF PROJECT DAYS LEFTCUMM $7,01500 VIS (SEC) OIL (%) RKB-TH CORRKB-TH CORRYEAR DRILLEDOT HOLE VOL (BBL TARGET DAY COMP PROJECTED AMOUNT LONG STRING (PM)SHORT STRING (PM) CASING (PM) PROJECT OBJECTIVE: TODAY REC TOTAL REC LOAD REMAIN TIME - TIME 40 Road Globe Rig 1 to Location FTP=0 Spot Reverse Unit Put Tubing & Racks on side of Location Park Logging Trucks on side of Location

University 5-20-21 #1H Joe Harrison 08/30/13 Thursday TOP OF FISH DAYS ON LOCATIONPREVIOUS $7,01500 5 1/2" 17# DAILY $17,90300 TYPE FLUID YP (#/100FT2MAX PULL (70%AX PULL (100ASING BURST (100ANN VOLUME (BBL PREVIOUS TOF PROJECT DAYS LEFTCUMM $24,91800 VIS (SEC) OIL (%) RKB-TH CORRKB-TH CORRYEAR DRILLEDOT HOLE VOL (BBL TARGET DAY COMP PROJECTED AMOUNT LONG STRING (PM)SHORT STRING (PM) CASING (PM) PROJECT OBJECTIVE: TODAY REC TOTAL REC LOAD REMAIN 9:00-11:00 20 ND Well Head on Both Wells Down to Master Valve 11:00-2:00 30 RU Jones Wire Line, PU Gauge Ring, Weight Bars & Collar Locator RIH to 6,000', Did not see Anything, POOH 2:00-4:30 25 PU 5 1/2" Wire Line Set AS1-X Watson Packer, With Rupture Disc, Set @ 6,350' POOH, PU 5 1/2" Wire Line Set RBP, RIH Set @ 5,700' Bleed Well Down, RU Basic Pumped 55 BBLS Fresh Water Pressured up to 1500 PSI Held "OK" for 15 Minutes, RD Basic 4L30-5:00 05 RD Jones SWI SD 5:00-6:00 10 Road Globe Rig 1 Crew to Midland

University 5-20-21 #1H 14,195' Joe Harrison 4232535136 09/03/13 Thursday TOP OF FISH DAYS ON LOCATIONPREVIOUS $24,91800 5 1/2" 17# P-110 DAILY $52,58500 TYPE FLUID YP (#/100FT2MAX PULL (70%AX PULL (100ASING BURST (100ANN VOLUME (BBL PREVIOUS TOF PROJECT DAYS LEFTCUMM $77,50300 VIS (SEC) OIL (%) RKB-TH CORRKB-TH CORRYEAR DRILLEDOT HOLE VOL (BBL TARGET DAY COMP PROJECTED AMOUNT icked Up By AccideLONG STRING (PM)SHORT STRING (PM) CASING (PM) PROJECT OBJECTIVE: TODAY REC TOTAL REC LOAD REMAIN RIH with Gas Lift Valves 6:00-8:00 20 Road Globe Rig 1 Crew to Location 8:00-11:00 30 Set Rig Mat, Set Pipe Racks, Put 198 Joints 2 7/8" J-55 Tubing RU WSU, Loaded Casing, Pressured Tested 5 1/2" 17# P-110 Casing to 5,100 PSI, For 15 Minutes Held "OK" 11:00-2:00 30 Ready to ND Frac Valve, NU BOP Spool from 10K to 5K We Had on Location Friday Got Picked up by Accident Had to wait on J & W to Bring another one 2:00-3:00 10 ND Frac Valve NU Spool & BOP 3:00-4:30 15 PU Over Shot RIH 4:30-6:00 15 While Running in the Hole Well did not Run Over Pumped about 15 BBLS well Circulated Gas & Oil Pumped 85 More BBLS Still Was not Solid Water Had Lots of Gas and some Oil SWI Will see if can Bleed it off in the Morning, And Reload it with Water or determine if we have a Problem 6>00-7:00 10 Road Globe Rig 1 Crew to Midland 130

University 5-20-21 #1H 14,195' Joe Harrison 4232535136 09/04/13 Wednesday TOP OF FISH DAYS ON LOCATIONPREVIOUS $77,50300 5 1/2" 17# P-110 DAILY $52,58500 TYPE FLUID YP (#/100FT2MAX PULL (70%AX PULL (100ASING BURST (100ANN VOLUME (BBL PREVIOUS TOF PROJECT DAYS LEFTCUMM $130,08800 VIS (SEC) OIL (%) RKB-TH CORRKB-TH CORRYEAR DRILLEDOT HOLE VOL (BBL TARGET DAY COMP PROJECTED AMOUNT icked Up By AccideLONG STRING (PM)SHORT STRING (PM) CASING (PM) PROJECT OBJECTIVE: TODAY REC TOTAL REC LOAD REMAIN RIH with Gas Lift Valves 6:00-8:00 20 Road Globe Rig 1 Crew to Location Well Was Full of Fluid, Pressured up to 2,000 PSI Held "OK" 15 Minutes 8:00-9:00 10 Latch onto RBP Set @ 5,700' 9:00-10:00 10 TOH (173 Joints) 2 7/8" J-55 Tubing PU BHA 1-5/2' AS1X Watson Packer, 1-187 " F" Nipple, 1-4' Sub, & 1-2 7/8" SN 10:00-11:30 15 TIH with 10 Gas Lift Valves, Latch into AS1-X Packer Set @ 6,350', 192 Joints ( (187 "F" Nipple in 15 Pts Compression) 11:30-12:00 05 ND BOP NU WH, Pumped out Rupture Disc 12:00-1:30 15 Pump 200 BBLS Fresh Water Down Tubing 2 BPM @ 500 PSI 1:30-2:30 10 RD WSU Move Out 85