. Korea Safety Management System

Similar documents
THE STUDY ON THE INTERNAL TEMPERATURE CHANGE OF TYPE 3 AND TYPE 4 COMPOSITE CYLINDER DURING FILLING

EKC International FZE. Safety Instructions For Handling & Inspection Manual For Refillable Seamless Steel Gas Cylinders

EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR ) 1. GRANTEE: Structural Composites Industries (SCI) Pomona, CA

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

Recommended applicable tubing. Specifications. Operating vacuum pressure. 20 C to 80 C Threads. Principal parts material

Sample C ylinde rs, Acce ssorie s, and O utage Tube s

BMW proposal for. Technical requirements concerning LIQUID HYDROGEN STORAGE SYSTEMS. for the use in hydrogen powered road vehicles

PRESSURE RETEST. 49 CFR, (g) Co#: Vin#: DOT Spec: MAWP:

Regulations Respecting Compressed Gas Pressure Vessels

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

DOCUMENT DESPATCH ADVICE Ref: MED 16 :3/T-45 Date:

Session 2.3: Pressure Storage Systems I. Dr. S. Rau, J.S. Colom. 25 th 29 th September 2006 Ingolstadt. Session 1.2: Introductory Lectures. K.

Technical Standard. API6D Ball & Plug Valve. Inspection & Test Procedure

Title: Pressure Relieving and Venting Devices Function: Ecology & Safety No.: BC Page: 1 of 7 Reviewed: 6/30/12 Effective: 7/1/12 (Rev.

Outline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (FOURTH REVISION)

Summary of the MRA LPG Codes of Practice

Hazardous Materials Handling High Pressure Cylinders Goals and Objectives

Composite. care. cylinder. for responsible paintballers!

SINEO Microwave Digestion Core Technology (2012)

Pressure Systems Safety Regulation

HEXAGON RAGASCO A BETTER SHAPE FOR YOUR BUSINESS NIELS FREDERIKSEN, TECHNICAL SUPPORT MANAGER JAKARTA, INDONESIA,

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C EXPIRATION DATE: June 30, 2015

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

HYDRAULIC INTENSIFIER Max. Pressure: See Intensifier Data Plate Weight: 16 Lbs. (7.26 kg)

Chapter 2. Welding Safety Delmar, Cengage Learning

INJECTION ODORIZING SYSTEMS : DOSAODOR TYPE

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

DRAFT 12/17/03 KMB 18/28 (BANDMASK) OVERHAUL, MAINTENANCE, AND INSPECTION CHECKLIST APPENDIX A

KMB 18/28 (BANDMASK) OVERHAUL, MAINTENANCE, AND INSPECTION CHECKLIST APPENDIX A

KMB 18/28 (BANDMASK) MONTHLY MASK INSPECTION APPENDIX A

Procedure: Pressure equipment safety

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

Warning: NEVER ALTER TEST EQUIPMENT

This document is a preview generated by EVS

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP 7218 (NINETEENTH REVISION)

An Urgent Bulletin from CSA Group

Handling and Storage of Gases

Pressure Relief Device Investigation Testing Lessons Learned

EXPIRATION DATE: January 31, 2015

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

TYPICAL TOXIC GAS SYSTEM INSPECTION VIOLATIONS

User Manual. Carbon Composite Cylinder. Alternative Fuel Cylinders

Transport of gas tanks for motor vehicles

GUIDELINES FOR CONDUCTING HYDROGENATION REACTIONS

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

BASIC REQUIREMENTS FOR FIBER REINFORCED PLASTIC (FRP) TYPE 3FC COMPOSITE CYLINDERS

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

Booster Regulator/Air Tank

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

ENGINEERING + SERVICES INSPECTION, MAINTENANCE + RECERTIFICATION (IMR)

Pilot Check Valve: Metal Body Type

RULES PUBLICATION NO. 119/P

SeriesTRBU. Flame Resistant (Equivalent to UL-94 Standard V-0) FR Double Layer Polyurethane Tubing

6301 TYPE CAST IRON SAFETY VALVES

TECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

20 Ton SD Shop Press Operating Instructions

CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION

Lab Cock. Contents. User s Manual (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2

PINE HILL FIRE DEPARTMENT

Hygienic Bubble Trap Installation and Operations Manual

EVT * -Pro Electronic Valve Tester

INSTALLATION & MAINTENANCE INSTRUCTION

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

PIPELINE AND HAZARDOUS MATERIAL SAFETY ADMINISTRATION CYLINDER REQUALIFICATION FACILITY INSPECTION REPORT GENERAL INFORMATION

DOT-SP 8391 (FIFTHTEENTH REVISION) EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR )

Notice for Pressure Special Equipment Manufacture Licensing

TECHNICAL DATA Q= C. Table 1 - Specifications

CENTRAL PLANT HEATING/CHILLED WATER OPERATOR Ref. Code: C-WO-4

Chemical Feed Equipment Floor-Mounted Gas Dispenser - Series CH4200

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

There are three fuelling systems which use LNG/CNG and which may be found in vehicles today:

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society

APPENDIX 1. PART 10: Leak Detection Inspector, Level 1, 2 and 3 CERTIFICATION SCHEME FOR PERSONNEL. 3 rd Edition, February 2016

Transport of gas tanks for motor vehicles

E/ECE/324/Rev.2/Add.109/Rev.2 E/ECE/TRANS/505/Rev.2/Add.109/Rev.2

Compact Ball Valves ASAHI AV VALVES. Contents. User s Manual. (Page) (1) Be sure to read the following warranty clauses of our product 1

Type 4 Compressed Natural Gas (CNG) Cylinder Installation and Maintenance Manual

A guide to Part 10 of the

Economic and Social Council

AUTOMATIC HOSE TEST UNIT, TYPE SPU

30T A/Manual Hydraulic Shop Press

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (ELEVENTH REVISION)

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

SF SERIES CNG COMPRESSOR MODEL HF-4MH. 4 Nm3/Hour Displacement OPERATION MANUAL

Series AS-FPQ/AS-FPG. Speed Controller with One-touch Fitting for Clean Room. Speed controllers for clean room use

TECHNICAL DESCRIPTION

TECHNICAL DATA. Table 1 - Specifications

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

GAS FUEL VALVE FORM AGV5 OM 8-03

Drum / cylinder handling

Annex 4A: paragraph 4

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

Series IRV1000/2000/3000

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER RELIEF VALVE

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

Transcription:

Vehicle Database Management Informant CNG Vehicle Management System Information Users Cylinder Manufacture Vehicel Manufacture Manage a Booking (Application, change, or closing) Management (CNG Cylinder Standard, Assessment, structural changes) Integrated service Management (Cylinder Installation, Valve Status, Group Monitoring) Support ( Notice & Fee Management) NOG TS NGO Association Management (Related History &Information &organization Management) Additional Business Management (Education, Recalls, and Community) Statistics Management (Performance Statistics, Vehicle Management, Safety Incident Statistics) System Management (Manufacture Station, Vehicle Code Inspector Management) Cylinder Manufacture Vehicle Manufacture TS Customers 61

Vehicle High Pressure Cylinder Safety Management System Manufacture Vehicle Cylinder Manufacture Cylinder Passed reinspection CNG Cylinder Cylinder Manufacturing Company Korea Gas Safety Corporation Inscpection Station High Pressure Cylinder Management Attatch Certificate System Cylinder Installation Installation Failed reinspection CNG Cylinder Cylinder Inscpection Cylinder history Vehicle Manufacturer Korea Automobile Testing & Research Institute Inscpection Station Fule Pipes Body Shop Issue Change Certificate Cylinder Structure Change Reconfigration - Cylinder reinspection CNG Cylinder Body Shop Vehicle Station Installation System Deconstruct & Recycle Company Issue Destruction Certificate 62

Facilities Station Inside Station Outside Fixed Lift Ladders for Low-Floor Bus Movable Lift 63

1.CNG Cylinder Group : Those Who Cylinder Manufacturing, Repair, Import Time : Before Cylinder Selling, Using Agency :KGS Place - Cylinder Manufacturing Plant Contents : Design Stage Test, Production Stage Test Result : Pass:Imprinting, Failure:Destruction Non- Penalty : Less than10 million won, Less than three years in prison Time/Method : Witness Test / (34day) 64

1.CNG Cylinder (2) Content Type Content Design Stage Dimensions, Flaws, Metal containers and liner Heat Treatment, Hydrostatic Test Markings : Total CNG 1,2,3,4 Leak Test: Only CNG 4 Surface Finish, End Closing By Forming: CNG 1,2,3 Production Stage Original Design,Liner : Total Resin :,, Brackets :, External Coating:,, Fiber :, Pressure Relief Device: Boss:, Ambient Cycling Test Environmental Test Extreme Temperature Cycling Test Hydrostatic Burst TestComposite Flaw Tolerance Test Drop TestBonfire Test Accelerated Stress Rupture Test Shooting Test Penetration Test Natural Gas Cycling Test Leak Before break Chlorine Spray Test 65

2. Installation (Manufacture) Group : CNG Vehicle Manufacturers Time : Installed on Cylinder Vehicle Agency : TS Place : Manufacture Plant Contents : Technical Test, Safety Test Non- Penalty :Less than10 million won, Less than three years in prison fee : 78,100 won, Time : 1hour Qualified Inspector: Vehicle / Gas National Certificate holder one person Result : 1509 Bus inspection ( 12.5.31) 66

2. Installation (Structural Modified) Group : CNG Vehicle that Structural Changed Fuel System Time : When the Fuel System Structural Modify to CNG Agency : TS Place - TS Station(56) Contents -Technical Test, Safety Test fee : 41,800 won, Time : 30 Minutes Qualified Inspector: Vehicle / Gas National Certificate holder one person Result : 1208 CNG Vehicle inspection ( 12.5.31) 67

2. Installation Standard Device Detailed Standard Storage Facility Standard Details of the Cylinder Fail (Note: Re- Standard) Safety distance The Rear Surface: More than 300mm The Outer Surface : More than 200mm Install Vents in Preparation for Gas Leaks Safe Distance from Cylinder to the surrounding Facilities: More than 5mm Gas Facility Standard Pipe Facility Standard Gas Filling Inlet Safety Distance -Exhaust Facilities: More than 300mm, Electrical Facilities: More than 200mm Main Valve : Safe Distance from Vehicle the Rear Surface and the Outer Surface Gas Filling Valve : Install Backflow Prevention Valve Pipe Material, Pipe Fixing Installation: 600mm Safe Distance from Electrical Facilities: 200mm Accident Precaution Mark ing Standard Whether or not Install Over Pressure Safety Device, Backflow Prevention Device Eddy Prevention Valve Mark(Type of Gas, The Maximum Charging Pressure) 68

3. Cylinder Periodic (1) Group : CNG, LNG Vehicle Owner Cycle : Non-Business Car(3 years), Other Car(4years) Agency : TS Place :TS Cylinder Station(22) Non- Penalty :Less than 10 million won, Less than three years in prison fee (Include VAT/Won) Number Fee Number Fee Number Fee Time : 4 hours(8 Cylinders) Qualified Inspector: Vehicle / Gas National Certificate holder one person 69

3. Cylinder Periodic (2) Extended Period of Extended Period:Up to 30 days in case of unavoidable reasons - When maintenance after the accident - When accepted case that impossible to operate a car (Vehicle Parts Delay, Vehicle Theft, Vehicle Seizure) Cylinder Reuse Condition/Method Condition : Within 8years from the Date of the First Cylinder Terms of Use: 15years Limitation : The Use of Commercial Taxi Cylinder Exceed 10 years Method : Cylinder Manufacturers Admit (Reuse) 70

3. Cylinder Periodic (3) Record Type 2011. 11.25 12.31 2012. 1.2 5.31 Periodic Frequent 70 1509 2 910 Result : Enter the information Computerized System Pass Cylinder Pass Sticker, Cylinder Imprinting 1) Cylinder Manufacturer Name 2) Lot and Serial Number 3) Pass Pressure Test year, month 4) Cylinder Volume (V, Unit: L) 5) Cylinder Weight(W, Unit : kg ) 6) The name of Charging Gas 7) The Maximum Charging Pressure (FP, Unit : MPa ) 8) The Hydrostatic Test Pressure(TP, Unit: MPa ) 71

3. Cylinder Periodic (4) Cylinder Procedure 72

. Korea Detailed inspection method General Standard Item - Stay dry, Clean the Cylinders - Fuel System Standard : Rules on Motor Vehicle Safety Standard Attached 3of 5, 5of 5 - The Gas Leak Test: Conducted in the Charged Fuel Using Gas Leak Detector, Test liquid - Check equality Contents - Cylinder(include Valve) : Damage, Deformation, Gas leaks - Pipe etc. Gas facilities : Installation, Operation status, Gas leaks 73

. Detailed inspection method_equipment Installation Equipment Installation Equipment(20Kinds/49Set) Devision Installation Equipment Name Devision Installation Equipment Name 1 Ultrasonic Waves Gas Leak Detector 11 Digital Depth Gauge 2 Ultrasonic Depth Gauge 12 Laptop Computer 3 Electronic Endoscope 13 Laser printer 4 Certificate Printer 14 Digital camera 5 General Tool SET 15 Explosion Proof Light 6 Board 16 Mobile Light Projector 7 Safety Helmet & Eye Shield 17 Light Scale Lupe(10X) 8 Gas Leak Detector 18 Mirror 9 Infrared Thermometer 19 Metal Ruler 10 Digital vernier calipers 20 Mobile lift 74

. Detailed inspection method_cylinder Standard Damage Example Standard Cut, Gouges, Scratches L 15 D: 1.25 depth is less than 0.5mm under metal, depth is Less than 1.25mm Under Composite Stress Take the stress of the material liner or composite Cracking Cylinder for cracks or no damage Abrasion depth is Less than 1.25mm Under Composite General Corrosion Corrosion Depth is less than 15% of wall thickness 75