MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

Similar documents
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

City of Oakland - Department of Transportation

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

Quantity Completed in FY 07/08 (e.g., bike lane miles, sidewalk sq. ft., bike parking spaces, etc. ) Project Status at the end of FY 07/08

Other Measure B Funds Expended on Project in FY 07/08 (i.e., grants, etc.) Measure B Mass Transit Pass-through Funds Expended in FY 07/08

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

Pavement Management Report. City Council Meeting of May 21, 2013

4 GENERIC COST ESTIMATING TOOL

Fiscal Year 2017 Bicycle and Pedestrian Metric Report

Chapter 4: Funding and Implementation

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Bicycle and Pedestrian Connectivity Study. Old Colony Planning Council

Background Planning Committee STAFF REPORT March 7, 2018 Page 2 of 2 On June 21, 2017, the Authority approved the programming of second cycle One Bay

Appendix D: Planning Level Cost Calculator

NJDOT Complete Streets Checklist

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate

Bicycle and Pedestrian Advisory Council May 15, 2015

Appendix 3 Roadway and Bike/Ped Design Standards

Reserve Study Navigation Options

Project Status Update

Engineering - Bicycle and Pedestrian

TRANSPORTATION TRAINING TOPICS. April 6, 2010

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

OneBayArea Grant Application

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

FUNDING SOURCES CHAPTER 6

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

Bicycle + Pedestrian Connectivity Gap Analysis

Prince George s County plans, policies, and projects

City of Madison: 2017 Capital Budget Capital Improvement Plan

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

Freeway ramp intersection study

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Chapter 3 DESIGN SPECIFICATIONS

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

Promoting Active Communities Award Application

CITY OF PORTSMOUTH PLANNING DEPARTMENT

2. Vision & Goals. Vision. Santa Rosa is a community where walking and bicycling are comfortable and convenient for people of all ages and abilities.

Paving for Progress Municipal Streets Seminar

Item No. 14 Town of Atherton

Grant Applications: Active Transportation Program for Safe Routes to School

AUTHORIZE BID ADVERTISEMENT

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

DISTRICT BICYCLE PROGRAM

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area

Pedestrian and Bicycle Improvements in Balboa Park Station Area

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

TRAFFIC CALMING POLICY & PROCEDURES

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

Polk Streetscape Project

MEMORANDUM. Nick Hutchinson, P.E., City Engineer Public Services Area Project Management Services Unit

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Rochester Downtown Bicycle Study 2009

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

Transportation Planning in Western SoMa

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

SRTS IMPLEMENTATION COSTS

Safety & Convenience for All Users, in All Modes. Barbara McCann NCSL December 3, 2013

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Transportation Development Act Grant Center Avenue Pedestrian Signal Project

SUMMARY OF TRANSPORTATION INVESTMENTS

Environment and Public Works Committee Presentation

Pedestrian Project List and Prioritization

Building Great Neighbourhoods LANSDOWNE

San Pablo High Treatment applied incrementally at each N + ++

Citywide Sidewalk and Crosswalk Programs

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

New Planning Code Summary: Better Streets Plan and Curb Cut Restrictions

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

Omaha s Complete Streets Policy

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

The DC Pedestrian Master Plan

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Lynchburg District Update

Make CSUN Shine Brighter: Pedestrian and Vehicular Traffic Improvement Initiative. Progress Update February 21, 2013

TOWN OF PARADISE VALLEY

Third Street Bridge & Corridor Project

PEDESTRIAN ACTION PLAN

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Non-Motorized Transportation 7-1

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Transcription:

MEASURE B AND MEASURE BB Annual Program Complia Report Reporting Fiscal Year 20162017 AGENCY CONTACT INFORMATION Agency Name: City of Piedmont Date: 12/4/2017 Primary Point of Contact Name: Chester Nakahara Title: Public Works Director Phone: 5104303061 Email: cnakahara@ci.piedmont.ca.us Agency's Certification of True and Accurate Reporting by Submission By submitting this Complia Report to the Alameda County Transportation Commission, the submitting agency certifies the complia information reported is true and complete to the best of their knowledge, and the dollar figures in the agency's Audited Financial Statement matches exactly to the revenues and expenditures reported herein. Program Complia Report Structure This Reporting Form is broken into the following sections for the and BB Direct Local Distribution Programs applicable to the recipient agency. * Cover Agency Contact * General Complia Reporting for all programs * Table 1 Summary of Revenue, Expenditures, and Changes in Fund Bala * Table 2 Detailed Summary of Expenditures and Accomplishments

DIRECTIONS: Complete the sections below based on the and BB Audited Financial Statements, for the applicable DLD programs for your agency. Values must match financial statements and total reported expenditures on Table 2. A. 2000 MEASURE B Direct Local Distribution Programs MEASURE B AND MEASURE BB Annual Program Complia Report Fiscal Year 20162017 TABLE 1: SUMMARY OF REVENUE, EXPENDITURES, AND CHANGES IN FUND BALANCE Bicycle / Pedestrian Local Streets and Roads Mass Transit Paratransit Total Notes Beginning of Year Fund Bala $ 69,723 $ 12,569 $ $ $ 82,292 Revenue $ 34,397 $ 426,867 $ $ $ 461,264 Interest $ 11 $ 130 $ $ $ 141 Expenditures $ 103,555 $ 366,960 $ $ $ 470,515 Expenditures Matches Table 2? TRUE TRUE #REF! #REF! End of Year Fund Bala $ 576 $ 72,605 $ $ $ 73,181 B. 2014 MEASURE BB Direct Local Distribution Programs Bicycle / Pedestrian Local Streets and Roads Mass Transit Paratransit Total Notes Beginning of Year Fund Bala $ 21,525 $ 2,226 $ $ $ 23,751 Revenue $ 27,874 $ 398,700 $ $ $ 426,574 Interest $ 40 $ 460 $ $ $ 500 Expenditures $ 23,799 $ 188,710 $ $ $ 212,509 Expenditures Matches Table 2? TRUE TRUE #REF! #REF! End of Year Fund Bala $ 25,640 $ 212,676 $ $ $ 238,316

1. Indicate the adoption year of the most current Bicycle/Pedestrian Master Plans, as applicable. Adoption Year Bicycle Master Plan Pedestrian Master Plan Bike/Ped Master Plan 2014 N/A Bicycle and Pedestrian Direct Local Distribution Program Reporting Period Fiscal Year 201617 GENERAL COMPLIANCE REPORTING If the plans are over fiveyears past the last adoption year, specify when your agency's will perform its next update. Indicate N/A, if not applicable. 2. Specify any large planned uses of fund balas within this program and their status i.e. planned or underway. Title 2017 Paving Brief Description Paving/microsealing various streets Anticipated DLD Status Expenditure $ 26,216.00 Underway 3. Confirm the completion of the publicity requirements in the table below (/No). Copy of Article, website, signage Attached? Article No No No Website Signage If applicable, briefly explain why the publicity requirement wasn't completed. Although articles were published, they failed to reflect funding was from Measures B and BB. The City had a turnover in staff during the year and this requirement was inadvertently overlooked.

Provide a detailed summary of and BB Expenditures for the reporting fiscal year. Expenditure total must correspond to your Audited Financial Statements, and Table 1 values. Bicycle and Pedestrian Direct Local Distribution Program Reporting Period Fiscal Year 201617 TABLE 2: DETAILED SUMMARY OF EXPENDITURES AND ACCOMPLISHMENTS No. Category (Dropdown Phase (Dropdown Type (Dropdown 1 Bike/Ped Operations Other Column H) Primarily Capital or Administrative Expenditure? Name Description/Benefits Administrative Annual Complia Reporting Requirements Generation of annual complia reports and audit to conform to requirements 2 Pedestrian PS&E Pedestrian Crossing Capital Linda Ave. Crosswalk Improvements Bulbouts and street lighting at 3 Pedestrian Construction Pedestrian Crossing Capital Linda Ave. Crosswalk Improvements Bulbouts and street lighting at 4 Pedestrian Scoping, Feasibility, 5 Pedestrian Construction Signage and Wayfinding 6 Bicycle Completion/Closeout 7 Pedestrian Scoping, Feasibility, Pedestrian Crossing Capital Grand Ave. and Oakland Ave. Pedestrian Safety Study Traffic data collection, crash history review and safety recommendations at Oakland Ave., west of Arbor Dr. and at Grand Ave. north of Linda Completed in FY 1617 Units for (Dropdown 1 Other Column K) 61% # of Plans Additional description on units or expanded detail on expenditures, performa, accomplishments Complia reporting requirements completed for FY 201617 Plans completed. 35% was completed in 201516. The remaining expenses for plan completion is in MBB/LSR 2 Signs Sidewalk and Pedestrian Facility is approx. 24% complete. See also MB/LSR & MBB/LSR. 1 Other Column L) Capital Oakland Ave./El Cerito Ave. Cross Walk Signs Installation of RFBB to improve safety at uncontrolled crosswalk 4 Signs Bikeways (nonclass I) Capital Grand Ave. Bicycle Lane Bike lane striping, marking and traffic loop detectors along Grand Ave. from Fairview Ave. to Cambridge Way. Pedestrian Crossing Capital Pedestrian Crosswalks Review and analyze request for new pedestrian crossings at various intersections 8 Bike/Ped Other Pedestrian Crossing Capital Safety Review of Specific Crosswalks Review of 6 crosswalks for bike and pedestrian safety. Copt design and budget 9 Bike/Ped Scoping, Feasibility, Pedestrian Crossing Administrative Stop Sign/Crosswalk Policy Develop overall policy for analyzing requests for installation of stop signs and crosswalks 1.05 Lane Miles 1 Other Column L) Studies completed. (Study inadvertantly noted as completed in 201516 reporting) also included 290 LF of crosswalks, 1 pushbutton station, pavement marking Bike lanes, pavement marking, 1,668 LF of crosswalk striping Field investigation and memo of findings Governing Board Approved? $ 263 $ $ 11,156 $ 438 $ 22,314 $ 6,294 $ $ 26,298 $ $ 34,585 $ $ 723 $ 6 Intersections Study completed $ $ 567 30% Other Column L) Policy document $ $ 481 10 Bike/Ped Construction Pedestrian Crossing Capital Stop Sign and Crosswalk Striping Install new stop signs and crosswalks 35 Signs also included 2,394 SF of $ 24,237 $ at 10 locations markings and 650 LF of striping 11 $ $ 12 $ $ 13 $ $ 14 $ $ 15 $ $ 16 $ $ 17 $ $ 18 $ $ 19 $ $ 20 $ $ 21 $ $ 22 $ $ 23 $ $ 24 $ $ 25 $ $ Total Percentage of Capital vs Administrative Costs 99% TOTAL $ 103,555 $ 23,799 a. Total Capital $ 126,611 Match to Table 1? TRUE TRUE b. Total Administrative $ 743 Is the total percentage of Capital vs Program Administration (outreach, staffing, administrative support) Costs GREATER THAN 50%? If not, explain how capital investments will increase in the future.

Local Streets and Roads (LSR) Direct Local Distribution Program Reporting Period Fiscal Year 201617 GENERAL COMPLIANCE REPORTING 1. What is agency's current Pavement Condition Index (PCI)? PCI = 64 Use PCI from the most recent MTC's VitalSigns linked here: http://www.vitalsigns.mtc.ca.gov/streetpavementcondition If your PCI falls below a score of 60 (fair condition), specify what actions are being implemented to increase the PCI. Indicate N/A, if not applicable. N/A Note that the above PCI is from the MTC Street Saver program, Network Summary Statistics report generated on 5/12/2017. This is higher than the PCI shown in the above listed hyperlink for Piedmont (by 2 points) 2. Were any DLD LSR funded improvements this year provided exemptions from the locally adopted complete street's policy? If so, which projects and why? N/A 3. Specify any large planned uses of fund balas within this program and their status i.e. planned or underway. Title Brief Description Anticipated DLD Expenditure Status 2017 Paving Paving/Micro sealing various roads $285,281 Underway 4. Confirm the completion of the publicity requirements in the table below (/No). Copy of Article, website, signage Attached? Article No No No Website Signage If applicable, briefly explain why the publicity requirement wasn't completed. Although articles were published, they didn't specifically mention Measures B and BB. Due to staff turnover at the City during the year, this requirements was inadvertently overlooked.

Local Streets and Roads Direct Local Distribution Program Reporting Period Fiscal Year 201617 TABLE 2: DETAILED SUMMARY OF EXPENDITURES AND ACCOMPLISHMENTS Provide a detailed summary of and BB Expenditures for the reporting fiscal year. Expenditure total must correspond to your Audited Financial Statements and Table 1 values No. Category (Dropdown Phase (Dropdown Type (Dropdown 1 Streets/Rds Operations Other Column H) 2 Streets/Rds Construction Street 3 Streets/Rds PS&E Street 4 Streets/Rds Scoping, Feasibility, 5 Streets/Rds Scoping, Feasibility, Street Streetscape / Complete Streets 6 Streets/Rds Other Other Column H) 7 Ped only Construction Pedestrian Crossing Improvements Primarily Capital or Administrative Expenditure? Name Description/Benefits Administrative Annual Complia Reporting Requirements Generation of annual complia reports and audit to conform to requirements Capital 2015 Pavement Pavement and intersection improvements from 2015 plans Completed in FY 1617 Capital 2017 Pavement Pavement and intersection improvement plans for 2017 60% Capital Pavement Management review and analysis of all Arterials and Collectors Per state and federal funding requirements, PMP's must be updated periodically to ensure accuracy. This update was for arterial and collector streets in the City. Capital San Carlos/Oakland Avenue Retaining Walls Field measurements and coptual plans for retaining walls in street 90% rightofway Administrative OBAG2 Street Paving Funding Seminar Training seminar of funding options for street paving. 1 Capital Grand and Oakland Ave Pedestrian Safety Measured timing of pedestrian crossing at ex. traffic signal and adjusted to meet standards. 8 Streets/Rds PS&E Sidewalks and Ramps Capital Curb Ramps and Intersection Repair Curb ramp and intersection improvement plans 9 Streets/Rds Construction Sidewalks and Ramps Capital Annual Sidewalk, Curb, Gutter Replacement Replacement of damaged curb, gutter and sidewalk 10 Streets/Rds PS&E Sidewalks and Ramps Capital Linda Ave. Crosswalk Improvements Bulbouts and street lighting at 11 Streets/Rds Construction Sidewalks and Ramps Capital Linda Ave. Crosswalk Improvements Bulbouts and street lighting at 12 Streets/Rds Construction Bikeways and Multiuse Paths 13 Streets/Rds Construction Pedestrian Crossing Improvements 14 Streets/Rds Maintena Street 15 Streets/Rds Construction Pedestrian Crossing Improvements Percentage of Capital vs Administrative Costs Capital Linda Ave. Crosswalk Improvements Bulbouts and street lighting at Capital Linda/Kingston/Rose Triangle Attractive refuge for pedestrians at the conflue of three streets Capital Annual Emergency Roadway Inspection and Repair Remove and replace existing asphalt roadway pavement, 47 1 Units for (Dropdown Other Column K) 0.2 Lane Miles 12 1 # of Plans Lane Miles # of Plans Other Column K) Additional description on units or expanded detail on expenditures, performa, accomplishments Complia reporting requirements completed for FY 201617 Improvements included 70 LF curb, gutter, sidewalk and pavement markings, bike lanes, signs and crosswalks, project completion & closeout These started as the 2016 Pavement and were renamed to 2017 Software costs along with surveying of arterial and collector streets and associated reporting Copt, design and budget estimate Governing Board Approved? $ 9,580 $ $ $ 119,756 $ 20,917 $ $ 11,550 $ $ 1,793 $ Seminar completed $ 700 $ Signals $ 1,795 $ 50% # of Plans $ 18,148 $ 1397 Linear Feet Curb, gutter & sidewalk and AC $ 213,069 $ plugs at various locations # of Plans Plans completed. 35% was $ $ 854 4% completed in 201516. The remaining expenses for plan completion is in MB/BP & MBB/BP Curb, gutter & sidewalk $ 19,665 $ 39,700 216 Linear Feet is approx. 24% complete. See also MBB/BP. Improvements include Street $ 28,400 2 Signs Lighting. is approx 24% complete. See also MBB/BP. contribution for capitol $ 55,689 322 Linear Feet improvement. Includes curb, gutter, sidewalk, plus 4 signs & 221 LF of pavement striping Square Feet 3 locations $ 6,934 $ Capital Oakland/El Cerito Cross Walk Signs Installation of RFBB to improve Signs New striping included $ 7,120 $ 4 safety at uncontrolled crosswalk 98% TOTAL $ 366,960 $ 188,710 a. Total Capital $ 545,390 Match to Table 1? TRUE TRUE b. Total Administrative $ 10,280 If your agency did not expend greater than 50% of total costs on Capital Investments, explain how capital investments will increase in the future over Program Administration (outreach, staffing, administrative support). Indicate N/A if not applicable. A minimum of 15% of LSR funds are required to be expended on bike/pedestrian Improvements. In this fiscal year, how much of LSR funds were expended on bike/pedestrian improvements? $ Percent of LSR funds expenditures on bike/pedestrian improvements: Meets minimum 28,400 15% threshold? 15.0% TRUE If your agency did not meet the 15% minimum expenditure requirement this fiscal year, explain why in the box below