SAND DRAW CREEK REHABILITATION - SD 14 BROWN COUNTY, NEBRASKA

Similar documents
CITY OF ANN ARBOR ENGINEERING RIVERVIEW DRIVE SANITARY SEWER AND WATER MAIN EXTENSION PROJECT. ITB No. 4555, FILE No WARREN STEIN BARTON

OUTDOOR FOOTBALL FIELD

CITY OF STURGIS ST. JOSEPH COUNTY, MICHIGAN WEST SOUTH STREET IMPROVEMENTS FEBRUARY 2017 VICINITY MAP WEST SOUTH STREET IMPROVEMENTS CITY OF STUGIS

JCRD-521: URBAN COUNTY ROADWAY SPECIFICATIONS

AIRPLANE PAVEMENT MARKINGS

GENERAL LEGEND 12"CMP

THORNCREEK COMMONS CONCEPTUAL SITE PLAN

D07-RW-VAR(B) PID

Community Development Department

DETAIL "A" (INSIDE OF ENCLOSURE)

RAILROAD CROSSING AT TWO LANE ROADWAY

f i r e - p a r t s. c o m

FALL PROTECTION PROGRAM

KEY PLAN SITE WORK KEY NOTES SCOPE OF WORK EXISTING KFC STORE: E KFC/TACO BELL. SITE PLAN Scale: NTS PROJECT SUMMARY PROJECT GENERAL NOTES

MOT-Jefferson Street Reconstruction PID

College Hill Carthage. Winton Hills. Mill Creek. Spring Grove Village Paddock Hills. North Avondale. Avondale. Evanston. CUF Walnut Hills.

10 Torque. Lab. What You Need To Know: Physics 211 Lab

AGENDA REPORT. side of Walden Woods Dr., south of E. Park Rd. and north of E. Alexander St., in

MOT-Stillwater Bikeway Bridge PID 99981

SHEET INDEX L-01 L-02 L-03 L L L-15 L-16

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS STANDARD DRAWINGS TABLE OF CONTENTS

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

Operator and Parts Manual

Accel. (m/s 2 ) Time (sec) Newton s 3 rd Law and Circular Motion. Group Problem 04

RESOLUTION No A RESOLUTION OF THE CITY OF SALISBURY, MARYLAND AUTHORIZING THE MAYOR TO ENTER INTO AN AGREEMENT BETWEEN THE CITY OF

Project Proposal: Characterization of Tree Crown Attributes with High Resolution Fixed-Base Aerial Photography. by Rich Grotefendt and Rob Harrison

SR-714 (Monterey Road) Martin County, Florida

Data Sheet. Linear bearings

Morrison Drive tel. Ottawa, ON, Canada K2H 8S fax. com


PlacesForBikes City Ratings Methodology. Overall City Rating

Experiment #10 Bio-Physics Pre-lab Questions

Fire-Safety Analysis Timber. FRILO Software GmbH As of 29/06/2016

"A Home for Gracious Living" (real estate brochure for Batten House)

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

Overview. ALDER STREET CORRIDOR REVIEW Open House March 12, City of Campbell River BACKGROUND STUDY AREA

UNCURBED INTERSECTIONS APPROACH TREATMENT DETAIL I

MSC Guidelines for Independent Fuel Tanks

PARK HILL HIGH SCHOOL TURF FIELD IMPROVEMENTS

RELATED RATE WORD PROBLEMS

Lesson 33: Horizontal & Vertical Circular Problems

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

Culvert Safety Inspection Report

WESTERN PLACERVILLE INTERCHANGES PHASE 2 PROJECT CIP # 41828

0ur Ref:CL/Mech/ Cal /BID-01(11-12) Date: 29 July 2011

TABLE OF WHITE PAVEMENT LETTERS ITEM ALIGN CL STATION SIDE DESCRIPTION C RT BIKE THROUGH ARROW 1

CORESTA RECOMMENDED METHOD N 68

MODELLING THE INTERACTION EFFECTS OF THE HIGH-SPEED TRAIN TRACK BRIDGE SYSTEM USING ADINA

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

College Hill Carthage. Winton Hills. Mill Creek. Spring Grove Village Paddock Hills. North Avondale. Avondale. Evanston. Walnut Hills.

CARDBOARD BOAT BUILDING 101

CDBG HANDICAP RAMPS 4TH TO 5TH STREET, EDDY TO SYCAMORE AND LIONS PARK IMPROVMENTS GRAND ISLAND, NEBRASKA INDEX OF SHEETS DESCRIPTION SHEET NO.

Interior Rule of the Quebec Open 2017

Operating Instructions Compressors

Installation and Operation Instructions

EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE. Golf Course Master Plan Implementation. Date: December 1, 2016

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council

Bicycle and Pedestrian Master Plan

DUVAL AND ASSOCIATED COUNTY MANATEE PROTECTION AREAS AND BOATING RESTRICTED AREAS

CORE MPO Non-motorized Transportation Plan. Appendix F. Technical Report on Cost Estimation Methodology

8. Tracking, Marking and Locating. 8. Tracking, Marking & Locating your FTTx Network

CITY OF RICHMOND, VIRGINIA BIKE LANE

Driveway Design Criteria

P r o j e c t T e a m

Northside School Class I Bike Path, Cool, CA Application Attachments

ELECTRICAL INSTALLATION CERTIFICATE [BS 7671:2008 as amended] Details of of the the Installation. For Design. For Construction

Experiment #10 Bio-Physics Pre-lab Comments, Thoughts and Suggestions

British Prime Minister Benjamin Disraeli once remarked that

Phase Behavior Introduction to Phase Behavior F.E. Londono M.S. Thesis (2001)

CITY OF ROSEVILLE DESIGN STANDARDS

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

CHAPTER 2F. TOLL ROAD SIGNS. Table 2F-1. Toll Road Sign and Plaque Minimum Sizes

The Dockline AUGUST Board of Directors. Greetings from the Commodore. Jim Manlick

A Force Platform Free Gait Analysis

City of Regina Standard Construction Specifications SECTION 2999 LIST OF ROADWAY STANDARD DRAWINGS

OBSOLETE DESIGN DATA. Foam 301a. February 9, 1998

LOADS OF SEWER MANHOLES WITHIN MINING AREA

PUBLIC NOTICE (11-137)

The Properties of. Model Rocket Body Tube Transitions

Multi-Robot Forest Coverage

DESIGN CRITERIA DIVISION 4900 TRAFFIC SIGNALS

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if

DIRECTIONAL DRILLING SAFE WORK PRACTICE

The Study About Stopping Distance of Vehicles

VWP CONSTRUCTION INSPECTION REPORT. Project Name: Berkmar Drive Extension Locality: Albemarle County Inspector: ERM

Dual Fuel Supplemental Manual Models: FBD

the Susquehanna River. Today, PFBC protects and conserves aquatic species throughout Pennsylvania.

Torque. Physics 2. Prepared by Vince Zaccone For Campus Learning Assistance Services at UCSB

THE GREAT CARDBOARD BOAT RACE INTRODUCTION, BOAT BUILDING & RULES by United Way of Elkhart County

A. Existing Conditions

High Axial Load Capacity, High speed, Long life. Spherical Roller Bearings

Bubble clustering and trapping in large vortices. Part 1: Triggered bubbly jets investigated by phase-averaging

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

SECTION PRESSURE TESTING OF PIPING

Design Engineering Challenge: The Big Dig Contest Platter Strategies: Ball Liberation

TYPICAL CONTRACTION JOINT PLAN TYPICAL EXPANSION JOINT PLAN T LOCATION AND DETAIL OF JOINTS FOR SIDEWALK

Performance Characteristics of Parabolic Trough Solar Collector System for Hot Water Generation

Tabulation of Bids. Counties:

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

Transcription:

8.7.8567 JEO POJECT # 14838. INDEX OF SHEETS: \\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:52 PM. AINSWOTH OLD HWY 7 HWY 7/HWY 2 VICINITY MAP N.T.S. POJECT LOCATION HWY 183 SHEET NO: SHEET NAME: C.1 COVE SHEET & VICINITY MAP C.2 S C.3 LOCATION MAP C.4 CONTOL C.5 GENEAL NOTES & QUANTITIES C.6 SITE ACCESS & STAGING PLAN C1. SITE PLAN C1.1 POPOSED SITE PLAN PP1.1-1.4 PLAN AND POFILE - ACCESS OAD PP2.1 PLAN AND POFILE - SD14 D1. STANDAD DETAILS NOTE: NEITHE THE OWNE (CLIENT) NO JEO CONSULTING GOUP, INC. ASSUMES ANY ESPONSIBILITY FO UTILITY LOCATIONS BEING ACCUATELY SHOWN O NOT SHOWN ON THE PLANS. A EQUEST FO UTILITY LOCATES WAS MADE FO THIS LOCATION AS PE THE ONE-CALL NOTIFICATION SYSTEM ACT. (: OC TICKET NO.: TICKET NO ). UTILITIES SHOWN AE FOM FIELD MAKINGS POVIDED IN THE FIELD BY THE UTILITY POVIDES. THE EXACT LOCATION AND/O SIZE OF UNDEGOUND FEATUES MAY NOT BE ACCUATELY, COMPLETELY AND ELIABLY DEPICTED. FIELD VEIFICATION OF UTILITIES MAY BE EQUIED. CONTACTO(S) SHALL NOTIFY THE ESPECTIVE UTILITY COMPANIES BEFOE COMMENCING ANY WOK. : 2//218 S-14838._SD-14.dwg 7 PECENT EVIEW COVE SHEET & VICINITY MAP C.1 14838. 2//218 7% INI 7% Date

LINESTYLES UTILITIES VEGETATION PAVEMENT S AND HATCH HATCH \\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:52 PM. BEAK LINE CABLE TELEVISION CENTELINE OF OAD CONTOU MINO (EX) CONTOU MAJO (EX) CONTOU MINO (EX SCEENED) CONTOU MAJO (EX SCEENED) CONTOU MINO (P) CONTOU MAJO (P) LIMITS OF CULVET ELECTIC (OVEHEAD) ELECTIC (UNDEGOUND) FENCE (WOODEN) FENCE (WIE O UNKNOWN) FENCE (CHAINLINK) FENCE (SECUITY) FIBE OPTIC LINE FLOWLINE (BEAKLINE) GAS LINE GUADAIL POPETY BOUNDAY POPETY LOT LINES (P) IGHT-OF-WAY LINE AILOAD IGHT-OF-WAY AILOAD TACKS ETAINING WALL SANITAY SEWE (EXIST) SANITAY SEWE (POP) SAN SEWE FOCE MAIN (EX) SAN SEWE FOCE MAIN (P) STOM SEWE (EXIST) STOM SEWE (POP) TELEPHONE LINE (UGND) TELEPHONE LINE (OVEHEAD) TEACE COPLINE TAVELED WAY WATE (EXIST) WATE (POP) FIE SEVICE SWPPP SILT FENCE INLET POTECTION STAW WATTLE CHECK STAW BALE CHECK FLOW AOW (PLAN) AEA INLET FILTE POTECTION IP AP SEEDING MATTING PAVING FEATUES PAVEMENT JOINT TANSVESE JOINT LONGITUDINAL JOINT EXPANSION/KEYED JOINT PAVEMENT MAKING PAVEMENT EBA HANDICAP TV LOC OHE UGE FO G 122 12 122 12 8'' SAN OW 8'' SAN 8'' FM 6'' FM (OFFSET TO PIPE SIZE) 12" ST (OFFSET TO PIPE SIZE) UGT OT 6'' W 6'' W 6'' F 122 12 OW 12"ST SF STOM SEWE WATE SEPTIC TANK POWE POLE () POWE POLE (POPOSED) POWE (ELEC) PEDESTAL POWE (ELEC) PULL BOX O MANHOLE POWE (ELEC) METE TELEVISION PEDESTAL FIE HYDANT () FIE HYDANT (POPOSED) FIE HYDANT IN POFILE WATE FITTINGS CUB INLET GATE INLET CATCH BASIN STOM SEWE MANHOLE SANITAY CLEANOUT SANITAY MANHOLE POWE, ELECTICAL, LIGHT, AND TAFFIC GUY WIE ANCHO ELECTICAL HIGHLINE TOWE (METAL O CONCETE) GAS TELEPHONE AI CONDITIONING UNIT ANTENNA ANCHO POLE/POST GUY POLE LIGHT POLE TAFFIC SIGNAL TAFFIC SIGNAL BOX TELEVISION MANHOLE WATE MANHOLE WATE VALVE WATE SHUT OFF O CUB STOP WELL WATE METE WATE METE PIT YAD HYDANT WATE ELEVATION WATE TOWE 11-1/4 22-1/2 45 9 COSS PLUG EDUCE TEE GAS METE GAS MANHOLE GAS FILL PIPE GAS PUMP GAS VALVE GAS VENT FIBE OPTICS PULL BOX TELEPHONE POLE TELEPHONE PULL BOX O MANHOLE TELEPHONE PEDESTAL MANHOLE (NON-SPECIFIC) UNDEGND STOAGE TANK VALVE (NON-SPECIFIC) BUSH CONIFEOUS TEE DECIDUOUS TEE MASH/WETLAND TEE MASS LINE TEE STUMP SITE & SIGNAGE SIGN BAICADE OAD SIGNS MISC FEATUES CENTE PIVOT CEMETEY GAVE CHUCH CAVE CISTEN LATINE OIL WELL GUAD POST COUNTY OAD INTESTATE HIGHWAY MILE MAKE POST STATE HIGHWAY IGHT OF WAY MAKE U.S. HIGHWAY AILOAD COSSING SIGNAL AILOAD SWITCH FLAG POLE MAILBOX POPANE TANK SATELLITE TV DISH WINDMILL CONTOL & ELEVATION TEMPOAY POINT TEST BOING POINT ELEVATION () POINT ELEVATION (POPOSED) GID TICK BENCHMAK CONTOL POINT (NON-POPETY) MONUMENT FOUND (POPETY) MONUMENT SET.. TC 1. TC ASPHALT PAVEMENT (EX.) CONCETE PAVEMENT (EX.) GAVEL (EX.) BICK PAVEMENT (EX.) ASPHALT PAVEMENT (P.) CONCETE PAVEMENT (P.) GAVEL (P.) BICK PAVEMENT (P.) GENEAL ACHITECTUAL MATEIALS UNDISTUBED EATH EATH GANULA FILL CONCETE BICK SAND MOTA, PLASTE DATUM POINT EFEENCED DEMOLITION NOTE EFEENCED PHOTOGAPH TAG OOM NAME & NO. DOO NO. WINDOW NO. WALL TYPE PLAN EVISION NOTH AOW ACHITECTUAL S COLUMN LINE COLUMN EFEENCE GID LINES EQUIPMENT O FIXTUE A B CONCETE BLOCK METAL OFFICE 11 11 2 X WOOD, FINISH WOOD, FAMING PLYWOOD TA-1 1 2 4 WOOD, FAMING INTEUPTED MEMBE 7 22 1 EFEENCED NOTE ELEVATION BUILDING SECTION WALL SECTION DETAIL ENLAGED DETAIL EVISION INTEIO ELEVATION(S) LVL - GLU-LAM INSULATION, BATT INSULATION, IGID 1 A11 GYPSUM BOAD (DBL LINE OMITTED AT SMALL SCALE) GLASS - ELEVATION 1 A11 1 A11 X XX-X 4 XXX'-XX" 3 1 A11 1 A11 1 A11 8.7.8567 : 2//218 S-14838._SD-14.dwg 7 PECENT EVIEW S SHEET C.2 14838. 2//218 7% INI 7% Date

JEO_SUVEY_IMPOT-216 JEO SUVEY STYLES AND LAYES JEO DESC KEY SET AND FIGUE STYLES 4 35 3 25 2 15 ALIGNMENT - (8) + +5 1+ 1+5 2+ 4 35 3 25 2 15 1 2 4 8.7.8567 APPOXIMATE POJECT LOCATION ACCESS OAD TO POJECT LOCATION 883D D \\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:53 PM. 428TH AVE LOCATION MAP 429TH AVE 882ND D MEADVILLE D / OLD HIGHWAY 7 432ND AVE 433D AVE : 2//218 S-14838._SD-14.dwg 7 PECENT EVIEW C.3 14838. 2//218 7% INI 7% Date

HOIZONTAL AND VETICAL SUVEY CONTOL - NAD 1983 AND NAVD 1988 POINT NAME NOTHING EASTING ELEVATION LONG DESCIPTION CP-11 12299.92 1687945.81 33.76 SET 5/8" X 24" EBA 5'± EAST OF WEST END, SOUTH SIDE CP-12 122137.71 1688727.38 29. SET 5/8" X 24" EBA 2'± WEST OF EAST END, SOUTH SIDE CP-13 122274.66 1688364.26 47.77 SET 5/8" X 24" EBA 6'± WEST OF EAST END, NOTH SIDE 3 6 12 8.7.8567 11+ 12+ KEY-2 13+ -3 14+ -2-1 -4 KEY-3 15+ 16+ -5 KEY-7-7 17+ 18+ -8 19+ KEY-8 11+ CP 13 111+ 112+ KEY-11 113+ -9-11 -12 114+ -1 KEY-12 115+ 116+ 116+14 KEY-4-6 KEY-9 KEY-1 CP 13 KEY-1 CP 11 \\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:55 PM. OCK KEYWAY POINT # NOTHING EASTING KEY-1 12286.82 1687596.29 KEY-2 12221.82 1687612.8 KEY-3 122227.92 1687676.6 KEY-4 12212.59 1687682.95 KEY-5 12252.39 168791.5 KEY-6 124.49 16886.69 KEY-7 122256.56 168795.21 KEY-8 122228.34 168812.51 KEY-9 122135.68 1688574.65 KEY-1 122147.8 1688672. KEY-11 12225.32 1688564.1 KEY-12 122254.22 1688667.1 KEY-5 KEY-6 IPAP LIMITS POINT # NOTHING EASTING -1 12213.68 168766.96-2 122136.4 1687677.16-3 12228.1 1687616.77-4 122212.96 168767.5-5 122118.7 1687921.61-6 1227.33 168856.54-7 12219.41 168794.2-8 122143.69 168872.79-9 12216.86 1688577.33-1 122165.65 1688665.96-11 1222.27 168857.7-12 1225.4 1688664.93 : 2//218 S-14838._SD-14.dwg 7 PECENT EVIEW CONTOL SHEET C.4 14838. 2//218 7% INI 7% Date

\\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:56 PM. BASE BID EATHWOK /EOSION CONTOL S 1 EATHWOK CY 1 2 HYDOSEEDING AND MULCHING AC 5 3 IPAP TON 442 8.7.8567 : 2//218 14838. 2//218 S-14838._SD-14.dwg 7 PECENT EVIEW 7% INI 7% Date C.5 GENEAL NOTES & QUANTITIES

\\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:56 PM. 3+29+ 32+ 31+ 33+ 37+14 34+ 35+ 36+ 37+ 28+ 27+ 26+ 25+ 24+ 2+ 19+ 18+ + 22+ 21+ POPOSED STAGING AEA CENTELINE OF ACCESS OAD 17+ 16+ 15+ 14+ 13+ 12+ + 2+ 1+ 3+ 4+ 5+ 6+ 7+ 8+ 11+ 9+ 1+ 433D AVE 75 15 3 8.7.8567 : 2//218 14838. 2//218 S-14838._SD-14.dwg 7 PECENT EVIEW 7% INI 7% Date C.6 SITE ACCESS & STAGING PLAN

3 6 12 4 44 4 GATE 4 114+ 13+ 15+ 3 14+ 3 3 111+ EDGE OF WATE 18+ 113+ 32 19+ 11+ 4 115+ 112+3 2 2 36 3 3 14 +6+ 61 111 1 37+ 3 APPOXIMATE CHANNEL CENTELINE, TYP. 16+ 8 5 4 4 3 2 2 3 28 3 SITE PLAN 4 28 12+ 5 5 3 11+ 3 44 5 4 2 54 4 42 3 2 4 5 4 3 4 6 56 5 5 8.7.8567 32 \\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:56 PM. 3 TEES AND BUSHES (DO NOT DISTUB) 32 ---: 2//218 4 EMOVE AND EPLACE BABED WIE FENCE AS NECESSAY 3 4 14838. 2//218 S-14838._SD-14.dwg 7 PECENT EVIEW C1. 7% INI 7% Date

2 4 8 8.7.8567 OCK IPAP WEI BELOW SECTION E-E SHEET BELOW SECTION E-E SHEET BELOW SECTION E-E SHEET POPOSED LIMIT OF GADING BELOW SECTION E-E SHEET BELOW SECTION E-E SHEET BELOW SECTION E-E SHEET B APPOXIMATE CHANNEL CENTELINE POPOSED LIMIT OF GADING 114+ 13+ 15+ 115+ POPOSED LIMIT OF GADING 14+ 17+ 111+ 18+ 11+ A 113+ EDGE OF WATE, TYP. 112+ A 19+ B POPOSED SITE PLAN 16+ EDGE OF WATE, TYP. BELOW SECTION E-E SHEET POPOSED LIMIT OF GADING BELOW SECTION E-E SHEET BELOW SECTION E-E SHEET OCK IPAP OCK IPAP WEI BELOW SECTION E-E SHEET ---: 2//218 \\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:57 PM. BELOW SECTION E-E SHEET POPOSED LIMIT OF GADING 14838. 2//218 S-14838._SD-14.dwg POPOSED LIMIT OF GADING BELOW SECTION E-E SHEET 7 PECENT EVIEW C1.1 7% INI 7% Date

\\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:57 PM. POPOSED 8 7 6 5 4 3 2 1 3+ 5+ 7+ -+5 + +5 1+ 1+5 2+ 2+5 3+ 3+5 4+ 4+5 5+ 5+5 6+ 6+5 7+ 7+5 8+ 8+5 9+ 9+5 1+ 1+5 11+ 11+5 12+ 12+5 13+ 13+5 14+ 55.5 5.7 45.2 42. 37.1 35.2 32.1 29.6 26..7 24.8 24.5 24.1 22.1.3.3.4.5.7 24. 24.1 24. POPOSED 25 5 1 : 25 5 HOIZ.= 5 1 VET.= 8 7 6 5 4 3 2 1 STA. 2//218 EVISION EVISION EVIEW BY EVIEW 2+ + 1+ 4+ 6+ 8+ 9+ 1+ APPOX. ACCESS OAD PLAN AND POFILE 2//218 14838. S-14838._SD-14.dwg PP1.1 MATCH LINE STA. 1+5 MATCH LINE STA. 1+5

\\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:58 PM. POPOSED 24 9 8 7 6 5 4 3 2 9+5 1+ 1+5 11+ 11+5 12+ 12+5 13+ 13+5 14+ 14+5 15+ 15+5 16+ 16+5 17+ 17+5 18+ 18+5 19+ 19+5 2+ 2+5 21+ 21+5 22+ 22+5 + +5 24+ 24. 25.1 24.3 24. 29. 35.1 41.1 38.6 44.3 5.5 56.2 61.8 66.3 69.3 69.1 69.4 67.4 68.8 73.2 76.3 79. 81.4 85.4 88.6 88.5 9.2 92.2 94. 95.6 POPOSED 25 5 1 : 25 5 HOIZ.= 25 5 VET.= 24 9 8 7 6 5 4 3 2 STA. 2//218 EVISION EVISION EVIEW BY EVIEW 14+ 15+ 18+ 19+ 2+ 21+ 22+ + 12+ 13+ 16+ 17+ ACCESS OAD PLAN AND POFILE 2//218 14838. S-14838._SD-14.dwg PP1.2 MATCH LINE STA. 1+5 APPOXIMATE MATCH LINE STA. + MATCH LINE STA. 1+5 MATCH LINE STA. +

31 + + 3 32 + + 29 33 + + 28 34 + + 27 35 + 6 2 + 36 + 24 IN HL 4 4 MA TC + 25 5 1 3 + 22 37 3+7 +1 POPOSED STAGING AEA ES T 2 A. + ---: 2//218 5 1 CP & BM 11 25 5 5 1 HOIZ.= VET.= 2415 95 95 MATCH LINE STA. + 245 75 65 85 APPOXIMATE 75 65 22+5 + +5 24+ 24+5 25+ EVISION 25+5 26+ EVISION 26+5 27+ 27+5 28+ 28+5 29+ 29+5 3+ 3+5 31+ 31+5 32+ 32+5 33+ 33+5 34+ EVIEW BY EVIEW 2//218 14838. S-14838._SD-14.dwg 34+5 35+ 35+5 36+ 36+5 ACCESS OAD PLAN AND POFILE 37+ POPOSED 37.6 38.6 41.7 47.9 46.3 47.4 49.3 5.6 52.5 58. 63.6 66.9 7.2 74.8 79.1 83.3 87. 9.2 93.1 95.8 99.8 242. 242. 241.8 241.4 241.1 24.9 24.6 24.9 24.9 241.2 24.7 241.2 24.9 24.8 241.4 241.2 241.4 241.8 242.6 243.2 243.5 243.4 243.1 242.5 243.3 243.9 244. 244. 244. 244. 244. 243.8 242.9 241.2 99. 35 97.5 35 95.6 45 94. 45 92.2 55 POPOSED 55 \\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 1:59 PM. 2415 245 85 FLOWLINE + 3+ + 25 STA. PP1.3

\\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 2:1 PM. POPOSED 45 4 35 3 25 2 15 1 5 3 36 11+ 12+ 13+ 14+ 15+ 16+ 17+ 18+ 19+ 11+ 111+ 112+ 113+ 114+ 115+ 27.5 26. 26.3 24.7 24.3 24.2 24.2 24.2 24.1 24..6.6 22.6 19.9 18.9 18.5 18.2 17.8 17.9 17.7 17.6 17.3 17.1 17. 17. 16.8 16.6 16.7 16.3 16.7 POPOSED 32 3 25 5 1 25 5 HOIZ.= 2.5 5 VET.= 45 4 35 3 25 2 15 1 5 STA. 4 34 32 28 : 2 3 2 28 4 3 116+ 116+14 2 3 19+ 3 14+ 16+ 15+ 12+ 13+ 11+ 17+ 18+ 3 3 11+ 2 3 111+ 112+ 3 3 32 113+ 3 115+ 114+ 4 4 44 OCK IFFLE #1 OCK KEY 3 14' WIDENED CEST FO LANDOWNE COSSING 4 5 4 38 OCK IFFLE #2 PE-DUG SCOU HOLE 2//218 EVISION EVISION EVIEW BY EVIEW 42 4 4 3 4 4 42 5 44 5 56 54 OCK IFFLE #3 5 4 4 5 5 5 6 PLAN AND POFILE - SD14 2//218 14838. S-14838._SD-14.dwg PP2.1

B D1. SCOPE: 1. PLACE OCK IPAP WEI AT 2:1 SLOPE. 2. ADD OCK IPAP 8' UP ON BANKS. 14.3' 96' 6' 58' TOP OF WEI POPOSED, TYP. GOUND, TYP. 8.7.8567 EX. FLOWLINE FLOW 2:1 SLOPE 2:1 SLOPE 3' FLOW EX. FLOWLINE OCK IPAP WEI (3' THICK MIN.) 5' B D1. 3:1 POPOSED WEI LONGITUDINAL SECTION A-A SCALE: N.T.S. GOUND, TYP. 3:1 PE-DIG SCOU HOLE OCK IPAP, TYP. 2:1 8' 2:1 \\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 2:3 PM. 3' MIN. COMPACTED BACKFILL, TYP. 1' CHANNEL WIDTH (O MATCH WIDTH) WEI COSS SECTION B-B SCALE: N.T.S. 6' 6' 2' MIN. OCK IPAP, TYP. IPAP KEYWAY SECTION C-C SCALE: N.T.S. : 2//218 S-14838._SD-14.dwg 7 PECENT EVIEW STANDAD DETAILS D1. 14838. 2//218 7% INI 7% Date

\\Maui\Projects\Engineering\14838. - Long Pine Creek Watershed Plan - Implementation Phase 1\7 Design\2 Drawings\Sheets\S-14838._SD-14.dwg, on 2//218 2:3 PM. SECTION B-B SCALE: N.T.S. 4' 2' 6' 1' A B C C C B 2' 2' 12' 27.5' 3:1 TYP. 4' 1' 3' 4' 4:1 TYP. FLOW FLOW 2:1 TYP. FLOW TYPE C OCK IPAP, TYP. 24" CMP CULVET @ 5% SLOPE. 3:1 TYP. POPOSED, TYP. TYPE C OCK IPAP 4.5' 3' 2' POPOSED CHANNEL BOTTOM FLOW, TYP. 2:1 TYP. 2' 1' A SECTION A-A SCALE: N.T.S. C 6' 8.7.8567 : 2//218 14838. 2//218 S-14838._SD-14.dwg 7 PECENT EVIEW 7% INI 7% Date STANDAD DETAILS