PALM BEACH COUNTY UNIFIED LOCAL MITIGATION STRATEGY DRAFT- LMS Prioritized Project List November 14, 2018 2018 ~ :'cniciiiec1/ C ~ IIEOITATION pflogv.p. 20 S O U T H M I L I T A R Y T R A I L, W E S T P A L M B E A C H, FL 33415
1* 2 3* 4* 5* 6 7* 8* 9** 10* 11* 12** 13* 14 15 16* 17 18 19* 20 21* 22 23 94.85 174 Greenacres Gladiator Lake Drainage Enhancements $1,300,000.00 93.15 428 Lake Worth 17 th Ave South Drainage Resiliency Improvements $ 700,000.00 91.99 425 Lake Worth 18 th Ave North Drainage Resiliency Improvements $ 350,000.00 87 59 Boynton Beach Sea Level Rise & Tidal Drainage Improvements $850,000.00 85.71 423 Lake Worth Wellesley Dr/Holy Cross Ln Drainage Resiliency $ 75,000.00 Improvments 84.86 702263 Greenacres Original Section Drainage Improvements Phase 6 & 7 $702,000.00 84 66 Indian Trail Improvement ITID MO Canal Reinforcement and Revetment Repair $700,000.00 83.72 466 South Bay Retrofit City Hall $ 95,000.00 83 71 Palm Beach Co. ERM Wildfire Mitigation (5) Natural Areas $ 170,000.00 82.99 419 South Bay Installation and Repair Existing Stormwater System $ 550,000.00 80 68 Lake Park Lake Shore Drainage Improvements $3,500,000.00 80 64 Indian Trail Improvement Moss Drainage Project $400,000.00 77.57 477 Greenacres Greenacres Public Works Generator $ 240,000.00 76 75 Pahokee Emergency Equipment $271,818.00 76 8 Juno Beach Juno Ocean Walk Drainage Project $35,000.00 74.71 437 Royal Palm Beach Bridge Slope Stabilization and Canal Dredging $ 60,000.00 73 74 Lake Worth New City Services Complex - EOC $4,000,000.00 73 242928 Palm Springs Davis Road North Basin Stormwater Improvements $976,752.00 72.57 434 Golf Residential Undergrounding of Powerlines $ 2,000,000.00 71 83 West Palm Beach North Flagler Improvements $1,379,070.00 70.43 572 SFWMD Palm Beach Data Acquisition, Simulation, and Scenario $ 400,000.00 Management (PBDASS) 70 85 Lake Worth North F St between 3 rd Ave and 6 th Ave North Drainage $2,038,300.00 70 86 Lake Worth 2 nd Ave North to 1 st So, F St to Dixie Drainage $2,929,300.00 2
24 25 26* 27 28 29 30 31 32 33 34 35 36 37* 38 39* 40 41 42* 43 44 45 69.14 562 West Palm Beach Stormwater System Rehab Phase 2 $ 3,000,000.00 69 87 Lake Worth North Lakeside/Duke/Notre Dame/Wellesley Dr. Drainage $1,791,900.00 68.71 551 West Palm Beach Water Treatment Plant Hardening and Windproofing $ 1,000,000.00 68 88 Mangonia Park Property Acquisition $ 283,603.00 68 89 Lake Worth 10 th Ave N to 13 th Ave N, E and F Streets Drainage $721,600.00 67.43 622298 Royal Palm Beach Bridge Slope Stabilization/Canal Dredging Phase II $2,600,000.00 67 12 Lake Worth 22 nd Ave N and Park Street Drainage 421,300.00 66 15 West Palm Beach South Flagler Improvements $1,015,014.00 66 17 Lake Worth Lake Ave to 1 st Ave South Drainage $2,956,800.00 66 18 Lake Worth 15 th Ave North and Dixie Drainage $563,200.00 66 16 Lake Worth 3 rd Ave South to 5 th Ave S Drainage 3,349,500.00 65.14 490 Delray Beach Thomas Street Pump Station Replacement $ 1,000,000.00 65 22 West Palm Beach Caroline Area Improvements $1,423,338.00 65 23 Jupiter Town Hall Retrofit $2,933,000.00 65.00 492 Delray Beach Basin Street Pumping Station $ 1,000,000.00 64.29 447 Palm Beach County FD&O Main County Courthouse Skylight Removal/Roof Retrofit $ 1,074,164.00 64.27 141 Lantana Lantana Cove Drainage Improvements (2017) $380,000.00 64 24 Boynton Beach Heart of Boynton Stormwater Study & Improvement $400,000.00 62.70 152 Wellington High Flow Lift Station Emergency Power $250,000.00 62 26 Lake Worth 10 th Ave S and G Street Drainage $ 74,700.00 62 28 Lake Worth 6 Ave South and F Street Drainage $224,400.00 62 25 Lake Worth 10 Ave S and South N Street Drainage $518,100.00 3
46* 47* 48 49 50 51 52* 53* 54* 55 56 57 58 59 60 61 62* 63 64 65 66 61.99 115 Palm Beach Townwide Undergrounding of Utilities $98,600,000.00 61.56 138 Wellington Pump Station Number 2 Hardening $2,085,000.00 61 29 Mangonia Park Elevate Lift Stations $40,000.00 61 33 Lake Worth 18 th Ave S and South Palmway Drainage $111,100.00 61 30 Lake Worth Palmetto Ave and South Pine Street $167,200.00 60 34 West Palm Beach Pineapple Park Improvements $1,961,862.00 59.85 139 Wellington Public Works Facility Retrofit $955,000.00 59.57 474 Indian Trail Improvement Dist Culvert Improvements Phase 1 $ 2,106,500.00 59.42 131 Briny Breezes Sub-Pump Emergency Response $50,000.00 59 36 Lake Worth City Hall Retrofit $831,000.00 58.43 587 West Palm Beach Lift Station Sea Level Rise/Tidal Flooding Impact Study and $ 5,850,000.00 Improvements 57.14 900137 Palm Beach Gardens City Hall, Police, Fire Station Wind Retrofit $600,000.00 54.86 493 Delray Beach New EOC $10,000,000.00 54.58 481 Delray Beach Fire Station 1 Hurricane Hardening $ 1,070,000.00 53 41 Belle Glade West Ave A Drainage $98,102.00 52.70 154 Wellington Water Reclamation Facility Emergency Operations/Central $500,000.00 Command Building 51.41 134 Juno Beach Universe Blvd Improvements $2,000,000.00 51 65 Indian Trail Improvement I Canal Drainage Improvements $225,000.00 50.42 155 Wellington Water Treatment Plant Hardening $75,000.00 49 47 Belle Glade Drainage Improvements at City Hall $206,205.00 47.57 438 Delray Beach Marine Way Pump Station $ 4,000,000.00 4
67 68* 69 70 71 72 73 74 75 76 77 78 79 47.00 002675 Hypoluxo Town Hall Hardening $450,000.00 45.14 567 West Palm Beach Tidal Valve Implementation Phase 2 $ 180,000.00 44 78 Glen Ridge Town Hall Emergency Generator $5,000.00 43 10 Pahokee East Lake Village Project $300,375.00 42 6 Mangonia Park Dexter Road Drainage Project $435,556.00 41 48 Belle Glade EOC Construction $2,900,000.00 39 49 Lake Worth Landscape Hardscape $ 741,200.00 37 52 Lake Worth Demo of Vacant Properties $692,000.00 36.29 928468 Indian Trail Improvement Dist Outfall Canal Control Structure $400,000.00 36.00 822223 Indian Trail Improvement Dist Pump Station Hardening $750,000.00 34.84 140 Wellington C-23/Pierson Rd Improvements $3,530,000.00 34 53 Mangonia Park Generator for Temporary Shelter at Community Center $46,362.00 33 520413 Indian Trail Improvement Dist M-2 Impoundment $105,126.02 *Applied for HMGP-Irma Funds, currently under review by FEMA for possible award. **Applied for HMGP-Matthew Funds, final technical issues being worked out to award projects. Note: Former Project #49 (Tracking Number 73) applied for HMGP-Irma as well but has been removed from list (5-year rule). It is still good for HMGP-Irma per the PPL in effect at the time of HMGP deadline in August 2018. ***Total Projects: 79 5