DRAFT- LMS Prioritized Project List

Similar documents
May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018

PALM BEACH COUNTY, FLORIDA AND INCORPORATED AREAS

ZONE TEAM SCHEDULES APRIL 2018

ZONE TEAM SCHEDULES JANUARY 2018

Table 4. FY2016 Grades for SDPBC Schools by School Type

HIA Working Group Meeting #4 September 27, 2017

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

INVITATION FOR BIDS. Printing, Packaging and Delivery of the 2016 Family Guides IFB #: Deadline for Responses: 2:00 PM 6/2/2016

Transit Initiatives 1

I I I I I I I ~ ' , I. Board of County Commissioners Impact Fee Report For Fiscal Year 2013

CHAPTER SIXTEEN THE MASTER PLAN. Oakland Alive

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

HERBERT HOOVER DIKE REHABILITATION PROJECT

TRIP SUMMARY by TRIP 11/13/2013 Ordered by Trip Name STECH TRIP 02 PM

Agenda. US-1 Corridor Study and HIA Update. Pathway Diagram / Primary Indicators. Research Questions. Linking Multimodal Improvements to Indicators

Palm Beach County Traffic Report November 16 through November 23, 2018

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

Palm Beach County Traffic Report October 26 through November 2, 2018

HIA Working Group Meeting #5 November 29, 2017

Palm Beach County Traffic Report January 11 through January 18, 2019

SHORE PROTECTION PROJECT Pinellas County, FL

DRAFT TENTATIVE WORK PROGRAM FY

South Florida Algal Bloom Sampling Results July

VENICE LOCAL COASTAL PROGRAM UPDATE: COASTAL HAZARDS WELCOME

MIAMI-DADE COUNTY MANATEE PROTECTION AREAS

Technical Advisory Committee (TAC)

Building Coastal Resiliency at Plymouth Long Beach

2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR

Reams Road RCA Study. Board of County Commissioners Public Hearing

MIAMI-DADE COUNTY MANATEE PROTECTION AREAS AND BOATING RESTRICTED AREAS

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

EXHIBIT A of Ordinance #32-15

June 13, 2016 Tom Garigen Re: Myrtle Beach Golf and Yacht Club Drainage assessment

PRECISIONAIRE SUBSURFACE SYSTEMS. #18- Country Club of Birmingham, AL

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

DELAWARE S VULNERABLE COASTAL AREAS. DELAWARE INLAND BAYS and DELAWARE BAY RECONNAISSANCE STUDY

CITY OF SOUTH DAYTONA

RIGHT OF ENTRY AND HOLD HARMLESS AGREEMENT (AGREEMENT) FOR VOLUNTARY ACTIVITIES

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

Community Advisory Committee (CAC) Workshop #6

Santaluces High School Competition Schedule

TPA Committee Meetings May 2018

Delaware Basin Stream Management Program

Ocean Park Boulevard Green Street Project Community Workshop

Grassy Waters A HISTORY OF A WATER CATCHMENT AREA. By Allen Trefry

Figure 2-1 City Of Boynton Beach, Florida Anionic Exchange Resin Facility and East Water Treatment Plant Improvements EXISTING SITE PLAN

ANNEX 5 - CITY OF OAKRIDGE. Version 5.0 (March 2018)

TRIP SUMMARY by TRIP 08/17/2016 Ordered by Trip Name GSTAR G002 AM

Keller Williams Realty Marco Island

2018 South Florida PGA GolfPass Collier County As of February 2nd

Kissimmee River Channelization

TRIP SUMMARY by TRIP 09/22/2015 Ordered by Trip Name GSTAR G002 AM

Jean Byers Award for Excellence in Cancer Registration

REGULAR MEETING MINUTES

ST. JOHNS GOLF CLUB PHASE II FINDINGS, PHASE III RECOMMENDATION, AND POTENTIAL PARTNERSHIP OPPORTUNITY

Restoring a Recreational Gem. Pete Jopke Water Resources Planner Dane County Land & Water Resources Department

We Make a Difference. New Maps, Now What? Updated Coastal Flood Hazard Information for Southern Georgia

Traffic and Flood Control Improvements in the Transit Oriented Development District Project Updates Tuesday, November 29, 2016 Meriden Public Library

2018 South Florida PGA GolfPass Extended Play As of November 5, 2018

RI Regulatory Setbacks & Buffers: Coastal Management Issues

GDOT GDOT PowerPoint. Title Page

North Shore of Long Island, Feasibility Study

Financial Project ID No(s).: and ETDM No(s).: and 14181

INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

The Storm Surge Hazard 2018 TS-8 Tropical Meteorology 2

Community Open House December 13, A project of the Green Infrastructure Center, supported by Skeo Solutions

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

SECTION V MITIGATION STRATEGY

West End Connectivity Master Plan

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

Does DFO Need to Review My Project?

Sea-Level Rise and Coastal Habitats in Southeastern Louisiana An Application of the SLAMM Model

Pedestrian and Bicycle Safety Study

RESILIENCE THROUGH RESTORATION

Q1 Where do you live?

Protecting our Beaches

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #2

Shore Drive Safety Task Force. Report to the SDAC

Conservation and Restoration Florida s Coastal Marshes: An Overview of MESS. Jeff Beal, Kent Smith, Erin McDevitt, Maria Merrill

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

Public Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022

AN EARTHWORK HILL, RINGED WITH SEATING AND SHAPED TO SLOPE DOWN TO THE RIVER, FORMS THE CENTERPIECE TO A NEW SOCIAL PIER. A WOOD SEATING TERRACE

Waikanae River Environmental Strategy. 12. Arapawaiti/Otaihanga Reach

Leaning Into Adaptation

5 CIRCULATION AND STREET DESIGN

HELM RANCH ROUND 2 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY

TOWN OF WINDSOR AGENDA REPORT

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

11U Boys Division 1 21 Teams 3 Groups of 4 & 3 Groups of 3 6 Group Winners + 2 Wildcards advance to Elite 8

2018 South Florida PGA GolfPass Collier County As of April 2018

2015 Reciprocal Clubs

Gold Seal Data October of 13

SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD

Town of Duck, North Carolina

HWY A1A DRIFTWOOD AVE. HEATH MILLIGAN PRINCIPAL

2013 FEDERAL STORM RESPONSE

Transcription:

PALM BEACH COUNTY UNIFIED LOCAL MITIGATION STRATEGY DRAFT- LMS Prioritized Project List November 14, 2018 2018 ~ :'cniciiiec1/ C ~ IIEOITATION pflogv.p. 20 S O U T H M I L I T A R Y T R A I L, W E S T P A L M B E A C H, FL 33415

1* 2 3* 4* 5* 6 7* 8* 9** 10* 11* 12** 13* 14 15 16* 17 18 19* 20 21* 22 23 94.85 174 Greenacres Gladiator Lake Drainage Enhancements $1,300,000.00 93.15 428 Lake Worth 17 th Ave South Drainage Resiliency Improvements $ 700,000.00 91.99 425 Lake Worth 18 th Ave North Drainage Resiliency Improvements $ 350,000.00 87 59 Boynton Beach Sea Level Rise & Tidal Drainage Improvements $850,000.00 85.71 423 Lake Worth Wellesley Dr/Holy Cross Ln Drainage Resiliency $ 75,000.00 Improvments 84.86 702263 Greenacres Original Section Drainage Improvements Phase 6 & 7 $702,000.00 84 66 Indian Trail Improvement ITID MO Canal Reinforcement and Revetment Repair $700,000.00 83.72 466 South Bay Retrofit City Hall $ 95,000.00 83 71 Palm Beach Co. ERM Wildfire Mitigation (5) Natural Areas $ 170,000.00 82.99 419 South Bay Installation and Repair Existing Stormwater System $ 550,000.00 80 68 Lake Park Lake Shore Drainage Improvements $3,500,000.00 80 64 Indian Trail Improvement Moss Drainage Project $400,000.00 77.57 477 Greenacres Greenacres Public Works Generator $ 240,000.00 76 75 Pahokee Emergency Equipment $271,818.00 76 8 Juno Beach Juno Ocean Walk Drainage Project $35,000.00 74.71 437 Royal Palm Beach Bridge Slope Stabilization and Canal Dredging $ 60,000.00 73 74 Lake Worth New City Services Complex - EOC $4,000,000.00 73 242928 Palm Springs Davis Road North Basin Stormwater Improvements $976,752.00 72.57 434 Golf Residential Undergrounding of Powerlines $ 2,000,000.00 71 83 West Palm Beach North Flagler Improvements $1,379,070.00 70.43 572 SFWMD Palm Beach Data Acquisition, Simulation, and Scenario $ 400,000.00 Management (PBDASS) 70 85 Lake Worth North F St between 3 rd Ave and 6 th Ave North Drainage $2,038,300.00 70 86 Lake Worth 2 nd Ave North to 1 st So, F St to Dixie Drainage $2,929,300.00 2

24 25 26* 27 28 29 30 31 32 33 34 35 36 37* 38 39* 40 41 42* 43 44 45 69.14 562 West Palm Beach Stormwater System Rehab Phase 2 $ 3,000,000.00 69 87 Lake Worth North Lakeside/Duke/Notre Dame/Wellesley Dr. Drainage $1,791,900.00 68.71 551 West Palm Beach Water Treatment Plant Hardening and Windproofing $ 1,000,000.00 68 88 Mangonia Park Property Acquisition $ 283,603.00 68 89 Lake Worth 10 th Ave N to 13 th Ave N, E and F Streets Drainage $721,600.00 67.43 622298 Royal Palm Beach Bridge Slope Stabilization/Canal Dredging Phase II $2,600,000.00 67 12 Lake Worth 22 nd Ave N and Park Street Drainage 421,300.00 66 15 West Palm Beach South Flagler Improvements $1,015,014.00 66 17 Lake Worth Lake Ave to 1 st Ave South Drainage $2,956,800.00 66 18 Lake Worth 15 th Ave North and Dixie Drainage $563,200.00 66 16 Lake Worth 3 rd Ave South to 5 th Ave S Drainage 3,349,500.00 65.14 490 Delray Beach Thomas Street Pump Station Replacement $ 1,000,000.00 65 22 West Palm Beach Caroline Area Improvements $1,423,338.00 65 23 Jupiter Town Hall Retrofit $2,933,000.00 65.00 492 Delray Beach Basin Street Pumping Station $ 1,000,000.00 64.29 447 Palm Beach County FD&O Main County Courthouse Skylight Removal/Roof Retrofit $ 1,074,164.00 64.27 141 Lantana Lantana Cove Drainage Improvements (2017) $380,000.00 64 24 Boynton Beach Heart of Boynton Stormwater Study & Improvement $400,000.00 62.70 152 Wellington High Flow Lift Station Emergency Power $250,000.00 62 26 Lake Worth 10 th Ave S and G Street Drainage $ 74,700.00 62 28 Lake Worth 6 Ave South and F Street Drainage $224,400.00 62 25 Lake Worth 10 Ave S and South N Street Drainage $518,100.00 3

46* 47* 48 49 50 51 52* 53* 54* 55 56 57 58 59 60 61 62* 63 64 65 66 61.99 115 Palm Beach Townwide Undergrounding of Utilities $98,600,000.00 61.56 138 Wellington Pump Station Number 2 Hardening $2,085,000.00 61 29 Mangonia Park Elevate Lift Stations $40,000.00 61 33 Lake Worth 18 th Ave S and South Palmway Drainage $111,100.00 61 30 Lake Worth Palmetto Ave and South Pine Street $167,200.00 60 34 West Palm Beach Pineapple Park Improvements $1,961,862.00 59.85 139 Wellington Public Works Facility Retrofit $955,000.00 59.57 474 Indian Trail Improvement Dist Culvert Improvements Phase 1 $ 2,106,500.00 59.42 131 Briny Breezes Sub-Pump Emergency Response $50,000.00 59 36 Lake Worth City Hall Retrofit $831,000.00 58.43 587 West Palm Beach Lift Station Sea Level Rise/Tidal Flooding Impact Study and $ 5,850,000.00 Improvements 57.14 900137 Palm Beach Gardens City Hall, Police, Fire Station Wind Retrofit $600,000.00 54.86 493 Delray Beach New EOC $10,000,000.00 54.58 481 Delray Beach Fire Station 1 Hurricane Hardening $ 1,070,000.00 53 41 Belle Glade West Ave A Drainage $98,102.00 52.70 154 Wellington Water Reclamation Facility Emergency Operations/Central $500,000.00 Command Building 51.41 134 Juno Beach Universe Blvd Improvements $2,000,000.00 51 65 Indian Trail Improvement I Canal Drainage Improvements $225,000.00 50.42 155 Wellington Water Treatment Plant Hardening $75,000.00 49 47 Belle Glade Drainage Improvements at City Hall $206,205.00 47.57 438 Delray Beach Marine Way Pump Station $ 4,000,000.00 4

67 68* 69 70 71 72 73 74 75 76 77 78 79 47.00 002675 Hypoluxo Town Hall Hardening $450,000.00 45.14 567 West Palm Beach Tidal Valve Implementation Phase 2 $ 180,000.00 44 78 Glen Ridge Town Hall Emergency Generator $5,000.00 43 10 Pahokee East Lake Village Project $300,375.00 42 6 Mangonia Park Dexter Road Drainage Project $435,556.00 41 48 Belle Glade EOC Construction $2,900,000.00 39 49 Lake Worth Landscape Hardscape $ 741,200.00 37 52 Lake Worth Demo of Vacant Properties $692,000.00 36.29 928468 Indian Trail Improvement Dist Outfall Canal Control Structure $400,000.00 36.00 822223 Indian Trail Improvement Dist Pump Station Hardening $750,000.00 34.84 140 Wellington C-23/Pierson Rd Improvements $3,530,000.00 34 53 Mangonia Park Generator for Temporary Shelter at Community Center $46,362.00 33 520413 Indian Trail Improvement Dist M-2 Impoundment $105,126.02 *Applied for HMGP-Irma Funds, currently under review by FEMA for possible award. **Applied for HMGP-Matthew Funds, final technical issues being worked out to award projects. Note: Former Project #49 (Tracking Number 73) applied for HMGP-Irma as well but has been removed from list (5-year rule). It is still good for HMGP-Irma per the PPL in effect at the time of HMGP deadline in August 2018. ***Total Projects: 79 5