E25 FATIGUE MANAGEMENT

Similar documents
INFORMATION SHEET: OUT OF HOURS WORKING RISK ASSESSMENT AND CONTROLS

Construction Design and Management

Process Safety Management Program for Contractors

Document Name WORK HEALTH AND SAFETY RISK MANAGEMENT POLICY AND PROCEDURE

Exercise 2: Reviewing the Workplace Inspection Checklist (30 min) p

Hot Work Policy and Procedures

Management: Shop Coordinator, Shop Supervisor and Fire Safety Staff

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

IMPLEMENTATION OF PROTECTIVE ACTIONS - USE OF KI FOR EMERGENCY WORKERS, INSTITUTIONALIZED INDIVIDUALS, AND THE GENERAL PUBLIC

General Industry Toolbox Talks. Providing Excellence in Regulatory Compliance Management Systems

Owner: USA Division Safety Revision No: 00 Date last revised: 01/14/2013

RESPIRATORY PROTECTION PROGRAM UW-GREEN BAY

THE FOOTBALL ASSOCIATION DISCIPLINE PROCESS FOR SMALL-SIDED FOOTBALL

CONFINED SPACES SAFETY & HEALTH ISSUES AND REGULATORY COMPLIANCE

WORK HEALTH AND SAFETY POLICY

CITY OF SACRAMENTO. Regulatory Compliance Program

2. For the tenth absence and all absences thereafter, a student s absences from school are considered excused for the following reasons:

HYDROGEN SULFIDE (H2S)

CACFO UK EDUCATION CENTRE

Field Instruction. 5.2 Poles Inspection and Support Prior to Commencement of Work

Topic Sheet No. 5 Safe rigging of rope access equipment

Guidance on Exception Reporting for Educational and Clinical Supervisors and Leads

Assistant Coach 2013/14 ANZ Championship Season. Position Description

A template mass rescue operations plan

REGIONAL ADMINISTRATORS. PATRICK J. KAPUST Acting Director, Directorate of Enforcement Programs DATE: October 19, 2017

FCS Bowl. Determined at the national level. For more information, please visit

First Aid. Policy and Guidance

Student Name: Application for Employment-Based Field Practicum. DEPARTMENT of SOCIAL WORK

GROVE SCHOOL BIRMINGHAM CITY COUNCIL E-SAFETY POLICY FOR SCHOOLS

WCSC Walnut Tournament 2018

ESF #5 Emergency Management Annex (1.0)

VOLLEYBALL AUSTRALIA NATIONAL SQUADS

WAIS Swimming Scholarship Selection Guidelines, Criteria and Process

SELECTION POLICY (PARA) WORLD RANKING EVENTS EURO GP, ITALY (2-10 JUN) EURO GP, CZECH (30 JUN 8 JUL)

First Aid Policy. North Halifax Grammar School. Approved by: Principal. Date approved: November Next review: Autumn Term 2020.

Demonstrate the adequacy of vehicles, equipment, procedures, and personnel for transporting contaminated, injured, or exposed individuals.

Users Requirements Statement

First Aid Policy Version 2.0

U00306: Maintain a safe and secure working environment

STATEMENT OF SAFETY & HEALTH RESPONSIBILITIES Administrative Practice

REGIONAL SWIMMING HUB STRATEGIC OVERVIEW

MISSOURI STATE 4-H COUNCIL REGIONAL REPRESENTATIVE APPLICATION

MECHANICS & TECHNIQUES 3PO

ADDITIONAL SOURCES OF INFORMATION ARE:

HYDROGEN SULFIDE (H2S)

URGENT MEDICAL DEVICE RECALL : /29/ C Z

Rep Tryout Procedure Guidelines. Supplement to Policy 7 - Rep Hockey. Date Revised: July Version 1.3

POSITION DESCRIPTION CSCS CLEANER

Field Instruction. Refer to General Safety Requirements in FI 10.6 Vegetation Management Work.

Positive Handling Policy

Cycling Strategy Group. Terms of Reference

Deer harvest objective for the Deer Plan

Domestic Assembly Update

IRATA Safety Bulletin No. 45

Confined Space Entry

Selection Policy for Badminton Australia Support Structure (BASS) and National Squad.

Ipswich Central State School Executive Summary

EXPRESSION OF INTEREST (EOI) For selection of recognized Training Providers who deliver the following courses:

Dubuque Dream Center DUBUQUE INTENSITY Traveling Basketball Program

Safety in Physical Education Guidance - updated January 2016

Method Statement January 2018 Service Works

SCALES NW BACK SAFETY PROGRAM

NC Sturgeon Safety Management System

NHBC Safemark Competency Accreditation Service

SPI-SAF-40 Flammable Gas Procedure

Visit Leader Emergency Action Card

VERIFICATION OF COMPETENCY (VOC) Frequently Asked Questions for Individuals

NATIONAL YOUTH SPORTS TACKLE FOOTBALL

Method statement for the erection of temporary inflatable structures that do not require a Temporary Structure Licence

2016 CONGU Handicapping Changes

Exposure Control Plan

Code of practice for commercial kangaroo harvesting in NSW

POLICY FOR MANUAL HANDLING

Effective Date: 15-March Table of Contents

Kennecott Utah Copper Corporation Safety and Health Standards

GURU GOBIND SINGH KHALSA COLLEGE December First Aid Policy

The Facts About Brentwood School s Expansion Plans

Plain Language Summary

Livermore Harley Owners Group RIDING WITH LIVERMORE HOG

Effective PSSR in Management of Change for Existing Plants

Medibank s Requirements for Recognised Providers

Understanding IRB Office of Research Integrity

Compliance with CPD Regulations A General Guide to CPD

STATE OF NORTH CAROLINA Office of the State Auditor

Pinnacle High School 2017 Spiritline Tryout Packet CHECKLIST:

WASHINGTON TOWNSHIP FIRE DISTRICT TOWNSHIP OF WASHINGTON

Animals (Teaching or Research)

Guidelines for Underground Soft Rock Miner Program # Common Core and Specialty Modules

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success)

ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019

LIFESAVING AWARDS KINDS OF AWARDS. Given for saving life or attempting to save life without risk to the candidate s own life.

National Premier Leagues WA. Operational Meeting 25 February 2015

Brook Cricket Club Pirrie Hall, Haslemere Road, Brook, Surrey, GU8 5UJ

West Bend East Wrestling Season Building the Framework of a Championship Team! Team before Individual

Emergency Support Function (ESF) 9 Search and Rescue Unit

BSO PLUS MONTHLY SAFETY TOPIC October 2012: Driving Hazards and Ergonomics

Winthrop University - Safety in the Chemistry Laboratory

Safety Folder Quick Start Guide

Canadian Sport Institute Pacific and BC Sailing Athlete and Coach Nomination Criteria

Policy Document. Water Safety Policy

Transcription:

E25 FATIGUE MANAGEMENT PURPOSE AND SCOPE This Prcedure prvides the requirements and guidance needed t manage fatigue fr Laing O Rurke railway peratins. It will need t be read in cnjunctin with the rail infrastructure managers fatigue risk management prgramme where apprpriate r it may be necessary t apply the RIM s fatigue management prgram in its entirety. Fatigue management applies t all rail safety wrkers. It is cnsidered that ffice based wrkers wh wrk rutine day wrk n weekdays nly will have a lw level f risk and n particular actins will be required. Their fatigue risk management will be aligned t Primary Standard Fitness fr Wrk Greater fcus is applied t situatins where higher fatigue may result. These include: Shift wrk, where wrkers are rstered t wrk during any perid that peple nrmally sleep; Lng perids f wrk, where emplyees may be required t wrk ver weekends as well as week days Perids f wrk in envirnments where the elements impact n a persn s fatigue levels PROCEDURES Laing O Rurke has a Rail Fatigue Management Plicy that utlines Laing O Rurke s cmmitment t managing fatigue as part f managing rail safety wrker fitness fr wrk. Implementatin f Fatigue Management will be verseen by the relevant Prject Leader with mnitring data included in mnthly reprts. Fatigue Risk Management Prgramme The fllwing requirements are thse determined by Laing O Rurke fr the railway peratins t be undertaken and must be applied unless a client s criteria r that f the prject itself especially thse in remte lcatins requires a variatin n wrking hurs, shifts, rsters breaks r travel times. Prjects need t cnduct a risk assessment fr their railway peratins t determine whether any exceptin t the shift patterns belw can be applied. Where the railway peratins are undertaken under the accreditatin f the RIM, apprval must be btained frm the RIM fr the revised Fatigue Risk Management Prgram t apply. Laing O Rurke shall apply the fllwing fatigue minimisatin cntrls t Laing O Rurke wrkers r thse f subcntractr / service prvider rganisatins wh may in the executin f their wrk be deemed t be rail safety wrkers in terms f the Rail Safety Natinal Law:

N mre than 12 hurs will be wrked at a time including travel except fr any unplanned event where wrk is required t exceed the 12 hur limit. This can als cver shutdwn wrk fr which the RIM requires 12 hur shifts at site and then travel abve that limit. An extensin f time can be authrised by the supervisr t a maximum f 14 hurs r the Prject Leader where an extensin t 16 hurs may be required. Shuld any extensin f the 12 hur rule be required a risk assessment must be undertaken and authrised by the respective persn prir t the extended perid being cmmenced In any extended perid the wrk perfrmed up t the maximum f 16 hurs at a time, must ensure wrkers are nt required t drive a mtr vehicle r perate heavy plant r equipment between the 13th and 16th hur Rest perids must ensure at least a 10 hur break between shifts Minimum break times per shift shall include a 30 minute meal break and tw 15 minute rest breaks in the perid f wrk befre and after the main meal break Maximum number f wrk days nt t exceed 12 wrk days in 14 cnsecutive days A reductin in night shifts must be applied with: 6 cnsecutive ccasins where 8 hurs are wrked at night (i.e. after 6pm) r 5 cnsecutive ccasins where 10 hurs are wrked at night r 4 cnsecutive ccasins where 12 hurs are wrked at night Ensure wrkers receive a minimum f 48 cnsecutive hurs free f wrk in a 14-day perid At least 24 hurs ff fllwing cmpletin f any blck f scheduled night shifts Have the capacity t replace r relieve wrkers where unplanned r unavidable extended hurs have created a risk t wrkers health and safety Fatigue Related Risks In accrdance with fatigue management prcesses it is necessary t undertake a risk analysis f the railway peratins t be undertaken which will include scrutinising the fatigue issues fr each task which includes the fllwing: The Envirnment: The Task The persn T assist in the fatigue risk management prcess use shuld be made f the (UK) HSE Fatigue Risk Calculatr (linked t this prcedure) which requires infrmatin t be inserted in the spreadsheet relating t: number f days, perid n duty, perid ff duty, jb type, breaks, cmmuting time, duty length, rest length and average duty per day which then relates t a fatigue risk scre being prvided. The Mean Daily Scre that results frm the data put in, is an indicatr nly and shuld be supprted by ther cntrls t assist in managing fatigue.

Risk Factrs fr Fatigue Risk factrs can be identified thrugh the fllwing: Findings frm incident investigatins Discussins with emplyees Emplyee surveys r questinnaires Walk thrugh inspectins Audit results Symptms f Fatigue The mst cmmn symptms assciated with fatigue are: Increased sleepiness Lack f cncentratin Temprary memry lss Slwed reactin times Irritability Headaches and general bdy aches Md swings Reduced physical strength and capabilities Reduced hand-eye crdinatin Pr judgement Effects t general health and well-being such as lss f appetite and weight Impacts f Fatigue Fatigue creates significant risks if engaged in hazardus tasks r changes in perfrmance which include: Lss f attentin Feeling apathetic and lethargic (lw energy) Inability t anticipate danger Shrt term memry prblems Pr decisin making Increased reactin time Lwer vigilance and alertness levels Reduced ability t slve prblems Impatience and increase risk taking Shrt unplanned naps (micr sleeps)

Pr perfrmance Self-Reprting During the peratin f the prject, steps will be put in place fr self-reprting f fatigue fr individuals wh may be affected, t accmmdate irregular r un-rstered wrking. This als includes wrk perfrmed by subcntractrs and fr vertime and extensin f shifts. With its 'just culture', Laing O Rurke encurages wrkers wh perfrm rail safety wrk t reprt if they are unfit t start r cntinue wrk as a result f suffering the effects f fatigue. Laing O Rurke will implement nn-punitive measures t address the situatin. Irregular r Un-Rstered Shift Wrk (including subcntractrs) Where it is nt pssible t rster wrk t predictable start and finish times and/r, where emplyees are rstered n-call, an alternative methd f assessment f fatigue shall be available. In rder t determine whether an emplyee wrking under these cnditins is fit t cmmence wrk, the fllwing guide shall apply: An emplyee can be cnsidered fit-fr-wrk if they have btained a minimum f 6 hurs sleep in the 24 hurs prir t cmmencing wrk. A minimum rest perid f 10 hurs shall apply between shifts. Overtime and Extensin f Shifts When unplanned situatins require vertime r extensin f shifts, the fllwing steps are required t select wrkers t extend time at wrk r prvide with vertime shifts n the basis f: Ability t wrk within rstering limits prvided in the rstering principles Recent rest perids, with pririty t thse with mst recent break f shifts Impact n future rstering. If wrkers are required t wrk vertime r extensin f shifts, an assessment f the wrkers fitness t wrk (E-C-8-1925 Fatigue Risk Assessment) will be carried ut by a Laing O Rurke representative wh has received fatigue management training prir t the extensin f wrk cmmencing. If a wrker is cnsidered t be at risk f fatigue then the fllwing risk mitigatins must be implemented: Wrk t be shared by mre than ne emplyee with the emplyees required t be vigilant fr symptms f fatigue Emplyee t be supervised Re-arrange wrk s that the fatigued emplyee is nt undertaking rail safety wrk. If nne f these steps can be put in place, unless it is safe t d s, the emplyee s shift must nt be extended r wrked as an vertime shift. Further arrangements may need t be put in place when emplyees wrk vertime r extended shifts, including:

Arrangements t get an at risk f fatigue emplyee safely hme Adjustment t future rsters s that fatigue is nt increased and adequate rest breaks is prvided. All such cases must be reprted t the Prject Leader with these reprts included in the mnthly safety perfrmance reprt. Mnitr Results Prject Leaders will arrange t have actual wrking hurs cmpared t rstered hurs n submissin f the emplyee's timesheet t ensure that rsters and fatigue levels are being managed. Where rsters are rutinely nt met, rsters will be reviewed and amended. Prject Leaders will review all cases where wrkers have reprted they were unfit t cmmence r cntinue Rail Safety wrk due t fatigue. Incident investigatin will be cnducted int incidents reprted under RSMS E21 Reprting Ntifiable Occurrences t determine whether fatigue culd have been a cntributing factr. Investigatin reprts that include fatigue as a factr in the incident will require a respnse frm the Prject Leader. Reprting Internally / Externally n Fatigue Related Issues The fatigue risk management prgram determined in terms f Laing O Rurke s accreditatin shall be applied in all instances at the respective prject. Shuld a breach f the fatigue risk management prgram ccur the Prject Leader r designated representative must advise the Rail Safety & Cmpliance Manager immediately as under the Rail Safety Natinal Law it is deemed t be a Ntifiable Occurrence. The Rail Safety & Cmpliance Manager must ldge the Ntifiable Occurrence with the Rail Regulatr within 72 hurs f becming aware that such a breach f the fatigue risk management prgram has ccurred. The Rail Safety & Cmpliance Manager shall include the nn-cnfrmance in the mnthly rail safety reprt submitted t the Hub Safety Bard. LEGISLATION, GUIDES AND STANDARDS Rail Safety Natinal Law ONRSR Guideline Preparatin f a Safety Management System RISSB Guideline Fatigue Management NTC Natinal Standard fr Health Assessment f Rail Safety Wrkers FORMS and TEMPLATES E-C-8-1925 Fatigue Risk Assessments HSE (UK) Fatigue Risk Calculatr