Inspection Chambers and Covers

Similar documents
Inspection Chambers Project

FP McCann Tunnels and Shafts 1

104 Chamber System Ostendorf. Ostendorf. Chamber System ISO RV-Systém OSMA

EUROFLO CULVERT PIPE. Fittings / Pipes

Hynds Manhole System. Technical Guide D4.1

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING

Simple to install connection fails. The Talbot Pushfit fitting is pressure rated PN 16.

CSO/STORMWATER MANAGEMENT. HYDROVEX HHV-E Vortex Driven Regulator

EUROFLO CULVERT PIPE. Fittings / Pipes

tunnels & shafts brochure

ACO External Drainage

Engineering Data Sheet

M03 WUNDATRADE. Heat Pump Manifold. Before you start: Check the contents. Optional. ...a division of WUNDA GROUP PLC

KlassikDrain Section. Technical Handbook and Product Catalog. General purpose trench drainage

G SERIES METRIC MACHINE SCREW ACTUATOR

Push-in fittings NPQH

Lecture 10 : Sewer Appurtenances

SPECIFICATION SHEET. OMEGAFLEX, Ltd. TracPipe Flexible Gas Piping Specification Sheet Specification date. ProjectName

KlassikDrain Section K200/K300 ACO DRAIN. Introduction Pgs 1-13 Selecting the right product

Remeha Quinta Cascade guide

9408 Series Dissolved Oxygen Systems. Dissolved oxygen systems designed for reliable operation with minimal operating costs

FITTINGS AND VALVES Düker Plunger Valve RKV Type 7015 Professional control of flow rates, reservoir levels and pressures Safe, hygienic and durable!

SPECIFICATION // DATA SHEET WATER DRAIN VALVE AM SENSORS LTD AMS-S-084/DS/ (ISSUE 1)

Push-in fittings NPQH

Reduce pressure zone device suitable for high and medium hazard rated applications BSP screwed connections

ABB MEASUREMENT & ANALYTICS DATA SHEET series Dissolved oxygen systems

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

Floor Mount Socket. T: +44 (0) F: +44 (0)

INSTALLATION INSTRUCTIONS FOR GRT75-PF-RFS PET FOUNTAIN

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

Push-in fittings CRQS, stainless steel

Indiana LTAP Road Scholar Core Course #10 Culvert Drainage. Presented by Thomas T. Burke, Jr., PhD, PE Christopher B. Burke Engineering, Ltd.

BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions

PVQ 13 A2 R SE 1 S 20 C-11 D

Discussion and guidance on the definition and qualification of porous loads

HumeCeptor system Installation guide. Issue 2

White paper. Fit for Purpose. Product Testing & Performance. Constant Force post system

INSTALLATION, OPERATING & MAINTENANCE MANUAL WATER DRAIN VALVE

WATER METERS.

Beany Block Combined Kerb and Drainage System

FLOWMETERING STORAGE TANKS FROM THE INSIDE

Operation and Maintenance Manual. First Defense and First Defense High Capacity. Vortex Separator for Stormwater Treatment

CSO/STORMWATER MANAGEMENT. HYDROVEX FluidMoon Self-Adjusting Knife-Gate Regulator

Instruction Manual. Alfa Laval SB Pressure Exhaust Valve ESE02965-EN Original manual

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual Minnesota

White paper. Fit for Purpose. Product Testing & Performance. Constant Force post system

SIMPLAIR PIPING TOOL. JXT Company

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

THE PROCESS OF JOINT INTEGRITY

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

Overview EUSDSG3.6. Gas tightness testing and direct purging

Product Range Trench Shoring.

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

TECHNICAL HANDBOOK nvent CADDY Speed Link Manual. SLS Locking Device

COLD WATER STORAGE CONTROL AYLESBURY DELAYED ACTION FLOAT-ACTIVATED VALVES

CLEANING, INSPECTION, AND TESTING OF SEWERS

DAV Series. DAV-MH Air Release & Vacuum Break Valves

LEVEL FALCO FALCOLEVEL (PRO) PARTNERS ON A JOURNEY TO URBAN CREATIVITY. The FalcoLevel and FalcoLevel-Pro are a multi

Speed control assembly model A-1

TRADITIONAL HIGH VIBRATION HOSE SYSTEM THE STANDARD FOR MANY AUTOMOTIVE APPLICATIONS

CALEFFI. Reduced pressure zone backflow preventer. 574 series 01022/18 NA D E C F B D E. Function

CHANNEL & SUPPORT SYSTEMS

Combination Air Valve

KBV21i and KBV40i Air Actuated Boiler Blowdown Valves

Wastewater combination air valve in stainless steel AISI 316 Mod. SCS

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

FINALIZATION OF THE HAND DUG WELL. Version : April 2009 Published by : Foundation Connect International Autors : Henk Holtslag & John de Wolf

DIY Shallow Water Anchor Assembly Instructions for Rods, T-grips, Stainless Tips, Stainless Couplers, and the 4-in-1 Paddle

SCA Series Inverted Bucket Steam Traps

Hand-operated regulating valves in stainless steel Types REG-SA SS and REG-SB SS

COLD WELD COPPER TUBE SAMPLING EQUIPMENT AND PROCEDURES

Pressure Reducing Valve DMV 750 set range: bar

Dean Pump Self-Priming Chemical Process Pumps

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors

VORTEX REGULATOR Type WAB (UCY / CY-F / CE/V)

Pneumatic spool valve islands

Blowdown vessels Meeting the requirements of HSE PM60

SG36KTL-M Quick Installation Guide. 1 Unpacking and Inspection

User Manual Important, read before use!

A rising main is a system of pipe work and valves that enables water to be delivered for fire fighting purposes to all floors in buildings over 18

Suspension Ropes. Suspension Rope

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

COUNTER CURRENT UNIT. Instruction Manual

Operating instructions Safety Rope Emergency Stop Switches ZB0052 / ZB0053 ZB0072 / ZB0073

Poollift Delphin. Version: February, 2015 MANUAL AND OPERATING INSTRUCTIONS

PowerDrain Section S100K/S200K/S300K ACO DRAIN. Introduction Pgs 1-13 Selecting the right product

Water Separators Installation & Operating Instructions THE SCIENCE OF SILENCE. Water Separators Installation & Operating Instructions 1

pdf WATER RETICULATION STANDARD VENTILATION LOUVRE BOXES SINGLE AND DOUBLE DUCT SYSTEMS

Residential Meters. Available innov8 Outputs 900 MHz Radio Virtual Network 3W Standard AMR 2W AMR 2W Standard Touchpad Scalable Pulse 4-20mA SCADA

ROLLGLISS TOP/R350. Safety and rescue system. Operating and Maintenance Instructions

TECHNICAL MANUAL. COPRA Anchoring Coupler. For Smart Bolted Connections

RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL

System 100: 110 x 54mm Rectangular Ducting and Fittings 5 7. System 125: 150 x 70mm Rectangular Ducting and Fittings 8 9

Suitable for anyone who is required to maintain industrial pneumatic systems. No prior knowledge of pneumatic or electrical principles is necessary.

Hand winch MANIBOX GR

Gas plug-in hose, straight-through form. Instructions for Use. suitable for gas socket model G2019T, G2016T. G2023 from 01/1990.

Fall Arrest Anchor Solutions

SV5 Safety Valve Installation and Maintenance Instructions

Model Copyright 2012 by General Machine Products (KT), LLC

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

Transcription:

Uniclass G632:G77 JR12/JR13 A16 EPIC J34 X71 CI/SfB (52.7) In6 (Y2) September 2010 OD110 Inspection Chambers and Covers Design and Installation Guide FOR RESIDENTIAL, COMMERCIAL AND INDUSTRIAL APPLICATIONS Intelligent Solutions for Below Ground Projects

Introduction to OSMA Inspection Chambers and Covers Introduction to OSMA Inspection Chambers and Covers Introduction OSMA Inspection Chambers offer a safe and effective method of providing access to the drainage system, with options to meet all access and layout requirements. The range includes: Max. Depth to Invert (m) Shallow Inspection Chamber (SIC) 0.6 Multi-Base Inspection Chambers 0.6 Universal Inspection Chambers (UIC) 1.2 Non-Entry Inspection Chambers (NIC) 3.0 Simple and easy to install OSMA Inspection Chambers offer significant advantages over traditional manholes in both time and cost: No need for wet trades No additional excavation required Quick and easy connection to pipe runs Satisfies all regulatory requirements for access provision Range of configurations to meet all drainage layout requirements Round and square cover options, for trafficked and non-trafficked areas The comprehensive range is designed to meet the requirements of building regulations and covers the latest amends to approved document H as highlighted below: Inspection Chambers - Shallow (see Table 11 from Part H doc ) In the 2002 Building Regulations update, the maximum depth for a shallow inspection chamber was increased from 1m to 1.2m. Inspection Chambers - Deep (see Table 11 from Part H doc ) A reduced access inspection chamber has an access opening reduced to a maximum of 350mm to prevent man entry. Inspection and maintenance operations are carried out from the surface using remotely operated equipment. The 2002 update of the Building Regulations allows for the use of reduced access inspection chambers as an alternative to a manhole at depths greater than 1.2m down to a maximum of 6m (as set out in BS 7158:2001). The OSMA Non-Entry Inspection Chamber (NIC), system can be installed to a maximum depth of 3m. This change reflects The Confined Spaces Regulations 1997. No person shall enter a confined space to carry out work for any purpose unless it is not reasonably practicable to achieve that purpose without such entry. Figure 1. Table 11 from Part H Document (Building Regulations) 2 CUSTOMER SERVICES 01249 766611 TECHNICAL ENQUIRIES 01249 766655 TECHNICAL FAX 01249 766653 EMAIL info@wavin.co.uk

Introduction to OSMA Inspection Chambers and Covers Introduction to OSMA Inspection Chambers and Covers Inspection Chamber Covers Fig. 3 4D920 The regulations have been updated to reflect health and safety issues on site. Extract from Part H: Small lightweight access covers should be secured (for example with screws) to deter unauthorised access (for example by children). A lightweight access cover is defined as a cover that meets the requirements of standard loading classification A15 (1.5T). Larger plastic lightweight covers and frames however, are typically designed to withstand a load greater than 1.5T, usually 3 3.5 T (30 35kN), which can be used in domestic driveways when surrounded by a concrete plinth. Fig. 4 4D924 All OSMA lightweight access covers listed below are secured to the frame by means of screws to prevent unauthorised access. Certain products can also be secured to the inspection chamber shaft by means of eyebolts or screws i.e. 4D920, 4D924 and 4D927. Fig. 5 4D927 Figure 2. OSMA Inspection Chamber Cover Table. OSMA Inspection Chamber Covers Cat Description Installation Loading Nominal Cover Code Depth Size (mm) Size (mm) 4D325 S/S Sealed, Round Up to 0.6m 10kN - 322 Cover and Frame 4D961 P/E Sealed, Square Up to 0.6m 10kN - 325 x 325 Cover and Adjustable Frame 4D969 P/E Sealed, Square Up to 0.6m 10kN - 323 x 323 Cover and Adjustable Frame 4D920 P/E Sealed, Square Up to 3.0m 15kN - 450 x 450 Cover and Adjustable Frame 4D924 P/E Sealed, Round Up to 3.0m 15kN - 450 Cover and Adjustable Frame 4D927 P/E Sealed, Round Up to 3.0m 15kN - 450 Cover and Frame 4D942 DI Cover and Frame Up to 3.0m 125kN - 450 - Class BS EN 124-B125 Guide to Inspection Chambers and Covers 2010 www.wavin.co.uk BELOW GROUND DRAINAGE SYSTEMS Introduction to Inspection Chambers and Covers 3

Shallow Inspection Chambers Shallow Inspection Chambers Product Specification Internal shaft diameter - 239mm External shaft diameter - 250mm Maximum installation depth - 0.6m Manufactured from Polypropylene Kitemarked to British Standard BS 7158:2001 Benefits D/S Shallow Inspection Chamber 4D960 for use with the 110mm OsmaDrain system Ideal cost-effective solution for access to drains at max. 600mm invert Manufactured as a single unit with a straight 110mm main channel and two 45 110mm inlets, one either side of the main channel Unit supplied with two blank-off plugs to seal unused side entries Cover options S/S Sealed Round Cover and Frame 4D325 P/E Sealed Square Cover and Adjustable Frame 4D961 Key installation points FIg. 6 Shallow Inspection Chamber installation 4D961 Cover and Frame illustrated 4D960 No additional trench excavation is required Sit Chamber on a 100mm bed of granular or suitable as-dug material Make pipe connections in the normal way Cut shaft to size using a fine toothed saw Lubricate top of shaft - inside for 4D961, outside for 4D325 and push-fit the appropriate Cover and Frame For loadings up to 10kN (1 Tonne), support frame with a 150mm concrete plinth Fig. 8 Shallow Inspection Chamber components 4D960 4D961 100mm bed of suitable as-dug or granular material 4D325 Figure 7. OSMA Shallow Inspection Chamber Table. OSMA Shallow Inspection Chambers Cat Description Code 4D960 D/S Shallow Inspection Chamber 4D325 S/S Sealed, Round Cover and Frame 4D961 P/E Sealed, Square Cover and Adjustable Frame 4 CUSTOMER SERVICES 01249 766611 TECHNICAL ENQUIRIES 01249 766655 TECHNICAL FAX 01249 766653 EMAIL info@wavin.co.uk

Multibase Shallow Inspection Chambers Multibase Shallow Inspection Chambers Product Specification Internal shaft diameter - 317mm External shaft diameter - 324mm Maximum installation depth - 0.6m Manufactured from PVC-U Kitemarked to British Standard BS 7158:2001 Benefits 10 unique 110mm base configurations Push fit shaft Tilt and rotate push fit cover and frame Lightweight Easy to install Modular system Maximum flexibility The many options within the range ensures maximum flexibility for installation By selecting the most appropriate base for the job, the cost of additional bends is avoided One or two push-fit shaft sections may be used to achieve invert required All component parts carry a kitemark and are fast and easy to install Key installation points No additional trench excavation is required Sit Chamber on a 100mm bed of granular or suitable as-dug material Make pipe connections in the normal way Depending on required depth, pushfit either one or, two shaft sections together, after pre-lubricating the inside of the shaft section Lubricate inside of top shaft section and insert Cover and Frame directly into top shaft section 937 Fig. 11 Multibase Shallow Inspection Chamber components 910 913 L/H (pictured) 914 R/H 918 Cover options P/E Cover and Adjustable Frame 4D969. Not suitable for internal use. Fig. 9 Multibase Shallow Inspection Chamber installation 100mm bed of suitable as-dug or granular material 969 Figure 10. OSMA Multibase Inspection Chamber Table. OSMA Multibase Inspection Chambers Cat Description Code 933 L/H (pictured) 934 R/H 4D910 D/S Shallow Inspection Chamber Base - straight main channel 4D911 D/S Shallow Inspection Chamber Base - straight main channel, 1x90 LH entry 4D912 D/S Shallow Inspection Chamber Base - straight main channel, 1x90 RH entry 4D913 D/S Shallow Inspection Chamber Base - straight main channel, 1x45 LH entry 4D914 D/S Shallow Inspection Chamber Base - straight main channel, 1x45 RH entry 4D917 D/S Shallow Inspection Chamber Base - straight main channel, 2x45 entries either side of the main channel 4D918 D/S Shallow Inspection Chamber Base - 90 bent main channel 4D933 D/S Shallow Inspection Chamber Base - straight main channel, 1x45 and 1x90 LH entries 4D934 D/S Shallow Inspection Chamber Base - straight main channel, 1x45 and 1x90 RH entries 4D935 D/S Shallow Inspection Chamber Base - 2x90 LH/RH entries 4D937 P/E Shallow Inspection Chamber Shaft - 150mm effective length, supplied with seal 4D969 P/E Sealed, Square Cover and Adjustable Frame Guide to Inspection Chambers and Covers 2010 www.wavin.co.uk BELOW GROUND DRAINAGE SYSTEMS Shallow/Multibase Shallow Inspection Chambers 5

Universal Inspection Chambers Universal Inspection Chambers Product Specification Invert depth of base (4D922) - 270mm Internal shaft diameter - 450mm External shaft diameter - 475mm Maximum installation depth - 1.2m Manufactured from Polypropylene Kitemarked to British Standard BS 7158:2001 Benefits Lightweight Easy to install Modular system: shaft can be built up to required length For use with 110mm and 160mm OsmaDrain pipework and 150mm UltraRib. Cover options DI Cover and Frame - 4D942 P/E Sealed, Square Cover and Adjustable Frame - 4D920 P/E Sealed, Round Cover and Adjustable Frame - 4D924 P/E Sealed, Round Cover and Frame - 4D927 P/E Square, Steel Recessed Cover and Polypropylene Frame - 4D945 P/E Sealed, Square, Steel Recessed Cover and Polypropylene Frame - 4D946 Key installation points No additional trench excavation is required Sit Chamber on a 100mm bed of granular or suitable as-dug material Make pipe connections in normal way Assemble Chamber to the required invert depth by placing one, two or three shaft sections on to the base, after pre-lubricating the inside of the shaft Intermediate depths are simply catered for by simply cutting the shaft section using a fine toothed saw Surround the Chamber with 150mm of similar material to that of the base bedding For loading applications support the appropriate frame with a 150mm concrete plinth Fig. 12 Universal Inspection Chamber components 920 942 975 922 928 924 / 927 929 Figure 13. OSMA Universal Inspection Chamber Table. OSMA Universal Inspection Chambers Cat Description Code 4D922 D/S Equal Inspection Chamber Base - 110mm 6D928 D/S Equal Inspection Chamber Base - 160mm 6D929 D/S Unequal Inspection Chamber Base - 160 x 110mm 6UR928 D/S Equal Inspection Chamber Base - 150mm 6UR929 D/S Unequal Inspection Chamber Base - 150 x 110mm 4D975 Inspection Chamber Shaft - 305mm 4D942 DI Cover and Frame 4D920 P/E Sealed, Square Cover and Adjustable Frame 4D924 P/E Sealed, Round Cover and Adjustable Frame 4D927 P/E Sealed, Round Cover and Frame 4D945 P/E Square, Steel Recessed Cover and Polypropylene Frame 4D946 P/E Sealed, Square Steel Recessed Cover and Polypropylene Frame 6 CUSTOMER SERVICES 01249 766611 TECHNICAL ENQUIRIES 01249 766655 TECHNICAL FAX 01249 766653 EMAIL info@wavin.co.uk

Universal Inspection Chambers Universal Inspection Chambers Fig. 14 Universal Inspection Chamber - non-load installation - utilizing 4D920 P/E Sealed, Square Cover and Adjustable Frame Fig. 16 Universal Inspection Chamber - in areas requiring loads up to 50kN (5.0 Tonnes), utilizing 4D920 P/E Sealed, Square Cover and Adjustable Frame 4D920 4D920 4D975 4D975 4D922 4D922 Fig. 15 Universal Inspection Chamber - non-load installation - utilizing 4D924/927 P/E Round Cover and Frame Fig. 17 Universal Inspection Chamber - non-load installation (patio) - utilizing 4D924 P/E Round Cover and Adjustable Frame 4D924/927 4D924 4D975 4D975 4D922 4D922 Guide to Inspection Chambers and Covers 2010 www.wavin.co.uk BELOW GROUND DRAINAGE SYSTEMS Universal Inspection Chambers 7

Non-Entry Inspection Chamber (NIC) Non-Entry Inspection Chamber (NIC) Product Specification Invert depth of base - 300mm Internal shaft diameter - 500mm External shaft diameter - 572mm Maximum installation depth - 3m Manufactured from Polypropylene Key installation points No additional trench excavation is required Sit the Chamber on a bed of 100mm of granular material or, alternatively a concrete bed Fig. 19 Non-Entry Inspection Chamber (NIC) components 920 Kitemarked to British Standard BS 7158:2001 Meets technical requirements of NHBC, LANTAC and STAS Benefits Lightweight Easy to install No need for lifting equipment Modular system: shaft can be easily cut to required length Make pipe connections in normal way Assemble Chamber using the appropriate shaft section Intermediate depths are simply catered for by simply cutting the shaft section, using a fine toothed saw Surround Chamber with 150mm of granular material For loading applications support the appropriate frame with a 150mm concrete plinth 934 / 938 Narrower trench required than manhole No requirement to work in a confined space (in line with Confined Spaces Legislation 1997) Cover options P/E Sealed, Square Cover and Adjustable Frame - 4D920 936 923/934 937 Figure 18. OSMA Non-Entry Inspection Chamber (NIC) Table. OSMA Non-Entry Inspection Chambers (NIC) Cat Description Code 4D923 D/S Equal NIC, Inspection Chamber Base - 110mm 6D936 D/S Equal NIC, Inspection Chamber Base - 160mm 6D937 D/S Unequal NIC, Inspection Chamber Base - 160 x 110mm 6UR936 D/S Equal NIC, Inspection Chamber Base - 150mm 6UR937 D/S Unequal NIC, Inspection Chamber Base - 150 x 110mm 4D920 P/E Sealed, Square Cover and Adjustable Frame 6D938 P/E NIC, Inspection Chamber Shaft - 3.0m 6D934 P/E NIC, Inspection Chamber Shaft - 1.5m 8 CUSTOMER SERVICES 01249 766611 TECHNICAL ENQUIRIES 01249 766655 TECHNICAL FAX 01249 766653 EMAIL info@wavin.co.uk

Covers and Frames Covers and Frames 4D920 - P/E Sealed, Square Cover and Adjustable Frame A square plastic cover and frame manufactured from black polypropylene. The 4D920 has a 450mm diameter opening restricted to 350mm - see Fig. 23 making it suitable for use at a maximum depth to invert of 3 metres. The unit also has the added benefit of being suitable for use with both the Universal Inspection Chamber and Non-Entry Inspection Chamber (NIC) systems Product Features/Benefits Kitemarked to British Standard BS 7158:2001 Can be loaded to 50kN (5.0 Tonnes) when surrounded by a concrete plinth (150mm x 150mm) Overall depth of the unit - 56mm The cover employs a dual fixing system so the frame can be fixed to the shaft and the cover to the frame, providing additional safety - see Fig. 22 350mm restricted access for use to a maximum depth of 3 metres Suitable for use with both the Universal Inspection Chamber and Non-Entry Inspection Chamber (NIC) systems For external use only 4D924 - P/E Sealed, Round Cover and Adjustable Frame A round plastic cover and frame manufactured from black polypropylene. The 4D924 has a 450mm diameter opening restricted to 350mm - see Fig. 23 making it suitable for use at a maximum depth to invert of 3 metres. The unit also has the added benefit of being suitable for use with both the Universal Inspection Chamber and Non-Entry Inspection Chamber (NIC) systems Product Features/Benefits Kitemarked to British Standard BS 7158:2001 For use in non-load applications up to 15kN (1.5 Tonnes) Overall depth of the unit - 56mm The cover employs a dual fixing system so the frame can be fixed to the shaft and the cover to the frame, providing additional safety 350mm restricted access for use to a maximum depth of 3 metres Suitable for use with both the Universal Inspection Chamber and Non-Entry Inspection Chamber (NIC) systems For external use only Fig. 22 Frame fixing eye bolts Fig. 23 350mm restricted access (4D920 pictured) Fig. 24 Increased location depth ensuring the unit is not easily knocked off during installation Fig. 20 Square Cover and Adjustable Frame - 4D920 Fig. 21 Round Cover and Adjustable Frame - 4D924 Guide to Inspection Chambers and Covers 2010 www.wavin.co.uk BELOW GROUND DRAINAGE SYSTEMS Non-Entry Inspection Chamber (NIC) Covers and Frames 9

Covers and Frames Covers and Frames continued 4D927 - P/E Round Cover and Frame Fig. 26 Frame fixing eye bolts A round plastic cover and frame manufactured from black polypropylene. The 4D927 has a 450mm diameter opening and is suitable for use with the Universal Inspection Chamber Product Features/Benefits The round cover and frame provides a high level of security via the dual fixing system. This enables the frame to be fixed to the shaft and the cover to the frame - see Fig. 26 Designed for use with the OSMA Universal Inspection Chamber Shaft (4D975) For use in non-load applications up to 15kN (Tonnes) Suitable for external use only Fig. 25 Round Cover and Frame 4D927 10 CUSTOMER SERVICES 01249 766611 TECHNICAL ENQUIRIES 01249 766655 TECHNICAL FAX 01249 766653 EMAIL info@wavin.co.uk

Notes Guide to Inspection Chambers and Covers 2010 www.wavin.co.uk BELOW GROUND DRAINAGE SYSTEMS Covers and Frames Notes 11

Inspection Chambers and Covers Design and Installation Guide Meeting your needs Below Ground Drainage systems, developed by Wavin Limited, form part of a comprehensive range of systems to provide intelligent solutions for all building, construction and utilities projects. All All OSMA OSMA systems systems are are backed backed by by full full technical technical literature literature and and project project support. support. See inside back cover for details. ISO 9001:2000 Wavin Limited operates a programme of continuous product development, and therefore reserves the right to modify or amend the specification of their products without notice. All information in this publication is given in good faith, and believed to be correct at the time of going to press. However, no responsibility can be accepted for any errors, omissions or incorrect assumptions. Users should satisfy themselves that products are suitable for the purpose and application intended. Wavin Limited Parsonage Way Chippenham Wiltshire SN15 5PN Tel: 01249 766600 OD110 www.wavin.co.uk