Submission to Metrolinx on Eglinton LRT - East End. Response to December 2012 Public Meeting

Similar documents
Transportation Assessment

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

The following notes describe comments received that were written/drawn on maps by workshop participants.

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Appendix A-K Public Information Centre 2 Materials

TORONTO TRANSIT COMMISSION REPORT NO.

DON MILLS-EGLINTON Mobility Hub Profile

DON MILLS-SHEPPARD Mobility Hub Profile

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

2.0 LANE WIDTHS GUIDELINE

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Hamilton Transportation Master Plan Public Consultation. Public Information Centre One Summary

Public Works and Infrastructure Committee. General Manager, Transportation Services. P:\2016\Cluster B\TRA\TIM\pw16009tim.docx

Rethinking Transportation

Transportation Impacts: Toronto York Spadina Subway Extension

Public Event 1 Community Workshops

NORTH YORK CENTRE Mobility Hub Profile

Markham Sports, Entertainment and Cultural Centre Transportation Overview

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

WalkShop. Highland Creek Village

Guildwood Village Traffic Response Prepared by City of Toronto Transportation Department

TCAT 2006 Platform Review February 16, 2010

Tonight is for you. Learn everything you can. Share all your ideas.

Building a Toronto that Moves

Public Works and Infrastructure Committee. General Manager, Transportation Services. P:\2014\Cluster B\TRA\TIM\pw14001tim.docx

DUNDAS WEST-BLOOR Mobility Hub Profile

Project Launch Community Meeting 1 Summary

Proposed White Flint Separated Bike Lane Network September 2015

NEWMARKET CENTRE Mobility Hub Profile

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Develop a Multi-Modal Transportation Strategy (Theme 6)

Chapter 5 Future Transportation

Appendix 1 Transit Network Analysis

North Coast Corridor:

Leaside Traffic Calming Plan Update. Community Meeting 2 November 22, :00 PM

ACTION TRANSMITTAL No

Comments The Plan for Port Whitby

5 CIRCULATION AND STREET DESIGN

3.5 Preferred Design Description of LRT/Road Layout, Stops and Stations

Boroondara Bicycle Users Group Response to: Monash Alliance M1 update plans 5 May 2008

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

Complete Streets. Designing Streets for Everyone. Sarnia

Viaducts, Eastern Core and False Creek Flats Cycling Improvements HUB Vancouver/UBC committee 2013/05/13

Active Transportation Infrastructure Investment A Business Case

10.0 CURB EXTENSIONS GUIDELINE

What is the status of the CPR Yards Crossing Study?

MONTGOMERY COUNTY COUNCIL

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

Better Market Street Project Update. Urban Forestry Council September 17, 2014

City of Davis East Covell Corridor Plan

1.1 Study Purpose. 1.2 Study Area 1. INTRODUCTION AND STUDY PROCESS

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

INTERMODAL TRANSPORTATION PLAN

ECONOMY PEOPLE ENVIRONMENT

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Executive Summary Route 30 Corridor Master Plan

PEDESTRIAN ACTION PLAN

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

STONY PLAIN ROAD STREETSCAPE

PROJECT FACT SHEET March 21, 2018

Bluffdale/ UDOT South High-T Intersection Project Type Operations

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Transportation Master Plan Advisory Task Force

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Duwamish Way-finding and CTR Report

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

GET TORONTO MOVING TRANSPORTATION PLAN SUMMARY REPORT TABLE OF CONTENTS. Rapid Transit Subways 5. Findings of the 1985 Network 2011 TTC Study 6


Better Market Street Project. Project Update January 15, 2015

San Jose Transportation Policy

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Cycling Network Plan Implementation in Thorncliffe Park and Flemingdon Park

Gardiner East. Gardiner Expressway & Lake Shore Boulevard Reconfiguration Environmental Assessment & Urban Design Study

US287 Asset Inventory Fort Collins. Figure 5-1 Fort Collins Bridges and Traffic Signals

Richmond-Adelaide Cycle Tracks

Fitting Light Rail through Well-established Communities

Route 7 Corridor Study

Transportation Corridor Studies: Summary of Recommendations

Key objectives of the survey were to gain a better understanding of:

Highland Creek Village Transportation Master Plan: Stakeholder #3 Meeting Summary

Welcome! San Jose Avenue Open House August 25, 2015

Dec 2, Dear Tri Ong, Sam Woods, and Scott Kubly,

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

SANTA MONICA BOULEVARD CORRIDOR

TORONTO VISION ZERO Improving Safety for Pedestrians and Cyclists Roger Browne, Manager Traffic Safety Unit October 11, 2018

Hospital Link Project Project Update September 2017

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

APPENDIX B. TDM Existing Conditions

Discussion Paper 1 June 2014 Current State of Transportation in Burlington

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

Transcription:

Submission to Metrolinx on Eglinton LRT - East End Project Response to December 2012 Public Meeting Prepared by: Cycle Toronto, cycleto.ca Authors: John Taranu, Michael Black January 21, 2013 1

Introduction This submission is a response to the public consultations for the Eglinton LRT East End Alignment (Laird Dr to Don Valley Parkway Environmental Project Report Addendum Online Consultation). Concerns Surface Bike Lanes We are concerned about the impact that moving the LRT line underground will have to the surface roadway between Laird Dr and the Don Valley Parkway. The original Transit City Environmental Assessment included surface bicycle lanes from the Brentcliffe LRT tunnel portal to the DVP. This section of Eglinton Ave currently suffers from high traffic speeds and is dangerous for cyclists and pedestrians. Map of cycling collisions along Eglinton, including fatality at Eglinton Ave, West of Leslie St in 2006 1 1 http://www.theglobeandmail.com/news/toronto/explore-the-data-toronto-bicycle-collisions-mapped-over- 25-years/article543684/ 2

There are no direct cycle routes running along secondary roads parallel to Eglinton that may serve as a safe alternative to bike lanes on Eglinton itself. The only route that comes close to fulfilling this function is along Overlea Blvd., which suffers from high collision rates. Eglinton Ave between Brentcliffe and Bayview is notoriously prone to automobile collisions. Bike lanes along the Laird to Don Mills Rd. section of Eglinton are crucial in providing a safe connection for cyclists between the old City of Toronto s midtown area and the suburban Don Mills area. With an underground alignment, the Eglinton Ave bridge west of Leslie St will not be widened. This will make it considerably more difficult to install bike lanes on the bridge. Similarly, the Eglinton Ave underpass at the CPR railway west of Leslie St will not be widened. This will also make it more difficult to install bike lanes under the bridge. The narrow section of Eglinton Ave west of Leslie, where the Westbound roadway narrows from three lanes to two, is especially problematic for cyclists. An experienced middle-aged cyclist was killed here in 2006 when he was rear-ended by a cement truck and dragged under its wheels 2. Without safe cycling infrastructure on Eglinton it will be hazardous for cyclists to travel from Leslie and the West Don to the LRT station at Laird. With an underground alignment, there will be no opportunity to widen or reconfigure this section of Eglinton to make it safer for cyclists. Proposed closure of Leslie Station We are especially concerned about losing Leslie Station. This has the possibility of breaking the connections to the West Don trail system, Sunnybrook Park, as well as the employment lands along Leslie, and a possible connection to the Don Mills Railtrail (Leaside Trail). Without Leslie Station, cyclists wanting to connect to the TTC will have to ride up the challenging, dangerous hill to Laird station, a 1km distance from Leslie. 2 http://allderdice.ca/?p=155 3

Map of Cycling Infrastructure near Eglinton and Leslie, showing Don Valley Trail [45] and Leaside Railtrail 3, which will soon be connected at its south end to Leslie St. The original (2010) plans for the Crosstown LRT 4 call for 43 stations, separated from each other by an average of about 500 m. This roughly conforms to the standards of the Bloor-Danforth subway line. The LRT mode is even better suited than subway to providing local service. Elimination of the Leslie (and Ferrand Stations) will shift the Crosstown LRT away from the local function to which it is best suited. The gap between Laird and Don Mills stations will be over 2 kilometres. 3 2012 City of Toronto Cycling Map, http://www.toronto.ca/cycling/map/pdf/front.pdf 4 http://www3.ttc.ca/pdf/about_the_ttc/transit_city/eglinton_lrt_route_diagram1.pdf 4

Cancellation of the Leslie (and Ferrand) stations will create significant gaps in the stretch between the Laird and the Wynford stations. This will have the effect of turning the Crosstown LRT into a regional transit service where station separation is too great to ensure adequate local service comparable to what buses currently provide. In the future, continuing to run buses along parts of Eglinton Ave. in order to supplement gaps in regional LRT service begs the question of why the LRT is being constructed in the first place. Without Leslie station, TTC buses will be routed to Laird Station instead, adding to the traffic congestion on Eglinton Ave. If the bus priority lanes on Eglinton are retained, they will make it considerably more difficult to fit in safe cycling infrastructure like bike lanes. If Leslie and Ferrand stations are not built, additional bicycle parking will be needed at the Laird and Don Mills stations. The potential of Leslie Street is not fully realized. Inevitably, the low and medium-rise corporate buildings that line Leslie will be replaced with denser development. An LRT station at Leslie will invigorate the whole area. Metrolinx claims that the substantial parkland surrounding the proposed Leslie station location will inhibit growth in potential LRT traffic. This conservative projection overlooks the investments in, and the expansion of, the Don trail system. A station at Leslie would be the prime entry point into the Don trails in this part of Toronto. Furthermore, many visitors to Edwards Gardens and Sunnybrook who presently drive to these locations will find it more convenient to take transit, providing that they can use a station at Leslie St. Map of City of Toronto s Bikeway Trails Implementation Plan showing upcoming connections to Leaside Trail and Don Valley trail system 5

Proposed cancellation of Ferrand Station While development is currently sparse in the immediate vicinity of the proposed Ferrand Station site, a dense group of high and medium-rise residential buildings is located 200 m. south of Eglinton. If a north/ south LRT line is built along Don Mills Road, then the vicinity near Ferrand will also see great changes, including greater densification. It is tremendously shortsighted to be cancelling rapid transit stations in close proximity to a major future mobility hub. Instead, we should be aiming to improve the infrastructure surrounding a regional nexus point. Don Mills and Eglinton is the single most dangerous intersection in the city. 5 By moving the LRT station underground, the street level will not be improved to make it safer for drivers, pedestrians and cyclists. Don Mills Station If the Ferrand station is eliminated, then the approaches to Don Mills station must be made safer for cyclists and pedestrians. Is Metrolinx incorporating any features in the station design to facilitate the future, construction of the Don Mills LRT line? This mobility hub is eventually going to be one the busiest Crosstown stations, with lots of bikes. Will there be a connection between the Don Mills station and the Gatineau Hydro Corridor, which runs about 600 m. south of Eglinton? How can cyclists travel to the employment / retail lands north of Eglinton? Will there be a left turn to Gervais Dr? Or do we use Don Mills to Wynford? The DVP ramps leading off of Eglinton need to be made safer for both cyclists and pedestrians Rationale for relocation of launch site Extending the buried section of the Crosstown LRT from Brentcliffe to Don Mills Road has mostly negative implications for cycling, road safety and the Eglinton streetscape. Whereas these impacts will be felt for decades, Metrolinx has justified its decision to tunnel for reasons of convenience that will be valid only during the 28-month construction period. Long-term safety of the populace should be given greater weight in decision-making than short-term convenience for Metrolinx. Metrolinx has cited various additional burdens that surface routing would impose at a Brentcliffe launch site: to the south, the foundations of a condo development would have to be shored up. In reply, we would mention that temporary shoring of condo foundations is common, especially in the downtown where high-rise building construction often is 5 http://www.theglobeandmail.com/news/news-video/video-don-mills-and-eglinton-torontos-mostdangerous-intersection/article6659047/ 6

squeezed into narrow lots. Implementation of this protective measure is routine in Toronto. Construction noise issues may indeed exist. It must be noted, however, that residents of the new condos were at all times aware that their buildings are located near LRT construction activity. Traffic would be disrupted. We would ask the question: on the entire Crosstown line, at what station or launch site location will construction NOT disrupt local traffic? Soil contamination issues. Remediating contaminated soil is often necessitated by projects that pass through land that was formerly industrial. Customary remediation procedures do not present any undue challenges we are not dealing with the decommissioning of a nuclear power plant. Slope stability issues north of Eglinton, near Brentcliffe. Again, engineering expertise is available to address this problem, which surely is insignificant compared to, say, stabilizing railway routes through mountain passes. Metrolinx has provided no comparative cost estimates. Nonetheless, we assume that the additional expense of tunnelling from Brentcliffe to Don Mills Rd. as opposed to building a surface route is far greater than the cost of remediating the above-noted five problems that Metrolinx cites as its reasons for going underground. Recommendations If the cancellation of two stations is needed to cover the cost of the additional tunnelling, then this sets a dangerous precedent for the rest of the Crosstown LRT project and indeed, the Finch and Sheppard LRT lines as well where local service is sacrificed for the creation of a highspeed express line. We propose the following recommendations: 1 A full cost assessment be undertaken for this proposed change. 2 Metrolinx adhere to its original plan to construct the LRT at surface grade between Laird and just west of Don Mills Station. 3 The approved bike lanes from Brentcliffe Dr to Don Valley Parkway should be retained regardless of the alignment of the LRT line. The roadway right-of-way is over 40m wide in this area, and can easily accommodate safe cycling infrastructure. 4 In future community consultations, feedback should be obtained from the public as to the preferred function of the Crosstown LRT line, especially focusing on whether priority should be given to comprehensive local service, or to express regional service. 7