MEPS 2010 Wiener Neustadt

Similar documents
MEPS Report Reina Doi

Intersection Safety 6/7/2015 INTERSECTIONS. Five basic elements should be considered in intersection design. Intersection Safety (continued)

91

SCHEDULES OF TRAFFIC CALMING IN THE CZECH REPUBLIC

Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Mark Malone, P.E. SD DOT

Literature Review: Final

Project Goals and Objectives

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

Tonight is for you. Learn everything you can. Share all your ideas.

Evaluation and Changes to Pedestrian Priority Phase Signal (Scramble Crossing) at Bay Street and Bloor Street

Traffic Calming & Cyclists

122 Avenue: 107 Street to Fort Road

TRAFFIC CALMING PLANNER S PORTFOLIO

ON-STREET PARKING IN THE HIGHCLIFFE HIGH STREET. M Mawbey

Operation and safety of tramways in interaction with public space. COST Action TU1103 «STATE OF THE ART» On behalf of the action: Matus Sucha

FEEDBACK SURVEY #2: WHO PARTICIPATED

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

At each type of conflict location, the risk is affected by certain parameters:

20mph. We want to make Edinburgh a better and safer place to live, work and play.

FEASIBLE SOLUTIONS FOR REDUCING TRAFFIC FROM MEERAMAKKAM MOSQUE JUNCTION TO THOPAWANA TEMPLE AREA IN KANDY

I Pedestrian Count Summary 1. II. Comparisons of Previous Years Data 3. III. Exhibits and Projections 5

Standing Committee on Policy and Strategic Priorities. Mount Pleasant Industrial Area Parking Strategy and Access Improvements

INNOVATIVE INTERSECTION DESIGN

CAMBRIDGE SOUTH WEST PARK & RIDE

Maynooth Cycling. Presentation to Maynooth Community Council 14 December 2015

Implementation Matrix

Student Pedestrian Safety Fiddlers Canyon Elementary Community Council 2012

Governance and Priorities Committee Report For the July 2, 2015 Meeting

T10:2012 Site Category 1a) T10:2012 Site Category 1b) Railway Level Crossing Approach Traffic Signal Approach Event Code F Event Code E

Multilane Roundabouts

Access Location, Spacing, Turn Lanes, and Medians

INTERSECTIONS AT GRADE INTERSECTIONS

New Strategic Road Safety Plan Risk assessment as alternative for (lack of) accident data?

CTH M Reconstruction

Union Street roundabout Turbo-style roundabouts the future? Patrick Lingwood Walking and Cycling Officer Bedford Borough Council

Unsafe & safe road way design for urban roads

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

The major street is typically the intersecting street with greater traffic volume, larger cross-section, and higher functional class.

Walk On, Victoria Pedestrian Issues Policy Research

Napier City road trauma for Napier City. Road casualties Estimated social cost of crashes* Major road safety issues.

EXECUTIVE SUMMARY March 2013

Relation between traffic safety and environmental protection

Post impact trajectory of vehicles at rural intersections

How do we design for pedestrians? Case study: transforming the Walworth Road

Interaction with the audience: expert, citizens, bike communities

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Giles Run Connector Road

M14A/D Select Bus Service

C.A.R.S. Project Design Report.

This objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis.

Pedestrian Safety in Cities

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

MARKHOUSE ROAD IMPROVEMENTS

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Marcus Jones, TRL. Presented by Name Here Job Title - Date

BETTER CONDITIONS TO ACHIEVE LOWER RISK FOR PEDESTRIANS IN THE INTERSECTION PLAZA ESPAÑA AV. REINA Mª CRISTINA IN BARCELONA

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

Road Safety. Inspections

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

Designing a Traffic Circle By David Bosworth For MATH 714

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Roundabouts A Case Study and Brief Overview

Calculation of Trail Usage from Counter Data

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

Study on fatal accidents in Toyota city aimed at zero traffic fatality

Traffic Signal Design

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

20 th Avenue Neighborway Project August 2, Second Open House

Sharing the Road Together. Drivers and Cyclists

Resident s Toolkit Traffic Control Device Local Area Traffic Management

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

TOWN OF PAYSON TRAFFIC CALMING MANUAL

WELCOME Public Information Centre

Edenbrook Hill Drive Traffic Calming Study

Public Information Centre

Turbo Roundabout Design? Redesign of Park City s 14 Year Old Deer Valley Roundabout Bill Baranowski, P.E. RoundaboutsUSA

Proposed Harmonized Warrants for Installation of 40 km/h Speed Limits and All-Way Stop Sign Control

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

Special Provisions for Left Turns at Signalized Intersections to Increase Capacity and Safety

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Relative safety of alternative intersection designs

Designing and Benchmarking Mine Roads for Safe and Efficient Haulage. Roger Thompson Alex Visser

Policies and actions for a bicycle friendly city

Simulation Analysis of Intersection Treatments for Cycle Tracks

SAFETY GUIDE FOR SCHOOL CHILDREN & PARENTS. toronto.ca/visionzeroto #VisionZeroTO

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

Lake Whitney Elementary School

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

RESTRICTED ROADS (20 MPH SPEED LIMIT) (SCOTLAND) BILL. 1. Is reducing the speed limit to 20mph the best way of achieving the aims of the Bill?

Nottingham Cycle City Frequently Asked Questions

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

Roundabout Design Principles

Roundabout Design: Safety and Capacity Background Paper July 25, 2004

Transcription:

FINAL REPORT MEPS 2010 Wiener Neustadt Group 1 Water tower Anna Mayerthaler 0012896 June 2010

Table of contents 1 Introduction... 1 2 Status quo... 2 3 Planning Ideas... 7 3.1 Solution 1 Roundabout... 7 3.2 Solution 2 two separate junctions...10 3.3 Solution 3 little planning steps...12 4 Conclusions...13 i

1 Introduction Figure 1 Location of the planning area Error! Reference source not found. shows the location of the planning area. The water tower is located at Südtiroler Platz, which is south-east of the centre of the city. From the centre the spot is reachable within walking distance. In the following report we will describe the planning area with the occurred problems for the traffic users in section 2. Section 3 resents the planning ides for redesigning the area around the water tower, based on the traffic surveys from 2008 and 2009, our own visual inspections and pictures and the traffic injury statistics for this area. This analysis of the actual junction and pedestrian crossing situation of the area around the water tower led to the following main goals of the planning process: Decrease the probability for accidents to happen Increase the crossing possibilities for pedestrians 1

Meliorate the cyclists track situation 2 Status quo The planning area around the water tower is facing several problems. Firstly, there are two points with an accumulation of accidents. The first point concerns the area where the side road Günser Straße leads into Grazer Straße. Within this area the course of the road is straight, but drivers have to give the right of the way to car drivers approaching from Neukirchner Straße. A straight course of the road works as an incentive for drivers to intuitively drive on (see Figure 2), and doesn t enforce them to reduce their speed. There is also a pedestrian crossing connecting the water tower with the eastern part of Grazer Straße (see Figure 3). This junction situation led to several rear end collisions in the past. Figure 2 Junction of Günser Straße and Neukirchner Straße 2

Figure 3 Pedestrian crossing at Günser Straße Secondly, the pedestrian crossing which connects the northern part of Neukirchner Straße with the eastern part of Grazer Straße is a point which caused a lot of conflicts (see Figure 4 andfigure 5). In this area the Neukirchner Straße has three lanes and Grazer Straße two lanes. The pedestrians have to cross 5 lanes, with a traffic island the middle, without signals. Additionally the speed is very high, which makes this crossing another dangerous accident point. Further more this pedestrian crossing ends into another crossing traversing Neukircher Straße. At this point pedestrians have to share the space with car drivers and cyclists coming from the cycle track coming from the city park Promenade (see blue circle in Figure 4). 3

Figure 4 Pedestrian crossing connecting northern Neukirchner Straße and eastern Grazer Straße Figure 5 Crossing as in Figure 3 view from the opposite site Thirdly, even the pedestrian crossing with signals at Grazer Straße led to accidents with pedestrians and cyclists, but compared to the other crossing it is relatively safe (see Figure 6). 4

Figure 6 Pedestrian crossing with signals crossing Grazer Straße in front of the school area. Fourthly, we consider the cycle track situation as not sufficient at the moment. There is a cycle track at the west side of Grazer Straße, but there is no possibility for cyclist to access the eastern part of Grazer Straße or Günser Straße. Figure 7 shows the traffic lane situation at the moment. The area has quite a complex structure. The lanes are very wide in Grazer Straße, giving space to two lines in each direction. Two lanes are accessing Neukirchner Straße from Grazer Straße, although this street is just a side road in this area. To summarize, one planning goal was also to clear up the junction situation. 5

Figure 7 Traffic lane situation at the moment. During our visits at the junction area, following observations were made: In peak and off-peak time, there is no capacity problem at the junction. The area where Günser Straße leads into Grazer Straße was identified as area with high speeds, making the pedestrian crossing there very risky. The pedestrian crossing connecting the eastern part of Grazer Straße with Neukirchner Straße is extremely dangerous. During our visit almost an accident between a private car and a pedestrian happened. 6

3 Planning Ideas Taking into consideration al the gathered information mentioned above we came up with a two step planning: 1. A Vision: 2 ideas for totally redeveloping the area Roundabout in the middle of the former junction. Splitting of the former structure into two separate junctions 2. Little planning steps, with the aim of increasing the situation for pedestrians and cyclists with as little construction works as possible. Minimum scenario. 3.1 Solution 1 Roundabout In our idea we would remove the former complicated mixture of classical junction and roundabout and replace it with a roundabout with just one lane in each direction. The underlying argument would be the built bypass which makes it possible to reduce capacity on Neukirchenr Straße, Maria-Theresien Ring as well as on Grazer Straße. The main aim of this measure would be to simplify the junction situation for cars as well as to improve the situation for pedestrians who want to cross the street. This measure implies that, it is not possible to turn into the northern part of Neukirchner Straße any more. The situation after the construction of the roundabout could be the following (see Figure 8): We would close the part of Neukirchner Straße for traffic coming from Grazer Straße (blue encircled area in Figure 8). People who want to use the parking places in Neukirchner Straße can reach this area via the Burggasse from Grazer Straße (green encircled area in Figure 8). 7

Figure 8 Traffic lane situation in solution number 1 This aforementioned solution would improve the possibility to cross the street at this point. Firstly, one lane for each direction significantly decreases the course of the street and therefore simplifies crossing. Secondly, the closure of Neukirchner Straße gives more space for the cycle and pedestrian intersection. In this area two cycle lanes (through the city park and from the Grazer Straße) and two pedestrian crossings come together. Therefore the additional space and reduced car traffic improve the clearness of the situation. Figure 9 andfigure 10 show the redesigned planning area in solution one. It can bee seen easily that there is just one lane in each direction and that therefore the junction area is simplified for car users. Furthermore the crossing possibilities for pedestrians are meliorated. The pink lanes are the new planned cycle lanes and the orange lane in Figure 10 depicts the separate bus lane. 8

Figure 9 Junction area in solution 1 Figure 10 Northern part of the junction area in solution 1 9

3.2 Solution 2 two separate junctions In this solution proposal we would split up the former big junction into two separate ones. The parking space south of the water tower would be used for two lanes, one in each direction to connect to Maria- Theresien Ring and the part of Neukirchner Straße which is south of Maria-Theresien Ring (see green circle in Figure 11). Only one lane would connect Günser Straße with Grazer Straße and we would change the former straightness of this part of the road by building in a curve connecting Günser with Grazer Straße (see red circle in Figure 11). Figure 11 Traffic lane situation in solution number 2 In this solution approach we would also close the northern part of Neukirchner Straße for car traffic. This measure enables us to totally reconstruct the previous complicated junction area (see Figure 12 andfigure 13). Firstly we would reduce the course section to 3 meters each lane. At the east part of Grazer Straße additionally the parking places in front of the buildings (tobacco store and doctor) are removed to give it to the cyclists, who get a cycle track towards Günser Straße, and pedestrians. The parking places north of the building would remain. Together with these measures a new pedestrian crossing and a cyclists crossing would be constructed. The reduction of the course section and the closure of the part of Neukirchner Straße would increase the safety for pedestrians and cyclists. 10

Figure 12 Map of planning solution number 3 (northern part), encircled in red improvements for pedestrians and/or cyclists. Figure 13 Map of planning solution number 3 (southern part), encircled in red improvements for pedestrians and/or cyclists. 11

In the area of the pedestrian crossing with signals the actual size of the course section is 7.2 meters for one direction and 6.5 meters for the other direction. The above mentioned decrease of the course section should reduce the speed a little bit and therefore even make this crossing more secure. 3.3 Solution 3 little planning steps This planning idea represents the most feasible one, but for us it represents just a minimal scenario. We wouldn t change the junction situation at the main roads (Neukirchner Straße, Grazer Straße and Günser Straße). But still this idea includes the closure of the northern part of Neukirchner Straße. From our point of view this is necessary anyhow to meliorate the crossing situation in this area. Additionally we would create a pedestrian crossing at the end of Günser Straße. To make it still possible to reach the parking places in the area in the closed part, we plan a possibility to turn from Grazer Straße into Burggasse as in the previous solution proposals. Figure 14 represents the new junction area. Figure 14 Map of solution number 3 12

4 Conclusions In this report we demonstrated our ideas to redevelop the junction area around the water tower in Wiener Neustadt. From the accident analysis as well as the observations we did ourselves the biggest challenges concerned the bad situation for pedestrians and cyclists. One main goal of the new planning ideas was to meliorate the situation for those transport users. In our opinion this planning goal would be at best achieved with solution number 1 or 2. These ideas would also be the most suitable ones to decrease the car speed in the whole planning area, because they would include a reduction of the width of the car lanes. For us, solution number 3 represents just a minimum scenario. 13