Issue Commentary Staff Response

Similar documents
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Abstract. Source of Copies

Transportation Impact Study Technical Working Group (TISTWG) Wednesday, March 1, 2017 Meeting #21 MRO Auditorium 1:30-3:30 PM.

Bradford s Landing. Preliminary Plan Abandonment AB753 & AB754 MONTGOMERY COUNTY PLANNING DEPARTMENT

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC STUDY GUIDELINES Clarksville Street Department

ADA TRANSITION PLAN 2013

Transportation Impact Study Technical Working Group (TISTWG) Wednesday, January 31, 2017 Meeting #19 MRO Auditorium 1:30-3:30 PM.

MONTGOMERY COUNTY PLANNING DEPARTMENT

MEMORANDUM. Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT. Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger

Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Street Paving and Sidewalk Policy

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION


Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Preliminary Transportation Analysis

Pedestrian Project List and Prioritization

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MEMORANDUM. David Mohlenbrok, Environmental Services Manager

Hennepin County Pedestrian Plan Public Comment Report

THIS PAGE INTENTIONALLY BLANK

SECTION 1 - TRAFFIC PLANNING

APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

City of Ottawa s Complete Streets Approach to Transportation Projects

CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

IMPLEMENTATION STRATEGIES

AMATS Complete Streets Policy

Bellevue Transportation: Challenges, Opportunities and Priorities Bellevue Downtown Association September 20, 2018

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

10.0 CURB EXTENSIONS GUIDELINE

Route 7 Corridor Study

CITY MANUALS AND STANDARDS REVIEW


TOWN OF PARADISE VALLEY

900 BICYCLE FACILITIES Traffic Engineering Manual

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Ann Arbor Downtown Street Plan

Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Long Island Rail Road Expansion Project Floral Park to Hicksville

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Americans with Disabilities Act and Curb Ramps

Pedestrian Crosswalk Audit

RCCG Jesus House. Preliminary Plan # TRAFFIC STUDY. Prepared for: RCCG Jesus House Montgomery County, Maryland

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

Clackamas County Comprehensive Plan

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Memorandum INTRODUCTION

4.0 TRAFFIC IMPACT STUDIES

DPW Order No:

TRAFFIC IMPACT ANALYSIS

WHEREAS, the New Jersey Department of Transportation' s Complete Streets

Preparing a Curb Ramp Project. December 15, 2010

Transportation Impact Study for Abington Terrace

Moving Towards Complete Streets MMLOS Applications

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

Road Diets FDOT Process

ALLEY 24 TRAFFIC STUDY

MnDOT. City of Zumbrota. Goodhue County

Access Management Regulations and Standards

Evolving Roadway Design Policies for Walking and Bicycling

Glenn Avenue Corridor Traffic Operational Evaluation

D.13 Transportation and Traffic

ADA Technical Frequently Asked Questions

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

900 BICYCLE FACILITIES Traffic Engineering Manual

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

MCPB Item No. 5 Date: White Flint West Transportation, Phase 2, CIP No , Mandatory Referral No. MR

Traffic Calming Policy

Traffic Impact Analysis (TIA) Process and Procedures Manual. September 2017

County of Loudoun. Department of Planning and Zoning MEMORANDUM

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

C Line Rapid Bus Preliminary Station Design

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

To: ACHD Commissioners and Director 3/14/2017. Peer Review of Highlands Neighborhood Traffic and Pedestrian Safety Plan Information Briefing

City of Saline. Complete Streets Ordinance

ADA PRESENTATION (CURB RAMPS)

Oldham County Major Thoroughfare Plan

Harriet Fraser Traffic Engineering & Transportation Planning

Environment and Public Works Committee Presentation

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

MnDOT Implementation of Complete Streets Policy. January 2014

UNCONTROLLED PEDESTRIAN CROSSING GUIDELINES

Transcription:

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 9 Date: 11-1-18 Local Area Transportation Review (LATR) Pedestrian Adequacy Test Technical Guidance Eric Graye, Planning Supervisor, Functional Planning and Policy Division, eric.graye@montgomeryplanning.org, 301-495-4632 Pamela Dunn, Chief, Functional Planning and Policy Division, pamela.dunn@montgomeryplanning.org, 301-650-5649 Completed: 10/25/18 Overview This item is a continuation of the Planning Board s discussion of the referenced topic that occurred at the Board s July 19, 2018 meeting. Key elements of the public testimony received at this meeting and the response of planning staff to this commentary are summarized in the table provided below. Summary of Public Commentary: LATR Pedestrian Adequacy Test Technical Guidance Issue Commentary Staff Response Finanical Imapct on small development projects Overlapping ADA Compliance Requirements No Bethesda Unified Mobility Program (BUMP) for Bethesda-related projects. Concern that requirements reflected in the technical guidance language would place an adverse/unreasonable financial burden on small development projects. Concern that the technical guidance language does not adequately address the need for equitable cost sharing among projects in close proximity to each other. Recognition that the pro-rata share provisions of a BUMP would address many of the issues/concerns expressed regarding the technical guidance for Bethesda-related projects. 1 Only medium and large development projects are subject to this requirement due to the 50-trip pedestrian trip generation threshold that would trigger the need for a pedestrian adequacy test. The tiers reflected in the technical guidance are designed to manage the overlap, with declining responsibilities or payment obligations for a project the further away one moves from the project boundary. Technical work in support of the BUMP is advancing and the program is anticipated to be available for public review in late-2018/early-2019. timeframe.

In response to the public commentary received, an outcome of the July 19, 2018 discussion, was a directive from the Board to Planning Department staff to work with Montgomery County Department of Transportation (MCDOT) staff to revise (as appropriate) the technical guidance memo developed by MCDOT pertaining to the application of the Local Area Transportation Review (LATR) pedestrian adequacy test. The proposed revisions are noted (in track changes ) in the attached document. Background The 2016-2020 Subdivision Staging Policy (SSP) describes context-sensitive, multi-modal transportation adequacy tests that were incorporated into the 2017 Local Area Transportation Review (LATR) Guidelines. In this context, pedestrian system adequacy is based on crosswalk capacity, in combination with a requirement to address Americans with Disabilities Act (ADA) non-compliance issues within a certain distance of a proposed project. This requirement is based on the logic that there is a nexus between new development and existing inadequate pedestrian circulation conditions when the new development generates sufficient pedestrian activity to substantially affect exposure to the inadequate conditions. Pedestrian system adequacy is defined as providing level of service (LOS) D or better for any signalized crosswalk (see Figure 1 below). The methodology for evaluating pedestrian level of service is described in the 2010 Highway Capacity Manual (HCM) in Chapter 18. Any development site that generates more than 50 pedestrian peak hour trips (including trips to transit) must: Fix (or fund) ADA non-compliance issues within a 500' radius of the development site boundary and Ensure LOS D for crosswalk pedestrian delay (or no more delay than existing) at LATR study intersections within 500' of site boundaries or within areas where the County s road construction code specifies use of urban design standards. Regardless of the development size and location, if an intersection operational analysis is triggered for any intersections within a Road Code Urban Area (RCUA)/Bicycle Pedestrian Priority Area (BPPA), mitigation must not increase average pedestrian crossing time at the intersection. Figure 1: Pedestrian Level of Service (LOS) 2

Summary In applying the new LATR pedestrian adequacy test, it has come to attention of Planning staff that there is too little information provided in the 2016-2020 SSP and the 2017 LATR Guidelines that gives guidance to applicants for completing the ADA non-compliance assessment. Based on early experience with this new requirement, the execution of the pedestrian adequacy test presents several challenges particularly in urbanized areas (i.e., Red and Orange policy areas identified in the 2016-2020 SSP), including: (1) the need for applicants to conduct an ADA non-compliance field survey that is fair and reasonable and (2) the need to ensure that the cost/burden associated with addressing inadequate pedestrian conditions is shared equitably among applicants in proximity to the proposed development site. To address these issues, MCDOT staff recommends the technical procedure described in the revised version of the attached April 3, 2018 memo to Planning Department staff. The proposed procedure is tiered, based on the significance for access to the subject development project coupled with the likelihood of participation in addressing ADA non-compliance issues by other nearby development projects. An applicant s requirements to fix or fund corrections to these conditions will depend on the location of the conditions relative to the project site. The proposed MCDOT technical procedure serves to provide useful guidance to other projects in need of addressing ADA non-compliance issues as an element of LATR requirements. Staff will continue the discussion of the application of the proposed ADA non-compliance technical assessment procedure at the Planning Board s November 1, 2018 meeting. Recommendation Staff recommends the Planning Board approve the proposed technical guidance for incorporation into the 2017 LATR Guidelines. Attachment: 1. April 3, 2018 memorandum, MCDOT LATR Pedestrian Adequacy Test Technical Guidance (Revised October 25, 2018) EG/PD/aj 3

ATTACHMENT 1 Isiah Leggett County Executive Al R. Roshdieh Director DEPARTMENT OF TRANSPORTATION ATTACHMENT M E M O R A N D U M April 3, 2018 Revised October 25, 2018 TO: FROM: SUBJECT: Eric Graye, AICP, PTP, Planning Supervisor Functional Planning and Policy Division Maryland National Capital Park and Planning Commission Rebecca Torma, Acting Manager Development Review Section Office of Transportation Policy Technical Guidance: 2016 Subdivision Staging Policy (SSP) ADA Noncompliance Test Procedures for urbanized areas This memorandum provides guidance to the development community on how to perform the pedestrian system adequacy test as required in the 2016 Subdivision Staging Policy (SSP) and the Local Area Transportation Review (LATR) guidelines, Fall 2017. The SSP has a goal to achieve an approximately equivalent transportation level of service in all areas of the County and provides for multi-modal transportation adequacy tests, including a test for pedestrian system adequacy. The SSP requires that any site that generates more than 50 pedestrian peak hour trips (including trips to transit) must fix (or fund) Americans with Disabilities Act (ADA) non-compliance issues within a 500 radius of the site boundaries Given the 50-trip pedestrian peak hour threshold associated with this adequacy test, it should be noted that this requirement would typically be triggered by large proposed development projects. However, there is little additional guidance in the SSP or LATR guidelines for completing this assessment. Based on early experience with this new requirement, MCDOT recommends the procedure outlined below to the Planning Department for determination of project compliance within urbanized areas (Red/Orange Policy Areas). This procedure is tiered based on the significance for access to the project and likelihood of participation in addressing ADA non-compliance issues by other nearby projects. The applicant s requirements to fix or fund corrections to these conditions will depend on the location of the condition with respect to the project site. 1. Establish evaluation tiers. The project-specific tiers should be confirmed at the scoping stage by the Planning Department, in consultation with MCDOT, before any assessment is done. The following guidance is provided for determining the tiers. a. Tier 1 Primary sidewalk i. The public or private street frontage of the project. Office of the Director 101 Monroe Street 10 th Floor Rockville Maryland 20850 240-777-7170 240-777-7178 FAX www.montgomerycountymd.gov Located one block west of the Rockville Metro Station

Mr. Eric Graye ADA Noncompliance Survey March 26October 25, 2018 2 ii. The same side of street up to the nearest public street intersection, or a maximum distance of 250 feet from the project boundary, measured along the street. iii. Approximately 25 feet along each intersecting street within 1.a.i and 1.a.ii. b. Tier 2 Connected sidewalk i. The same side of the street as the project between the first public road intersection and 250 feet (if applicable), measured along the fronting street. ii. The corresponding opposite side of the street as 1.a.ii and 1.b.i. iii. Approximately 25 feet along each intersecting street within 1.b.i, and 1.b.ii. c. Tier 3 Network connections 2. Adequacy Determination a. Tier 1 b. Tier 2 c. Tier 3 i. Between 250 feet and 500 feet, measured along the fronting street. ii. The corresponding opposite side of the street. iii. Along both sides of each intersecting street in 1.a and 1.b, up to the next public road intersection or a maximum distance of 500 feet from the project boundary, measured along the street. iv. Approximately 25 feet further along each intersecting street identified in 1.c.iii. ramps, traffic signals, significant trip hazards, cross slope deviations, and broken, missing, structurally failing sidewalks. ii. Beyond the site frontage, the applicant is not required to relocate utilities or traffic signal cabinets, reconstruct utility vaults, relocate fire hydrants, relocate street trees or relocate manhole covers. ramps, traffic signals, significant trip hazards, and missing or structurally failing sidewalks. ii. A minimum recommended contribution of $100,000 toward ADA compliance may satisfy this requirement. ramps, traffic signals, significant trip hazards, and missing or structurally failing sidewalks. ii. A minimum recommended contribution of $50,000 toward ADA compliance may satisfy this requirement. 3. For applicants to comply with the pedestrian system adequacy test, the contributions should be placed into a CIP fund for the relevant policy area (if applicable) or the countywide ADA Compliance Transportation CIP (P509325). If you have any questions regarding this memorandum please call Rebecca Torma, at 240-777-2118.