Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Similar documents
A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Chelmsford City Growth Package

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

MARKHOUSE ROAD IMPROVEMENTS

HISTON ROAD Have your say on better public transport, cycling and walking journeys

Your views are important. Please fill in a form before you leave. Or alternatively

Chelmsford City Growth Package

Loughborough University Travel Planning

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

CAMBRIDGE SOUTH WEST PARK & RIDE

Chelmsford City Growth Package

LET US KNOW WHAT YOU THINK

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

M25 junction 28 improvement scheme. Have your say

Frome Street Bicycle Route

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

1. Provide a dedicated westbound approach bus lane at the intersection;

M6 Junction 10 Public Consultation

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

BYRES ROAD: PUBLIC REALM Public Consultation

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

SCHEME DESIGN AND ENGINEERING

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE

Welcome. If you have any questions or comments on the project, please contact:

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

PROPOSED RESIDENTIAL SUBDIVISION

Lea Bridge Road A street for everyone Tell us

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk

ENFIELD TOWN THE REVISED DESIGN

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Easton Safer Streets - Final Project Report BRISTOL

Public Consultation on A127 / A130 Fairglen Interchange Improvement Scheme. Consultation open from 6 February to 20 March 2018 HAVE YOUR SAY

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Community engagement guide May 2018

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Highways England Creative M Welcome. Smart motorway M6 junctions 16 to 19 public information exhibition

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

The Wincheap Society

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

APPELLANT S STATEMENT OF CASE

1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.

MILTON ROAD LLF PROJECT UPDATE

Milton Road Bus Stop and Crossings Workshop WSP. 19th September 2017

Milton Road Project Update. Paul van de Bulk 30 January 2018

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

Green Streets and Urban Greenways

A52 Nottingham Junctions Nottingham Knight and Wheatcroft Public information exhibition

Bulwell Cycling Consultation

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

The Consultation has now ended.

Classification Criteria

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Design Workshops Summary of all Feedback January 2017

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

-Current Get On Board initiative: Existing LTC program to help make LTC accessible, informative, and encourage use of public transit

DYNAMIC LANES FOR AUCKLAND

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

SANDGATE PRIMARY SCHOOL Updated School Travel Plan January 2017

Mill Hill Broadway Capacity Improvement

Sevenways Roundabout, and the need for a Road Safety Scheme:

Have your say on the transformation of Oxford Street West

Transit boulevard: A new road type for Sydney s Growth Centres

Part 3: Active travel and public transport planning in new housing developments

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Public Works and Infrastructure Committee. General Manager, Transportation Services

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Maynooth Cycling Submission on North South Corridor

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants

2. Context. Existing framework. The context. The challenge. Transport Strategy

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Appendix N(b): Portishead Station Outline Travel Plan

The Rower Traffic Management Scheme

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

CUERDEN TRANSPORT PROPOSALS

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

Introduction. Prince Street Cycling Ambition Fund Public Realm Project

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

Tonight is for you. Learn everything you can. Share all your ideas.

TRANSPORT AND MOVEMENT

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

Drawing 5269/GA01: A2/A28 Coast bound off-slip - Wincheap Scheme

ECONOMY PEOPLE ENVIRONMENT

Transcription:

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018

Contents Introduction 3 Background 4 Springwood Drive Roundabout Improvements 5 Station Access Improvements 7 One-way system and contraflow on-street cycle lane 8 Redesign options for bus layby 9 A120 Millennium Way Slips 11 Further Information 15

Station Approach west towards Braintree Rail Station

Introduction The Braintree Integrated Transport Package (ITP) is a package of schemes aiming to improve access to Braintree Town Centre. We are keen to hear your views on two of the key schemes proposed as part of the Braintree ITP Springwood Drive Roundabout Improvements and Station Access Improvements - in advance of further detailed design work. We are also asking for views on the A120 Millennium Way Slips scheme, for which funding has been secured. Springwood Drive Roundabout Improvements (Springwood Drive / Rayne Road / Pod s Brook Road): Junction improvements to address traffic congestion and accommodate future growth Station Access Improvements (Station Approach / Rose Hill & South Street Junctions): Improvements to Station Approach to enhance accessibility and amenity for users of Braintree Station and local residents A120 Millennium Way Slips: creation of two new slip roads connecting Millennium Way (B1018) with the A120 to the south-east of Braintree. N Springwood Drive Roundabout Improvements 0 125 250 500 750 Metres Contains OS data (C) Crown Copyright and database right 2017 BRAINTREE Station Access Improvements A120 Millennium Way Slips Your feedback during the consultation period will provide the project team with valuable information about the potential impact and benefits of the proposals which will help inform final design and implementation. 3

Background The Braintree ITP emerged from a study by Essex Highways in 2016 which looked at access to Braintree Town Centre from all directions and how this could be improved. This study identified a large number of links and junctions operating over capacity at peak times and presented a comparative assessment of various options for intervention. The options identified for further consideration in the study have been shortlisted further and a number of these put forward in a bid by Essex County Council to the South East Local Enterprise Partnership Growth Fund Round 3. Between 2016 2017 design work was undertaken to develop scheme options. Building on the initial study in 2017 Essex County Council commissioned further work to evaluate current provision for various groups of users accessing Braintree Station. The Braintree Station Access Study looked at provision for rail and bus users, pedestrians, cyclists, taxi-users and those travelling by car using the local highway network. It recommended a number of possible measures to improve access to Braintree Station including a proposal to implement a one-way system, an on-street cycle route and improvements to the layout and design of the bus stop adjacent to the station. In 2017, Essex County Council decided to take forward three options through to final design development as part of the Braintree ITP. In addition to improvements at Springwood Drive Roundabout and Station Approach a number of Traffic Management Measures (TMM) were identified and shortlisted. Proposals taken forward in this area include: Replacement of outdated signs and provision of additional signage to facilitate safer and smoother movement of traffic in the town centre; Provision of a new taxi rank on Fairfield Road. Being close to the town centre market and bus station, the proposed location will aid accessibility within the town centre - particularly for less mobile user groups; Consideration of the potential for further pedestrianisation in the town centre. Independently of the ITP, in 2017 Essex County Council also secured funding for creating two new slip roads connecting Millennium Way (B1018) with the A120 to the south-east of Braintree. Map data: Google, DigitalGlobe 4

Springwood Drive Roundabout Improvements Traffic modelling has highlighted that this junction regularly operates over capacity during the afternoon peak period, when traffic queues on Rayne Road and Springwood Drive. Traffic from Springwood Industrial Estate moving into the town centre during the afternoon peak period via Springwood Drive also creates significant congestion. Traffic modelling shows that existing congestion issues are likely to worsen significantly in the long term without intervention. Rayne Road east and west in particular are also expected to see a significant growth in traffic. The limited entry width on the Pod s Brook Road approach is another issue with the roundabout currently, with some evidence of vehicles mounting the kerb of the footway when turning left on to Rayne Road. The improvements proposed to Springwood Drive Roundabout involve widening the roundabout and improving the layout in order to increase capacity. The scheme is designed to help resolve existing traffic congestion at Springwood Drive and accommodate future traffic growth. The proposals include: Enlarging the roundabout to improve capacity and accessibility Improving the geometry of the roundabout and adding lane markings to improve safety Adding an additional lane (dedicated left turn / straight ahead) on the southern approach to the roundabout (Pod s Brook Road) Additional lane added (left turn / straight ahead) Enlarged roundabout with lane markings 5 Visualisation of proposed design in operation

Springwood Drive Roundabout Improvements The diagram below illustrates the widening and geometry changes proposed for the roundabout. The red represents the road area while the blue represents the shared footway. All widening will take place within the highway boundary. 6 Widening and geometry changes to Springwood Drive Roundabout

Braintree Station Access Improvements Following from the recommendations of the Station Access Study, this scheme seeks to improve accessibility for all Braintree Station users and provide appropriate facilities for nonmotorised users & local residents. The Station Approach proposals include: Introduction of a one-way system from east to west along Station Approach to minimise conflict between road users (including buses, taxis and car park users) Additional non-motorised user access along Station Approach, including a contraflow cycle lane Rearrangement of the existing taxi rank in front of the station as an offline five bay layby Enhanced urban environment, including five design options for a new pedestrianised area (to replace the existing bus turning circle) and new bus stop facilities beside the station. Off-street taxi lay by Off-street bus lay by Contraflow cycle lane Changes to bus and taxi laybys outside Braintree Station Direct access to properties Bus layby redesigned as pedestrianised space Reorganisation of parking layout to provide more space and improved accessibility Changes to layout of parking area and bus layby on Station Approach 7

Braintree Station Access Improvements One-way system and contraflow on-street cycle lane The introduction of a one-way system traveling east to west along Station Approach will improve traffic flow on the local road network. It also allows for the rearrangement of the existing taxi rank to be provided as an offline five bay layby. Modification of the existing signal arrangement at the eastern junction is required to accommodate the proposed one-way system and also the exit of cyclists from the contraflow cycle lane at this junction. The proposal for the provision of a contraflow cycle lane running west to east along Station Approach will enhance cycling provision and access to the railway station from the centre of the town. At the South Street/Station Approach junction to the west various traffic calming measures are being considered to reduce risk to cyclists at the junction from the town centre. Introduction of a oneway system travelling east to west along Station Avenue New on-street contraflow cycle lane Station Approach/ South Street Junction (West) Rose Hill Junction widening (additional lane) and traffic signals upgrade Exit of contraflow cycle lane Entrance to Station Approach one-way system from east Station Approach/ South Street/Rose Hill Junction (East) 8

Braintree Station Access Improvements Redesign options for bus layby Five options have been designed for the layout of a new pedestrianised space in the area currently occupied by the bus layby between the rail station and the car park. All options include bicycle parking racks, seating and planting and are designed to make the space more accessible, comfortable and visually appealing for all users. Option 1 This option includes a single bus shelter on the side closest to the station. There is a line of three bicycle racks behind this, at the back of the space, with planting running diagonally in front of these. A bench beside a foliage feature is located in the centre of the pedestrianised area towards the station. Option 2 This option also includes a larger, single bus stop in the far corner of the space adjoining the road. A larger, single bicycle rack occupies the space behind, with a bench in front. A large tree stands in the centre away from the road, with further seating beyond this, closer to the station. Option 3 This option also includes a larger, single bus stop in the far corner. Bicycle racks and planting are distributed throughout the rest of the space. Option 4 This option includes four bicycle racks at the back of the area, adjacent to the railway. Two bus stops are set apart on the other side, nearest the road. Benches are dispersed throughout the central area accompanied by planting. Option 5 This option includes 3 bicycle racks throughout the space in the centre, with seating and landscaping to the back of the area. Five benches provide seating along two edges, with landscaping behind. Option 1 9

Braintree Station Access Improvements Redesign options for bus layby Option 2 Option 3 Option 4 10 Option 5

A120 Millennium Way Slips This scheme involves the creation of two new slip roads connecting the B1018 (Millennium Way) with the A120. One slip road from the B1018 will allow entry to the A120 westbound, the other from the A120 providing an exit to the B1018 towards Braintree town centre. Associated changes include a dedicated lane on Millennium Way for traffic turning right on to the A120 westbound and the installation of traffic lights at this junction. While not part of the Braintree ITP, the scheme is located to the south-east of Braintree and will also contribute to improving access to the town centre. We are therefore inviting you to view the plans for A120 Millennium Way Slips in conjunction with our public exhibitions. In addition to providing improved access, the scheme is intended to help relieve congestion on the A120 at Galley s Corner and to accommodate future growth in the region. The A120 forms an east-west route linking the M11 and London Stansted Airport with the A12, Colchester and Harwich. Braintree is located half way along this corridor. Funding for this scheme has been secured through the Department for Transport s National Productivity Investment Fund (NPIF) for the Local Road Network, with support from Highways England, Braintree District Council and Essex County Council. Dedicated lane for traffic turning into A120 westbound For further information on this scheme, please visit the Millennium Way Slips web page: www.essex.gov.uk/120millenniumway Left turn only for A120 traffic towards Braintree New traffic lights at junction A120 Millennium Way slip roads and associated changes to the B1018 (Millennium Way) 11

Further information For further information on all three schemes please attend one of the consultation events at: Braintree Town Hall: Saturday, 6 October, 10am-4pm Alec Hunter Academy: Friday, 12 October, 11am 7pm Interactive visualisations of the proposals will be displayed at the events and staff will be on hand to provide information and answer any questions you may have. The Consultation Process The consultation period will open for six weeks, from Monday, 24 September to Monday, 5 November. Once the, consultation closes, we will analyse the responses and publish a report on the key findings from the consultation in Winter 2018. How to respond Your views are important to us. You can fill out your consultation response online at: www.essex.gov.uk/braintreeitp If you have any problems responding using the online feedback form, please contact the Essex County Council customer service team by telephone: 0345 603 7631. What happens next? Once the consultation has closed, feedback submitted will be analysed and presented in a Consultation Report later this year. Towards the end of 2018 and in early 2019 we will continue to work towards the funding application for the Springwood Drive Roundabout and Station Access schemes through SELEP. Further detailed design of these schemes will be undertaken in Spring/ Summer 2019. Station Approach, Braintree 12

This information is issued by Essex County Council You can contact us in the following ways: Visit our website: www.essex.gov.uk/braintreeitp By post: Essex County Council County Hall Chelmsford Essex CM1 1QH If responding to this consultation, please only use the dedicated response channels included on page 12 of this document. Sign up to Keep Me Posted email updates on topics you want to hear about at: essex.gov.uk/keepmeposted Visit our website at essex.gov.uk Follow us on Find us on Essex_CC fb.com/essexcountycouncil The information contained in this document can be translated, and/or made available in alternative formats, on request. Published September 2018 Limitation: The drawings in this document have been prepared by Jacobs on behalf of Essex County Council are for the exclusive use of Jacobs Client, and are subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsover for, or in respect of, any use or reliance upon, this drawing by any third party. Copyright 2018 Jacobs UK Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright.