Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Similar documents
DRAFT INVESTMENT CORRIDORS

Bicycle Facilities Planning

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Section 1 - North Lamar: Tech Ridge to US 183

CONNECTING PEOPLE TO PLACES

Enhancements Short-term improvements to keep Austin moving. Mobility Hubs

Active Transportation Facility Glossary

Welcome. If you have any questions or comments on the project, please contact:

Southside Pilot Proposal

Bus Rapid Transit Plans

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

KEARNY MESA COMMUNITY PLAN UPDATE

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

C C C

5. RUNNINGWAY GUIDELINES

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

Roadways. Roadways III.

TRAFFIC IMPACT ANALYSIS

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Washington DC Section of ITE Project Briefing

North Shore Transportation Improvement Strategy

Broad Street Bicycle Boulevard Design Guidelines

Designing Streets for Transit. Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014

Executive Summary Route 30 Corridor Master Plan

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Sandwich Pedestrian/Bicycle Planning

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

MASTER BICYCLE AND PEDESTRIAN PLAN

ALTERNATIVES TO BE CONSIDERED

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Geary Corridor Bus Rapid Transit

Preliminary Transportation Analysis

Cycle Track Design Best Practices Cycle Track Sections

Working Group Meeting

Welcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid

Bus Queue Jump (Lane) Utilization: A case study in Calgary, AB Canada Muhammad Asim P.Eng, M.Sc. The City of Calgary

Duwamish Way-finding and CTR Report

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Route 7 Corridor Study

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Highway 217 Corridor Study. Phase I Overview Report

Draft North Industrial Area-Wide Traffic Plan

Kennedy Plaza and Providence Downtown Transit Connector PUBLIC MEETING. Stakeholder Meeting #1 October 24, 2016

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

City of Wilsonville 5 th Street to Kinsman Road Extension Project

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

PEDESTRIAN ACTION PLAN

Item Description: Presentation and Discussion: Berkeley Rapid Transit Locally Preferred Alternative

Vision. Goals and Objectives. Walking

Contents. Champaign-Urbana Mass Transit District Stop Placement Guidelines

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Broad Street Bicycle Boulevard City Council Study Session Summary

41st Avenue B-Line Kerrisdale Village Street Improvements

City of Novi Non-Motorized Master Plan 2011 Executive Summary

LOOP 360 IMPROVEMENT STUDY

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

ALTERNATIVE A ONLY. Right Turn Only. BOTH ALTERNATIVES on southbound Mission from 23rd St to 25th St and on northbound Mission from 20th St to 23rd St

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

MCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017

Outreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary

COMPLETE STREETS PLANNER S PORTFOLIO

Richmond-Adelaide Cycle Tracks

FEDERAL HIGHWAY ADMINISTRATION APPLICATION

Dowling/Beaty Cycling Route

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

CHAPTER 1 INTRODUCTION

Bicycle Master Plan Goals, Strategies, and Policies

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Hennepin County Bicycle and Pedestrian Planning

TRANSPORTATION IMPROVEMENT STRATEGY

Transportation 6. A. Transit Center Circulation and Access. 1. Transit Center Circulation

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

El Centro Mobility Hub

EXECUTIVE SUMMARY. Vision

San Pablo High Treatment applied incrementally at each N + ++

Transcription:

Short-Term Enhancements Improvements to keep Austin moving Long-Term Investments Projects to support our future Mobility Hubs MetroRapid MetroRail MetroExpress Commuters Connectors Circulators Project Connect Project Connect is the Central Texas high-capacity transit plan that will create real, tangible transit projects that offer an alternative to mindnumbing traffic congestion. It s not about a single train or bus route, but a robust transit system that improves travel into, out of and around Central Austin from the surrounding region. It will provide options that build upon one another and create a system to move more people, more quickly. The end result will connect residents, businesses, schools, services, and shopping through a high-capacity transit network. MetroRapid The MetroRapid Short-Term Enhancements flipbook provides an overview of locations and transit improving projects that intend to encourage more riders and move more people through the same space. The projects cover small infrastructure improvements, policy changes, and technology upgrades. Key Terms TPL TSP Transit Priority Lane High Capacity Transit

What are MetroRapid Short-Term Enhancements? What are MetroRapid Short-Term Enhancements? The MetroRapid enhancements are a set of shortterm, location specific projects that are designed to help improve the transit service. Projects focus on service, infrastructure and technology improvements that speed up trips, increase reliability, enhance the passenger experience and implement key safety treatments. MetroRapid Short-Term Enhancements have been evaluated on 7 potential benefits to transit riders and the overall transit system shown in the graphic to the right. The evaluation focused on a high level assessment on whether the benefit could be observed, or not. Benefits not observed in projects are faded on the following project sheets. Low Cost Projects that have low capital cost. Faster Travel Times Quicker and more reliable service. 0 60 40 80 0 00 0 Faster Implementation Projects implemented on a - year time frame. A full prioritization evaluation will be completed in the final step of this Project Connect planning process. The evaluation will consider detailed metrics and utilize input gathered from public feedback received online, at community events and in coordination with the Multimodal Community Advisory Committee mittee An optimized transit system that is efficient and reliable is beneficial to users s and can be beneficial to the city as awh whole. The short-term enhancements ents are key to keeping Austin moving in the short term, and setting tin the stage for potential tial long-term investments nts also being studied in Project Connect. Safety Crosswalk, sidewalks and bicycle facilities improvements. More People Carrying Capacity Move more passengers efficiently. Station Connectivity and Access Multimodal options to get to and from stations. Station Amenities Modified stations that will provide riders with better protection from the elements.

What are MetroRapid Short-Term Enhancements? MetroRapid Short-Term Enhancements Each MetroRapid enhancement has been evaluated to have a low and high set of project options. The low or high option refer to general costs of implementation, benefits to riders, and value to transit system operations. The following short-term enhancements have been identified for MetroRapid and discussed further in the following pages. Guadalupe St Burnet Rd E 8th St E MLK Jr Blvd W Anderson Ln N Lamar Blvd 8 E 45th St 5 W Braker Ln 7 8 90 Airpot Blvd 5 8 W 9th St Guadalupe St!(!( E Dean Keeton St E MLK Jr Blvd The Drag - Guadalupe St. and MLK Jr. Blvd. to 9th St. Improves transit system operations through transit priority treatments. Adds pedestrian and bicycle safety enhancements. 4 Guadalupe St./Lavaca St./ MLK Jr. Blvd. Adds transit priority treatments and pedestrian safety enhancements that reduce delays, provide safety and move more people. Capitol Station Adds pedestrian and station amenities. Austin History Center Station Improves system reliability by reducing bus stacking. Adds pedestrian and bicycle safety treatments. N Lamar Blvd W 6th St W 5th St W Cesar Chavez St 6 5 4!( Lavaca St!( Guadalupe St San Jacinto Blvd W 5th St E 8th St E 7th St E th St 5 5 6 7 Guadalupe St. and Lavaca St. Improves transit system operations by extending transit priority lanes to Cesar Chavez St. and activating Transit Signal Priority. South st St. Bridge Adds transit priority treatments that reduce delays and help move more people over the bridge. Chinatown Station Adds pedestrian safety treatments, station amenities, and improves transit system connectivity. Legend Roads MetroRapid Route * Station Area Projects * Transit Priority Projects S st St S Congress St N 8 Crestview Intersection Improves transit congestion issues around the station by reducing conflicts between automobiles, transit vehicles, bicycles and pedestrians. 4

MetroRapid Short-Term Enhancement Examples MetroRapid Short-Term Enhancement Examples Transit Priority Lanes (TPL) Dedicated bus lanes that allow transit to bypass traffic. MetroRapid Station Modifications Retrofitting station roofs to better protect people from the elements. Contraflow Lane Dedicated transit lanes that flow in the opposite direction of current traffic. This treatment is typically used on one-way streets. Improved Sidewalks & Crosswalks Highly visible striped crosswalks and improved sidewalks add safety and accessibility. Peak Hour Reversible Vehicle Lane Reversible lanes are vehicle lanes in which the direction of travel can be changed to maximize available roadway space during peak travel times. Bike Box/Improved Bicycle Facilities Bike boxes allow cyclists a safe and visible way to get ahead of queuing traffic during a red traffic signal phase. Improving and adding bicycle facilities encourages multimodal transportation. 5

MetroRapid Enhancement Projects Example Solutions MetroRapid Short-Term Enhancement Examples Queue Jump Signal Allows buses to quickly travel through congested intersections by providing transit-only signal cycle before a green signal is given to general purpose traffic. Bus Only Markings Highly visible painting, or markings in lanes that designate usage. Pedestrian Hybrid Beacon Provides pedestrians and bicyclists safe crossing at non-signalized intersections such as mid-block crossings. Transit Signal Priority (TSP) Allows buses to have an earlier and/or longer green signal to maintain frequencies and on-time performance. Don t Block the Box Striping Highly visible striping discourages motorist from obstructing intersections. Fines and ticketing are policy enforcement strategies that may accompany signage and striping if deemed necessary. Grade Separation Grade separation of transportation infrastructure commonly includes elevated structures or tunneling to reduce potential conflicts with street-level transportation and/or pedestrians. 6

The Drag - Guadalupe St. and MLK Jr. Blvd. to 9th St. The Drag - Guadalupe St. and MLK Jr. Blvd. to 9th St. The Drag is a section of Guadalupe Street between MLK Jr. Boulevard and 9th Street. The corridor is very active due to its proximity to the University of Texas and numerous restaurants and retail shops. The City of Austin recently completed a corridor study for this area that recommends a variety of treatments that improve conditions for transit, bicyclists and pedestrians. The short-term enhancement goals are to optimize transit operations through The Drag corridor, improve MetroRapid station amenities and enhance pedestrian and bicycle safety. Project at a Glance Key Considerations: Improve transit travel time, frequency and reliability. Proposed relocation of UT Dean Keeton and West Mall MetroRapid Stations. Protect people from the elements and improve customer experience. Location Map 74 W 9th St. Project Recommendation: 44 UV 60 5 UV 90 The low short-term enhancement option best satisfies the goals of improving transit operations and customer experience. 8 W 6th St. 969 UV 0 UV 7 W 7th St. 5 o MetroRapid Routes W Dean Keeton St. tin Luther King Jr. Blvd. Guadalupe St. W 4th St. W st St. W nd St. Project Area N Not to scale 7

The Drag - Guadalupe St. and MLK Jr. Blvd. to 9th St. The Drag - Guadalupe St. and MLK Jr. Blvd. to 9th St. The low option addresses pedestrian and bicycle safety and improvements to MetroRapid stations. The low option is recommended for implementation. Project Benefits: 0 60 40 80 0 00 0 Transit Time Savings Transit efficiency and reliability would be improved through the corridor. Safety Highly visible pedestrian and bicycle infrastructure improvements. Project Cost Approximately: $850,000 to $950,000. Site Plan - Guadalupe St. and W Dean Keeton St. Site Plan - Guadalupe St. and UT West Mall Project Implementation Within approximately 6 months. Station Connectivity & Access Project does not address connectivity or access. Station Amenities Improved customer experience at stations. More People Carrying Capacity Project does not increase the movement of people through the corridor Modified shelters include a new roof, improved lighting and additional seating. Station Painted and Buffered Modification Bike Lanes Buffered and painted bike lanes provide a highly visible delineation between vehicles and cyclists. Crosswalk Restriping and Pedestrian Scramble Provides a signal phase for crossing pedestrians, and restriping add visibility 8

The Drag - Guadalupe St. and MLK Jr. Blvd. to 9th St. The Drag - Guadalupe St. and MLK Jr. Blvd. to 9th St. The high option improves station connectivity and pedestrian safety. The option is consistent with the preferred alternative from the City of Austin s Guadalupe Corridor Study. Project Benefits: 0 60 40 80 0 00 0 Transit Time Savings Transit efficiency and reliability would be significantly improved by TPLs. Site Plan - Guadalupe Street and W Dean Keeton Street 4 4 Safety Improvements will increase pedestrian and bicycle crossing visibility. Site Plan - Guadalupe Street and UT West Mall Project Cost Approximately: $,700,000 to $,00,000. Project Implementation Approximately years. 4 4 Station Connectivity & Access Relocated stations would provide improved access and could encourage increased ridership in the area. Station Amenities Relocated stations would feature modified roof, improved lighting and additional seating. More People Carrying Capacity Potential improved transit efficiency and frequency could help move more people through the Drag at existing service levels. Station Relocation and Modification Stations consolidated to dedicated locations. Buffered and Painted Bike Lanes Reduces conflicts between transit, automobile, and bicycle traffic. 4 Painted TPLs Clear marking discourages automobile use. Crosswalk Restriping and Pedestrian Scramble Provides a signal phase for crossing pedestrians, and restriping add visibility 9

This page intentionally blank. 0

N MetroRapid Guadalupe St./Lavaca St. at MLK Jr. Blvd. Guadalupe St./Lavaca St. at MLK Jr. Blvd.: Overview Congestion at the intersection of MLK Jr. Boulevard and Guadalupe/Lavaca streets is some of the most heavy in downtown. Short-term enhancement goals are to improve transit travel times for MetroRapid, MetroExpress, and MetroLocal buses while mitigating impacts to vehicle traffic. Currently, buses traveling north on Lavaca Street must wait for a transit only signal to make a left turn. During high volume traffic periods, buses experience long delays and may miss multiple traffic signal cycles due to the lack of capacity for left turns on to MLK Jr. Boulevard. Project at a Glance Key Considerations: Clearly mark lanes for buses only. Improve overall congestion at the intersection. Enforcement of Don t Block the Box intersections. 44 60 UV 60 5 UV 74 90 8 969 Location Map Guadalupe St. Project Recommendation: The high option best satisfies the goals of improving transit travel times by routing buses from Lavaca Street on to 8th street and utilizing a contraflow lane to travel north on Guadalupe Street through the MLK Jr. Boulevard intersection. Additionally, the option improves pedestrian and bicycle safety while balancing costs. UV 7 UV 0 Martin Luther King Jr. Blvd. 5 o MetroRapid Routes W. 8th St. Guadalupe St. Lavaca St. Project Area Not to scale

Guadalupe St./Lavaca St. at MLK Jr. Blvd Guadalupe St./Lavaca St. at MLK Jr Blvd: Low The low option improves transit travel time and bus stacking issues through the intersection and enhances pedestrian and bicycle safety. Site Plan Project Benefits: 60 40 80 0 00 Transit Time Savings Improved intersection throughput. 4 0 0 Safety Improvements increase pedestrian and bicycle visibility. Project Cost Approximately: $80,000 to $80,000. 5 Project Implementation Approximately 6 months or less. Station Connectivity & Access Project does not address connectivity or access. Station Amenities Project does not address station improvements. More People Carrying Capacity Project does not increase the movement of people through the corridor Painted TPL Clear marking discourages automobile use Don t Block the Box Striping Discourages intersection obstruction. 4 Crosswalk 5 Restriping Increased safety for pedestrians Painted Bicycle Lane Painted lanes encourage bicycle lane use by adding safety. Traffic signal timing adjustment Recalibrated signal phases would optimize intersection operations.

Guadalupe St/Lavaca St at MLK Jr Blvd Guadalupe St./Lavaca St. at MLK Jr Blvd: High The high option utilizes a contraflow lane and traffic signal timing adjustments to improve transit operations. The high option is recommended for implementation. Project Benefits: Site Plan 4 5 0 60 40 80 0 00 0 Transit Time Savings Significant time savings improvements during peak-hour congestion. Safety Restriped highly visible pedestrian crossings and bicycle lanes will enhance safety for users. 6 Project Cost Approximately: $485,000 to $585,000. Project Implementation Approximately years. Station Connectivity & Access Consolidated station location improves access to multiple transit routes. Station Amenities Relocated station would feature modified roof, improved lighting and additional seating. More People Carrying Capacity Improved transit efficiency and frequency would move more people through the intersection at existing service levels. Contraflow Bus-Only Lane Bus-only lane improves transit operations through MLK Jr Blvd intersection. Traffic Signal Timing Adjustment Recalibrated signal phases would optimize intersection operations. Don t Block the Box Striping Discourages intersection obstruction. Crosswalk 4 5 6 Restriping Increased safety for pedestrians. Relocated Transit Stations Northbound MetroRapid Musuem Station and MetroLocal Station 609/7th moved to 8th Street Painted Bicycle Lane Painted lanes encourage bicycle lane use by adding safety.

Guadalupe St./Lavaca St. at MLK Jr. Blvd. Guadalupe St./Lavaca St. at MLK Jr. Blvd.: Traffic Analysis The high option would include a reroute of northbound buses onto 8th Street and the utilization of a contraflow bus-lane on Guadalupe Street traveling north to MLK Jr. Blvd. This option was compared with existing conditions based on expected traffic flow changes for both general purpose automobile and bus. The graph below shows the combined travel times through the Guadalupe St./Lavaca St. and MLK Jr. Blvd. intersections. The analysis found that the morning periods saw a % increase in the time buses would spend at the intersection. However, the afternoon bus travel time decreased approximately 90 seconds. Notably, automobile traffic analyzed in the scenario remained unchanged from existing conditions. Combined Peak Hour Travel Time - Guadalupe St./Lavaca St. at MLK jr. Blvd Minutes: Seconds :4 :09 :55 :40 :6 : 0:57 0:4 A.M - Peak P.M - Peak Combined A.M/P.M. - Peak 0:8 0:4 0:00 Existing - Auto High Option - Auto Existing - Bus High Option - Bus Existing Combined - Auto/Bus High Option Combined - Auto/Bus 4

N MetroRapid Capitol Station Capitol Station: Overview The Capitol Stations are located on Guadalupe Street and Lavaca Street between th and th Streets. The stations are within the Uptown/Capitol District of the Downtown Austin Plan and they are a short walk from the State Capitol. Short-term enhancement goals are to improve pedestrian and bicycle safety around the station and enhance station amenities. Project at a Glance Key Considerations: Improve pedestrian and bicycle safety and visibility at the busy downtown station. Protect people from the elements and improve customer experience. UV 60 5 UV 74 90 Location Map Project Recommendation: Only one option is outlined for Capitol Station. The low option satisfies the goals of improving safety for pedestrians and bicyclists and enhancing customer experience. 44 8 5 969 UV 0 UV 7 o Guadalupe St. W th St. MetroRapid Routes W th St. Lavaca St. Colorado St. W. th St. Project Area Not to scale 5

Capitol Station Capitol Station: Low The low option is the only short-term enhancement option recommended for Capitol Station. Project Benefits: 0 60 40 80 0 00 0 Transit Time Savings This project does not address transit time saving. Site Plan Safety Improvements will increase pedestrian crossing and bicycle visibility. Project Cost Approximately: $50,000 to 50,000. Project Implementation Within approximately 6 months. Station Connectivity & Access Project does not address connectivity or access. Existing MetroRapid Stations N Station Amenities Improved customer experience at stations. More People Carrying Capacity Project does not increase the movement of people through the corridor Crosswalk Restriping Increased safety for pedestrians. Station Modifications Modified shelters include a new roof, improved lighting and additional seating. See page 5. Bike Box Painting Allows bicyclists safer turning movements through intersections by skipping automobile queue. 6

N MetroRapid Austin History Center Austin History Center: Overview Located on Guadalupe Street and Lavaca Street between at 8th Street, the stations are centrally located in downtown and serve numerous cultural, performing arts and public park destinations. Short-term enhancement goals include improving pedestrian and bicycle connections and enhancing station amenities. Project at a Glance Key Considerations: Improve pedestrian and bicycle safety and visibility at the busy downtown station. Protect people from the elements and improve customer experience. 60 UV 60 5 UV 74 90 Location Map W. 0th St. Project Recommendation: Only one option is outlined for the Austin History Center Stations. The low option satisfies the goals of improving safety for pedestrians and bicyclists and enhancing customer experience. 44 8 969 W 9th St. UV 0 5 UV 7 o MetroRapid Routes Guadalupe St. W 8th St. Lavaca St. Colorado St. Project Area Not to scale 7

Austin History Center Austin History Center: Low The low option is the only short-term enhancement option recommended for the Austin History Center Station. Site Plan Project Benefits: 60 40 80 0 00 0 0 Transit Time Savings Project does not address transit time savings. Safety Improvements will increase pedestrian crossing and bicycle visibility. Project Cost Approximately: $50,000 to $50,000. Project Implementation Within approximately 6 months. N Station Connectivity & Access Project does not address connectivity or access. Station Amenities Improved customer experience at stations. Crosswalk Station Restriping Increased safety for pedestrians. Modifications Modified shelters include a new roof, improved lighting and additional seating. See page 5. Bike Box Painting Allows bicyclists safer turning movements through intersection by skipping automobile queue 8 More People Carrying Capacity Project does not increase the movement of people through the corridor

Guadalupe Street and Lavaca Street Guadalupe Street and Lavaca Street: Overview During peak travel hours, the downtown corridors experience heavy congestion, delaying transit and frustrating riders. Short-term enhancement goals are to improve transit speed and reliability through downtown Austin by completing the transit priority lane (TPL) network and activating existing transit signal priority (TSP) technology at key intersections. Currently, Guadalupe Street and Lavaca Street have TPLs from rd Street to MLK Jr. Boulevard allowing them to bypass traffic. UV 60 5 UV 74 90 Location Map However, when operating in mixed-traffic on the south side of downtown, the buses become delayed. MetroRapid buses and downtown traffic signals are equipped with TSP, but are currently not granted access to extend traffic signal phases in downtown. Additionally, bicycle lanes on Guadalupe street should connect from north of rd street to Cesar Chavez Street. Martin Luther King Jr. Blvd. Project at a Glance Key Considerations: Complete TPL network Allow TSP activation when necessary at key intersections on both Lavaca Street and Guadalupe Street. Connect bicycle lanes to existing network. Project Recommendation: The high project best satisfies the goals of improving transit travel times and reliability. The high project also more adequately improves safety for bicyclists in downtown. 44 8 969 W. 5th St. 5 UV 0 UV 7 o MetroRapid Routes Guadalupe St. Lavaca St. W. th St. W. th St. W. 9th St. W. 7th St. W. 5th St. W. Cesar Chavez St. W. rd St. Project Area N Not to scale 9

Guadalupe Street and Lavaca Street Guadalupe Street and Lavaca Street: Low The low option meets overall project goals to improve transit travel times and reliability by extending TPLs to Cesar Chavez. Site Plan Project Benefits: 0 60 40 80 0 00 0 Transit Time Savings Significantly improved transit travel times, frequency and reliability. Safety Improvements will increase bicycle lane visibility. Project Cost Approximately:$40,000 to $40,000. Project Implementation Within approximately 6 months. Station Connectivity & Access Project does not address connectivity or access. Station Amenities Project does not address station improvements. More People Carrying Capacity Improved transit efficiency and frequency would move more people through the intersection at existing service levels. Extend Shared Bike TPL Lanes Completes a continuous dedicated lane network through downtown. Restriping shared bike lane markings improve bicyclist visibility. Transit Signal Priority Activation Coordination with the City of Austin to allow MetroRapid TSP through downtown. 0

Guadalupe Street and Lavaca Street Guadalupe Street and Lavaca Street: High The high option meets overall project goals to improve transit travel times, reliability and improving safety. The high option is recommended for implementation. Project Benefits: 0 60 40 80 0 00 0 Transit Time Savings Significantly improved transit travel times, frequency and reliability. Site Plan Safety Highly visible bicycle facilities increase awareness and safety. Project Cost Approximately: $60,000 to $60,000. Project Implementation Within approximately years. Station Connectivity & Access Project does not address connectivity or access. 4 Station Amenities Project does not address station improvements. More People Carrying Capacity Improved transit efficiency and frequency would move more people through the intersection at existing service levels. Extended and Painted TPLs Completes a continuous dedicated lane network through downtown. Bike Lane Painted 4 Relocation Improves safety by moving to a street with generally less vehicle traffic. Bicycle Lane Painted lanes encourage bicycle lane use by adding safety. TSP Activation Coordination with the City of Austin to allow MetroRapid TSP through downtown.

This page intentionally blank.

N MetroRapid South st Street Bridge South st Street Bridge: Overview The South st Street Bridge is of main north-south river crossings for downtown Austin. The bridge is important to general traffic as well as Capital Metro s MetroRapid, MetroLocal and MetroExpress buses. During peak hours the bridge, Cesar Chavez Street and Riverside Drive intersections experience heavy congestion. Northbound automobiles are delayed in the morning and southbound in the evening rush hours. Buses experience UV 60 5 UV 74 90 Location Map the same delays until they reach existing transit priority lanes (TPLs) north of rd street. Short-term enhancement goals are to improve transit travel times and reliability over the South st Street Bridge without heavily impacting travel times of passenger vehicles. W. Cesar Chavez St. Project at a Glance Key Considerations: Install TPLs on the South st Street bridge. Explore installing a reversible lane on the bridge to add capacity during peak periods. Improve bicycle safety on the bridge. Project Recommendation: The high project best satisfies the goals of improving transit travel times and reliability. The high project also more adequately improves safety for bicyclists. 44 8 969 Riverside Dr. UV 0 UV 7 5 o MetroRapid Routes S. st St. Barton Springs Rd. Project Area Not to scale

South st Street Bridge South st Street Bridge: Low The low option improves bicycle safety, but marginally improves transit operations. Site Plan - North Site Plan - South Project Benefits: 0 60 40 80 0 00 0 Transit Time Savings Potential transit time savings, however existing conditions are mostly unchanged. Safety Improvements will increase bicycle safety crossing the bridge. Project Cost Approximately: $0,000 to $0,000. Project Implementation Within approximately year. Station Connectivity & Access Project does not address connectivity or access. Station Amenities: Project does not address station improvements. More People Carrying Capacity Project does not increase the movement of people through the corridor Painted Bike Lanes Painted lanes encourage bicycle lane use by adding safety. TSP Activation Coordination with the City of Austin to allow MetroRapid TSP through downtown. 4

South st Street Bridge South st Street Bridge: High The high option focuses on maximizing available space available on the bridge and improving transit travel times and reliability. The high option is recommended for implementation. Project Benefits: 0 60 40 80 0 00 0 Transit Time Savings Significant time savings improvements during peak-hour congestion. Safety Improvements will significantly increase bicycle safety crossing the bridge. Site Plan- North Site Plan - South Project Cost Approximately: $970,000 to $,70,000. Project Implementation Approximately years. 4 Station Connectivity & Access Project does not address connectivity or access. Station Amenities Project does not address station improvements. More People Carrying Capacity Improved transit efficiency and frequency would move more people over the bridge at existing service levels. Painted TPLs Allows transit vehicles to bypass congestion on the bridge and move more people. Bike Lanes Moved Off-Street Dedicated lanes add safety. 4 Peak-Hour Reversible General Purpose Lane A center running, peak-hour, reversible lane for automobiles would be implemented to mitigate vehicle congestion. The lane would move people north into downtown in A.M. hours and south during the peak P.M. hours. Transit Queue Jump Allows buses their own signal phase to turn left at Riverside Dr. 5

South st Street Bridge South st Street Bridge: Traffic Analysis The high option is expected to decrease transit travel times by over minutes and 0 seconds. The peak-hour reversible general purpose lane would largely mitigate the effects of adding TPLs to the sides of the bridge. Automobile traffic crossing the bridge would experience minimal travel time increases. Minutes: Seconds South st Street Bridge Travel Time 6:00 4:48 :6 A.M P.M :4 Combined A.M/P.M. : 0:00 Existing - Auto High Option - Auto Existing - Bus High Option - Bus Existing Combined - Auto/Bus High Option Combined - Auto/Bus 6

Chinatown Station Chinatown Station: Overview The Chinatown Station serves the MetroRapid 80 bus route and is located at North Lamar Boulevard and Kramer Lane. Short-term enhancement goals include addressing pedestrian and bicycle safety deficiencies near the north and southbound stations and to improve transit connectivity. 44 UV 60 5 UV 74 8 90 969 UV 0 Location Map The Chinatown Station is located within the project boundaries of the North Lamar Corridor Improvement Project. The plan recommends pedestrian safety improvements and station relocation. Short-term enhancements would be implemented in accordance with the adopted North Lamar Corridor Improvement Project. W Braker Ln. N. Lamar Blvd. Project at a Glance Key Considerations: Lamar Corridor at Chinatown Station is 4 lanes wide and dangerous for pedestrians to cross. Potential station relocation would connect MetroRapid to MetroLocal Bus routes stop at Braker Lane. Station modifications would better protect transit users from weather. Sidewalk and other corridor improvements would be implemented in accordance with the North Lamar Corridor Improvement Project. Project Recommendation: The low project best satisfy the goals of improving pedestrian and bicycle safety near the MetroRapid Chinatown Stations while balancing potential costs and overall benefits. UV 7 5 o MetroRapid Routes Kramer Ln. Project Area N Not to scale 7

Chinatown Station Chinatown Station: Low The low option improves access and safety for pedestrians and bicyclists and enhances station amenities. The low option is recommended for implementation. Site Plan Project Benefits: 60 40 80 0 00 0 0 Transit Time Savings Project does not significantly improve transit travel times. Safety Increased safety for pedestrians. Project Cost Approximately: $60,000 to $460,000. Some project costs may overlap with North Lamar Investment Corridor Project. Project Implementation Less than year. Station Modifications Modified shelters include a new roof, improved lighting and additional seating. See page 5. Pedestrian Hybrid Beacon Provides a signalized crossing phase for pedestrians MetroRapid Stations N Station Connectivity & Access Adding sidewalks improve station access. Station Amenities Improved customer experience at stations. Sidewalk Improvements Sidewalks on the east side of North Lamar would meet pedestrian accessibility standards and provide safe paths to transit stations Proposed 8 More People Carrying Capacity Project does not increase the movement of people through the corridor

Chinatown Station Chinatown Station: High The high option improves connectivity between MetroRapid and Local bus service, improves bicycle connections and pedestrian safety.. Site Plan Project Benefits: 60 40 80 0 00 0 0 Transit Time Savings Project does not significantly improve transit travel times. Safety Removes existing mid-block station and adds highly visible safety enhancements. 4 Project Cost Approximately: $,000,000 to $,00,000. Some project costs may overlap with North Lamar Investment Corridor Project. Project Implementation Within approximately years. Station Connectivity & Access Station relocation enables convenient transfers to local routes. Also, adding sidewalks improve station access. Station Amenities Improved customer experience at stations. Station Relocation and Modification Relocation of stations provides better connectivity to local bus routes 9 and 75. See page 5. 4 Bike Box Painting Allows bicyclists safer turning movements through intersection by skipping automobile queue N Sidewalk Improvements Sidewalks on the east side of North Lamar would meet pedestrian accessibility standards and provide safe paths to transit stations. Crosswalk Restriping Increased safety for pedestrians. More People Carrying Capacity Project does not increase the movement of people through the corridor 9

This page intentionally blank. 0

N MetroRapid Crestview Intersection Crestview Intersection: Overview The Crestview MetroRapid Stations are located at the intersection of two major arterials North Lamar Boulevard and Airport Boulevard. Additionally, MetroRail and freight rail track crosses Lamar Boulevard parallel to Airport Boulevard at-grade. The complex intersection experiences regular vehicle congestion throughout the day and especially at peak times. Short-term enhancement goals are to improve transit and traffic flows in the Crestview Station area and improve pedestrian safety. Capital Metro is currently studying multiple railroad and vehicle grade separation solutions at the Crestview intersection area that include: rail-over-road or rail-under-road projects. Project at a Glance Key Considerations: Key pedestrian safety improvements. Potential grade separation of MetroRail and freight rail from auto traffic. Adjustments to rail signal timing and gates. Optimize intersection efficiency 44 UV 60 5 UV 74 90 8 969 Location Map N. Lamar Blvd. W. St. Johns Ave. Project Recommendation: At this time, the low project best satisfies the goals of improving transit travel times and improving pedestrian safety at the Crestview Station intersection. Capital Metro will continue to explore grade separated solutions should funding become available. UV 0 5 UV 7 o Justin Ln. MetroRapid Routes Airport Blvd. Project Area Not to scale

Crestview Intersection Crestview Intersection: Low The low option addresses the need for more efficient traffic throughputs and providing increased safety for pedestrians. The low option is recommended for implementation. Site Plan Project Benefits: 0 60 40 80 0 00 0 Transit Time Savings Adjustments to traffic and rail signals would improve intersection efficiency. Safety Pedestrian islands provide increased safety when crossing the roadways or to the transit station. Project Cost Approximately: $6,900,000 to $7,400,000. Project Implementation Approximately 6 months. N Station Connectivity & Access Improved access through pedestrian safety enhancements. Station Amenities Project does not address station improvements. Rail Signal Timing/ Gate Control Railroad signals and gates would be reconfigured to properly raise and lower for commuter rail trains. Existing gates operate in a manner consistent with freight rail operations and remain down for an extended amount of time causing traffic delays. Pedestrian Safety Pedestrian islands provide increased safety when crossing roadways or to the transit station. More People Carrying Capacity Project does not increase the movement of people through the corridor Traffic Signal Timing Adjustments Recalibrated signal phases would optimize intersection operations.

Crestview Intersection Crestview Intersection: High The high option recommends below-grade (roadover-rail) separation of vehicle and railroad traffic to significantly improve traffic flow. Additionally, pedestrian safety enhancements are recommended. Site Plan Project Benefits: 0 60 40 80 0 00 0 Transit Time Savings Significant time savings improvements from intersection reconfiguration. Safety Pedestrian islands provide increased safety when crossing the roadways or to the transit station. 4 4 Project Cost Approximately: $50,000,000 to $60,000,000. Project Implementation Approximately 5 years or more. N Station Connectivity & Access Improved access through pedestrian safety enhancements. Station Amenities Project does not address station improvements. More People Carrying Capacity Project does not increase the movement of people through the corridor Pedestrian Grade Separation Reconfiguration of the intersection reduces conflict between automobiles, transit, bicyclists and pedestrians. 4 Additional Traffic Signals New signals to facilitate traffic crossing. Safety Pedestrian islands provide increased safety when crossing roadways or to the transit station. Traffic Signal Timing Adjustments Recalibrated signal phases would optimize intersection operations.

Additional Information Want to learn more? Go to www.projectconnect.com to read more about the work we re doing through Project Connect. Tell us what you think, take the Phase Survey! https://www.capmetroengage.org/en/provide-input Additional Project Connect briefing books: High Capacity Transit 0 briefing book Investments program briefing book and project flip books Enhancement program briefing book and project flip books Project Connect Funding and Financing briefing book

Led by Capital Metro with support from the City of Austin. Prepared by AECOM, Nelson\Nygaard Consulting Associates, and Alliance Transportation Group with support from Bronner Group and Robin O Connell Design