FORGE Energy UL 21 Freedom 1 API Number: 42-371-39061 07/13/2013 RU E&P WL Open well RIH correlate GR log to get on depth. Run BL found cement to surface. Tag 7566' PBTD. RU Rising Star test lines to 5000 psi test casing to 4650 psi for 3 min. RIH with pref gun (2 holes per foot - 4') shoot hole in casing POOH with gun. RIH with GBB spot acid top of perf. POOH RD E&P wire line.pump 7 BBLs in to get brake down 4682 #. Pump water to get rate 5.5 bpm. max 4700 psi pump 60 BBLs total water ISIP 3252 psi. 5 min 2169 15 min 1947 30 min 1767 45 min 1606 60 min 1529 07/16/2013 Set up to frac 07/17/2013 Set 1 gas buster open top tanks, 4 light towers, 4 anchors, 1 trash trailer, 2 portable restrooms. 07/18/2013 Remove DFIT recorder, shoot holes in casing, RU frac tanks put fresh water in tanks. 07/19/2013 Rising Star frac R/U, test lines, comp went out. 07/20/2013 Frac 3 stages from 7283' to 7198, 7135' to 7055', 7021' to 6953'. Used feet of water from frac pond. 07/21/2013 Rig up sand trap and MIRU coil tubing. 07/22/2013 RU coil tubing, drill out CBPs, TIH to PBTD. POOH with coil tubing RDMO. Start flowing well to flow back tanks. 07/23/2013 Flow well, set pumping unit, hook up knock out. 05:00 Casing 1175 psi, H2O 65 BBLs /
hour, total H2O 1834 BBLs, TR of oil, 9.43 % Fluid recovered. 07/24/2013 RU knock out to flow line. Flow well to frac tanks. Choke 18/64,casing 850 psi,h2o 53 BBLs per hour, Oil 5 BBLs per hour, Chloride 55,000, flaring gas, no sand, 07/25/2013 Flowing well to knock out CL are running around 50,000 to 60,000. We where trying to get 70 BBLs per hour through knock out but we started have a lot of water carry over with the oil, so I made the call to slow the rate down to 65 BBLs per hour. 06:00 psi 800, H2O 52 BBLs per hour, gas 7.3, choke 17/64, oil 5 BBLs per hour. 22.67 % Fluid recovered, total 4407 BBLs 07/26/2013 Flowing well to knock out. Started to have a lot of water carry over with the oil. Slowed the rate down to 50 BBLs per hour. AT 0600 HRS: 19/64 choke, 775 psi casing pressure, 60,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 1,062 bbl water, 70 bbl oil, 397 mcf gas. CUMULATIVE: Recovered 5,469 bbl water, 182 bbl oil, 946 mcf gas. LOAD: Recovered 28% of 19,442 bbl total load to recover. 07/27/2013 AT 0600 HRS: 20/64 choke, 675 psi casing pressure, 65,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 824 bbl water, 94 bbl oil, 479 mcf gas. LOAD RECOVERY: Recovered 6,293 bbl of 19,442 bbl total load to recover (32.4%). 07/28/2013 AT 0600 HRS: 20/64 choke, 550 psi casing pressure, 70,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 852 bbl water, 106 bbl oil, 560 mcf gas. LOAD RECOVERY: Recovered 7,527 bbl of 19,442 bbl total load to recover (36.8%). 07/29/2013 AT 0600 HRS: 20/64 choke, 550 psi casing pressure, 78,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 624 bbl water, 79 bbl oil, 456 mcf gas. LOAD RECOVERY: Recovered 7,767 bbl of 19,442 bbl total load to recover (39.45%). 07/30/2013 AT 0600 HRS: 22/64 choke, 495 psi casing pressure, 83,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 564 bbl water, 71 bbl oil, 487 mcf gas. LOAD RECOVERY: Recovered 8,323 bbl of 19,442 bbl total load to recover (42.8%). 07/31/2013 AT 0600 HRS: 25/64 choke, 350 psi casing pressure, 85,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 600 bbl water, 112 bbl oil, 462 mcf gas.
LOAD RECOVERY: Recovered 8,899 bbl of 19,442 bbl total load to recover (45.77%). 08/01/2013 AT 0600 HRS: 25/64 choke, 350 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 474 bbl water, 96 bbl oil, 496 mcf gas. LOAD RECOVERY: Recovered 9457 bbl of 19,442 bbl total load to recover (47.97%). 08/02/2013 AT 0600 HRS: 25/64 choke, 250 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 449 bbl water, 94 bbl oil, 403 mcf gas. LOAD RECOVERY: Recovered 9906 bbl of 19,442 bbl total load to recover (50.95%). 08/03/2013 AT 0600 HRS: 27/64 choke, 200 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 438 bbl water, 99 bbl oil, 459 mcf gas. LOAD RECOVERY: Recovered 10334 bbl of 19,442 bbl total load to recover (53.2%). Sold 2 loads of oil. 08/04/2013 AT 0600 HRS: 27/64 choke, 150 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 390 bbl water, 74 bbl oil, 391 mcf gas. LOAD RECOVERY: Recovered 10736 bbl of 19,442 bbl total load to recover (55.22%). 08/05/2013 AT 0600 HRS: Open through gut line, 100 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 230 bbl water, 54 bbl oil, 294 mcf gas. LOAD RECOVERY: Recovered 10966 bbl of 19,442 bbl total load to recover (56.4%). 08/06/2013 AT 0600 HRS: Open through gut line, 50 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 59 bbl water, 24 bbl oil, 251 mcf gas. LOAD RECOVERY: Recovered 11007 bbl of 19,442 bbl total load to recover (56.6%). 08/07/2013 Set WLTRBP did not hold bleed well off flaring gas. AT 0600 HRS: Open through gut line, 35 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 40 bbl water, 12 bbl oil, 91 mcf gas. LOAD RECOVERY: Recovered 11047 bbl of 19,442 bbl total load to recover (56.82%). 08/08/2013 AT 0600 HRS: Open through gut line, 20 psi casing pressure, 87,000 ppm chlorides. PREVIOUS 24 HRS: Recovered 0 bbl water, 5 bbl oil, 48 mcf gas. LOAD RECOVERY: Recovered 11047 bbl of 19,442 bbl total load to recover (56.82%). 08/09/2013
AT 0600 HRS: Shut in. PREVIOUS 24 HRS: Recovered 0 bbl water, 0 bbl oil, 38 mcf gas. LOAD RECOVERY: Recovered 11047 bbl of 19,442 bbl total load to recover (56.82%). 08/10/2013 Pull 2 WLTRBP, run production tubing 08/11/2013 Run rods, build flow line 08/28/2013 MIRU WSU, Kill well, unseat pump & POOH w/ polish rod, 154-3/4, 103-7/8, 8-K bar & pump. NDWH, NUBOP, RIH w/ 19 jts lowering string already in hole. TAC @6796, SN @7316, Cavins @ 7320, BP @ 7432.29, NDBOP, attempted to set TAC without success. SDFD 08/29/2013 RU swabbing equip, made 13 runs taking samples & recording fluid level each time. A swab cup broke on the last run and their was no extras on rig. Dropped two soap sticks down tbg & SIFD 08/30/2013 RIH w/ rods and then POOH w/ rods laying down 08/31/2013 POOH W/ tbg. RU wireline and set bridgeplug at 6907' then RIH w/ open ended tbg. Pressure test plug, circulated hole w/ 150 bbls fresh water and biocide then spotted acetic acid. POOH laying down tbg. SIFD 09/01/2013 Finish laying down the tbg in the derrick, RDBOP and assist in setting frac head. RDMO WSU. 09/04/2013 RIG UP SCHLUMBERGER WIRELINE AND SHOOT 40 PERFS 6866' BACK TO 6776',RIG DOWN WIRELINE,RIG UP RISING STAR PUMP TRUCK,PRESSURE TEST LINES BREAK DOWN FORMATION @ 2300',INCREASE RATE TO 4.9 BBLS AMD PUMP 50 BBLS ACID IN PERFS, ISIP 2560#,5 MINUTES 2283#,10 MINUTES 2174#, 15 MINUTES 2106#,SHUT WELL IN FOR NIGHT, RIG UP FRAC CREW FOR FRAC JOB, HAUL WATER TO FILL FRAC TANKS FOR JOB,RIG UP FLOWBACK CREW,AND WATER PUMPING PUMP FOR FRAC TANKS, 09/05/2013 UNLOAD SAND TO BINS IN ORDER TO START FRAC JOB,PUMP 1ST STAGE,SCREEN OFF ON
TAIL IN OF JOB,FLOW BACK WELL TO FLOWBACK TANKS TO CLEAN WELLBORE,RUN WIRELINE GAUGE RING,SPOT ACID,RIG UP AND SET PLUG @ 6759', SHOOT 40 PERFS FROM 6742' BACK TO 6642',SHUT WELL IN FOR NIGHT 09/06/2013 Stage 2,3 and 4 were pumped successfully today. All sand was pumped as designed with some changes to the gel fluid schedule which improved sand placement. Job complete at 17:45 hours. RDMO equipment and prepare for drill out and flowback. Pumped 22,882 bbls. total. 09/07/2013 Move open top gas buster frac tank from Voyage location and setup on location for drill out. 09/08/2013 MIRUCT drill out 3 plugs, RU flow back flow well. 06:00 1450 psi, 366 BBLs 09/09/2013 AT 0600 HRS: 19/64 choke, 1050 psi casing pressure. PREVIOUS 24 HRS: Recovered 1815 bbl water, 0 bbl oil,. Chlorides 27,000 ppm. LOAD RECOVERY: Recovered 2181 bbl of 22,882 bbl total load to recover (09.53%). 09/10/2013 AT 0600 HRS: 19/64 choke, 750 psi casing pressure. PREVIOUS 24 HRS: Recovered 1708 bbl water, 0 bbl oil, no gas. Chlorides 27,000 ppm. LOAD RECOVERY: Recovered 3890 bbl of 22,882 bbl total load to recover (17.0%). 09/11/2013 AT 0600 HRS: 26/64 choke, 150 psi casing pressure. PREVIOUS 24 HRS: Recovered 1559 bbl water, 0 bbl oil, no gas. Chlorides 52,000 ppm. LOAD RECOVERY: Recovered 5449 bbl of 22,882 bbl total load to recover (23.81%). 09/12/2013 AT 0600 HRS: Open to gut line, 5 psi casing pressure. PREVIOUS 24 HRS: Recovered 659 bbl water, 5 bbl oil, no readable gas. Chlorides 52,000 ppm. LOAD RECOVERY: Recovered 6108 bbl of 22,882 bbl total load to recover (26.69%). 09/13/2013 Rig down flow back. 09/17/2013 MIRU WSU, unable to kill well due to high csg pressure. RU flow back and open well to frac tanks, well has flowed 250 bbls so far and has a rate of 25 bbls/hr now. SDFD 09/18/2013
Arrived on location, well had 3-5 psi & still flowing a small amt. RU pump truck and pump 100bbls brine, well had ~275psi after pumping, Open well back to frac tanks. Let well bleed back down and pump 114 bbls of KCL before shutting down, well stabilized at 400 psi. Open well back to tanks to flow overnight. FB crew is on location. 09/19/2013 Arrived at location, well flowed 200 bbls of water overnight, there was very little pressure on well but still flowing(6 bbl/hr), RU wireline and pressure test lubricator, RIH with gauge ring making a dummy run. POOH and LD gauge ring, PU bridgeplug, RIH and set at 6300'. POOH and RD wireline, opened well to frac tanks(dead well) ND frac head, NU BOP. RU pump truck and pressure test casing to 2000 psi. for 15 min.(tested good), RD pump truck, SDFD