R I T. Title: Amray 1830 SEM Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 09/29/03 1 SCOPE 2 REFERENCE DOCUMENTS

Similar documents
5.1.3 Mechanical Hazards Drive assemblies have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts.

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

LEO SEM SOP Page 1 of 9 Revision 1.4 LEO 440 SEM SOP. Leica Leo Stereoscan 440i

LEO 1525 FEG SEM Standard Operating Procedures Mar. 6, 2012 For additional assistance, please contact the facility manager.

Issue: H Title: CHA E-Beam Evaporator Page 1 of 7. Table of Contents

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

Operating Procedures for Metal Evaporator I

Approved by Principal Investigator Date: Approved by Super User: Date:

Scanning Electron Microscope JEOL JSM F

SEM LEO 1550 MANUAL. I. Introduction. Generality

TYPICAL OPERATION PROCEDURES

Login to ilab Kiosk. Revised 05/22/2018. Load your sample:

Standard Operating Manual

Warnings: Notes: Revised: October 5, 2015

[needs to be discussed with faculty if any new material to be done]

KARL SUSS MJB3 MASK ALIGNER STANDARD OPERATING PROCEDURE

Approved by Principal Investigator Date: Approved by Super User: Date:

BASIC Z-STACK AND TIME SERIES SCAN ON THE ZEISS LIGHTSHEET Z. 1

SPUTTER STATION STANDARD OPERATING PROCEDURE

Oerlikon Sputtering Evaporator SOP

Cryo-Evaporator Operation

Standard Operating Manual

SOP for Karl Suss MJB3 #1 Mask Aligner

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

5890II GC Standard Operating Procedure 9/2/2005

Approved by BNC Managing Director Paul Lum Date: Approved by PI (s) /Super User (s): _Peter Hosemann/Andy Minor_Date:

LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY)

1)! DO NOT PROCEED BEYOND THIS MARK

Standard Operating Procedure. For. PVD E-Beam

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel

Mass Spec will not Autotune

1.1 Equipment: substrate, wafer tweezers, metal targets 1.2 Personal Protective Equipment: nitrile gloves, safety glasses 1.

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

Standard Operating Manual

Plasma Asher: March PX-500 User guide (May-30, 2017)

Angstrom E-Beam Instructions. PROCESS CHECKS: the tooling factors of each metal; Ti/Au layer for wire bonding pull test.

OXFORD PLASMALAB 80PLUS (CLOEY)

Approved by Principal Investigator Date: Approved by Super User: Date:

Nanofabrication Facility: ECR Etcher SOP Rev. 01b, March 06. Standard Operating Procedure for PlasmaQuest ECR II Etching

r β tr t t s t r s t s tr tt r t r t r r r tt r e s tt e tt r e s tt r e r r e r 2 t ö t t r s s t t r r r ts r rr t

OPERATION OF THE DIMPLER

OPERATION MANUAL NTF-60 Plus

OPERATION MANUAL NTF-15

DART-Bruker Vapur Interface Manual SI-410-A-R Rev 1-3

Arizona State University NanoFab XACTIX ETCHER. Rev A

The SPI Sputter Coater Handbook

THERMAL EVAPORATION UNIT (for Al evaporation)

Nordiko Metal Sputtering System Standard Operating Procedure

RADIATION PROCEDURES MANUAL Procedure Cover Sheet

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

University of MN, Minnesota Nano Center Standard Operating Procedure

Standard Operating Manual

Warnings: Notes: Revised: January 8,

Arizona State University Center for Solid State Electronic Research. Table of Contents. Issue: C Title: Oxford Plasmalab 80plus (Floey) Page 1 of 8

Usage Policies Notebook for NanoFurnace Furnace (EasyTube 3000 System)

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

David Cockayne Centre for Electron Microscopy.

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1

Thermo K-Alpha XPS Standard Operating Procedure

The Broadest Gauging Line in the Industry

COBILT CA-800 Mask Aligner Equipment Operation

Angstrom Dielectric Sputterer Operation Manual

Unaxis ICP/RIE SOP Revision 8 09/30/16 Page 1 of 5. NRF Unaxis ICP/RIE Etch SOP

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

Karl Suss MA6 Mask Aligner SOP

OAI Model 200 Tabletop Mask Aligner Portland State University

BEST KNOWN METHODS. Transpector XPR3 Gas Analysis System. 1 of 6 DESCRIPTION XPR3 APPLICATIONS PHYSICAL INSTALLATION

March Asher Operation

TECHNICAL MANUAL CALIBRATION PROCEDURE FOR PRESSURE GAUGE. This publication replaces T.O. 33K dated 30 January 2012.

Product Information News

ATL R/V Atlantis AUXILIARY PLANT OPERATION APPENDIX OPERATING PROCEDURES

Chapter 2 General description of the system

SPI Supplies Plasma Prep III Process Controller Operation Manual

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH PNEUMATIC RELEASE

Equipment Operating Procedure Glove Box

Standard Operating Manual

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

Standard Operating Manual

G SPECIFICATION: TITLE: VOLUME: 4 REVISIONS:

NTF-230 OPERATION MANUAL

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

Universal Valve Company Inc

WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, PHONE #: (970) FAX #: (970) TO-Clean Manual

Operating Procedures for the. SAMCO ICP RIE System

User guide for operating the Agilent 6420A QqQ mass spectrometer by direct infusion/injection

Standard Operating Manual

Xactix XeF2 OPERATION MANUAL

WIKA INSTRUMENT CORPORATION

Revised: June 7, 2017

LOW PRESSURE VOLTAGE BREAKDOWN TEST PROCEDURE FOR GSS FSU FLIGHT SPARE HVA BOARD October 28, P0938 Rev

Agilent ICP-MS Interactive Troubleshooting tool for Low sensitivity

Installation Instructions for NP100 Series Nitrogen Control Panels

Edge Isolation Tool. Standard Operating Procedure. Version 1.1. Date: Prepared by, Sandeep S S. Department of Electrical Engineering

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

Burner Management System DEMO Operating instructions

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

Transcription:

Fabrication Laboratory Revision: A Rev Date: 09/29/03 Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the Amray 1830 SEM. All users are expected to have read and understood this document. It is not a substitute for in-person training on the system and is not sufficient to qualify a user on the system. Failure to follow guidelines in this document may result in loss of privileges. 2 REFERENCE DOCUMENTS o Material Safety Data Sheets for colloidal graphite and silver paint. o Appropriate Tool Manuals 3 DEFINITIONS 3.1 LaB6 Filament used in SEM 4 TOOLS AND MATERIALS 4.1 General Description 4.1.1 The AMRAY 1830 SEM will accommodate wafer pieces as well as whole wafers. Image capture is done with PC on tool, through the use of the Snappy program. 5 SAFETY PRECAUTIONS 5.1 Personal Safety Hazards 5.1.1 Radiation-This equipment can produce low levels of radiation. Do not operate tool if any covers are not in place. 5.1.2 High Voltage-The SEM employs voltages that are dangerous and may be fatal to personnel. Do not attempt to defeat the protective interlock systems. 5.1.3 Mechanical Hazards-Drive assemblies in the chamber have sufficient power to cause injury. Keep hands, fingers, clothing and tools clear of moving parts. 5.2 Hazards to the Tool RIT SMFL Page 1 of 8

5.2.1 Use caution when handling samples in the chamber. If a sample drops into the chamber, there is no way to get it out and it will seize-up the positioning motors. 5.2.2 Do not load a sample too high on the mounting apparatus. If the sample is too high, it may damage the final aperture when focusing. 5.2.3 When using out-gassing materials such as photo resist, use a lower KV setting. No highly out-gassing materials such as adhesives are allowed in the chamber. They will contaminate the column and damage the tool. 5.2.4 Do not open V1 until the system has reached the proper vacuum level. 5.2.5 Always close V1 before turning off the console and never leave V1 open when the tool is unattended. 6 INSTRUCTIONS 6.1 Initial State Check 6.1.1 Verify that compressed air is preset at 60 psi (regulator is located behind instrument - no adjustment normally needed). 6.1.2 In Service Chase 2725, turn on the nitrogen. The switch is labeled Surface Analysis 2810. 6.1.3 Verify that vent nitrogen is preset at 2 psi (regulator is located behind the instrument - no adjustment normally needed). 6.1.4 Ensure valve V1 is closed, located on the left side of column. This is done by, (a)- pressing down on the metal tab and (b)-pushing in on the valve towards the column. (a) (b) RIT SMFL Page 2 of 8

6.1.5 Verify ION pump is on, light is illuminated above [ION PUMP] button. Establish pump is operating correctly by looking at the display on the chamber column gauge and indicator lights. Ensure that the light that is illuminated for the Ion Pump is either the 2mA or 200µA. (Panel 9) 6.1.6 If the 2mA light is illuminated the meter should indicate between the two red lines shown below. (Panel 9) 6.1.7 If the 200µA light is illuminated the meter should indicate between the two red lines shown below. (Panel 9) 6.1.8 If none of the lights are illuminated then press the [METER SELECT] button until lights illuminate. 6.1.9 If the Ion Pump does not indicate within either of these parameters, get the technician. (Panel 9) RIT SMFL Page 3 of 8

V1 Monitor Vacuum Control Joystick Controller Electronics Console 6.2 Operating the system 6.2.1 Sample Loading 6.2.1.1 On the column verify that the V1 valve is closed. It should be pushed in. 6.2.1.2 Verify that the V1 indicator light is flashing on the display below the column. (Panel 9) 6.2.1.3Press the Vent button on the panel below the column. (Panel 9) 6.2.1.4 If rough pump does not shut off when [VENT] is depressed, get technician ***********************CAUTION*********************** RIT SMFL Page 4 of 8

Do not push [METER SELECT] button Unless GREEN READY light is illuminated ******************************************************** 6.2.1.5 Press REF on the Stage Motor Controller to center the stage before opening the door. (Panel 10) 6.2.1.6 SLOWLY open Chamber Door ***********************CAUTION*********************** Be careful when opening chamber door. Door swings on two sets of hinges. ******************************************************** 6.2.1.6 Insert sample and secure with set-screw and close door. 6.2.1.7 Press Evacuate to pump out the chamber. (Panel 9) 6.2.1.7 Watch vacuum meter for needle deflection to the right. Once needle is all the way to the right depress [METER SELECT] button until CCG light illuminates and wait for the pressure to go below 8E-7 on the top scale, then open the V1 valve by pulling it out. (Panel 9) 6.2.2 Preliminary Settings 6.2.2.1 Press the [POWER ON] button on electronics console. (Panel 1) 6.2.2.2 Press the [ 10] button on the Magnification panel to 25X (Panel 7) 6.2.2.3 Select CRT on SEM keyboard. (Panel 11) 6.2.2.4 Select AUTO on SEM keyboard. (Panel 11) 6.2.2.5 Select ALT then 1 on SEM keyboard. (Panel 11) 6.2.2.6 Adjust STIGMATOR KNOBS to the 12 o clock position. (Panel 6) 6.2.2.7 Adjust IMAGE SHIFT KNOBS to the 12 o clock position. (Panel 8) 6.2.2.8 Adjust BEAM ALIGNMENT KNOBS to the 12 o clock position (Panel 3) 6.2.2.9 Ensure BIAS is at 2 and HEAT is at 8. (Panel 3) 6.2.3 Obtaining and Image 6.2.3.1 Press the [ ] button on the console until the desired Acceleration Potential is achieved. (Panel 3) 6.2.3.2 Press the AUTO HEAT button and watch for the red light between the HEAT and BIAS knobs to go out and the green emission current lights to RIT SMFL Page 5 of 8

illuminate. Emission should be approximately @10KV(50mA), @20KV(100uA), and @30KV(150uA). (Panel 3) 6.2.3.3 Adjust BEAM ALIGNMENT knobs to obtain highest brightness on CRT. CONTRAST may have to be decreased to optimize beam alignment. (Panel 3) 6.2.3.4 Press the COND LENS button to adjust the aperture size. While COND LENS button is illuminated turn silver knob. When desired aperture size is obtained press the DEGAUSS button. Press the COND LENS button again to get back to FINAL LENS. 6.2.3.5 Press the FINAL LENS button to adjust focus. While FINAL LENS button is illuminated turn silver knob. Once focus is obtained depress DEGAUSS button. When DEGAUSS is complete, refocus as necessary. 6.2.3.6 Press Wobbler and adjust the final aperture. (Panel 8) 6.2.3.6.1 This is accomplished by turning knobs (1) and (2) on the front and side of the final aperture assy. Until image shifts in and out of focus. Shifting up and down of the image or left and right of the image denotes improper alignment and further adjustments to the final aperture are needed. (1) (2) 6.2 Optimizing the Image 6.2.2 The best way to optimize the focus and astigmatism is to zoom in on a very small spherical particle and then make the adjustments so that the small particle looks sharp and then zoom back out to your actual image. 6.2.2.1 The partial field [PF] button may be pressed to look at only a small area of the screen. This may be useful in optimizing the image. 6.2.3 Adjustment of the Stigmator can be accomplished at this time. Be sure to move each knob independently from one another. (Panel 6) 6.2.4 Brightness and Contrast can be varied to achieve desired image on the CRT RIT SMFL Page 6 of 8

6.3 Removing a Sample Without Going to Standby 6.3.2 Close V1. (left side of column) 6.3.3 Press the [VENT] button. (Panel 9) 6.3.4 If rough pump does not shut off when [VENT] is depressed, get technician. 6.3.5 Follow instructions 6.2.1 Sample Loading 6.4 Placing the SEM in Standby 6.4.2 Remove sample from SEM by following instruction 6.2.1 Sample Loading 6.4.3 Make sure V1 is closed. (Pushed in all the way.) (left side of column) 6.4.4 Turn off electronics console by pressing the [OFF] button. (Panel 1) 6.4.5 Turn off Surface Analysis N2 2810 in service chase 2725. 6.3 Picture Taking 6.3.2 Image capture is done with the SNAPPY program on PC on SEM 6.3.3 Double click on the SNAPPY icon. 6.3.4 Click on preview on SNAPPY program. 6.4 Errors during Run 6.4.1 If the system fails to vent the chamber, make sure that the N2 is on in the service chase. 6.4.2 If the image is lost, return the SEM to the preliminary settings and start over. RIT SMFL Page 7 of 8

6.4.3 If the filament is blown, no current will flow and the red light will come on and stay on. GET TECHNICIAN 7 APPROPRIATE USES OF THE TOOL 7.1 Avoid contaminating the column- only clean samples may be used. 7.2 No out-gassing materials such as adhesives are allowed. 7 ATTACHMENTS 7.2 Manual for Sample Preparation in the Denton Sputterer REVISION RECORD Original Issue Summary of Changes Originator Rev/Date Sean O Brien A-09/29/03 RIT SMFL Page 8 of 8