COFFS HARBOUR SEDIMENT MODELLING AND INVESTIGATION

Similar documents
COASTAL EROSION: INVESTIGATIONS IN THE SOUTHWEST COAST OF SRI LANKA

Appendix E Cat Island Borrow Area Analysis

MIAMI BEACH 32ND STREET HOT SPOT: NUMERICAL MODELING AND DESIGN OPTIMIZATION. Adam Shah - Coastal Engineer Harvey Sasso P.E.

Available online at ScienceDirect. Procedia Engineering 116 (2015 )

COFFS HARBOUR BOAT RAMP LONG WAVE DATA COLLECTION TO EVALUATE PERFORMANCE OF BASIN EXTENSION WORKS

Physical Modeling of Nearshore Placed Dredged Material Rusty Permenter, Ernie Smith, Michael C. Mohr, Shanon Chader

Nearshore Placed Mound Physical Model Experiment

IMPACTS OF COASTAL PROTECTION STRATEGIES ON THE COASTS OF CRETE: NUMERICAL EXPERIMENTS

Concepts & Phenomena

Coastal Wave Energy Dissipation: Observations and Modeling

Nearshore Morphodynamics. Bars and Nearshore Bathymetry. Sediment packages parallel to shore, that store beach sediment

Appendix D: SWAN Wave Modelling

Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia

PHYSICAL AND NUMERICAL MODELLING OF WAVE FIELD IN FRONT OF THE CONTAINER TERMINAL PEAR - PORT OF RIJEKA (ADRIATIC SEA)

Passage Key Inlet, Florida; CMS Modeling and Borrow Site Impact Analysis

BILLY BISHOP TORONTO CITY AIRPORT PRELIMINARY RUNWAY DESIGN COASTAL ENGINEERING STUDY

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby

Comparison of Predicted and Measured Shoaling at Morro Bay Harbor Entrance, California

Inlet Management Study for Pass-A-Grille and Bunces Pass, Pinellas County, Florida

DUXBURY WAVE MODELING STUDY

SELECTION OF THE PREFERRED MANAGEMENT OPTION FOR STOCKTON BEACH APPLICATION OF 2D COASTAL PROCESSES MODELLING

ACOUSTIC DOPPLER CURRENT PROFILING FROM KIRRA BEACH TO COOK ISLAND FIELD EXERCISES UNDERTAKEN BY THE TWEED RIVER ENTRANCE SAND BYPASSING PROJECT

CHAPTER 134 INTRODUCTION

BYPASS HARBOURS AT LITTORAL TRANSPORT COASTS

Comparisons of Physical and Numerical Model Wave Predictions with Prototype Data at Morro Bay Harbor Entrance, California

TWEED RIVER ENTRANCE AND BYPASS SEDIMENT DYNAMICS

Tweed River Entrance Sand Bypassing Long Term Average sand transport rate

Simulating Long Waves in a Coffs Harbour 3D Physical Model Using Short Wave Spectra

Longshore sediment transport

USE OF SEGMENTED OFFSHORE BREAKWATERS FOR BEACH EROSION CONTROL

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario

CHAPTER 281 INFLUENCE OF NEARSHORE HARDBOTTOM ON REGIONAL SEDIMENT TRANSPORT

Impacts of breakwaters and training walls

The construction of Deepwater Navigation Channel (DNC) in the Bystry arm of the Danube Delta has started in The whole project provides the

EVALUATION OF THE CERC FORMULA USING LARGE-SCALE MODEL DATA

Chapter 4 EM THE COASTAL ENGINEERING MANUAL (Part I) 1 August 2008 (Change 2) Table of Contents. Page. I-4-1. Background...

A Preliminary Review of Beach Profile and Hardbottom Interactions

HARBOUR SEDIMENTATION - COMPARISON WITH MODEL

OCEAN WAVES NAME. I. Introduction

Wave-dominated embayed beaches. Andrew D Short School of Geosciences University of Sydney

Beach Wizard: Development of an Operational Nowcast, Short-Term Forecast System for Nearshore Hydrodynamics and Bathymetric Evolution

Cross-shore sediment transports on a cut profile for large scale land reclamations

THE WAVE CLIMATE IN THE BELGIAN COASTAL ZONE

EVALUATION OF BEACH EROSION UP-DRIFT OF TIDAL INLETS IN SOUTHWEST AND CENTRAL FLORIDA, USA. Mohamed A. Dabees 1 and Brett D.

INTRODUCTION TO COASTAL ENGINEERING

LAB: WHERE S THE BEACH

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA

MONITORING SEDIMENT TRANSPORT PROCESSES AT MANAVGAT RIVER MOUTH, ANTALYA TURKEY

CMS Modeling of the North Coast of Puerto Rico

Shoreline Evolution Due to Oblique Waves in Presence of Submerged Breakwaters. Nima Zakeri (Corresponding Author), Mojtaba Tajziehchi

Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque

Appendix M: Durras Lake Tailwater Conditions

Advanced Series on Ocean Engineering - Volume 14 COASTAL STABILIZATION. Richard Silvester John R C Hsu. \v? World Scientific

Technical Note AN EMPIRICAL. METHOD FOR DESIGN OF BREAKWATERS AS SHORE PROTECTION STRUCTURES

CROSS-SHORE SEDIMENT PROCESSES

SWASH MODELLING OF A COASTAL PROTECTION SCHEME

To: William Woods, Jenni Austin Job No: CentrePort Harbour Deepening Project - Comments on community queries

STORM RESPONSE SIMULATION

Wave Energy Atlas in Vietnam

The Islands. Barbados. A prefeasibility study. R. Drieman M. Hinborch M. Monden E.A.J. Vendrik

Hydrodynamic and hydrological modelling to support the operation and design of sea ports

TRANSPORT OF NEARSHORE DREDGE MATERIAL BERMS

CHAPTER 132. Roundhead Stability of Berm Breakwaters

Undertow - Zonation of Flow in Broken Wave Bores

SORTING AND SELECTIVE MOVEMENT OF SEDIMENT ON COAST WITH STEEP SLOPE- MASUREMENTS AND PREDICTION

Feasibility Study for Dredging of Khaprabhanga Chapalir Don River in Patuakhali District for Improvement of Navigability

Wave Transformation, Prediction, and Analysis at Kaumalapau Harbor, Lanai, Hawaii

THE HYDRAULIC AND MORPHOLOGICAL RESPONSE OF A LARGE COASTAL LAKE TO RISING SEA LEVELS

INTRODUCTION TO COASTAL ENGINEERING AND MANAGEMENT

Modeling Sediment Transport Along the Upper Texas Coast

April 7, Prepared for: The Caribbean Disaster Emergency Response Agency Prepared by: CEAC Solutions Co. Ltd.

RAINBOW BAY FIELD REPORT

MODELING OF CLIMATE CHANGE IMPACTS ON COASTAL STRUCTURES - CONTRIBUTION TO THEIR RE-DESIGN

INVESTIGATING STRATEGIES TO REPAIR HISTORIC TIDE WALLS ON THE CLARENCE RIVER AND ADJACENT BEACH AND RIVER BANK PROTECTION

Wave Setup at River and Inlet Entrances Due to an Extreme Event

Tanya M. Beck. Kelly Legault. Research Physical Scientist Coastal & Hydraulics Lab, ERDC Vicksburg, MS

Undertow - Zonation of Flow in Broken Wave Bores

An integrated three-dimensional model of wave-induced pore pressure and effective stresses in a porous seabed: II. Breaking waves

New Jersey Coastal Zone Overview. The New Jersey Beach Profile Network (NJBPN) 3 Dimensional Assessments. Quantifying Shoreline Migration

LABORATORY EXPERIMENTS ON EROSION CONTROL PERFORMANCE OF AN L- SHAPED PERMEABLE STRUCTURE. Abstract

CALCASIEU SALINITY STRUCTURES. HYDRODYNAMIC MODELING (To Support Design of Salinity Barriers)

HYDRODYNAMICS AND MORPHODYNAMICS IN THE SURF ZONE OF A DISSIPATIVE BEACH

THE EXPANSION OF THE PORT OF HANSTHOLM THE FUTURE CONDITIONS FOR A BYPASS HARBOUR

Wave behaviour in the inner surf zone

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

CHAPTER 179. Performance of a Submerged Breakwater for Shore Protection

STUDY ON TSUNAMI PROPAGATION INTO RIVERS

LOCALLY CONCENTRATED SEVERE BEACH EROSION ON SEISHO COAST CAUSED BY TYPHOON T0709

LITTLE LAGOON & LITTLE LAGOON PASS: RESEARCH UPDATES & DIRECTIONS

Inspection of Clarence City Beaches following Winter 2011 Storm Events

Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA

SHORE PROTECTION AND HABITAT CREATION AT SHAMROCK ISLAND, TEXAS ABSTRACT

page - Laboratory Exercise #5 Shoreline Processes

Using UNIBEST and Delft3D

Earth Science Chapter 16 Section 3 Review

Artificial headlands for coastal restoration

Australian Coastal Councils Conference

ANALYSIS OF MECHANISM OF SAND DEPOSITION INSIDE A FISHING PORT USING BG MODEL

Environmental Protection on the Gold Coast of Queensland, Australia. 1. What is the appeal of the Gold Coast to tourists?

Coastal & Marine Environment. Chapter. Wave Transformation. Mazen Abualtayef Assistant Prof., IUG, Palestine

Transcription:

COFFS HARBOUR SEDIMENT MODELLING AND INVESTIGATION Luke McAvoy Undergraduate Engineer (Civil) Griffith School of Engineering, Griffith University, Gold Coast, Australia Daniel Rodger Senior Engineer Water Technology Pty Ltd, Brisbane, Australia Abstract Water Technology has teamed with Griffith University as a part of the Industrial Affiliates Program to complete a Sediment Modelling Investigation for Coffs Harbour. The harbour at Coffs Harbour has been infilling with sediment since breakwall construction and reclamation linked two nearshore islands with the mainland in the 1920s, interrupting the Longshore Sediment Transport (LST) pathway. The harbour has become a sand sink; sand is entering the harbour and then cannot be removed by natural processes. Following on from previous reports from Carley (2005) and Lord (1984), the investigation has used the latest numerical modelling software, volumetric analysis programs and analytical methods for LST estimation to investigate the effects of the harbour on sediment transport. The effect of the breakwall orientation on wave height and particle velocity for different incident wave directions was investigated using a MIKE 21 Flexible-Mesh Spectral Wave model. The model predicted bottom water particle velocities throughout the harbour and mapped potential accumulation hotspots and sediment pathways. Bathymetric surveys spreading 118 years were analysed with the volumetric analysis program 12D Model. The results showed sand accumulating within the harbour in the lee of the eastern breakwall after its construction, as predicted in the MIKE model. This shoal built up to a uniform level before extending across the entire width of the harbour. Each periodic bathymetric comparison showed the sediment extending further within the harbour as a wave. The rate of infilling reached a maximum of around 50,000 m 3/ yr, which requires confirmation through analysis of a current survey. Estimates of LST were undertaken using the CERC (1984), Kamphuis (1991) and Bayram (2007) on the beach updrift of the harbour. The uncalibrated CERC method was found to overestimate sediment transport by an order of magnitude, while Kamphuis and Bayram were more accurate. The Bayram formula produced the closest estimate of LST to measured rates. 1

Introduction Longshore Sediment Transport (LST), or littoral drift, is a natural phenomena of sediment movement induced by two mechanisms, beach drifting in the swash zone and transport in the breaker zone (Kamphuis, 2000). It is the main method of longitudinal sediment transport on sedimentary coastlines around the world. Coffs Harbour is situated on the Mid North Coast of NSW. It has a coastal climate typical of Australia s east coast, experiencing the effects of tropical cyclones, mid latitude cyclones and east coast lows (Short, 2007). The result of this wave climate is a predominantly northwards LST system (Lord, 1984). Figure 1 shows important elements of harbour construction and the local beach system. Park Beach Northern Breakwater and Inner Harbour Jetty Beach Muttonbird Island Eastern Breakwater Boambee Beach Southern Reclamation Figure 1. Harbour at Coffs Harbour The construction of the harbour began in 1892 with the completion of the harbour jetty. Further construction works have created an almost fully sheltered harbour. Figure 2 shows the construction history from 1892 to the present day. Important dates in the construction timeline include the southern reclamation, completed in 1927, the northern breakwater, completed in 1924, and the eastern breakwater, the majority of which was completed in 1946 (Carley et al., 2005). Since its construction sediment has accumulated at Boambee Beach (updrift of harbour), on the south side of the southern reclamation and inside the harbour. The harbour has become a sand sink; sand is entering between Muttonbird Island and the eastern breakwater and settling within the harbour. This sand cannot be significantly removed by natural processes and the functionality and safe navigation of the harbour has been maintained through dredging by local and state governments. 2

Figure 2. Construction History of Coffs Harbour harbour (Source: Carley et al., 2005). This project aimed to verify previous studies completed at the harbour and gain an understanding of sediment processes in the harbour. The study aimed to: 1. Quantify LST rates approaching the harbour, 2. Map historic sediment build-up rates, 3. Numerically model harbour wave behavior and currents, and 4. Map and predict sediment accumulation hotspots. To achieve these goals analytical formulae and numerical modelling software was used to analyse the harbor infilling. 3

Part 1: Analytical Formulae The potential LST approaching the harbour was calculated using empirical methods. This methodology was chosen to assess the use of purely empirical formulae for estimating LST. The calculated rates have then been compared to previous estimates of LST for Coffs Harbour. 1.1 Methodology Three internationally recognised formulae for potential LST have been used to estimate the potential sediment rate approaching the harbour, proposed by the United States Army Corps of Engineers Coastal Engineering Research Centre (known as the CERC (1984) formula), Kamphuis (1991) and Bayram (2007). CERC (1984) Formula ) (Source; USACE, 1984) The K coefficient represents an empirical calibration parameter, Hb represents the breaking wave height, γ is the wave breaker parameter, ρs represents sediment density and n represents sediment porosity. Wave breaker angle is given by αb whilst the water density is represented by ρ. Kamphuis (1991) Formula (Source; Kamphuis, 1991) Where D is the mean particle diameter, m represents the bathymetry slope and the peak period is given by Tp. Bayram (2007) Formula (Source; Bayram et al, 2007) Where ws represents fall speed, F represents energy flux, ε is an empirical transport coefficient, and gives mean longshore current velocity. Sediment porosity a is the equivalent of n in the CERC formula. Daily wave data for the offshore waverider buoys at Byron Bay (direction data) and Coffs Harbour (for significant wave height data) was obtained from the Manly Hydraulics Laboratory (MHL) for 2010. Offshore data was transformed using small amplitude linear wave theory and wave transformation equations proposed by Kamphuis (1991). Boambee Beach, positioned updrift of the harbour, was broken into segments in order to accurately represent the beach orientation (refer Figure 3). On review of the beach segments, sections North B, South A and South B were considered inappropriate for analysis due to the lack of evidence of parallel offshore contours and sheltering in the lee of headlands or the harbour structure. 4

Figure 3 Beach Sections at Boambee Beach. 1.2 Sediment Transport Rates The three empirical formulae gave results of varied accuracy. The results considered to be most accurate was the Bayram (2007) formula, which gave estimates of 55,000 to 170,000m 3 /yr for the year 2010. This compares well to the anticipated 70,000m 3 /yr values summarised in previous studies of Carley et al. (2005). The Kamphuis (1991) formula LST rates ranged from 140,000 to 300,000 m 3 /yr, while the uncalibrated CERC formula gave results at least twice that of previous estimates and other formulae. In all cases rates at for the middle section were higher due to beach orientation. Figure 4 Estimated 2010 Sediment Transport at Beach Sections A (left) and Middle (right). 5

Part 2: Spatial and Volumetric Analysis An analysis of the sediment infilling of the harbour was undertaken to determine the spatial and volumetric characteristics of the harbour sediment accumulation. The analysis was undertaken using spatial and volumetric analysis software. 2.1 Methodology Historical bathymetrical surveys dating back to 1890 were obtained through the New South Wales Land and Property Management Authority (LPMA) and the New South Wales Public Works Department (PWD). The majority of the surveys were scanned hardcopies of varying quality, scales, units and datums. After a comprehensive review of suitability of the surveys, maps from 1890, 1937, 1961, 1980, 1997, 2005, and 2008 were selected to be analysed. The surveys were adjusted to their respective datums, manually digitized and georeferenced using the Geographic Information System ArcGIS (Esri, 2010). The change in volume between each bathymetry was then analysed by the civil and surveying software package 12d Model (12d Solutions, 2011). As the surveys were based on bathymetric data, the analysis was not able to include the accretion on Jetty Beach. AWACS estimated this amount to be around 1800 m 3 /yr in 1995. 2.2 Sediment Accumulation Rates Through analysis of the bathymetric surveys sediment was observed to begin accreting during the initial period of harbour construction. Sediment firstly built up against the northern breakwater, which blocked the LST passageway between Muttonbird Island and the mainland. Another large shoal was observed in the leeward side of the eastern breakwater. As this shoal built up, it decreased the depth in the harbour to approximately 6.5m. This shoal has been periodically extending into the harbour towards Jetty Beach. The final survey reveals this shoal has extended approximately two-thirds of the length of the harbor. The bathymetric models were analysed volumetrically to calculate total sediment build-up. Any dredged material removed from the harbour during its history was included in the analysis. Sediment accumulation rates were observed to begin after harbour construction, and were relatively small during the initial years, at around 5000m 3 /yr until the 1961 survey. Accumulation increased throughout the 1960-1980 period, possibly explained by the large storm events experienced during this time, particularly in 1968 and 1974 (Short, 2007). Infilling rates continued to increase until peaking around the 2005 survey at a rate of approximately 48,000m 3 /yr. Recent surveys show a possible reduction in sediment infilling of the harbour, which will require confirmation through analysis of a current survey. Figure 5 shows the results of the volumetric analysis. Figure 6 shows the spatial progression of the shoal into the harbour over the 118 year period. Colour indicates the difference in depth experienced between bathymetric surveys. 6

A detailed breakdown is as follows: Sediment was found to begin accumulating between 1914 and 1937 during the initial period of harbour construction. Sediment built up as a large shoal on the leeward side of the eastern breakwater, which was not fully constructed during this time. Sediment also shows significant (>3.0m) accumulation along the south of the northern breakwall. Between 1.0 1.5m build-up is seen in the harbour mouth. From 1937 to 1961 around 6.0m of sediment accumulation was observed in the lee of the eastern breakwater. The sand shoal began to propagate into the harbour from the mouth into the centre of the harbour. Build-up is also evident on the south and south east side of Muttonbird Island. The harbour mouth had accumulated a minimum of 1.5m during this time. Accumulation across the northern breakwater was minimal due to the completion of the southern and eastern breakwaters. Between 1961 to 1980 the shoal extended north-south across the entire harbour and continued extending eastward. Large accumulation in the south east section of the harbour was seen which was linked to major storm events of 1967, 1971, and 1974. Build up in the mouth of the harbour was in the order of 1.5m, however accumulation on the leeward side of the eastern breakwater had reduced. Limited accumulation was seen on the northern breakwater. The inner harbour breakwater was completed and experienced significant build-up on the western wall. The 1980 to 1997 surveys confirmed the continued eastward propagation of the sand into the harbour, and the relative stabilisation of depth at the harbour mouth. Major buildup (>3.0m) was seen around the mouth of the inner harbour breakwater, particularly on the eastern wall. 1997 to 2005 surveys shows the shoal continuing to enter the harbour and spread across its entirety. Build-up at the mouth of the inner breakwater has ceased. Analysis between the surveys of 2005 and 2008 further confirmed the advance of the sand shoal and the stability of the depth to approximately 6.5m. Some build-up is seen at the harbour mouth, boat ramp and the southern end of Jetty Beach. Figure 5 Volumetric sediment accumulation rates within Coffs Harbour 7

1914-1937 1937-1961 1961-1980 1980-1997 1997-2005 2005-2008 Figure 6 Spatial sediment accumulation within Coffs Harbour 8

Part 3: Numerical Modelling The wave conditions and currents experienced within the harbour was analysed by creating a numerical model based on the latest bathymetric survey. 3.1 Spectral Wave Model Analysis A Flexible Mesh MIKE21 Spectral Wave Model of the harbour was created using the 2008 bathymetric survey. Three incident waves were used as boundary conditions, with a significant wave height (Hs) of 2.14m, a period (Tp) of 7.46 seconds and wave directions from the north-east, east and south-east (64 O 93 O and 154 O respectively), refer to Table 1. The absence of wave gauges the outer harbour did not allow full calibration of the model. A wave gauge does exist in the inner harbour, however it is positioned in an area of minimum wave influence and is used as a tide gauge. It was not deemed appropriate for use in this study. Table 1 Wave Events Modelled in Coffs Harbour MIKE21 Spectral Wave Model Scenario Hs (m) Tp (s) Dir. (Deg TN) Verification 1.76 15.1 154 NE Swell 2.14 7.46 64 Easterly Swell 2.14 7.46 93 SE Swell 2.14 7.46 154 3.2 Modelled Harbour Conditions Wave energy was seen to reduce upon entering the harbour, while north-easterly and easterly storm event waves penetrated the harbour further than the south-easterly event. The energy dissipation due to the orientation of the eastern breakwater is shown to be highly effective during south-easterly swell. Figure 7 shows wave penetration during the easterly and north-easterly wave events. (a) (b) Figure 7 North Easterly (a) and Easterly (b) Wave Penetration in the Harbour. Wave generated currents were observed to travel against the north and south boundaries of the harbour. North-easterly swells produced currents travelling against the southern boundary, and south-easterly swells against the northern boundary. Easterly swells produced currents travelling around both the northern and southern boundaries, which 9

extend to run parallel past Jetty Beach. These currents supported previous studies including the Coffs Harbour Boat Ramp Siltation Investigation (AWACS 1995)), the Coffs Harbour Port - Shoal Management Planning Program (CHCC 2002) and the Specialist Coastal Engineering Advice for Harbourside Project Coffs Harbour (Carley et al 2005). High Particle Velocity High Particle Velocity Figure 8 North easterly (a) and easterly (b) swell event particle velocity at harbour bed Discussion and Conclusion The aims of the Coffs Harbour Sediment Modelling Investigation were to quantify and draw conclusions relating to the sediment entering and bypassing Coffs Harbour via LST. The use of solely empirical formula for determining LST has had mixed results. The results from Bayram (2007) have shown to give reasonable estimates of LST, while Kamphuis (1991) was found to overestimate. Bayram (2007) potential LST rates ranged from around 55,000-170,000m 3 /yr, similar to previously published rates of approximately 70,000m 3 /yr given by Carley et al (2005). The results produced by the CERC formula were extremely high. This supports criticism of the formula in papers such as Stutz and Pilkey (1999). The applicability of theoretical wave transformation and breaking calculations was a limitation of the study. To obtain more accurate results it is recommended that a numerical wave transformation model such as SWAN by Delft Hydraulics be used. Never-the-less, the results from Bayram formula produced a reasonable estimate of LST. The use of the GIS and volumetric analysis software as a method of comparing a time series of bathymetric surveys was successful, however the potential for error when digitizing and geo-referencing hardcopy maps could impact reliability of the data. Infilling rates in the harbour initially remained relatively small after the breakwater construction, which increased due to severe weather events during the 1970s. Sediment accumulation peaked around 48,000m 3 /yr during 2005. The infilling rate has appeared to have since decreased however this trend requires further analysis to be confirmed. The MIKE Spectral Wave Model, while uncalibrated, offered indications of wave behaviour and currents within the harbour. The orientation of the eastern breakwall significantly reduced wave energy during south-easterly events, while wave penetration was greatest during north-easterly and easterly wave events. Currents were observed to travel around the landward boundaries of the harbour, which may be a method of sediment transport towards Jetty Beach. These currents supported the proposed sediment transport currents in previous studies. 10

References 12d Solutions, 2011, 12d Model, 12d Solutions Pty Ltd Australian Coastal and Water Studies (AWACS), 1995, Coffs Harbour Boat Ramp and Siltation Investigation, Report 95/18 Bayram. A, Larson M., and Hanson H., 2007, A new formula for the total longshore sediment rate, Coastal Engineering, Vol. 54, 700 710 Coffs Harbour Port Shoal Management Planning Program, 2002, Coffs Harbour City Council (CHCC) Coffs Harbour Working Group. Carley, J., Wyllie, S. and Cox, R., 2005, Specialist Coastal Engineering Advice for Harbourside Project Coffs Harbour, WRL Technical Report No 2005/21, Water Research Laboratory, University of New South Wales. Danish Hydraulic Institute, 2011, MIKE21 Spectral Wave Model, DHI Group Esri, 2010, ArcMap 10, Esri Inc. Kamphuis J., 2000, Introduction to Coastal Engineering and Management, World Scientific, Advanced Series on Ocean Engineering, Vol. 16 Lord, D.B. 1984, An Assessment of Harbour Infilling Resulting from Longshore Sediment Transport at Coffs Harbour, Master of Engineering Science Thesis, University of New South Wales. Short, A.D., 2007, Beaches of the New South Wales Coast: A guide to their nature, characteristics, surf and safety, 2nd Edition Stutz M.L. and Pilkey O.H., 1999, Discussion of: Wang, P; N.C. Kraus, and R.A. Davis. 1998. Total Longshore Sediment Transport Rate in the Surf Zone: Field Measurements and Empirical Predictions. Journal of Coastal Research, 14 (1), 269 282., Journal of Coastal Research, Vol. 15, 272 274 USACE, 1984, Shore Protection Manual, CO. Eng. Res. Centre, US Army Corps of Engineers, Vicksburg, MS, USA 11