PANACEA P200 STAINLESS STEEL USER MANUAL

Similar documents
PANACEA P125 USER MANUAL

PANACEA P100 LOW PRESSURE USER MANUAL

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Air Operated Hydraulic Pumping Systems to 50,000 psi

Installation, Operation, and Maintenance Manual

Pressure Dump Valve Service Kit for Series 2300 Units

MAINTENANCE PROCEDURE FOR X 650

Operation Manual - PN A MENSOR MODEL 73 SHOP AIR BOOSTER

Geotech 1.66 Auto-Reclaimer

Geotech 1.66 Auto-Reclaimer Installation and Operation

Geotech 1.66 Reclaimer

MB-SP Series Solvent Purification System

Application and Sizing

DBML-60/80 Squeeze Tool

Pressure Dump Valve Service Kit for Series 3000 Units

Geotech Portable Bladder Pumps Installation and Operation Manual

Paintball Marker. User s Manual. 530 South Springbrook Road Newberg, OR 97132

Geotech Bladder Pumps

Installation Instructions

4400 TwinHybrid Gas Seal

Combination Air Valve

Syringe, Distribution Valve and Infusion Pump Removal/Replacement ATTENTION SYRINGE REPLACEMENT

LRS(H)4 Pressure-Reducing Regulator User Manual

CRP INSTALLATION, OPERATING AND MAINTENANCE INFORMATION FOR INLINE SAMPLING VALVES

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

COMPRESSION TUBE FITTINGS

Smooth Vent Valve. Series XVD XL XL Q D- XVD XGT CYV

Designed for low pressure, medium volume circulation of finishing materials

Installation, Operation, and Maintenance Manual

COMPRESSION TUBE FITTINGS

RD(H)20/25 Pressure-Reducing Regulator User Manual

COMPACT TRIPLE WALL OUTLET STATION MODEL INSTALLATION AND OPERATING INSTRUCTIONS

Beverage Systems. Component Inspection and Service TSB-Y Date: Subject: Products Affected: Description: July Inspection of CO 2

RHPS Series PRV 6 User Manual

TECHNICAL BENEFITS OF CJS / RAISE HSP. Technical Advantages

Zero Head Space Extractor. Catalogue No. YT HW. Operation and Maintenance Manual

RS(H)20, 25 USER MANUAL

Suggested Installation & Operating Instructions for Sidewinder Pumps

VRS Assembly & Operating Instructions

GREIG FILTERS, INC. OPERATION MANUAL

Geotech Bladder Pumps Installation and Operation Manuals

Booster Pump PB4-60 Replacement Kits

Smooth Vent Valve XVD. Series

TECHNICAL DATA. Q = C v P S

Inflatable Packers for Grouting 11/10/00

Smooth Vent Valve. XVD Series

PRO SINK -R 1 and 2. Dilution system CONTENTS

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

ISOMEGA BLADDER PUMPS

Allspeeds Ltd. Royal Works, Atlas St Clayton le Moors Accrington Lancashire England BB5 5LW. Tel +44 (0)

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER INLOOP ACE CRUDE OIL SAMPLER

2.0 INSTALLATION & SERVICE

Geotech 3.5 Reclaimer Installation and Operation Manual

Hodge Clemco Ltd. SG-300 Suction Gun. Owner s Manual. Hodge Clemco Ltd

Operating Instructions Models and Hydrostatic Test Pumps

VALVCHEQ BACKFLOW PREVENTERS FIGURE RP03

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

Universal Valve Company Inc

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

Universal Valve Company Inc

Geotech 1.66 Reclaimer Installation and Operation Manual

4 IN. BALL LAUNCHER Engine Mounted / PTO Driven

Pneumatic Powered - Plunger Pumps

Plant, components and devices for very high and high pressures (7000 bar and over)

RG1200 Service and Repair Manual

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

Easy Nest Kits. Installation Suggestions

UBP32 Sealed Balanced Pressure Thermostatic Steam Trap for use with PC_ Pipeline Connectors Installation and Maintenance Instructions

DynaPak Gas Sampler S Y S T E M S U P P O R T M A N U A L DP-2000

Installation, Operation and Maintenance Manual for Back Pressure Regulator

600 o F High Temperature Aging Cell Instruction Manual

Geotech 3.5 Auto-Reclaimer

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL

Installation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Solid Indicator (Non-mixer) Model CP-30SI

abc OPERATING, INSTALLATION & MAINTENANCE MANUAL FOR G6 GAS SAMPLER

DynaPak 2000L System Support Manual Version

Gas Lines. Technical Manual. Sumitomo (SHI) Cryogenics of America, Inc Vultee Street Allentown, PA U.S.A.

SCUBAPRO Repair Guide. S600-S550 Second Stages

Inflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer

BIMBAR INFLATABLE PACKERS AND ACCESSORIES

Geotech Portable Bladder Pumps

HPIC D Hydrostatic Test Pump PRODUCT INFORMATION AND OPERATING INSTRUCTIONS

Nitrous Oxide / Oxygen FLOOR MOUNTED OUTLET STATION Installation and Instructions

SIMPLAIR PIPING TOOL. JXT Company

Anti-flood device Model B-1

Connectors. SECTION 2 OF 3 SECTIONS ON CONNECTORS VHP Tees and Crosses. Top Seller SEE STARRED PRODUCTS. VHP Tees & Crosses for Capillary Tubing

PRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.

Axial Compression Packing Method

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

STIH) Technical Information Accessories for STIHL cut-off machines / drills. 1. New pressurized water tank

Installation Instructions MODEL VSTI-A020 Tank Indicator Installation Model: VSTI-A020, Stainless Reverse Read System Versa Steel Inc. Guide Cables No

Installation Operation Maintenance

Flexfence Swaging Unit. Product Manual. Release 02/16.

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

DIAPHRAGM PUMP MODEL PDM 1-175

Subsea Safety Systems

RST INSTRUMENTS LTD.

TECHNICAL DATA. Q= Cv S

Transcription:

Basic Features Stainless Steel body with 1.75 outside diameter. Will fit into wells down to 2 (schedule 80). Has an internal chamber volume of 200mL. Maximum depth below ground surface of 3000ft. Other Features Compatible with Volume Booster for increased volume per cycle. Compatible with Timer Control Unit for pump cycle automation. Compatible with Zone Isolation Sampling Technology (ZIST). Specifications Stainless Steel (PU-P-200-2000) Body Construction 316 Stainless Steel Length (in) 23.5 Outer Diameter (in) 1.75 Weight (lbs) 9 Maximum Pressure (psi) 1500 Maximum Depth (ft bgs) 3000 Minimum Submergence (ft) 6 ft with Volume Booster Internal Volume (ml) 200 Standard Filter Pore Size (µm) 60, others available Standard Tubing OD (in) 1/4, others available Seal Material Buna-N Gas Compatibility Nitrogen, Compressed Air ZIST Compatibility 2 and 4, requires adapter Panacea P200 Precautions For Safe Use 1. Never disassemble the pump while it is connected to a pressurized source. 2. Never operate the pump past its specific maximum pressure. 3. Never use tube ferrules other than those provided by BESST INC. or authorized distributor 4. Never disconnect the pump while it is pressurized with gas. 1

Panacea P200 Deployment Procedure Step 1: Connect gas tube to fitting on the lower platform with the eye bolt. Connect sample return tube to fitting on the raised platform. Step 2: Place the nut, back ferrule, and front ferrule onto the tube. Rotate the nut finger-tight. Tighten nut 1.25 turns. Note: If the tube has already been swaged rotate the nut finger-tight then tighten the nut a quarter turn. Step 3: Connect 3 way valve or timer control unit to the end of the gas line. Connect pressure source to the 3 way valve or timer control unit. Connect Gas tube to 3 way valve or timer control unit Connect Gas Pressure Source 2

Step 4: Connect wire to deployment hook. Step 5: Deploy pump and tubing down well pipe Panacea P200 Downhole Operation Step 1: Determining the mode of operation. The Panacea pump can be used to purge and ratchet ground water samples to the surface. In both modes of operation the operator pressurizes the pump s gas tube to displace water into the sample return tube, and then depressurizes the pump to allow the refill of the pump and gas tubing. Purge Mode Fully discharge water in the system each pump stroke High pumping rates and volumes Minimizes gas usage Ratchet Mode Partially discharge the system with each pump stroke Samples are gently discharged, ideal for delicate analytes Sample water does not contact nitrogen gas Purge Mode Ratchet Mode Note: The mode of use is dependent upon the pressure, flow rate, and time of the pump cycle. Step 2: Determining regulator pressure. The pressure to be used to pump the sample up to the surface is dependent upon the static water pressure, and frictional losses due to fluid movement while pumping. The pressure needed to overcome static water pressure is: = h = h = Pressure (psi) = Fluid density = gravitational constant h = Depth below ground surface (ft) For water applications: = 0.4325 / h = 25 50 3

The pressure needed to overcome frictional losses is subjective to system setup. BESST INC. recommends that an additional pressure of 25psi to 50psi be added to the static water pressure to compensate for these frictional losses and help with the sealing of the foot valve poppet. = 25 50 The pressure to be set on the regulator is the total pressure. = + In use the operator of the pump can adjust the dynamic pressure to achieve a specific flow rate. Step 3: Determine time of cycle. The cycle time will consist of an on time and an off time. On Time The time that the gas tube is pressurized. Sample is displaced from the gas tube and the pump into the sample tubing. Off Time The time that the gas tube is vented of the pressure. Refill of the pump and gas tube to static water level. Cycles are sequenced for time efficiency. To achieve the specific mode of operation the timing of the pump cycle must meet the following criteria. Purge Mode On Time will cause pressurized gas to escape the sample tube. Off Time Will allow for gas tube to completely vent of pressurized gas. Ratchet Mode On Time will result in no pressurized gas exiting the sample tube. Off Time will allow for gas tube to completely vent of pressurized gas. Note: The first few pump cycles in Ratchet Mode will typically build the water column in the sample tubing. It is the best practice to determine timing cycles once the water On Time Pressurizing pump and getting sample. = + Off Time Venting pump and refilling to static water level. 4

column has been built to ground level. Step 4: Refine pressure and timing intervals for optimum performance. 5

16 10 17 5 11 2 12 7 3 15 8 6 13 9 1 14 4 Number Panacea P200 Part Number Part Name Quantity 1 PU-P200-2001 Filter Hold Cap 1 2 PU-P200-1002 Threaded Rod 1 3 PU-P200-1003 Ceramic Filter 1 4 PU-P200-2004 Foot Intake Valve 1 5 PU-P200-1005 Filter Screen 1 6 PU-P200-0006 Valve O-Ring 111 4 7 PU-P200-0007 Poppet Sleeve 2 8 PU-P200-0008 Poppet 2 9 PU-P200-0009 Foot Valve Spring 1 10 PU-P200-2010 Chamber 1 11 PU-P200-2011 Pump Top 1 12 PU-P200-0012 Top O-Ring 216 1 13 PU-P200-2013 Poppet Cover 1 14 PU-P200-0014 Sample Return Extension 1 15 PU-P200-0015 Sample Return Spring 1 16 PU-P200-0016 Tube Connector 2 17 PU-P200-0017 Hook 1 6

Panacea P200 Disassembly Procedure Step 1: Remove the filter hold cap by unscrewing from threaded rod. Step 2: Slide off ceramic filter. Step 3 Unscrew threaded rod. 7

Step 4 Slide off filter screen. Step 5 Unscrew the foot valve intake. Note: If following instructions for reassembly, the foot valve intake must be firmly tightened to the chamber to provide an adequate O-Ring seal. Step 6 A -111 O-Ring seals the foot valve intake and the poppet sleeve. This O-ring can be removed from the base of the internal thread on the foot valve intake. 8

Step 7 The poppet should slide out of the poppet sleeve, followed by the 1/3PSI spring. Note: The poppet head should always face the foot valve intake for the pump to perform properly. Step 8 Unscrew the poppet sleeve from the chamber. Step 9 A -111 O-Ring seals the chamber and the poppet sleeve. This O- ring can be removed from the base of the internal thread on the chamber. 9

Step 10 Unscrew top assembly from the chamber. Step 11 Unscrew the sample return extension from the top assembly. Step 12 Unscrew the poppet cover from the top assembly. Note: If following instructions for reassembly, the poppet cover must be firmly tightened to the top to provide an adequate O-Ring seal. 10

Step 13 A -111 O-Ring seals the poppet cover and the poppet sleeve. This O- ring can be removed from the base of the internal thread on the poppet cover. Step 14 The poppet should slide out of the poppet sleeve, followed by the 1PSI spring. Note: The poppet head should always face the poppet cover for the pump to perform properly. Step 15 Unscrew the poppet sleeve from the top. 11

Step 16 A -111 O-Ring seals the top and the poppet sleeve. This O-ring can be removed from the base of the internal thread on the top. Step 17 Remove -216 O-Ring from top. Panacea P200 Troubleshoot Symptom 1: Pump is hooked up and deployed downhole. Gas is on and nothing happens. That is, neither air nor water comes out of the sample return line. Causes 1. The sample return tube and gas tube are switched. The sample return poppet is being locked by pressurization. Turn the gas off and connect the gas tube to the gas regulator. Turn gas on and retest. 2. Using too low of a pressure. The pressure is not high enough to overcome static pressure. Recalculate the necessary static pressure. 3. There is a leak. Pull pump from well. Check position of poppets. The flat of the poppet should face the bottom of the pump. Make sure a -111 O-Ring is on either side of both poppets. When re-assembling make sure the poppet cover is tightened firmly against top, and the foot valve intake is tightened firmly against chamber. Check condition of the -216 O-Ring on the chamber top. 12

Symptom 2: Pump is hooked up and deployed downhole. Gas is on and just gas comes out of the sample return tube. Symptom 3: Sample is flowing back into the pump after the pump cycle. Causes 1. Initial gas discharge is caused by the displacement of water in the sample return tube. Allow several pump cycles to build water column. 2. The pump is not submerged in water. Lower the pump to at least 6 ft below water level. 3. High pressure compressed gas is coming out of the pump. Purging for too much time. Lower the cycle on time. Repeat cycling of the pump. 4. Using too low of a pressure. The pressure is not high enough to overcome static pressure. Recalculate the necessary static pressure. Causes 1. Top poppet is not sealing. Pull pump from well. Check position of poppets. The flat of the poppet should face the bottom of the pump. Make sure a -111 O-Ring is on either side of both poppets. When re-assembling make sure the poppet cover is tightened firmly against top, and the foot valve intake is tightened firmly against chamber. Check condition of the -216 O-Ring on the chamber top. 13