TP 11249E SHIP SAFETY STANDARD FOR IN-WATER SURVEYS

Similar documents
IMO ANY OTHER BUSINESS. Alternative arrangements for the inspection of the outside of the passenger ship s bottom (other than ro-ro passenger ships)

Assessment of Ships and Managers for the Acceptance of Extended Interval Between Bottom Surveys in Dry-Dock

The following Rule Changes were approved by the ABS Rules Committee on 1 June 2018 and

IMO WORK PROGRAMME. Alternative arrangements for the bottom inspection requirements for passenger ships

NEWS. Finding the best solution for specific conditions... 3 Small but essential maintenance operations... 7

Number 159. Permanent underwater insert repair in Norway Fast underwater ship hull cleaning on largest container vessels in the world..

Underwater Blanking Tools

NEWS LETTER 196. Number 187

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS

Owners/Operators ofpanamanian Mobile Offshore Units, Recognized Organizations and Masters

Guidance for. Floating Liquefied Gas Units GC-13-E

RULES FOR CLASSIFICATION OF SEA-GOING STEEL SHIPS

PART 3 HULL INTEGRITY AND ARRANGEMENT

1.0 PURPOSE AND NEED

LNG REGASIFICATION VESSELS

Testing Procedures of Watertight Compartments

Rules for Classification of Ships, July 2006 Pt.7 Ch.1. Thruster Survey. Issued 7 February Det Norske Veritas AS. All rights reserved

Section 3 SURVEYS GENERAL REQUIREMENTS

Testing Procedures of Watertight Compartments

Underwater Blanking Tools. Miko Plaster. Tanker Kit. Sea Chest Blanking. Pipe Plugs

CLIENT NAME: LOCATION: CALM BUOY INSPECTION:

Underwater scrubber sea chest installation

Part 3 Hull Chapter 2 General arrangement design

RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING

PART 3 HULL INTEGRITY AND ARRANGEMENT

California State Lands Commission Marine Invasive Species Program Hull Husbandry Reporting Form. Part I: Reporting Form

Testing Procedures of Watertight Compartments

OVERALL SURVEY: A survey intended to report on the overall condition of the hull structure and determine the extent of additional close-up surveys.

Challenges in Ship Design to Maintain Thrusters inside Ship

Table 6: Schedule of Operational Commitments

SCANTLING AND EQUIPMENT TABLES (STEEL AND ALUMINIUM ALLOY)

STEEL VESSELS 2014 RULES FOR BUILDING AND CLASSING PART 3 HULL CONSTRUCTION AND EQUIPMENT. (Updated July 2014 see next page)

Type Testing Procedure for Crankcase Explosion Relief Valves

ICE LOADS MONITORING SYSTEMS

MARINE INVASIVE SPECIES PROGRAM ANNUAL VESSEL REPORTING FORM

PART 1 GENERAL REQUIREMENTS

Control of Energy - Isolation Process

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

Work Permit Help Document For changes introduced in ShIPS Revision 7.1 (Released 11/12/2008)

RESOLUTION MSC.235(82) (adopted on 1 December 2006) ADOPTION OF THE GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF OFFSHORE SUPPLY VESSELS, 2006

MSC Guidelines for Sanitary & Sewage Systems

SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE

RULES FOR CLASSIFICATION Naval vessels. Part 1 Classification and surveys Chapter 5 Surveys for submarines. Edition January 2016 DNV GL AS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

Guidance for Undergoing Class Maintenance Surveys

MSC Guidelines for Engine Cooling Systems

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

ANNEX 2 RESOLUTION MEPC.124(53) Adopted on 22 July 2005 GUIDELINES FOR BALLAST WATER EXCHANGE (G6) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

INSTRUCTION MANUAL Kobelco Eagle Marine Water Lubricated Stern Tube Seals

We re Going Global. Vessel Loss Control. Technical Notes #36

GUIDANCE NOTICE. Unpowered Barges. Definition. General. Risk assessment. Application. Safety Management. Compliance

Underwater thruster repairs on two ships at the same time in Mexico

Survey Report. For...

REDUNDANT PROPULSION SHIPS RULES FOR CLASSIFICATION OF NEWBUILDINGS DET NORSKE VERITAS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS PART 6 CHAPTER 2

Assembly-, installation- and maintenance instruction manual for bladder accumulators IBV / EBV , top reparable

Rules for Classification and Construction Ship Technology

Volvo Open 70 Measurement Group. Guide to. Ashore Measurement

STRUCTURAL MEMBERS OF A SHIP. compartment stem frame beam bracket girder stern post hull angle bar stiffener

Section Purpose, Applicability, and Date of Implementation.

MSC Guidelines for Review of General Arrangements (Subchapters H, I, K, R, & U)

MSC Guidelines for Vents, Fills and Sounds

A Professional Commercial Diving & Marine contractor. Tel :

BMA INFORMATION BULLETIN No. 96

AMENDMENTS NO. 2/2012 to

HEAD OFFICE VITORIA BRANCH PARANAGUA BRAZIL

Recent Topics at IACS

National Marine Manufacturers Association

Schedule 1 Safety Equipment & Scrutineering Check List

SHIPS FOR NAVIGATION IN ICE

Wrecking barge Petrus

MSC Guidelines for Review of Stability for Sailing Catamaran Small Passenger Vessels (T)

RULES PUBLICATION NO. 20/P SHIP SIDE STRENGTHENING OF FISHING VESSELS MOORING AT SEA ALONGSIDE OTHER VESSELS

GREIG FILTERS, INC. OPERATION MANUAL

MSC Guidelines for Review of Gas Carrier/Barge Structures

PRIMARY EDUCATION PACK SHIP TERMS

SALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS

Special Considerations for Structural design and Fabrication for. tankers or similar vessels with Large Size (150m or more in length) in.

MSC Guidelines for Review of Inland Tank Barge Stability Procedure Number: C1-13 Revision Date: May 13, 2016

TITAN FLOW CONTROL, INC.

Manual Actuated Boiler Blowdown Valves

MSC Guidelines for Independent Fuel Tanks

Commandant IN-SERVICE INSPECTION PROGRAM (ISIP) FOR FLOATING FACILITIES IN THE OUTER CONTENENTAL SHELF (OCS)

Flexible hoses - Non-metallic materials

Liquefied gas cargo tanks and process pressure vessels

MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL

NOBLE REV 02 FPSO MOORING SYSTEM INTEGRITY STUDY

TOOL BOX 033- HOSEREEL SERVICE / FAULT FINDING

MSC Guidelines for Review of Stability for Towing Vessels (M)

15ME-014 INSTRUCTION MANUAL OF STERN TUBE SEALING TYPE EVK2RV. URL

Remark: When calling at especially tank cleaning installations located outside the yard area, a certificate of call is not required.

ADMINISTRATIVE INSTRUCTION No. STCW-14 QUALIFICATION / CERTIFICATION REQUIRED FOR OPERATION OF A DOMESTIC VESSESL

INSTALLATION, OPERATION AND SERVICE MANUAL ABS AIR BAG LIFT

641/01 AVK SWING CHECK VALVE OPERATION & MAINTENANCE MANUAL. AVK UK Limited OM270710

Mobile Offshore Units

Part 3 Structures, equipment Chapter 1 Hull design and construction, general

Headquartered in Vitoria Brazil, Aqua Port is a reputable company in Ship Repairs and Underwater Services. Founded in 1989 aiming bring quality and

RULES FOR CLASSIFICATION OF SEA-GOING STEEL SHIPS

Transcription:

TP 11249E SHIP SAFETY STANDARD FOR IN-WATER SURVEYS Canadian Coast Guard Ship Safety Branch 1992

TP 11249E RECORD OF CHANGES STANDARD FOR IN WATER SURVEYS DATE OF AMENDMENT AMENDMENT NUMBER SECTION AMENDED DATE INSERTED

STANDARD FOR IN-WATER SURVEYS 1. APPLICATION a) The procedures and requirements outlined in this Standard apply to non-passenger vessels to which permission has been granted by Ship Safety Headquarters for the acceptance of in-water survey in lieu of alternate drydockings. b) This Standard does not apply to tankers, Inland Waters vessels and 80% Ocean Modulus vessels 2. GENERAL a) In lieu of a drydocking, an examination of the underwater portion and fittings of the hull as required by the appropriate regulations may be made by a team of divers and technicians in the presence of a Marine Surveyor. This in-water survey should provide, insofar as practicable, the information on the condition of the vessel's underwater hull and fittings usually obtained from a drydocking survey. b) The owner should be advised that a survey in drydock should be arranged if the in-water survey is not to the Marine Surveyor's satisfaction or if the condition of the vessel warrants a survey in drydock. c) Any surveys normally due at the time of the drydocking survey shall be conducted at the same time as the in-water survey. In any case, the Surveyor should satisfy himself as to the overall condition of the hull and machinery of the vessel. 3. PERIODICITY OF IN-WATER SURVEYS An in-water survey may be carried out in lieu of alternate surveys in drydock. 4. IN-WATER SURVEY PROGRAMME An initial application should be made by the owner to Ship Safety indicating the intention to have any ship(s) participate in an in-water survey programme. Upon acceptance of the ship into the programme by Ship Safety Headquarters a preparatory survey in drydock shall be conducted. - 1 -

5. PREPARATORY SURVEY IN DRYDOCK An owner who desires to enter his vessel into the in-water survey programme must first drydock the vessel. The purpose of this preparatory drydocking is to conduct a survey of the hull and appropriate machinery items to evaluate their condition and the feasibility of conducting an inwater survey. In addition the following is required: a) Plans. Three (3) copies of plans showing details of the hull and attachments below the waterline should be provided, one copy of which should be retained on board the ship. The plans should include the following information: (i) (ii) (iii) A shell expansion drawing of the vessel indicating the following information: - external hull markings, - bilge keels, - drain plugs, - watertight and oil tight bulkheads, - all shell openings and means of access, e.g. bolted plates, etc. Specific plans and data detailing (as relevant): - rudder, stock, stern frame and associated fittings, propeller(s), - "A" frames, bossings, any other attachments to the hull, - stabiliser fin boxes, bow thruster(s), - any other item which might be considered to be a - feature for which details would be useful in the - context of undertaking an in-water survey Reference data and instructions for the divers for any necessary underwater operations such as means of access to rudder bearings and for determining clearances of rudder bearings or propeller shaft strut and stern bearings, removal of sea suction grids and blanking off of openings. - 2 -

b) Hull Markings. The hull should be permanently marked externally to indicate the position of transverse primary members, transverse and longitudinal bulkheads or frames numbers. This may entail a weld bead grid system on the hull, a contrasting colour system or any other arrangement that is satisfactory to the attending Marine Surveyor. Means should also be provided to orientate the diver. c) Stern Bearings. Means should be provided for ascertaining that the seal assembly on oil lubricated bearings is intact and for verifying the clearance or weardown of the stern bearing. For wood or rubber bearings, an opening in the top of the rope guard and a suitable gauge or wedge should be provided for checking the clearance by the diver. d) Rudder Bearings. Means and access should be provided for determining the condition and clearance of the rudder bearings and for verifying that all parts of the pintle and gudgeon assemblies are intact and secure. e) Sea Connections. Means of blanking sea chests and sea connections should be provided for the removal of sea valves unless inspected in drydock. f) Photographs. Colour photographs and/or video tapes of the following items together with a suitable scale should be taken for the purpose of subsequent identification of those items by the diver at the time of in-water survey: - in-water shell openings including those for main inlets, discharge and thrust units, - rudder and shaft closing plates in way of weardown gauge plugs, - additional items as may be considered necessary by the Marine Surveyor. Copies of the photographs and/or video tapes should be readily available on board ship and should also be provided to Ship Safety Headquarters and to the Regional Office concerned. - 3 -

g) Preventative Measures. In preparation for the extended period between drydockings, measures should be taken such as renewal and/or recording of clearance of rudder bearings and bushes, shaft surveys, overhaul of ship's side valves etc., to take account of the maximum time allowed before the next scheduled drydocking survey. 6. IN-WATER SURVEY REQUIREMENTS Prior to each in-water survey, a request should be made by the owner to a Ship Safety office indicating information such as date and location of the survey, general information on the diving company and a schedule for undertaking the in-water survey. The in-water survey should be conducted in accordance with the following requirements: a) Master's Statement. At the time of in-water survey the Master or Owner's representative should provide a declaration of all suspected or actual damage that has occurred since the previous drydocking. b) Survey Site. The proposed survey site should be in a protected location with calm clear water providing good underwater visibility. Sufficient visibility shall be available to enable the Marine Surveyor to ascertain if the hull has undergone any permanent setup or setdown. Special attention should also be given to the effects of current. c) Hull Condition. The hull should be clean for external survey and the Marine Surveyor should be satisfied that the method and quality of pictorial presentation is satisfactory and that the information obtained enables a reliable assessment to be made of the condition of the hull. The survey should be discontinued if the conditions or equipment deteriorate to the extent that the transmitted pictures and/or communications are no longer acceptable. d) Underwater Areas. An examination of the entire vessel below the waterline should be carried out by a competent diver using closed circuit television with two-way communication capable of being monitored by the Marine Surveyor as required. Where practicable the in-water survey should be carried out while the vessel is in Light Operating Condition to facilitate the survey. - 4 -

e) Above Waterline Areas. An examination of the outside of the shell plating above the waterline and exposed portions of appendages should be carried out by the Marine Surveyor. Means should be provided to enable the Surveyor to accomplish this visual examination. f) Internal Inspection. Where a defect or damage is detected or suspected as a result of the in-water survey or the Master's statement, the internal structure should be examined as considered necessary to clarify or confirm the findings. Vessels operating in ice should have the internal structure examined in way of areas which are susceptible to ice damage. In this respect, attention should be given to the hazards associated with entering ship's tanks. g) Report. Copies of the diver's report, pertinent colour photographs and/or video tapes should be submitted to the attending Marine Surveyor and Ship Safety Headquarters for record purposes. 7. REPAIRS AND DEFICIENCIES Any required repairs should be carried out to the satisfaction of the attending Marine Surveyor. 8. NEXT DRYDOCKING The in-water survey report should subsequently be compared with the survey undertaken at the next drydocking to confirm if the vessel condition is still suitable for subsequent in-water surveys. - 5 -