GCSE Design and Technology: Electronics and Control Systems

Similar documents
GCE Applied Science. Mark Scheme for June Unit G628: Sampling, Testing and Processing. Advanced GCE. Oxford Cambridge and RSA Examinations

GCSE. German. Mark Scheme for June General Certificate of Secondary Education Unit A713/01/02: Reading (Foundation and Higher Tier)

Cambridge National Sport Studies. Mark Scheme for January Unit R051: Contemporary issues in sport. Level 1/Level 2

Hand lever valves VHER

Cambridge Technicals Sport. Mark Scheme for June Unit 4: Working safely in sport, exercise, health and leisure

Suitable for anyone who is required to maintain industrial pneumatic systems. No prior knowledge of pneumatic or electrical principles is necessary.

Level 3 Cambridge Technical in Sport and Physical Activity 05828/05829/05872 Unit 4: Working safely in sport, exercise, health and leisure

Maximum 0.85 MPa pressure setting Long-life, high flow perfect for balancer applications

GCSE ENGINEERING Mark scheme June Version: 1.0 Final

AUTOMATIC HOSE TEST UNIT, TYPE SPU

LEVEL 1 FUNCTIONAL SKILLS MATHEMATICS 09865

SPECIMEN. All items required by teachers and candidates for this task are included in this pack.

Higher Tier Monday 16 November 2009 Afternoon Time: 1 hour 30 minutes

Product Manual B-Safety ClassicLine & PremiumLine Emergency Eyewash and Eye/Face Wash Equipment

CYLINDER RETEST STATIONS

SF 6 Product Guide. Gas Analysis Instruments and Accessories

THE COMPACT LINE. Mobile power packs in convincing BAUER quality l/min 225 / 330 bar TOUGH RELIABLE WELL ESTABLISHED

Assembling and testing fluid power systems

Tuesday 6 June 2017 Afternoon

RARS5000 AIR BODY SAW OWNER S OPERATING MANUAL

BREATHING AIR FOR LIFE. DRÄGER COMPRESSORS. Cra 28 No. 71b - 25 / / /

Tuesday 6 June 2017 Afternoon

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

ES18 Security Theory/Regulations Answer Schedule

VERTICAL AIR COMPRESSORS

CHAPTER 1 General Part

SAFETY TRAINING LEAFLET 02 BASIC RULES FOR SAFETY AND GOOD HOUSEKEEPING

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

Single and double acting, magnetic, self-centering Bores: ø 16, 20, 25, 32, 40 mm

Morning Time: 1 hour 30 minutes

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL OTHER FLUID POWER VALVES. This work covers part of outcome 2 of the Edexcel standard module:

G622. APPLIED SCIENCE Monitoring the Activity of the Human Body ADVANCED SUBSIDIARY GCE. Thursday 27 May 2010 Afternoon. Duration: 1 hour 30 minutes

General Precautions for handling compressed gases

air/hydraulic nut riveter heavy-duty vacuum system

Introduction to Pneumatics

VS18/26 with PROFINET and EtherNet/IP Interface. ATEX Installation Instructions

LEVEL 1 FUNCTIONAL SKILLS MATHEMATICS 09865

A REFERENCE GUIDE FOR REQUALIFICATION OF GAS CYLINDERS

Friday 19 May 2017 Afternoon

Official Journal of the European Union L 92/3

Post-Standardisation

GCSE Biology. BL3FP Final Mark Scheme June Version/Stage: v1.0

4-7 kw/ hp. Dual Output Compressors (Air/Nitrogen) Driving Nitrogen Forward

SEMEM3-73 Maintaining medical gas pipeline systems and equipment

MOBILAIR M 235. Portable Compressor With the world-renowned SIGMA PROFILE Flow rate 18.1 to 23.3 m³/min ( cfm)

Workshop Compressors CLASSIC Series

Tourniquet System. Ideal for single or bi-lateral orthopaedic surgery and pain management

COMMON PRECAUTIONS Data Sheet - Be Sure To Read Before Handling Page 1 of 6

GCSE 4241/02 GEOGRAPHY (Specification B) HIGHER TIER UNIT 1

Rapidmain Installation Guide

FV Flash Vessel Installation and Maintenance Instructions

Instruction Manual EMA 84 Digital Pressure Gauge

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

Factors that affect the motion of a vehicle along a surface

Compressed Airline Breathing Apparatus

3-Jaw Parallel Gripper

Norrsken Family Booklet

AutoDrill s OUTSTANDING FEATURES

Level 3 Cambridge Technical in Sport and Physical Activity 05828/05829/05872

TWIN CYLINDER RAPID INFLATOR With Direct Battery Connection

V-Major, V-Compact. Reciprocating Compressors. Intelligent Air Technology

Operating Manual. R280 Pressure regulator made of brass. 1. Intended Use

Installing, Repairing or Modifying Construction Resources by Heating, Welding, Brazing, Soldering and Thermal Cutting in the Workplace L/505/0144

Eliminating Dropped Objects at the Worksite

AIR DRIVEN LIQUID PUMPS AIR DRIVEN AIR AMPLIFIERS AIR DRIVEN GAS BOOSTERS HIGH PRESSURE VALVES, FITTINGS AND TUBING TEST AND CALIBRATION EQUIPMENT

Valves, manually operated

Product Sheet Spraymist Unit

General maintenance engineering applications

EU minimum requirements. Training and certification for personnel and companies

Locator Locator-D-Lux Air-Saver G1 Air-Saver G2

COMPRESSED AIR DISTRIBUTION SYSTEMS

Daily Investment on Pneumatic Conveyor

Related Products: Auto Drain Valve. Model/Specifications. Model

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

Producing Aircraft Detail Assemblies. Ofqual unit reference number (code) Organisation Reference M/508/4691. Unit Level Level 2. Unit Sub Level GLH 64

Valves, manually operated

Innovation Electrical Industry

Oxygen Usage Best Practice Guide

G10K - 1/2" Heavy-Duty Air Impact Wrench

Series IRV1000/2000/3000

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

VERTICAL AIR COMPRESSORS

7.0 Compliance certificates

2-Jaw-Parallel Gripper

PROSTHETIC ACTUATION: A CASE FOR PNEUMATICS.


Method Statement: Testing Dry Riser System

The ultimate powered air purifying respirator

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

USERS HANDBOOK. This handbook refers to all Pro-Sport models

General maintenance engineering applications

DIN/ISO Parallelgripper 2-Jaw Parallel gripper

Cambridge Technicals Sport. Mark Scheme for January Unit 4: Working safely in sport, exercise, health and leisure

M03 WUNDATRADE. Heat Pump Manifold. Before you start: Check the contents. Optional. ...a division of WUNDA GROUP PLC

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN GASFITTER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

METHOD 3A - DETERMINATION OF OXYGEN AND CARBON DIOXIDE CONCENTRATIONS IN EMISSIONS FROM STATIONARY SOURCES (INSTRUMENTAL ANALYZER PROCEDURE)

Series Environmental Chambers

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

AirElite 4h KO₂ closed circuit breathing apparatus

Transcription:

GCSE Design and Technology: Electronics and Control Systems Unit A515/02: Sustainability and technical aspects of designing and making pneumatics General Certificate of Secondary Education Mark Scheme for June 2017 Oxford Cambridge and RSA Examinations

OCR (Oxford Cambridge and RSA) is a leading UK awarding body, providing a wide range of qualifications to meet the needs of candidates of all ages and abilities. OCR qualifications include AS/A Levels, Diplomas, GCSEs, Cambridge Nationals, Cambridge Technicals, Functional Skills, Key Skills, Entry Level qualifications, NVQs and vocational qualifications in areas such as IT, business, languages, teaching/training, administration and secretarial skills. It is also responsible for developing new specifications to meet national requirements and the needs of students and teachers. OCR is a not-for-profit organisation; any surplus made is invested back into the establishment to help towards the development of qualifications and support, which keep pace with the changing needs of today s society. This mark scheme is published as an aid to teachers and students, to indicate the requirements of the examination. It shows the basis on which marks were awarded by examiners. It does not indicate the details of the discussions which took place at an examiners meeting before marking commenced. All examiners are instructed that alternative correct answers and unexpected approaches in candidates scripts must be given marks that fairly reflect the relevant knowledge and skills demonstrated. Mark schemes should be read in conjunction with the published question papers and the report on the examination. OCR will not enter into any discussion or correspondence in connection with this mark scheme. OCR 2017

Annotations Annotation Meaning Blank Page this annotation must be used on all blank pages within an answer booklet (structured or unstructured) and on each page of an additional object where there is no candidate response. Level 1 Level 2 Level 3 Noted but no credit given Tick 3

SECTION A Question Answer Mark Guidance 1 A 1 2 A 1 3 B 1 4 D 1 5 A 1 6 Reduction in the amount of waste materials. 1 Allow other valid responses related to less environmental pollution. 7 Reduction in emissions of carbon dioxide or greenhouse 1 gases made in order to compensate for an emission made elsewhere. 8 Use less energy / power 1 Last longer Easier recycling process and less waste. 9 The colour red is often used in warning and hazard 1 signs It symbolises danger It stands out against other colours It is a very visible colour in daylight. 10 Refuse 1 11 True 1 12 True 1 13 False 1 14 False 1 15 False 1 4

Question Answer Marks Guidance 16 (a) Any of the following: 3 Accept any other valid response. Spring loaded Quick lock and release button - allow control button Do not allow extendable, portable or ergonomic with no link Comfortable (ergonomic) handle to a feature. Flexible lead Clip is attached easily to dog s collar Durable / tough plastic case. 3 x 1 marks (b) Batteries have limited life / need to be replaced 2 Accept any two answers or other valid response. No harm to the environment No batteries to dispose of No additional expense e.g. battery disposal. 2 x 1 marks (c) Simple statement e.g.: its properties can change. (Does not state how the change is triggered) 1 mark. 2 (d) A material whereby its properties can be changed by external stimuli, such as stress, temperature, moisture, ph, electric or magnetic fields, 1 mark. Both features included in the redesign [2 x 1] Specific materials identified [1] Components identified [1] Helpful annotation to explain thinking. [1] 5 5

Question Answer Marks Guidance (e) Low cost to manufacture Easy to work / shape / form Can be recycled / made from recycled materials Biodegradable Print directly to surface / decorate Protect contents Durable / strong Lightweight and easy to transport. 2 x 1 marks 2 6

Question Answer Marks Guidance Content Levels of response (f)* Advantages Improved living standards Increase in public health benefits Interconnected nations share best practice. Kyoto Protocol, for example Larger markets, create more jobs Ease of internet purchase. Disadvantages Worldwide shortages of finite materials Worker exploitation (ETI) Increased energy consumption impact on carbon footprint transportation impact toxic waste in relation to production & manufacture Changes to social and spiritual well being Spread of human, animal and plant diseases. Maximum of 2 marks for a bullet point list. Level 3 (5-6 marks) Thorough explanation, with examples, showing a clear understanding of how globalisation affects the environment. There may be three or more clearly identified and explained points. Specialist terms will be used appropriately and correctly. The information will be presented in a structured format. The candidate will demonstrate the accurate use of spelling, punctuation and grammar. Level 2 (3-4 marks) Adequate explanation, possibly with examples, showing a sound understanding of how globalisation affects the environment. There will be some use of specialist terms, although these may not always be used appropriately. The information will be presented for the most part in a structured format. There may be occasional errors in spelling, grammar and punctuation. Level 1 (1-2 marks) Basic explanation, possibly without examples, showing some understanding of how globalisation affects the environment.. There will be little or no use of specialist terms. Answers may be ambiguous or disorganised or list like. Errors of grammar, punctuation and spelling may be intrusive. [6] 7

(0) Response worthy of no marks. TOTAL [35] 8

SECTION B Question Answer Mark Guidance 17 (a) (i) Name Symbol A air supply [1] B... exhaust [1] C bi-directional flow restrictor [1] [7] double acting [1] cylinder [1] D... (ii) E... push button spring return [1] 3 port 2 way valve [1]... Wear in components can be reduced by using: A lubricator unit, 1 mark. in the air line, 1 mark Filter unit, 1 mark and drain valve, 1 mark Electroplating components, 1 mark to resist corrosion, 1 mark Use of a cushioned cylinder, 1 mark to prevent damage when valves change state, 1 mark. [2] Accept reference to oil in the compressed air or used externally on components. Accept reference to the result of cushioning. Accept reference to reducing friction. 9

(b) (i) The cylinder will begin to outstroke [1] and return as soon as valve V is released. [1] [2] (ii) The cylinder will outstroke [1] and remain outstroked, drilling the hole [1]. [2] (iii) Different materials require different drilling speeds, 1 mark. [1] (iv) A risk assessment should be carried out. [1] TOTAL 15 Accept reference to hardness of materials Allow any other valid response, including suitable PPE. 10

Question Answer Mark Guidance 18 (a) (i) tube to be drilled cylinder A valve V 1 mark for each correct connection, 4 x 1 marks. drill jig valve W valve X cylinder B [4] cylinder C valve Y valve Z (ii) Secure fixing, 1 mark Allow for removal,1 mark Accurate alignment, 1 mark Drill prevented from twisting against bracket, 1 mark Clear annotation of sketches, 1 mark. [5] 11

Question Answer Marks Guidance Content Levels of response (b)* Discussion should include some but not all of the following points: Reliability Low maintenance Interchangeable parts Flexible system with most components being robust and able to stand up to hostile environments. Health and Safety No risk of electric shock when working in wet conditions Cost Risk of air lines becoming unattached and causing damage Risk to user of compressed air or pressurised oil against skin. High initial setup cost The majority of components can be reused in a new setup Less risk of obsolescence than Maximum of 2 marks for a bullet point list. Level 3 (5-6 marks) Shows detailed understanding of reliability, safety and cost aspects in pneumatic equipment. Suitable examples used. Specialist terms will be used appropriately and correctly. The information will be presented in a structured format. The candidate can demonstrate the accurate use of spelling, punctuation and grammar. Level 2 (3-4 marks) Shows some understanding of reliability, safety and cost aspects in pneumatic equipment. There will be some use of specialist terms although theses may not always be used appropriately. The information will be presented for the most part in a structured format. There may be occasional errors in spelling, punctuation and grammar. Level 1 (1-2marks) Shows understanding of reliability, safety and cost aspects in pneumatic equipment. No examples used. There will be little or no use of specialist terms. 12

electronic components Parts are readily available and system can generally be repaired. [6] Answers may be ambiguous or disorganised. Errors of grammar, punctuation and spelling may be intrusive. 0 Response worthy of no marks. TOTAL [15] 13

Question Answer Mark Guidance 19 (a) (b) V W V Y V X/Z Z/X Rearrangement of formula P = F / A, 1 mark Substitution of values P = 60 / π x 12.5 x 12.5, 1 mark 60 / 490.6, 1 mark P = 0.12 Nmm -2, 1 mark. [5] [4] Do not award first two boxes as these are given on the question. Allow the last two boxes in any order X-Z or Z-X 1 mark each for order of cylinder operation, 3 x 1 marks. 1 mark each for operating valve V to drill hole in all positions. Award 4 marks fr correct answer with no working. (c) (i) Reed switch, 1 mark Cylinder, 1 mark. [2] Award 1 mark for reed switch without reference to cylinder (ii) When the cylinder outstrokes and instrokes, the magnet at C closes the reed switches at A and B. [1] The closed reed switch can be used to signal an operation by the microprocessor. [1] [2] (iii) There may be a cost advantage as the power (air) is already available near to the drill position, 1 mark Lower cost to operate and maintain, 1 mark There will be no need to have an electrical supply to the circuit, 1 mark. Safer, as no sparking can occur, 1 mark [2] 2 x 1 marks Higher torque available, 1 mark Pneumatic powered drill will be more robust / reliable and require less maintenance, 1 mark. TOTAL 15 14

OCR (Oxford Cambridge and RSA Examinations) 1 Hills Road Cambridge CB1 2EU OCR Customer Contact Centre Education and Learning Telephone: 01223 553998 Facsimile: 01223 552627 Email: general.qualifications@ocr.org.uk www.ocr.org.uk For staff training purposes and as part of our quality assurance programme your call may be recorded or monitored Oxford Cambridge and RSA Examinations is a Company Limited by Guarantee Registered in England Registered Office; 1 Hills Road, Cambridge, CB1 2EU Registered Company Number: 3484466 OCR is an exempt Charity OCR (Oxford Cambridge and RSA Examinations) Head office Telephone: 01223 552552 Facsimile: 01223 552553 OCR 2017