George Massey Tunnel Replacement Project

Similar documents
George Massey Tunnel Replacement Project

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide)

City of Richmond. Report to Committee CNCL - 411

BC Ministry of Transportation and Infrastructure

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

McKenzie Interchange Project Spring 2016 Comment Period. Appendix 1: Display Boards and Feedback Form

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

Highway 1 Kamloops to Alberta Four-Laning Program

CITY OF ABBOTSFORD TRANSPORTATION AND TRANSIT MASTER PLAN

Traffic Data Overview

Welcome to the McKenzie Interchange Project Open House!

APPENDIX 5: STAKEHOLDER MEETING NOTES

DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director

Port Mann/Highway 1 Improvements

395 Express Lanes Extension

STAKEHOLDER MEETING STANFORD RANCH ROAD/GALLERIA BOULEVARD/SR 65 NORTHBOUND RAMPS PROJECT APPROVAL & ENVIRONMENTAL DOCUMENT (PA&ED) PHASE

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

North Vancouver Community Associations Network. November 15, pm to 9 pm

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

Capital Beltway HOT Lanes Project

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Hennepin County Bicycle and Pedestrian Planning

Date: February 18, 2015 Page: 1 of 9. ICBC invests $1.195 million to improve Surrey, Delta & White Rock roads

ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer

Anniedale- Tynehead NCP Best Practices in Transportation Planning Summary

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Durham Region Long Term Transit Strategy

ICBC invests $1.175 million to help make Surrey, Delta and White Rock s roads safer in 2013

Meeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018

Typical Rush Hour Commute. PennyforTransportation.com

Satisfaction with Canada Line and Connecting Buses. Wave 2

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

Guide to travelling to and around Panmure April 2013

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

I-25 PEL: CO Springs Denver South Connection. Presentation to Castle Rock Town Council

Scope of the Transit Priority Project

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

STUDY ADVISORY COMMITTEE. October 8, 2015

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

PRIORITIES RESULTS YOUR PRIORITIES FOR BRIDGEPORT 5% 4% 13% RESIDENTIAL CHOICES TRAILS & PARKS

Frequently Asked Questions (FAQ)

NEW WESTMINSTER AREA STUDY

CHIEF PEGUIS TRAIL EXTENSION WEST

Highway 217 Corridor Study. Phase I Overview Report

41st Avenue B-Line Kerrisdale Village Street Improvements

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

Journey to Excellence. Building Markham s Future Together MARCH 24, 2015 HIGHWAY 407 TO HIGHWAY 7 MAIN STREET MARKHAM

Governance and Priorities Committee Report For the July 2, 2015 Meeting

95 th Street Corridor Transportation Plan. Steering Committee Meeting

Santa Clara I-280 CORRIDOR STUDY

WELCOME. The following materials and resources are available to you:

Active Transportation on the Rise

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

RATE PER RM/NT CODE HOTEL NAME & ADDRESS SEASONALITIES SGL TWN TRP SGL TWN TRP U S D C A D VANCOUVER (YVR) R A T E S I N C L U D E 5 % G S T

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

Capital Beltway HOT Lanes - Frequently Asked Questions

METRO RTA TRANSIT MASTER PLAN. May 25-26, 2011

Project Status Update

Welcome to the Open House

WELCOME Public Information Centre

Classification Criteria

Route 29 Solutions Projects

Transportation Day at the Capitol. Charlie Zelle Commissioner, MnDOT Feb. 16, 2017

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Dumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

Iowa Highway 58 Corridor Improvement Study

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

LONDON s. system TRANSFORMING THE WAY LONDON MOVES

Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee

Chapter 5 Future Transportation

KING STREET TRANSIT PILOT

CAMBRIDGE SOUTH WEST PARK & RIDE

MnPASS System Today and the Future

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

Summary Report. Lower Lynn Improvements - Mountain Highway Interchange Public Information Sessions and Comment Period. February 21 March 11, 2017

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Downey Road. Transportation Improvement Study

PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013

Design Criteria. Design Criteria

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

2015 Data review. Capturing Ready Lane NEXUS vehicles

To: Public Works and Transportation Committee Date: May 24, PROPOSED ROAD SECTIONS IN RICHMOND TO BE ADDED TO TRANSLlNK'S MAJOR ROAD NETWORK

Directions to Coast Plaza Hotel & Suites 1763 Comox St, Vancouver, BC V6G 1P5

Eliminate on-street parking where it will allow for a dedicated bus only lane %

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

DUNBOW ROAD FUNCTIONAL PLANNING

VOLUME 3, ISSUE 10, MARCH in this issue

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

Evaluation of Alternatives and Options For the City of Windsor Sam Schwartz Engineering PLLC January 2005

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

Transcription:

George Massey Tunnel Replacement Project Richmond General Purposes Committee January 18, 2016 GP - 11

Project Consultation 2 2012: Phase 1 consultation (1000+ participants) 2013: Phase 2 consultation (1000+ participants) 2013/14/15: City of Richmond consultation (60+ meetings) Current Phase 3 consultation: December 16 January 28 Two environmental public comment periods: January 15 February 15 and again later in 2016 GP - 12

Overview 3 New 3.3 km bridge (8 lanes plus 2 transit/hov lanes) Replace 3 interchanges; 5 overpasses 24 km of Highway 99 improvements 50 lane-km of transit/hov lanes (transit priority to Canada Line at Bridgeport) Bike and pedestrian pathway Allow for future rapid transit Decommission Tunnel Cost: $3.5 billion Benefit/Cost Ratio: 2.1 to 1 Funding: Funded through user tolls 30-year public private partnership Procurement to begin in 2016 GP - 13

Traffic Analysis: Northbound Traffic Vancouver 40% Burnaby/ New Westminster 1% ORIGIN DESTINATION Richmond 59% George Massey Tunnel Tilbury 8% North Delta/Surrey 19% Deltaport 2% Ladner 17% Tsawwassen 19% U.S. Border/ White Rock/ South Surrey 35% GP - 14

What Happens at the Oak Street Bridge? 5 Morning queues will continue as today; traffic patterns may change somewhat but no significant change in total traffic 60% of tunnel users end their trip in Richmond Efficiency of Oak Street Bridge will continue to be governed by traffic lights at 70 th Street in Vancouver Traffic volumes on the Oak Street Bridge have been constant or declining over the past decade (Canada Line effect) GP - 15

Traffic Analysis: Southbound Traffic Vancouver 34% Burnaby/ New Westminster 1% ORIGIN DESTINATION Richmond 65% George Massey Tunnel Tilbury 7% North Delta/Surrey 21% Deltaport 2% Ladner/ Tsawwassen 34% U.S. Border/ White Rock/ South Surrey 36% GP - 16

Project Goals 7 Reduce congestion Improve safety Support trade and commerce Support improved transit on Hwy 99 Support options for pedestrians and cyclists Enhance the Environment GP - 17

Project Scope 8 Bridgeport Road to Highway 91 GP - 18

New Bridge Scope 9 GP - 19

Project Scope Transit 10 Dedicated Transit connection between Highway 99 and Bridgeport Canada Line Station Integrated Transit Stop: Steveston Highway DELTA Integrated Transit Stop: Highway 17A RICHMOND 50 LANE KILOMETRES OF DEDICATED/MEDIAN TRANSIT LANES GP - 20

11 Project Scope Richmond Cycling/Pedestrian Access Northern Connection: Help bridge the gap from Bridgeport Road to Canada Line Improved Cross-Hwy 99 Access: Shell Road Westminster Highway Blundell Road Steveston Highway: Improved cross Highway 99 access Convenient access to new bridge Improved access to Rice Mill Road and Dyke Trail Access to median transit stop platforms GP - 21

Project Benefit/Cost Analysis 12 User Benefits: Congestion reduction Improved reliability Travel time savings Vehicle operating cost savings Traffic safety (35% reduction in collisions) Reduced seismic risk Cyclist/pedestrian, transit Long-term Economic Benefits GP - 22

Environmental Benefits 13 GP - 23

Agricultural Effects 14 Net gain to agricultural land in Richmond Improved travel time/reliability for perishables Wider lanes, higher clearances for traffic Improved safety Drainage improvements No long term effects from Tunnel decommissioning GP - 24

Navigation/River Depth Effects 15 GP - 25

Schedule 16 Community & Stakeholder Engagement Planning Regulatory Review Three Phases of Consultation Procurement Construction 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 GP - 26

Current Consultation 17 Project Definition Report December 16 January 28 EA Project Review Part 1: January 15 February 15 Part 2: Spring/Summer 2016 Online: masseytunnel.ca In person: Project Office in Richmond Open Houses Email: masseytunnel@gov.bc.ca Online: http://www.eao.gov.bc.ca/pcp/index.html Mail: Michael Shepard Project Assessment Manager Environmental Assessment Office PO Box 9426 Stn Prov Govt Victoria, BC V8W 9V1 Fax: 250-387-0230 GP - 27

Open Houses 18 Tuesday, January 26, 2016 2:00 p.m. to 8:00 p.m. Sandman Signature Hotel Vancouver Airport Round Room 10251 St. Edwards Drive, Richmond BC Wednesday, January 27, 2016 2:00 p.m. to 8:00 p.m. Delta Town & Country Inn Ballroom 6005 Highway 17A, Delta BC GP - 28

George Massey Tunnel Replacement Project masseytunnel.ca 1-8-555-MASSEY 2030 11662 Steveston Highway (Ironwood Plaza) GP - 29