nhc northwest hydraulic consultants water environment solutions VIA VIA COURIER December 8, 2003

Similar documents
Shovelnose Creek Off-Channel Complex Berm Repair

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

Lakelse Sockeye Recovery Program

Cheakamus River IR 11 Floodplain Restoration Final Report Project Number 13.CMS.01

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

Lagoon Spawning Bed Rehabilitation

COA-F17-F-1343 YEAR END REPORT

Prescription to Restore Stream 11 (Orphan Channel) in the Burman River Watershed, March 2007

Fish Passage Culvert Inspection (FPCI) Nicklen Creek Watershed

Creation of Fish and Wildlife Habitat on the Closed Salmon Harbour Mine in Minto, NB

Skeena Salmon. Skeena River Basin. Sockeye Escapement ( ) 1. Average number of spawners. Introduction. Total Accessible Stream Length (km)

Job Performance Report, Project F-73-R-9 Subproject II: SALMON AND STEELHEAD INVESTIGATIONS Study I: Salmon Spawning Ground Surveys

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Northwest Hydraulic Consultants (NHC) is pleased to submit this assessment of the wave climate at Lazo Road, Comox.

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

JAP Additional Information Sheet

Project Completion Abstract Fish Passage Activity ( Engineering Activities)

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

Steelhead Stock Status Review British Columbia

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Trout Buffer Variance

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5

Rivers Inlet Salmon Initiative

Campbell River Elk Falls #3 Intake and Connector Channel Construction Summary

Relationships Between Aggregate Extraction, Groundwater and Salmonid Populations in a Southern Ontario Trout Stream.

Sockeye Reintroduction program. April 12, 2014 BCWF AGA Howie Wright

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Okanagan Sockeye Reintroduction

SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING. Kara Hurtig, Water Resources Engineer, Northwest Hydraulic Consultants, BC, Canada

1 INTRODUCTION AND SUMMARY

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

Ned Currence, Nooksack Indian Tribe

Climate Change Adaptation and Stream Restoration. Jack Williams;

RESPONSE TO COMMENT: 45

Follow this and additional works at:

Terms and Conditions for Changes In and About A Stream Specified by MOE Habitat Officers, Cariboo Region

September 4, Update on Columbia basin Salmon and Steelhead Recovery Planning

Terms and Conditions for Changes In and About A Stream Specified by MWLAP Habitat Officers, Cariboo Region

MCCAW REACH RESTORATION

Proposed 2018 Fisheries Management Measures to Support Recovery of Interior Fraser River Steelhead

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

STEELHEAD SURVEYS IN OMAK CREEK

Don Pedro Project Relicensing

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0

REPORT TO THE MINISTER OF NATURAL RESOURCES. Pursuant to an appointment made by the Honourable Frank S. Miller, Minister of Natural

EcoLogic Memorandum. TO: Ben Brezell; EDR FROM: Mark Arrigo RE: Possible Impacts of Dredging Snooks Pond DATE: 6/4/07

Watershed Watch Salmon Society 2007 Annual Report

STREAM CLASSIFICATION AND MAPPING. Prepared For. MacMillan Bloedel Ltd. Menzies Bay Division BOX 6000, Campbell River V9W 5E1.

THE DON DISTRICT SALMON FISHERY BOARD RIVER DON DRAFT GRAVEL MANAGEMENT PLAN NEWE DAM

River Restoration: Culvers Island weir removals and river naturalisation project.

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

Please teach your students and supervisors the following considerations:

Photo 1: Typical 4 Weephole

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Fish Passage Culvert Inspection (FPCI) 12 Sites on TFL 18 (FIA ) 1 Site on FL #A18688 (Thuya Creek) (FIA )

Nechako white sturgeon are an Endangered Species

Ecology of Place: What salmon need Eric Beamer Skagit River System Cooperative. November 2010

NUMERICAL AND PHYSICAL MODELING

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

Firth Creek Habitat Enhancement Project 1993

UNDERWATER BRIDGE INSPECTION REPORT METRO DISTRICT - ANOKA COUNTY

What is causing declines in the annual returns of Fraser River sockeye salmon?

Yakima/Klickitat Fisheries Project

R & E Grant Application 13 Biennium

APPENDIX G DREDGING STUDIES. G.1: Fish Related Dredgi g I pacts a d Mitigatio

Ninilchik Harbor Page 2 of 11

Salmon and Migratol~Y Trout of the N,anaimo 'River lind Adjacent Streams (Revised 1,973)

Press Release New Bilateral Agreement May 22, 2008

Salmon and Steelhead in the American River Tim Horner, PhD Geology Department California State University, Sacramento

LIFE HISTORY DIVERSITY AND RESILIENCE

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

Site Tour, August 24, Fish Science - Big Lake Coho Salmon Migration and Habitat Use

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

North American Salmon Stronghold Partnership. Harrison Basin Certification Application

NORTHAMPTON COUNTY WETLANDS BOARD Minutes December 15, 2010

COAL CREEK PARKWAY CULVERT/BRIDGE CITY OF BELLEVUE

Fish Habitat Rehabilitation in the Englishman River, 2006

BC Ministry of Forests. March Fish Stream Crossing Guidebook. Forest Practices Code of British Columbia.

Annex E Bridge Pier Protection Plan

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Steelhead Sport Fishing Regulations Proposals Vancouver Island Region for April 1, 2007

The Calawah River System

APPENDIX A AGENCY COORDINATION

Stormwater Level of Service Study - Phase 2 Flooding Adjacent to Rock Creek

FISH PASSAGE DESIGN FOR UNNAMED CREEK

Alaska Sustainable Salmon Fund Statement of Work

Future Condi,ons coastal hazard modeling and mapping

Chutes Part 2: Synthetic linings

PRELIMINARY STORM DRAINAGE REPORT

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

2012 Bring Back the Natives Awarded Projects

The Wild Trout Trust. Giving Wild Trout A Future!

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District

SITE C FISHERIES STUDY UPPER HALFWAY RIVER WATERSHED BULL TROUT SPAWNING SURVEY 2008

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

FACT SHEET MCGREGOR LAKE RESTORATION HABITAT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN ENVIRONMENTAL MANAGEMENT PROGRAM

Transcription:

water environment solutions 3-3983 VIA EMAIL VIA COURIER December 8, 2003 Western Forest Products Ltd. 118-1334 Island Highway Campbell River, B.C. V9W 8C9 nhc ATTN: Mr. Ken Hall Manager, Environmental Restoration & Certification Audits Dear Ken: RE: MACHMELL RIVER INTAKE Connection Channel Completion Report and Schedule A Certificate n o r t h w e s t h y d r a u l i c c o n s u l t a n t s 30 gostick place north vancouver british columbia canada V7M 3G2 tel (604) 980-6011 fax (604) 980-9264 www.nhcweb.com I have reviewed photographs taken of the completed work and have had further discussions with Alma Vantschip regarding the excavation of the connection channel. The design memorandum (dated November 21, 2003) has been attached for reference. Photos 1 and 2 show construction of the channel and the initial flow as the connection is made with the mainstem. Water is now flowing along the right bank to the intake (Photo 3). Based on our review, it is our opinion that the project was completed as recommended in the design memorandum, with no significant changes to the intended design. A completed Schedule A is attached for the project. Please contact our office if you have any questions, or require further information. Sincerely, northwest hydraulic consultants Bruce Walsh, P.Eng. Principal c: Alma Vantschip

nhc Photo 1 Final excavation of connection channel. Photo 2 Initial flow into the connection channel.

Photo 3 Increased flow at intake. nhc

Leaders in water resource technology nhc memorandum Date: November 21, 2003 Project: Subject: To: Machmell River Intake Winter Low Flows Ken Hall, Western Forest Products Ltd. From: Bruce Walsh, nhc File: 3999 Doc: nhc attended a site inspection on November 20, 2003 to assess recent channel changes on the Machmell River near the Xausmdas Sockeye Spawning Channel. The site inspection included Alma Vant Schip (ARM), Brad Koroluk (DFO Bella Coola), Sandie McLaurin (Bella Coola), and Wayne Pederson (DFO Regional HQ). Site Inspection The following key hydrotechnical observations were made during the site inspection: Conclusions A large storm during the early part of October caused extensive floodplain erosion for a number of kilometers upstream of the intake (Photo 1) Large quantities of wood and sediment were introduced into the channel which has caused a reduction in the flow along the right bank at the intake (Photo 2) The intake is isolated from the main channel, although groundwater currently supplies 45L/s of flow at the intake (Photo 3). The biologists indicated that sockeye salmon were present in the ponded water along the right bank and that some spawning had occurred along the right bank. The groundwater flow at the intake is expected to decrease as flow in the main channel recedes in the coming winter months. This will also result in the drying of the wetted area along the right bank both upstream and downstream of the intake (and was noted by the biologist that this could affect survival of salmon eggs along the right bank). The channel changes due to the October event are temporary, and occurred due to the intense short duration of the event. During next summers runoff period, when the longer duration of higher flows occurs, flow along the right bank is expected to re-establish connection with the main channel. Page 1 of 2

nhc memorandum Recommendations To provide flows along the right bank and to augment groundwater flow at the intake, it is recommended that a short connection channel be excavated along the right bank as shown in Photos 2 and 4. The connection channel would be about 3 m wide on the bottom and extend about 40 m through the gravel bar. The channel would be excavated about 1m deep at the downstream to about 0.5 m at the upstream end. All excavated material is to be side-cast and thinly spread over the left gravel bar. I trust this meets your immediate requirements. Please call me at (604)-980-6011 if you have any questions or require further information. Yours truly, northwest hydraulic consultants ltd. Bruce Walsh, P.Eng. Page 2 of 2

Photo 1 About 3 km upstream of the intake viewed downstream. Extensive erosion of the right floodplain has introduced sediment and debris into the channel.

Intake Proposed connection channel Photo 2 Downstream view of debris and sediment that has temporarily reduced flows along the right bank. Note location of intake and ponded water along right bank. (Note that the location of the proposed connection channel is also shown.)

Photo 3 Groundwater supply at the intake, with about 45 L/s entering the Xausmdas channel.

Excavated Material Connection Channel Photo 4 Recommended location of the connection channel. The connection channel would be about 3 m wide on the bottom and extend about 40 m through the gravel bar. The channel would be excavated about 1m deep at the downstream end bout 0.5 m deep at the upstream end. All excavated material is to be side-cast and thinly spread over the left gravel bar.