TIP Scheme List Huntingdonshire

Similar documents
St. Ives Transport Strategy

TIP Scheme List East Cambridgeshire

St Neots Market Town Transport Strategy

= <10k <250k = <500k = 500k+ Major schemes

Cycle Network Background Paper

Chelmsford City Growth Package

Appendix 11 Barton Greenway Review

The Ramsey Market Town Transport Strategy 26 th April 2010

HISTON ROAD Have your say on better public transport, cycling and walking journeys

Scheme Category. Traffic Management. Traffic Management. Implementation LBAS ,000. Traffic Management. Traffic Management. Traffic Management

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

Yorkhill & Kelvingrove Community Council Cycling Village Proposal. Yorkhill Kelvingrove Cycling Village (1.3)

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

THE STRATEGY: PROPOSED PROJECTS TO BE DELIVERED. Walking

MAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June

NW Bicester Masterplan. Access and Travel Strategy Appendix 2 Walking and Cycling Linkages

Strategy for Walking & Cycling Action Plan

CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update

MILTON ROAD LLF PROJECT UPDATE

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Guildford Borough (Draft)

TRAFFIC INFORMATION. road closures and diversions

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

Chelmsford City Growth Package

Introduction. Prince Street Cycling Ambition Fund Public Realm Project

CAMBRIDGE SOUTH EAST. Transport Study. Consultation extended to 9 April. Formerly known as A1307, Three Campuses to Cambridge.

CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE

ENFIELD TOWN THE REVISED DESIGN

1.2. South Cambridgeshire Local Plan Proposed Submission, July 2013

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

CAMBRIDGE EAST SUSTAINABLE TRANSPORT STUDY

North West Non-Technical Summary of the Transport Assessment September 2011

Audit No. RSA Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection

Design Workshops Summary of all Feedback January 2017

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

SCHEME DESIGN AND ENGINEERING

Bulwell Cycling Consultation

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

Appendix 1 Greenway Standards

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

National Cycle Network Funding Scheme 2012/2012 Application Form. Waterford City Council. Paul Cleary, Executive Engineer. 3.2km 289, ,000

Madingley Road / A428 Corridor Study Options Appraisal Report Cambridgeshire County Council. 20 June 2014

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE

MARKHOUSE ROAD IMPROVEMENTS

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

Green Streets and Urban Greenways

Angel Drove carpark 3/day

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cambourne to Cambridge Better Bus Journeys Cambridge City Centre - Potential Bus Priority Greater Cambridge Partnership. July 2017

Explanation of Draft Scheme of The Project for Upgrading of Kukum Highway

A1307 HAVERHILL TO CAMBRIDGE CORRIDOR

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

A27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised

Cycle Superhighway 4 from Tower Bridge to Greenwich

CUERDEN TRANSPORT PROPOSALS

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

ECONOMY PEOPLE ENVIRONMENT

The Rower Traffic Management Scheme

Transportation Corridor Studies: Summary of Recommendations

The Chatteris Market Town Transport Strategy

Community engagement guide May 2018

The Wincheap Society

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Comments on the Hailsham to Eastbourne Sustainable Transport Corridor

Background. Caversham a vision for the future. Joint public meeting arranged by:

City Deal Public Consultation Response - Cambourne to Cambridge Better Bus Journeys A428/A1303 Improvements

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

Mill Hill Broadway Capacity Improvement

Tonight is for you. Learn everything you can. Share all your ideas.

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Navan Cycle Network (Athlumney to Trim Road Cycle and Pedestrian Scheme) Part 8 Report

1.0 Introduction. Long standing options identified in the 2006 South Marston Village Report.

City of Wells Cycle Network

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants

SH1 Western Belfast Bypass Transportation Assessment

BICYCLE RESEARCH REPORT NO. 129

How do we design for pedestrians? Case study: transforming the Walworth Road

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

10 SHERFORD Town Code

Principles. 4biii. Good Urban Design

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

Cambridge Past, Present & Future Wandlebury Ring, Gog Magog Hills Babraham, Cambridge CB22 3AE Phone

to the Public Information Centre for the Downtown Traffic Study

Parapet Heights on Cycle Routes

Local Highway Panels Members Guide. 5 Crossing Facilities

Devonport City Cycling Network Strategy

Initial ideas for bus and cycle links

College Green traffic management changes

Improving Thetford Cycling Provision. In and Around Thetford

Transcription:

Scheme List 2018 - Huntingdonshire C = cycling, W = walking, P = public transport, T = traffic and highway, S = safety 265 T A1096 junction capacity enhancements Highway Capacity Improvements LTTS around St Ives 266 T S B1090 Sawtry Way, between A141 and Highway Capacity and Safety LTTS A1123 Improvements 267 P St. Ives key bus stop locations Bus Stop improvement St Ives 268 P St Ives, A1123 Houghton Road, from B1090 to Hill Rise On Street bus priority measures St Ives 269 T St Ives; Needingworth Road, Pig Lane, Traffic Management Scheme St Ives Meadow Lane 271 T St Ives; Burstellars and The Pound Traffic Management Scheme St Ives 273 C W St Ives, Houghton Road and Saint Audrey Lane, A1123, route 3 276 C P St Ives bus station and key locations within St Ives 278 C W S St Ives, A1123 Crossing - access to/from Compass Point Business Park Walking and Cycling schemes St Ives Delivery in progress New Cycle Parking Facilities St Ives Improved pedestrian and cycle crossing 284 P St Neots, bus stops on Cambridge Road New Real Time Passenger Information Displays 285 C St Neots, St Neots Road, route 3 and Cycling and Walking route 2 St Ives St Neots St Neots & LSTF Audit 286 W St Neots, public footpath 32 Cycling and Walking St Neots 288 P High Quality Bus Network Infrastructure, St Ives (Busway) to Wyton Airfield and Alconbury Weald Public Transport Improvement LTTS 289 P High Quality Bus Network Infrastructure, St Ives (Busway) to Huntingdon. Public Transport Improvement LTTS 290 P High Quality Bus Network Infrastructure, Alconbury Weald to Huntingdon Public Transport Improvement LTTS 292 P Alconbury Weald Transport Interchange Public Transport Improvement LTTS 293 P Wyton Airfield Transport Interchange Public Transport Improvement LTTS 294 P Hartford Transport Interchange Public Transport Improvement LTTS 295 T A141 northern bypass capacity Highway Improvements LTTS enhancements around Huntingdon 296 T A141 Alconbury Weald / Enterprise Zone Highway Improvements LTTS southern access 297 T Wyton Airfield Access Highway Improvements LTTS 298 T A1 capacity improvements at Buckden roundabout 299 C W Wyton Airfield cycle and pedestrian link to Huntingdon Highway Improvements LTTS Cycling and Walking 301 C W Alconbury Weald development to key destinations; Alconbury Village, North Huntingdon, Great Fen Cycling and Walking 303 C W Ermine St/ Northbridge development Cycling and Walking 304 P New regular bus service to serve key locations within Stukeley Meadows, Huntingdon, and Hinchingbrooke vicinity Public Transport Scheme Page 1 of 6

Scheme List 2018 - Huntingdonshire 305 P Huntingdon, town centre to Public Transport Scheme 306 C The Stukeleys to Stukeley Meadows Cycleway provision 307 C W Stukeley Meadows to Town Centre Cycling and Walking 308 C W Alconbury Weald to Town Centre Cycling and Walking 309 C Oxmoor to Town Centre Cycleway improvement 310 C Wyton to Hartford to Town Centre Cycleway Improvement 311 C W to Town Centre: Post Street, Causeway, NCN51, Cambridge Road Traffic Calming; Cycling and Walking improvements 312 C W to Town Centre Cycling and Walking 313 C W Brampton to Town Centre Cycling and Walking 317 P Houghton & Wyton A1123 Public Transport bus stop infrastructure scheme Delivery in progress 318 P Huntingdonshire Community Transport Area Public Transport Scheme 322 P Key routes and destinations in Huntingdon - bus service Bus Service Revenue Support 323 P Alconbury Weald Station Public Transport Scheme 324 P Key routes and destinations St Ives, Public Transport Scheme Huntingdon, Alconbury and Peterborough - busway service 325 P Potential P&R sites on public transport corridors from Huntingdon Feasibility study to investigate role of park & ride 327 T Sapley Road, Hartford Traffic Calming Page 2 of 6

Scheme List 2018 - Huntingdonshire 328 T Main approaches to the ring road Huntingdon Parking Scheme - introduce a Variable Message Signing system 333 T A14 Bypass Air Quality Management 336 P Many bus stops around Ramsey Installation of RTPI display screens Ramsey 339 W Off-road route from Upwood School to High Street and Abbey School, Ramsey Walking and Cycling schemes Ramsey 340 C W North of Ramsey, to the Great Fen Walking and Cycling schemes Ramsey 341 C Maltings, to the High Street, Ramsey Walking and Cycling schemes Ramsey 343 C Northern Gateway Site, to Abbey School, Walking and Cycling schemes Ramsey Ramsey 344 C W From Ramsey towards Warboys and Walking and Cycling schemes Ramsey Wistow Woods via disused railway 345 C W Link from Ramsey to Ramsey Forty Foot Walking and Cycling schemes Ramsey 346 C W Key locations around Ramsey town centre New Cycle Map Ramsey 577 T A141 future Huntingdon Bypass alignment Highway Improvements LTTS 598 C W Between Little Paxton and St Neots Footway / Cycleway improvement St Neots 599 P Between proposed development on Mill Lane, Little Paxton, St Neots Railway Station and St Neots town centre / market square Bus Service Revenue Support St Neots 626 P Throughout St Neots Improvements to Bus Stop Infrastructure, including investigation of potential bus station 636 P Bus service linking St Ives with proposed supermarket located south of A1123 (Needingworth Road) and east of A1096 New / upgraded / extended bus service St Neots St Ives 637 W Between St Ives and proposed supermarket located south of A1123 (Needingworth Road) and east of A1096 Pedestrian Signage Boards St Ives 642 T Priory Road, St Neots Implementation of a Traffic Regulation Order St Neots 647 P Between development located at Orchard House, Houghton Road and key locations in St Ives Bus Service Revenue Support St Ives 648 P Yaxley: Opposite Chapel Street, Broadway Bus Shelter Installation 680 P Throughout Provision of Real Time Passenger Information facilities at existing bus stops 681 P Between and Huntingdon and and Cambridge Bus Service Revenue Support 687 W T S Area around Abbots Ripton Environmental and public realm enhancement measures Page 3 of 6

Scheme List 2018 - Huntingdonshire 689 T A141/A1123/B1514 roundabout, Huntingdon Minor Junction Improvement 690 T Post Street, The Causeway and Cambridge Street, Local Transport Management Measures 691 T Riverside Road / Avenue Junction in Junction Improvement 695 C W St Neots - Bridge over River Great Ouse Northern crossing pedestrian/cycle bridge 696 T St Neots, at bridge on northern link to Little Paxton Explore options for improvements to prevent flooding at St Neots bridge to Little Paxton St Neots St Neots 697 T St Neots, Priory Lane Review of traffic management measures in town centres, including option of allowing left turn only to cars entering town centre at Priory Lane St Neots 698 W St Neots, path that follows Hen Brook behind Hampden Way/ Howitt's Lane, Eynesbury Upgrade of path that follows Hen Brook behind Hampden Way/ Howitt's Lane, Eynesbury St Neots 699 W St Neots, Ireton Close along Hen Brook to join Cromwell Road Continuation of path at back of Ireton Close along Hen Brook to join Cromwell Road St Neots 700 T Little Barford roundabout Lights at roundabout St Neots TC 701 W High Street (St Neots) Pedestrian improvements St Neots 702 C St Neots Eaton Ford, Great North Road, Cycle Route 4 Widen footway between Lowry Road & Queens Gardens St Neots 703 C W St Neots, Cambridge Street Pedestrian crossing and access improvements St Neots 704 W P T St Neots, New Street Speed reduction measures St Neots 705 W St Neots, Huntingdon Street Pedestrian improvements LSTF Audit 706 W St Neots, Huntingdon Road Relocate pedestrian crossing St Neots 707 W St Neots, Huntingdon Road Pedestrian improvements St Neots 708 W St Neots, Crosshall Road Pedestrian improvements St Neots 709 C W St Neots, Mill Hill Road Cycle / pedestrian improvement St Neots 710 W T St Neots, Montagu Street Raised table at existing crossing point 711 W P S St Neots, Priory Hill Road Slope stabilisation and edge protection, plus pedestrian improvements 712 C St Neots, Station Road Convert cycle track from segregated to unsegregated 713 W St Neots, Station Road Improve pedestrian crossing facilities St Neots St Neots LSTF Audit St Neots 714 W St Neots, Hawkesden Road Footway improvements St Neots 715 S St Neots, Kimbolton Road Parapet upgrade St Neots 716 C W St Neots, Longsands Road Footway improvements St Neots Page 4 of 6

Scheme List 2018 - Huntingdonshire 717 W St Neots, Cromwell Road Footway improvements St Neots 718 W S St Neots, Cambridge Road Pedestrian improvements St Neots 719 C Great North Road (Little Paxton) Widen footway/create shared use facility St Neots 720 C St Neots, Riverside Park Improvements to paths/cycle routes 721 C St Neots, Priory Park Improvements to paths/cycle routes 722 C St Neots, Hen Brook Improvements to paths/cycle routes St Neots St Neots St Neots 723 C Cycle Route 12 near St Neots Footway / Cycleway improvement LSTF Audit 724 C St Neots, Keys Walk Footway / Cycleway improvement St Neots 725 C W FP 56 (St Neots Road to Peppercorn Lane - "Back Path") Footway / Cycleway improvement 727 W Eynesbury - Town Centre To include improved tactile paving, guard railing, new signs and maintenance where appropriate. To include St Mary's Street, Berkley Street and Barford Road. St Neots St Neots 728 W Little Paxton footpath improvements New footway linking to Nature Reserve from High Street. New and improved crossings in other parts of the village, including (Mill Lane, Little Paxton Lane and Gordon Road) St Neots Delivery in progress 729 C W Eaton Socon footpath improvements Extend westbound footway towards A1 (Bushmead Road), upgrade crossing facilities and reduce vehicle parking on Nelson Road and new kerbing and tactile paving and fence on Barford Road pocket park St Neots 787 C W A1198 Wood Green to New shared use footway / cycleway 803 C W Shared cycle/nmu route following line of Brampton Footpath No. 4 between Gloucester Road and Layton Crescent, Brampton Upgrade existing footpath to cycle track or bridleway and increase width to 3 metres. 823 S St Neots Town Centre Upgrade existing SCOOT/UTC system Identified through Development Process St Neots 824 W P T S St Neots High Street and Town Centre Adjust kerbs/tactile paving, St Neots relocate bus shelter, remove some parking bays, improve uncontrolled crossing points and widen footways where appropriate. To include High Street, Market Square, South Street, Brook Street, Tebbutts Road and Church Street. 861 P Mill Green bus stops Warboys Installation of Two RTPI units 862 W Between the site and Flaxen Walk Upgrade to PROW no. 4 between the site and Flaxen Walk as will be a key walking route to the primary school 863 C Implement 5 x cycle stands in centre of Warboys Implement 5 x cycle stands in centre of Warboys Page 5 of 6

Scheme List 2018 - Huntingdonshire 864 C W P S Ramsey Road, Houghton Road, St Audrey Lane St Ives. Pedestrian Island widening and signal timing review and MOVA at the junction. Requires a new design of the junction. 865 W Old Ramsey Road between Hill Rise and Site access 866 P Huntingdon - Eastbound bus stop on Hill Rise south of Old Ramsey Road 867 P Southbound bus stop on Ramsey Road south of Hill Rise 868 C W S Hill Rise between its junctions of Ramsey Road and Old Ramsey Road Widening of footway to 2.5m Bus Shelter Installation RTPI unit 2m wide island Page 6 of 6