MARTA Expansion Update

Similar documents
Major Mobility Improvement Program (MMIP)

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

Creating the Future Bruce B Downs Blvd

I-20 East Transit Initiative

Metropolitan Council Transportation Committee

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

Highway Transitway Corridor Study

TIP/RTP Amendment #3 Update. Transportation Coordinating Committee March 17, 2017

Crenshaw Transit Corridor Study. Working Group Meetings March 2009

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

Virginia Beach Transit Extension Study Draft Environmental Impact Statement Town Center Alignment Alternative Public Informational Meetings September

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

Comprehensive Collection of Stakeholder Alternatives by Mode

Cedar Avenue Transitway/ METRO Red Line Implementation Plan Update. Metropolitan Transportation Committee July 27, 2015

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

POLICY ADVISORY COMMITTEE

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

In Collaboration with: City of Belton Cass County FHWA Johnson County KDOT MoDOT City of Olathe City of Overland Park

Afeasibility study to evaluate bus rapid transit service in the East-West Corridor connecting major employment and activity centers between downtown

Arterial Transitway Corridors Study. Ave

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Basalt Creek Transportation Refinement Plan Recommendations

Welcome to the Open House

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

Final Study Recommendations AMES TRANSIT FEASIBILITY STUDY. For Public Review and Comment. October Ames Transit Feasibility Study

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Central Jersey Transportation Forum. March 2007

Bus Rapid Transit Plans

Aurora Corridor to E Line

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

GEARY CORRIDOR BUS RAPID TRANSIT Environmental Analysis. Special Intersections: Preliminary Concepts

Anniedale - Tynehead NCP. Transportation Highway 15 & Golden Ears Way Analysis

Welcome to the Sellwood Bridge Project Open House!

Item B1 November 19, 2009

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Speed Limits Study and Proposal. Public Input Session: 8/14/13

BUS RAPID TRANSIT. A Canadian Perspective. McCormick Rankin International. John Bonsall P.Eng

I-35W Solutions Alliance Project Update July 13, 2017

Transportation Master Plan Advisory Task Force

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

TRANSPORTATION TRAINING TOPICS. April 6, 2010

5. RUNNINGWAY GUIDELINES

NorthRail Streetcar Study

Preliminary Transportation Analysis

County of Fairfax, Virginia. Department of Transportation

Arterial Transitway Corridors Study

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM,

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

15 April CAMPUS MASTER PLAN UPATE F o c us G r o up M o b ility

MEETING Agenda. Introductions. Project Overview. Key Study Components. Alternative Station Concepts. Preferred Station Concept. Next Steps.

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Operational Comparison of Transit Signal Priority Strategies

3.0 PROJECT DESCRIPTION

Initial Alternatives Identification and Evaluation Report. November 2011 APPENDIX B. Summary of Stakeholder Single Mode Suggestions

I-20 East Transit Initiative. Stakeholder Advisory Committee Meeting September 9, :00-6:00 PM

Washington DC Section of ITE Project Briefing

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

4 Ridership Growth Study

Dumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016

SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

US 1 Express Lanes Public Kick-Off Meeting

Project Mobility - Route 3 South Express Toll Lanes. Industry Day Overview

Item Description: Presentation and Discussion: Berkeley Rapid Transit Locally Preferred Alternative

Hurontario-Main Light Rail Transit (LRT) Project

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Craig Rempp, Transit Superintendent Mary Karlsson, Kimley-Horn. Mankato City Council Meeting 6/25/2018

Interim Transit Ridership Forecast Results Technical Memorandum

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015

The Atlanta BeltLine. Quarterly Briefing December @atlantabeltline. Eastside Trail Southern Extension

Project Description Form 8EE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Design of Stanley Park S-Curve

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

Revised Draft 2017 Development Charge Background Study and Bylaw

Technical Working Group November 15, 2017

Transportation Impacts: Toronto York Spadina Subway Extension

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

North Shore Transportation Improvement Strategy

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Planning and Programming Committee Meeting April 14,

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

Highway 217 Corridor Study. Phase I Overview Report

South King County High-Capacity Transit Corridor Study

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

Transcription:

MARTA Expansion Update CITY OF SANDY SPRINGS BRIEFING January 2019

BACKGROUND: GA 400 TRANSIT INITIATIVE 2011-2015 2015 2017 2018 2018- Present MARTA NEPA Planning Heavy Rail Transit (HRT) Bus Rapid Transit (BRT) in exclusive guideway BRT in managed lanes (Express Lanes) GDOT Major Mobility Improvement Program (MMIP) Express Lanes funded on GA 400 and I-285 Fulton County Transit Master Plan Recommends BRT in Express Lanes on GA 400 MARTA Locally Preferred Alternative Approval MARTA Board adopts BRT as LPA Ongoing Agency Coordination and BRT Planning Revise NEPA document to reflect LPA 2

NEPA ALTERNATIVES CONSIDERED Heavy Rail (LPA) BRT in same alignment as LPA BRT in GA 400 managed lanes Stations proposed at: Northridge Road Holcomb Bridge Road North Point Mall Old Milton Parkway Windward Parkway Large photo here 3

FULTON COUNTY TRANSIT MASTER PLAN Large photo here Comprehensive transit plan for Fulton County outside of Atlanta Integrate with Fulton cities planning objectives Develop an investment strategy for transit Provide scenarios for potential referendum Determine public support for scenarios Plan approved in February 2018 4

FULTON TMP MARKET BASED SCENARIO Heavy Rail GA 400 to Holcomb Bridge Norfolk Southern Railroad I-20 West Extension Light Rail I-285 Bus Rapid Transit GA 400 Holcomb Bridge to Windward Holcomb Bridge Road Highway 141 Highway 29 South Fulton Parkway to Chattahoochee Hills Arterial Rapid Transit Roswell Road Old Milton Parkway Camp Creek Parkway Fulton Industrial Boulevard Frequent Local Bus Johnson Ferry Road Large photo here 5

FULTON TMP PREFERRED INVESTMENT SCENARIO Large photo here 6

FULTON TMP OUTCOMES Prepares for potential referendum Emphasis on BRT Georgia 400 Holcomb Bridge Road Roosevelt Highway South Fulton Parkway HB 930 0.2 cent sales tax Advances GA 400 and South Fulton Parkway 7

GDOT MMIP MMIP Express Lanes GA 400 I-285 Top End I-285 Eastside I-285 Westside Coordination with MARTA for: Transit planning Station and access coordination Potential cost savings Reduced construction time Large photo here 8

GA 400 LPA MODIFICATION Consistent with Fulton County TMP Recommendations Leverages MMIP investment in Express Lanes State funds not available for HRT under HB 930 Expanded funding options: $100 million designated by Governor Deal for BRT on GA 400 Fulton County tax referendum 9

GA 400 LOCALLY PREFERRED ALTERNATIVE Adopted in July 2017 Mode Bus Rapid Transit (BRT) Accommodates potential for future HRT extension Large photo here Alignment North Springs MARTA rail station to Windward Parkway Operate in Express Lanes on GA 400 Outside running to Pitts Road Median running north of Pitts Road 10

GA 400 POTENTIAL STATION LOCATIONS Potential Stations: Windward Parkway (Off-Line) Old Milton Parkway (Inline) North Point Mall (Inline) Holcomb Bridge Road (Inline) North Springs Other Potential Connections: Connection to Perimeter Center and I-285 Top-End BRT Connection to ART/BRT routes on Holcomb Bridge Road Connection to ART/BRT routes on Old Milton Parkway 11

NORTH SPRINGS STATION Modifications needed for BRT: Ramp Express Lane integration Station reconfiguration options: Limited modification At-grade BRT Elevated BRT Potential on-site parking capacity options Does not preclude future opportunity for HRT extension 12

NORTH SPRINGS LIMITED MODIFICATIONS Access Connection Estimated Cost Existing bus bay Existing flyover Northbound return only Rail transfer via stairs/elevator $10 M in 2018 dollars 13

NORTH SPRINGS AT-GRADE DIRECT ACCESS Access Connection Estimated Cost New northbound and southbound ramp connections Direct access to Express Lanes New At-Grade BRT Station Rail transfer via stairs/elevator $90 M in 2018 dollars 14

NORTH SPRINGS AT-GRADE DIRECT ACCESS 15

NORTH SPRINGS ELEVATED ACCESS Access Connection Estimated Cost New northbound and southbound ramp connections Direct access to Express Lanes New elevated BRT station Level with rail platform $125 M in 2018 dollars 16

NORTH SPRINGS ELEVATED ACCESS 17

NORTH SPRINGS PARKING Current Capacity 2,378 parking spaces 73-96% utilization rate Exploring leasing opportunities with developers for parking space Exploring opportunities to share space with businesses in neighboring parking decks 18

GA 400 TRANSIT SCHEDULE Planning Alternatives Analysis and Scoping (2011 2014) Environmental NEPA/Concept Design (2015 2019) Engineering Project Development (2019 2021) Construction Construction (2022 2024) Operation Operation (2025) 19

GA 400 FINANCIAL PLAN Source Mechanism Anticipated/Committed Funding Funding Contingencies Capital Investment Local Fulton County 0.2 cent sales tax Anticipated: Share of projected $27.5 million per year* State/ Regional Referendum anticipated November 2019 General Obligation Bonds Committed: $100 million - Atlanta Regional Commission (ARC) Surface Transportation Block Grant Program (STBG) Anticipated: $30 60 million in flex funding Federal FTA Capital Investment Grant program Anticipated: $100 million (maximum) FTA and US DOT grant and formula funds Operations and Maintenance Funding (Annual) Local MARTA Committed Anticipated potential funding Successful Transportation Improvement Program (TIP) Solicitation Successful grant application Funding availability, competitive applications 20

NEXT STEPS Continue GDOT MMIP coordination Finalize GA 400 station locations Perform ridership and traffic modeling Advance revised environmental review document Develop implementation schedule Finalize funding options and implementation strategy Modify projects in the Regional Transportation Plan 21

CONTACT Benjamin T. Limmer, AICP blimmer@itsmarta.com 404-848-4401 22