Lynnwood Link Extension. Shoreline & Seattle Open House

Similar documents
MOTION NO. M Contract Amendment for Systems Construction Management Consultant Services

CURRENT AND VOTER APPROVED SOUND TRANSIT SERVICE

7 NE 145TH STREET STATION TOD POTENTIAL

SOUND TRANSIT AT A GLANCE

Interim Transit Ridership Forecast Results Technical Memorandum

Vicinity Map. Proposed Roosevelt Street Sidewalk Project OVERLAND ROAD TO CASSIA STREET W ROSE HILL ST W ALBION ST S OWYHEE ST W CASSIA ST

I-395 Express Lanes Northern Extension Project Public Hearings

Montgomery County Life Sciences Center Loop Trail

PROJECT OVERVIEW. Auburn Station Access Improvements Project

Public Information Meeting

Reams Road RCA Study. Board of County Commissioners Public Hearing

Third Street Bridge & Corridor Project

City of Burnaby Environmental Review Committee (ERC) Guide for Applicants

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

Compliance with Section 18-52(4) City of Thornton Development Code

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

2010 Regional Bicycle and Pedestrian Count Report

CITY VIBE NATURAL BEAUTY

Chapter 7 Nonmotorized Facilities

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

BEAR CREEK PARK AND RIDE

SAWS QA/QC CHECKLIST WATER ADJUSTMENT/RELOCATION PROJECTS

TOD TOWNHOUSE SITE. Seattle Apartment Team 70,000 LOT SF 7 TAX PARCELS 50+ TOWNHOUSE POTENTIAL SHORELINE, WA SEATTLE CBD

Somerville Community Path Feasibility Study

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

CITY VIBE NATURAL BEAUTY

Community Task Force March 14, 2018

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Central Jersey Transportation Forum. March 2007

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

Bicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)

East Corridor Final Environmental Impact Statement

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

MASTER BICYCLE AND PEDESTRIAN PLAN

Capital Metro Downtown Multimodal Station

Traffic Impact Memorandum. May 22, 2018

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

Fitting Light Rail through Well-established Communities

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

section 4 Existing Conditions, Issues, and Options

Welcome to the Sellwood Bridge Project Open House!

I-10 AT SCENIC LOOP RD. Open House

3105 Alderwood Mall Blvd, Lynnwood, WA FOR SALE PAUL SLEETH th Street SW. Alderwood Mall Parkway

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

MEMORANDUM INTRODUCTION/PURPOSE/OVERALL FINDINGS

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Crystal City Citizen Review Council Meeting. July 10, 2013

RECOMMENDED MOTION: I MOVE TO PASS SECOND READING AND ADOPT ORDINANCE 556, TO REMOVE NE 173RD STREET FROM THE DESIGNATED PEDESTRIAN-ORIENTED STREETS.

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Downtown Redevelopment Project Update

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

On Road Bikeways Part 1: Bicycle Lane Design

UNIVERSITY OF WASHINGTON TO SOUND TRANSIT U-LINK PEDESTRIAN CONNECTION PROJECT EIS ADDENDUM

Elmhurst Metra Station. Public Hearing Wednesday - November 30, 2016

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Bellevue Chamber of Commerce, Transportation & Public Affairs Committee meeting. July 12, 2016

STADIUM DISTRICT CENTER PLATFORM TACOMA LINK EXPANSION. Existing bus stop remains. Existing parallel parking removed for bus access.

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida

Purpose + Need. Connect: Thrive: Develop: < Strengthen the spine of our regional transportation system

George Washington Bridge Restoring the George Construction Program Supplemental Information on Bicycle and Pedestrian Access

RESTORING THE CONNECTION BETWEEN CREEK AND LAKE: FRESH WATER ESTUARINE CREATION IN MISSISSAUGA

Welcome to VTA s BART Silicon Valley Phase II Extension Project Scoping Meeting

Application of Value Engineering The Crosstown Project

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

Osceola County Expressway Authority. Alternatives Public Meeting

RIDGE ROAD EXTENSION - PHASE I AND II (FROM RIDGE ROAD I DECUBELLIS ROAD I MOON LAKE ROAD INTERSECTION TO US 41)

Edmonds School District STEM Expo April 29, :00-8:00pm Mountlake Terrace High School

Citizen Advisory Committee Meeting. November 15, 2011 MPRB Headquarters- 6:30-8:30 p.m.

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

FOR SALE SOMI LAND DOWNTOWN SOUTH MIAMI MIXED-USE DEVELOPMENT SITE EXCLUSIVELY PRESENTED BY:

TENW Transportation Engineering NorthWest

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Intersection Control Evaluation Report Project: Alternative: Location: Evaluator:

Decommissioning Regulatory Process

September 2010 Review Project Concepts SCHEMATIC DESIGN NEGOTIATION CONSTRUCTION

Minam Curve. Project Location OR82: Minam Curve Project Wallowa Lake Hwy No. 010 (OR 82) Umatilla. Wallowa

Crosstown Commons. If You Build It they Will Come Communicating to the Public During Major Construction Projects

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS

Employment 8,881 17,975 9,094. Households 18,990 31,936 12,946

NORTH SEATTLE SUBJECT PROPERTY DEVELOPMENT SITE. Dane Erickson TH AVE NE SEATTLE, WA 98125

CONSERVATION COMMISSION Meeting Minutes THURSDAY May 10, :00 p.m. Stoughton Police Department 26 Rose Street, Stoughton, MA 02072

Seattle Bicycle Master Plan

MARLWOOD GOLF & COUNTRY CLUB WASAGA BEACH, ONTARIO

Government of the District of Columbia Department of Transportation

1. In Reach 3, Perry, Knox, Lowell, and Hooker have crossings identified. What are these?

Appendix J: Q1-Highway 35 Route Construction Plan

Technical Advisory Committee Meeting

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION

Streetscape Report Streetscape Report FALL 2017

2200 FIFTH STREET CONTINUED PRELIMINARY DESIGN REVIEW

SUMMARY Public Kick-Off Meeting on June 11, 2031 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

Durrance Elementary School

Broad Street Bicycle Boulevard City Council Study Session Summary

Transcription:

Lynnwood Link Extension Shoreline & Seattle Open House

Presentation Overview Introductions Project description and schedule Construction preview Station design & updates Permits Open house guide

Current Service and Approved Projects Near term Link extensions: University of Washington Northgate (2021) Northgate Lynnwood (2024) Downtown Seattle Overlake (2023) Angle Lake Federal Way (2024) Tacoma Theater District S 19 th Additional extensions shown were passed in Sound Transit 3.

Lynnwood Link Extension 8.5 mile extension - Northgate to Lynnwood City Center 4 stations: Shoreline South/145th elevated Shoreline North/185th at grade Mountlake Terrace elevated Lynnwood City Center elevated

Project Schedule

Construction Preview Summer 2018: Selective demolition Fieldwork Construction anticipated in early 2019 Early 2019 Utility relocations Clearing and grading Mid-2019: Active construction begins Service begins 2024

Shoreline South/145th Vicinity Map and Site Plan

Shoreline South/145th Aerial View

Shoreline South/145th Floor Plan

Shoreline South/145th View looking West from the South Pedestrian Plaza

Shoreline South/145th North Entry View

Shoreline South/145th South Entry View

Shoreline South/145th Platform View

Shoreline South/145th Parking garage

Station Artist: Buster Simpson

Shoreline North/185th Vicinity Map and Site Plan

Shoreline North/185th Aerial View

Shoreline North/185th Plaza Level Plan

Shoreline North/185th Platform Level Plan

Shoreline North/185th South Entry View

Shoreline North/185th North Entry View

Shoreline North/185th Pedestrian bridge

Shoreline North/185th Platform View

Station Artist: Mary Lucking

Also tonight: Part of City of Shoreline Special Use Permit application Intent of Permit: Tonight s meeting satisfies requirement for application to City of Shoreline Permit will place conditions on project to ensure compatibility with adjacent land uses SUP addresses critical areas and administrative code modifications required for the project Process: Formal application submittal August 2018 21-day Public Comment Period starts with City s Notice of Application Final decision is made by the City s Hearing Examiner

Critical areas Wetlands, Streams, and Buffers Most wetlands between NE 151st St to NE 155th St Filling 0.35 ac of wetlands and 0.68 ac of buffers Mitigating at Ronald Bog Park Vegetation impacts to McAleer Creek buffer to be restored on-site in I-5/SR 104 Interchange loop

Critical areas (continued) Landslide Hazard Areas Very high-risk landslide areas as defined by City North and south of Ridgecrest Park NE 159th to NE 172nd North of North City Elementary NE 189th to NE 205th St Removing vegetation and excavating cut/fill slopes Design strategies include tiebacks and retaining walls

List of other anticipated permits Critical Area Special Use Permits for Ronald Bog Mitigation Site and McAleer Creek Building Permits Demolition Permits Site Development Permits Right-of-Way Use Permits Floodplain Development Permits

Comments and information Comment sheets and sticky notes Comments and Sound Transit s responses documented in a Neighborhood Meeting Summary Sign up to receive more information on the SUP Contact for City of Shoreline: Jennifer Wells City of Shoreline - ST Senior Planner Phone: (206) 801-2528 Email: jwells@shorelinewa.gov

Open House guide Lynnwood Open House: 7/25/2018 Lynnwood Convention Center Online Open House: LynnwoodLink.Participate.Online

Thanks! soundtransit.org/lle