MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE/PES TRANSFORMER COMMITTEE MINNEAPLOS, MN OCT 17, 2007

Similar documents
TECHNICAL SPECIFICATION

INTERNATIONAL STANDARD

Notes Assess Transmission Future Needs SDT Project

VI.D AIR DISCONNECT SWITCHES

System Operating Limit Definition and Exceedance Clarification

System Operating Limit Definition and Exceedance Clarification

Analysis of Pressure Rise During Internal Arc Faults in Switchgear

FINAL FACILITY STUDY. KV1C Transformer Addition at Badwater Substation 2009-T1. November 17, 2009

ISO 2944 INTERNATIONAL STANDARD. Fluid power systems and components Nominal pressures. Transmissions hydrauliques et pneumatiques Pressions nominales

Project Single Points of Failure

Issues and Research Related to the Qualification of the Transformer-Bushing System. Anshel J. Schiff 2/4/06. Executive Summary

ISO INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

Categorizing Faults via DGA. GE Grid Solutions M&D

ISO INTERNATIONAL STANDARD. Natural gas Calculation of compression factor Part 2: Calculation using molar-composition analysis

ISO INTERNATIONAL STANDARD. Personal fall-arrest systems Part 1: Full-body harnesses

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD. Gas cylinders Fitting of valves to gas cylinders. Bouteilles à gaz Montage des robinets sur les bouteilles à gaz

Leakage Current Testing Is it right for your application?

ISO INTERNATIONAL STANDARD. Transportable gas cylinders Inspection and maintenance of cylinder valves

INTERNATIONAL STANDARD

ELECTRIC OPERATING PROCEDURES Date: 11/01/06

ISO INTERNATIONAL STANDARD. Hydraulic fluid power Filter elements Determination of resistance to flow fatigue using high viscosity fluid

Preview to the 2018 NFPA 70E, the Standard for Electrical Safety in the Workplace

North Central Texas Council of Governments

INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD. Gas cylinders Cylinder bundles Design, manufacture, testing and inspection

ISO 4081 INTERNATIONAL STANDARD. Rubber hoses and tubing for cooling systems for internal-combustion engines Specification

Transformer Lifecycle Services. Container Id: Miscellaneous Id: Second Name: Sequence #:

ISO 9539 INTERNATIONAL STANDARD. Gas welding equipment Materials for equipment used in gas welding, cutting and allied processes

Innovation Electrical Industry

Online DGA-monitoring of power transformers

ISO INTERNATIONAL STANDARD. Breathing system filters for anaesthetic and respiratory use Part 2: Non-filtration aspects

INTERNATIONAL STANDARD. Cranes - Safety signs and hazard pictorials - General principles

ISO 6570 INTERNATIONAL STANDARD. Natural gas Determination of potential hydrocarbon liquid content Gravimetric methods

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD. Earth-mover tyres and rims Part 3: Rims. Pneumatiques et jantes pour engins de terrassement Partie 3: Jantes

Constitution of International Golf Federation

ISO INTERNATIONAL STANDARD. Cryogenic vessels Pressure-relief accessories for cryogenic service Part 1: Reclosable pressure-relief valves

EXPERIENCES WITH APPLICATION, DIAGNOSTIC VALUE AND IMPACT ON ASSET MANAGEMENT OF INSULATION OIL ANALYSIS

NESC WORKSHOP Revisions to Part 4 (Work Rules) Sam Stonerock. October 18, 2016

IEC April Authorized Sole Agent : PT. Wisma Niagatama Perkasa. Phone : (031) Fax. : (031)

ISO INTERNATIONAL STANDARD. Earth-mover tyres and rims Part 3: Rims. Pneumatiques et jantes pour engins de terrassement Partie 3: Jantes

ISO INTERNATIONAL STANDARD. Ergonomics Manual handling Part 1: Lifting and carrying

Selection of Electrical PPE Tables

Micafil RIP bushings High-voltage Resin Impregnated Paper bushings. Power and productivity for a better world TM ABB

TECHNICAL PAPER PRESENTATION

Dissolved Gas Analysis - Past, Present and Future

ISO INTERNATIONAL STANDARD. Gas cylinders Safe handling. Bouteilles à gaz Sécurité de manutention. Second edition

Micafil RIP bushings High-voltage Resin-Impregnated Paper bushings. Power and productivity for a better world TM ABB

A Revised Framework for the Transformer DGA Guide

KMU SUBSTATION WORKSHOP

January 10, EEI OSHA Team

COOPER POWER. SERIES VariSTAR type composite light-duty under-oil (CLU) MOV arrester installation instructions. Surge Arresters MN235023EN

NORTHMEAD BOWLING, RECREATION AND SPORTING CLUB LTD

Ships and marine technology Servicing of inflatable life-saving appliances

Operating Committee Strategic Plan

ISO 5367 INTERNATIONAL STANDARD. Breathing tubes intended for use with anaesthetic apparatus and ventilators

ISO 5355 INTERNATIONAL STANDARD. Alpine ski-boots Requirements and test methods. Chaussures de ski pour skis alpins Exigences et méthodes d'essai

BRITISH STANDARD BS 341-4: Transportable gas container valves. Part 4: Pressure relief devices ICS

COOPER POWER SERIES. 200 A 15, 25, and 35 kv class portable feedthru installation instructions. Loadbreak Apparatus Connectors MN650037EN

ISO INTERNATIONAL STANDARD. Snowboard plate-bindings without a release mechanism Requirements and test methods

ISO INTERNATIONAL STANDARD

Chapter 2.7 Bylaw sport governance and management

ISO INTERNATIONAL STANDARD

DISCOVERY BAY WOMEN S GOLF CLUB BYLAWS

INTERNATIONAL STANDARD

MODERN APPROACH FOR CONDITION MONITORING OF POWER TRANSFORMERS USING DISSOLVED GAS ANALYSIS

Off-Target Well Requirements

DISSOLVED GAS ANALYSIS OF NATURAL ESTER FLUIDS UNDER ELECTRICAL AND THERMAL STRESS

ISO/TS TECHNICAL SPECIFICATION. Stainless steels Chemical composition. Aciers inoxydables Composition chimique. First edition

ISO INTERNATIONAL STANDARD

Major Changes. Standard. TECH TOPIC standards and. By Peter Walsh, PE

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD. Small craft Watertight cockpits and quick-draining cockpits

ISO INTERNATIONAL STANDARD. Continuously hot-rolled stainless steel Tolerances on dimensions and form Part 2: Wide strip and sheet/plate

International One Metre International Class Association (IOM ICA) Special General Meeting Amended Agenda. October 31, 2009

This document is a preview generated by EVS

Using Perfluorocarbon Tracers (PFT) for detecting oil leakages in LPOF cable systems. J.C.M. VAN ROSSUM * Prysmian Group NL The Netherlands

ISO INTERNATIONAL STANDARD

CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS

ISO INTERNATIONAL STANDARD. Plain bearings Appearance and characterization of damage to metallic hydrodynamic bearings Part 1: General

Power Transformer Maintenance. Maintenance Practices & Procedures for Substation Class Distribution Power Transformers

ISO INTERNATIONAL STANDARD. Welding consumables Gases and gas mixtures for fusion welding and allied processes

ISO 407 INTERNATIONAL STANDARD. Small medical gas cylinders Pin-index yoke-type valve connections

Control Units for Oil+Air Lubrication

INTERNATIONAL STANDARD

ISO 2503 INTERNATIONAL STANDARD

Grafiska symboler för scheman Del 8: Ventiler och spjäll. Graphical symbols for diagrams Part 8: Valves and dampers

WHS-05 Electric Shock Response

Information on work in progress in CEN

Preamble to the AFF Selection Policy

Provläsningsexemplar / Preview INTERNATIONAL STANDARD. Cranes - Safety signs and hazard pictorials - General principles

Inspection Recommendations

ROSE-HULMAN INSTITUTE OF TECHNOLOGY Department of Mechanical Engineering. Mini-project 3 Tennis ball launcher

ISO INTERNATIONAL STANDARD. Flow-metering devices for connection to terminal units of medical gas pipeline systems

ISO INTERNATIONAL STANDARD. Natural gas Measurement of properties Volumetric properties: density, pressure, temperature and compression factor

ISO 6406 INTERNATIONAL STANDARD. Gas cylinders Seamless steel gas cylinders Periodic inspection and testing

ISO INTERNATIONAL STANDARD. Cranes and lifting appliances Selection of wire ropes Part 1: General

Transcription:

MINUTES OF MEETING BUSHING SUBCOMMITTEE OF THE IEEE/PES TRANSFORMER COMMITTEE MINNEAPLOS, MN OCT 17, 2007 8.9 Bushing Subcommittee Fred Elliott, Chair 8.9.1 Introduction/Attendance Fred Elliott - Chair opened the meeting at 3:00 PM and welcomed the members and guests. There were 44 attendees with 13 members and 31 guests present. Two (2) guests requested for membership IEEE patent policy was addressed and no patent conflicts were reported. The Chair informed the participants please review information on Transformers Committee website for details. 8.9.2 Approval of Minutes of Last Meeting The minutes of last meeting in Dallas, TX were approved as written. 8.9.3 Chairman s Remarks The chair made the following remarks after attending the Administrative Subcommittee. Next meeting will be held in Charlotte, North Carolina, March 16-20. To join in balloting process, one must be a member of IEEE Std Association. References used in the documents shall be properly addressed and referred. 8.9.4 Working Group (WG) and Task Force (TF) Reports 8.9.4.1 WG - Revision of C57.19.00 - Keith Ellis, Chair No meeting was scheduled. 8.9.4.2 TF - Revision of C57.19.100 Tommy Spitzer, Chair C57.19.100 Bushing Application Guide Tuesday, Oct 16, 2007. The meeting was called to order at 3:15 pm with 15 members and 5 guests. After introductions, no one had any patent disclosers. The minutes from the spring meeting were approved. 1

Draft 1 of the revision was distributed before the meeting and Trench and PCORE both had comments and changes to the draft. These will be included in Draft 2. The Chair plans to continue to distribute these by e-mail and have a final document in time for the next meeting and proceed to balloting. The meeting was adjourned at 4:30 pm. 8.9.4.3 TF GSU Bushings Catherine Hurley, Acting Chair for Les Recksiedler Catherine reported as follows: Task Force GSU Bushings Standardization 9:30 10:45 AM, Tuesday, Oct 16, 2007 1. Introduction Everyone 2. Sign in Lists Attendance 37 13 members 3. Titles for the standard a. Discussion about limiting MVA or current for this standard, this will not occur b. It was determined that this standard would follow a similar title as C57.19.01 since these bushings are specifically excluded from this standard c. Hurley will prepare this final title and send out to all members for comments 4. Discussions over if this should be a guide or a standard. Concerns about agreement between all parties if it becomes a standard. It was determined that it was most beneficial to proceed with a standard. 5. It was determined that this standard would be a companion standard to C57.19.01 with references to C57.19.00. This standard will include LV bushings only with high current that are excluded from C57.19.01 6. Scope of Work a. It was discussed to have a similar detailed scope as C57.19.01 has b. C Hurley will draft this an send out a copy to all members for comments 7. IEC bushing standard a. Volunteers were requested to compare to the IEC bushing standard b. IEC bushing standard also excludes these bushings but will be updated in the next revision c. John Graham volunteered to correspond with the IEC on this information 8. List of GSU bushings available a. C Hurley volunteered to get the information for AEP b. Keith Ellis volunteered to provide a list for manufacturers to compare 8.9.4.4 C57.19.03 DC Bushing Standard Fred Elliott, Chair No meeting was scheduled. 8.9.4.5 IEC Bushing Standards Activity - John Graham of Trench Ltd., UK IEC BUSHINGS STANDARDISATION Revision of IEC60137 Insulated Bushings for Alternating Voltages above 1000V 2

A Committee Draft was passed at the IEC TC36: Insulators meeting in Berlin in September 2006. The document had a majority positive vote but there were strong objections again from TC14: Transformers. At their meeting in South Africa and subsequently in Mexico TC14 made a decision that testing of transformer bushings in IEC60137 should cover all the requirements for transformer tests in IEC60076-3: 2000 with an additional 10% on test voltage. This requirement would mean all bushings >72.5kV rated would be subject to lightning impulse tests with additional switching impulse and long duration AC withstand required for some higher voltage bushings. SC36A have continued to object to this requirement on the basis of technical justification and cost. In September 2007 a meeting of the officers of SC36A, TC14 and SC17C: Switchgear was held in Geneva. A compromise was reached on changes to bushing tests as follows: Type Test Routine Test Lightning Impulse 72.5kV FW ± ve 100% >72.5 to <245kV FW + ve 100% FW ve 110% CW ve 121% 245kV FW + ve 100% AC Withstand On 3 bshgs FW ve 100% (CW ve 11%) 72.5kV 1min wet 100% 1min dry 110% >72.5 to 245kV 1min wet 100% 1min dry 110% 170kV ACLD 1min dry 110% Switching Impulse < 245kV 245kV Dry + ve 100% Dry ve 110% 300kV Wet ± ve 100% Dry ve 110% These changes will be included in a final draft (FDIS) to go to vote by the end of 2007 with probable publication in 2008. Review of IEC61464 Dissolved Gas Analysis of Oil Impregnated Paper Bushings This document was published as a Guide in 1998. SC36A will join TC10: Insulating Fluids to review this document and incorporate in the wider guide IEC60599: Interpretation of DGA from oil filled equipment. TC14 may also join this work. John Graham 12 October 2007 8.9. 5.Old Business 3

IEEE 693 Bushing Update A. Next IEEE 693 Meeting October 23-24, 2007 Main Topic: Discussion of an early draft of a proposal to change the qualification procedure for bushings. Brief outline of the proposal: I. The bushing manufacturer would perform a shake table test, using modified IEEE 693 requirements, to determine a failure rating based on a g-level at the "Critical Center of Gravity" and the basic IEEE 693 spectral shape. The g-level reported would be that which causes failure of the bushing (independent of the traditional 0.25g or 0.5g values). The bushing manufacturer would develop a structural, finite element, model for the bushing that is validated by the shake table tests. II. The transformer manufacturer would develop a "detailed" finite element model of the transformer, including the bushing model information, and perform a time history analysis. The analysis would be required to show that: a. The bushing has not exceeded a specified level at the Critical Center of Gravity. b. The transformer maximum input ground motion g-level at the specified bushing level. (Example, the shake table test shows the bushing will fail at 1.2g at the Critical Center of Gravity. The bushing manufacturer reports to the transformer manufacturer a bushing design level of 0.6g, 50% of the failure value, applied at the Critical Center of Gravity. The transformer model shows that a 0.25g ground motion input causes a 0.6g bushing acceleration at the Critical Center of Gravity.) III. The utility would specify a required transformer input ground motion. The transformer manufacturer would design the transformer to satisfy the Utility's input ground motion requirement and the bushing manufacturer's g-level requirement at the Critical Center of Gravity. The Critical Center of Gravity is the bushing CG only considering the upper portion of the bushing, above the flange connection to the tank. B. 500 kv Bushing Shake-Table Research MCEER (University of Buffalo, New York) is still conducting 500 kv bushing shake table test research. This project could receive additional funding from the California Energy Commission. Reported by Fred Elliott based on input from others. Oct 17, 2007 8.9.6 New Business No new business was reported. 8.9.7 Technical Papers No activity was reported for this mtg. 4

8.9.8 Adjournment The meeting adjourned at 4:15 PM. Minutes submitted respectively by, Peter D. Zhao Secretary Bushing Subcommittee 5