Event Time Event Name Meeting Room Sunday, January Monday, January

Similar documents
ASME BOILER CODE WEEK AND PRESSURE VESSEL CODE WEEK May 5-10, 2019 Grand and Little America Hotels, Salt Lake City, Utah

ASME BOILER CODE WEEK AND PRESSURE VESSEL CODE WEEK October 29 - November 3, 2017 Pointe Hilton Squaw Peak Hotel

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

API-510 PRESSURE VESSEL INSPECTOR

MSC Guidelines for Pressure Vessels

SECTION III. ASME Boiler and Pressure Vessel Code An International Code. Div ision 1 Su bs e c t i o n N C Class 2 Comp on en ts

BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION

QUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7

Pressure Vessel Program

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

Inspection Credit for PWSCC Mitigation via Peening Surface Stress Improvement

NASA AEROSPACE PRESSURE VESSEL SAFETY STANDARD

HYDROGEN STANDARDIZATION INTERIM REPORT For

Liquefied gas cargo tanks and process pressure vessels

Notice for Pressure Special Equipment Manufacture Licensing

PRESSURE VESSELS, Part II: Pressure Vessel Design, External Pressure, Flat Covers and Self Nozzles.

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

PIP PNE00012 Piping Examination and Leak Test Guide

Nondestructive Examination

THE PROCESS OF JOINT INTEGRITY

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

2018 Spring Refining and Equipment Standards Meeting

CONTENTS Article NC-1000 Introduction Figures Article NC-2000 Material

HEALTH AND SAFETY EXECUTIVE HM NUCLEAR INSTALLATIONS INSPECTORATE

Pressure Vessel Design

DRAFT REGULATORY GUIDE DG-1074

API 510: Pressure Vessel Inspection Code (API Exam Preparation Training)

SDO MECHANICAL CODES CONVERGENCE BOARD:

High Pressure Iron (HPI) Recertification Guidelines & Procedures

DVS Technical - Codes and Bulletins. Table of Contents

Justification of Risk Reduction through In-Service Inspection / REDUCE

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014

This document is a preview generated by EVS

JAPANESE PD EXAMINATIONS FOR DEPTH SIZING OF SCC IN AUSTENITIC STAINLESS STEEL PIPES FROM 2006 TO 2012

2015 Spring Refining and Equipment Standards Meeting

ENGINEERING TECHNICAL REPORT

NBIC Committee Action Block

Outline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products

STS 650 PRESSURE EQUIPMENT

2018 Fall Refining and Equipment Standards Meeting FINAL PROGRAM

COMPETENCIES FOR IN-SERVICE INSPECTORS OF PRESSURE EQUIPMENT (NOTE 1)

Guidelines for Pressure Boundary Bolted Flange Joint Assembly

July 2017 NBIC Committee Meeting Minutes

INSPECTION OF RECOVERY BOILERS

Guidelines for Certification - Pressure Equipment Inspectors. DOCUMENT No PRO-CER-08

APPENDIX 1. PART 10: Leak Detection Inspector, Level 1, 2 and 3 CERTIFICATION SCHEME FOR PERSONNEL. 3 rd Edition, February 2016

Project Manager David Tuttle. Summary of Changes New paragraph to add pressure relief valve requirements for locomotive boilers.

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

Australian/New Zealand Standard

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs)

Regulations Respecting Compressed Gas Pressure Vessels

TECHNICAL REPORT ON CAPACITY BUILDING IN USE OF EDDY CURRENT TESTING EQUIPMENT

API SC 6 SUBCOMMITTEE ON VALVE AND WELLHEAD EQUIPMENT TASK/WORK GROUP STATUS REPORT. 6D/6DSS TG02 on Revisions & Corrections FEBRUARY 8, 2011

ISO 6406 INTERNATIONAL STANDARD. Gas cylinders Seamless steel gas cylinders Periodic inspection and testing

CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION

Procedure: Pressure equipment safety

2016 Fall Refining and Equipment Standards Meeting

2018 Exploration & Production Winter Standards Meeting January 22-26, 2018 Hyatt Regency San Antonio San Antonio, Texas

RUPTURE HAZARD OF PRESSURE VESSELS

v. Size shall be specified on drawings.

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124

ISO 6406 INTERNATIONAL STANDARD. Gas cylinders Seamless steel gas cylinders Periodic inspection and testing

Standard Pneumatic Test Procedure Requirements for Piping Systems

Transport of gas tanks for motor vehicles

Design and Analysis of Reactor Dish Vessel

MSC Guidelines for Engine Cooling Systems

CONVECTION SECTION FAILURE ANALYSIS AND FITNESS-FOR-SERVICE ASSESSMENT

ASYBCO 90 O ELBOW LONG RADIUS O.D. I.D.

Annex to the Accreditation Certificate D-IS according to DIN EN ISO/IEC 17020:2012

DVS Technical Codes an Bulletins

By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document

Supervisory Inspection Rule for Safety Performance of. Boiler and Pressure Vessel Products

Davis-Besse Small Bore Class 1 Piping Socket Weld Destructive Examination

Annex G (normative) Requirements for Nondestructive Examination

DCV6 Disc Check Valve

Approved Code of Practice for. Pressure Equipment. (Excluding Boilers)

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL

RELIEF VALVES. General Description

CERTIFICATION PROGRAM FOR ASSESSING THE MECHANICAL INTEGRITY OF PRESSURE VESSEL SYSTEMS

Technical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart

Notable Clarifications to Directive 077 Requirements

Use of Underwater Dry Welding for In Situ Repair to Offshore Structures. Sabine Powell 02/12/2016

Technical Standard. API6D Ball & Plug Valve. Inspection & Test Procedure

NONDESTRUCTIVE INSPECTION OF HULL WELDS

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)

The Need for a New Joining Technology for the Closure Welding of Radioactive Materials Containers

NOTICE REGARDING CODE CASES OF THE ASME B31 CODE FOR PRESSURE PIPING

Pressure Vessel Inspection Code: In-service Inspection, Rating, Repair, and Alteration

ASME Boiler & Pressure Vessel Code Analysis of the 1497 MHz High-Current Cryomodule Helium Vessel

Ballot ID: Action item Reference Number: Addition of common causes and susceptibility diagram to API RP 581, 3rd Edition, Section 12

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

DCV1, DCV3 and DCV3LT Disc Check Valves Installation and Maintenance Instructions

Liquid Penetrant Procedures TABLE OF CONTENTS

CNS In-Pool Assembly Mechanical Design for OYSTER Project

ASME BPVc.m.l.ND-2015

Design of Pressure vessel for the Hydrocarbon release from the Vent Header Lines

5th Pan American Conference for NDT 2-6 October 2011, Cancun, Mexico. Inspection of Dissimilar Metal Welds in Reactor Pressure Vessels in Spain

Electrical. Version 1.0

T e l N o : F a x N o : E m a i l : a i s h c m c - m e. c o m w w w. c m c - m e.

Transcription:

Event Time Event Name Meeting Room Sunday, January 25 2015 Opens @ 12:00 PM - 06:00 PM Registration Opens @ 12:00 PM - 06:00 PM ASME Office 01:00 PM - 03:00 PM CNC Task Group on NQA-1 Part II Checklist [CLOSED MEETING] 03:00 PM - 05:30 PM CNC Task Group on Survey Demonstrations [CLOSED MEETING] 03:00 PM - 06:00 PM TG Procedures/Review Req. (CBPVCA) Oak 09:00 AM - 05:00 PM ASME Senior Consultant Meeting 01:00 PM - 05:00 PM Task Team NDE Performance Qualifications (SC XI) 04:00 PM - 06:00 PM TG Weld Residual Stress (WRS) for New Plant Components (BPV III) 04:00 PM - 08:00 PM TG Creep Strength Enhanced Ferritic Steels (BPV II) 05:00 PM - 07:00 PM TG HDPE Materials, Fabrication & Examination (SG-MFE, BPV III) Suite 05:00 PM - 07:00 PM SG Materials (SC IV) Continental 07:00 PM - 09:00 PM TG Evaluation Procedures for Degraded Buried Pipe Monday, January 26 2015 07:00 AM - 06:00 PM Registration 08:00 AM - 10:00 AM QAI Subcommittee on Accreditation Sage 08:00 AM - 05:00 PM Committee on Nuclear Certification (CNC) 12:00 Noon - 01:30 PM CNC Officers Meeting 07:00 AM - 08:00 AM TG Data Analysis (BPV II) 08:00 AM - 10:00 AM WG High Temperature Liquid-Cooled Reactors (SG-HTR, BPV III) 08:00 AM - 10:00 AM SG General Requirements (BPV XII) 08:00 AM - 11:30 AM ANDE SC on Testing Working Sessions Continental 08:00 AM - 12:00 PM Joint TG on HDPE NDE (BPV III/V/XI) 08:00 AM - 12:00 PM TG Repair by Carbon Fiber Composites

08:00 AM - 01:00 PM SG External Pressure (BPV II) 08:00 AM - 01:00 PM SG Performance and Procedure Qualifications (BPV IX) 08:00 AM - 01:00 PM SWG Industry Experience for New Plants (BPV III & BPV XI) Consulate 08:00 AM - 02:00 PM WG Piping Design (SG-D, BPV III) Consort I 08:00 AM - 04:00 PM PCC SC R&T Subgroup on Examination and Testing 08:00 AM - 04:00 PM SG Strength, Ferrous Alloys (BPV II) 08:00 AM - 04:00 PM SWG Design by Analysis (BPV VIII) 08:00 AM - 05:00 PM SG Nonferrous Alloys (BPV II) 08:30 AM - 10:30 AM TG Temper Bead Welding 08:30 AM - 12:00 PM TG General Requirements for Graphite Core Components 08:30 AM - 12:00 PM TG Cast Stainless Steel Oak 08:30 AM - 05:00 PM SWG RIM 08:30 AM - 05:00 PM WG Risk-Informed Activities The Roof Westin Oaks - 21st Level 08:30 AM - 06:00 PM WG Pipe Flaw Evaluation 10:00 AM - 12:00 PM Committee on Conduct of Conformity Assessment Activities (BCA) I 10:00 AM - 12:00 PM SG Fabrication, Inspection, and Continued Service (BPV XII) 10:00 AM - 12:00 PM WG High Temperature Gas-Cooled Reactors (SG-HTR, BPV III) 10:30 AM - 01:00 PM TG Partial Excavation and Weld Repair of Dissimilar Welds 11:30 AM - 02:00 PM Materials on Database Training Session Regal Westin Galleria - 24th Level 01:00 PM - 02:00 PM SG Brazing (BPV IX) I 01:00 PM - 03:00 PM ASME ANDE Standards Committee 01:00 PM - 05:00 PM SG Design (SC-SVR) 01:00 PM - 05:00 PM SG Ferrous Specifications (BPV II) Oak 01:00 PM - 05:00 PM SG Design and Materials (BPV XII) 01:00 PM - 05:00 PM SG General Requirements (SC-SVR)

01:00 PM - 05:00 PM SG Testing (SC-SVR) 01:00 PM - 05:00 PM TG Appendix VIII 01:00 PM - 05:00 PM WG Analysis Methods (SG-ETD, BPV III) 01:00 PM - 05:00 PM WG Design of Division 3 Containments (SG-CD, BPV III) Consulate 01:00 PM - 05:00 PM WG Graphite and Composite Design Sage 01:00 PM - 05:00 PM WG HDPE Materials (SG-MFE, BPV III) 01:00 PM - 07:00 PM TG High Strength Nickel Alloys Issues 02:00 PM - 04:00 PM WG Environmental Effects Continental 02:00 PM - 04:00 PM SG Welded Boilers (BPV IV) 02:00 PM - 04:00 PM TG Temper Bead Welding (BPV IX) 02:00 PM - 05:00 PM SG Materials (BPV IX) I 02:00 PM - 05:00 PM TG Buried Components Inspection and Testing 02:00 PM - 06:00 PM WG Environmental Fatigue Evaluation Methods Consort I 03:00 PM - 05:00 PM Project Team on Section V Glossary of Terms (BPV V) I 03:00 PM - 05:00 PM SG General Requirements (BPV IX) I 03:00 PM - 05:00 PM TG on Optimization of Ultrasonic Examination Requirements Executive Westin Oaks - 4th Level 03:30 PM - 07:00 PM ANDE SC on Testing Working Session 04:00 PM - 06:00 PM SG RRA Executive 04:00 PM - 06:30 PM SG International Material Specifications (BPV II) 04:00 PM - 07:00 PM SG Stength of Weldments (BPV II & BPV IX) 04:00 PM - 07:00 PM SWG Regulatory Interface (BPV III) Standards Committee on Qualifications for Authorized 04:00 PM - 07:00 PM Inspection (QAI) 05:00 PM - 06:30 PM SC-SVR Chairman's Meeting 05:00 PM - 06:30 PM SG WCS Executive 05:00 PM - 07:00 PM TG Alloy 617 Code Case (SG-ETD, BPV III) Regal Westin Galleria - 24th Level

05:00 PM - 07:00 PM WG Non-Metals Repair/Replacement Activities and TG HDPE Repair/Replacement 05:00 PM - 07:00 PM SG Nonmandatory Appendices (BPV XII) 06:00 PM - 08:00 PM TG Flaw Evaluation in HDPE Pipe 06:00 PM - 08:30 PM SG Toughness (BPV VIII) 06:30 PM - 08:00 PM TG Scope & Exemptions (BPV VIII) Tuesday, January 27 2015 07:00 AM - 06:00 PM Registration BPV II Executive Session 08:00 AM - 09:30 AM 08:00 AM - 02:00 PM 03:00 PM - 08:00 PM Committee on BPV Conformity Assessment (CBPVCA) BPV XI Executive Committee 08:00 AM - 11:00 AM BPV Committee on Transport Tanks (BPV XII) 08:00 AM - 11:00 PM WG Radiography (BPV V) 08:00 AM - 12:00 PM SG Design (BPV I) 08:00 AM - 12:00 PM WG HDPE Design of Components (SG-CD, BPV III) SWG General Requirement Consolidation 08:00 AM - 12:00 PM 08:00 AM - 12:00 PM WG Creep-Fatigue & Negligible Creep (SG-ETD, BPV III) 08:00 AM - 12:00 PM SG NUPACK (BPV III) 08:00 AM - 01:00 PM WG Valves (SG-CD, BPV III) 08:00 AM - 01:30 PM BPV Committee on Welding, Brazing & Fusing (BPV IX) 08:00 AM - 03:00 PM WG Supports (SG-CD, BPV III) 08:00 AM - 04:00 PM WG ISC 08:00 AM - 04:00 PM WG Vessels (SG-CD, BPV III) 08:00 AM - 04:00 PM SG Design (BPV VIII) I The Roof Westin Oaks- 21st Level II Regal Westin Galleria - 24th Level Continental Westin Oaks- 3rd Level

08:30 AM - 10:30 AM PTC 25 Pressure Relief Devices 08:30 AM - 12:00 PM WG Procedure Qualification and Volumetric Exam 08:30 AM - 12:00 PM WG Personnel Qualification SV and ECE 08:30 AM - 12:00 PM Sub-Task Groups on Severe Accident Management Sage 08:30 AM - 03:00 PM WG General Requirements 08:30 AM - 04:00 PM WG Flaw Evaluation Consort I 08:30 AM - 04:00 PM WG Operating Plant Criteria Consulate 08:30 AM - 04:00 PM WG Pressure Testing Oak 08:30 AM - 05:00 PM WG Containment Executive Westin Oaks - 4th Level 08:30 AM - 05:00 PM WG Graphite and Composite Design 08:30 AM - 05:00 PM WG Welding and Special Repair Processes 08:30 AM - 05:00 PM WG Design and Programs 09:00 AM - 12:00 PM WG Fatigue Strength I 09:00 AM - 12:00 PM ASME ANDE SC on Testing Working Session 09:30 AM - 05:00 PM BPV Committee on Materials (BPV II) 12:00 PM - 04:00 PM WG Ultrasonics (BPV V) 12:15 PM - 01:45 PM TG Materials Supporting Division 3 Strain-Based Criteria (BPV II/III) 01:00 PM - 04:00 PM SG Fabrication & Examination (BPV I) II 01:00 PM - 04:00 PM WG Quality Assurance, Certification & Stamping I 01:00 PM - 04:00 PM WG Duties and Responsibilities 01:00 PM - 05:00 PM WG Allowable Stress Criteria (SG-ETD, BPV III) 01:00 PM - 05:00 PM Board on Conformity Assessment (BCA) 01:00 PM - 05:00 PM SWG HDPE Stakeholders (BPV III) 01:00 PM - 05:00 PM Subcommittee on Safety Valve Requirements (SC SVR) 01:00 PM - 05:00 PM SWG New Advanced Light Water Cooled Reactor Plant Construction Issues (BPV III)

01:30 PM - 03:00 PM SG Cast Iron Boilers (BPV IV) 02:00 PM - 04:00 PM TG Plate Heat Exchangers (BPV VIII) 02:00 PM - 04:00 PM TG PWHT (BPV IX) 02:00 PM - 05:00 PM WG Design Methodology 03:00 PM - 05:00 PM SG Plastic Fusing (BPV IX) SG Care and Operation of Heating Boilers 03:30 PM - 05:00 PM Section VI (IV) 04:00 PM - 05:00 PM WG Guided Wave UT (BPV V) 04:00 PM - 06:00 PM Project Team on Article 2 Appendices (BPV V) TG Evaluation of Beyond Design Basis Events 04:00 PM - 06:30 PM 04:00 PM - 06:30 PM TG U-2(g) (BPV VIII) 05:00 PM - 06:00 PM WG Acoustic Emissions (BPV V) WG High Temperature Flaw Evaluation 05:00 PM - 06:00 PM (SG-ETD, BPV III & XI) 05:00 PM - 07:00 PM Subcommittee Design (BPV III) WG Probabilistic Methods in Design 05:00 PM - 07:00 PM (SG-CD, BPV III) 05:00 PM - 07:00 PM ISI Program Owners Group 05:00 PM - 07:00 PM TG Modernization (BPV I) 05:15 PM - 06:30 PM BPV IV Executive Committee 06:00 PM - 07:30 PM Materials Database Working Group (MDWG/II) Project Team on the Reorganization of Section V 06:00 PM - 08:00 PM (BPV V) Wednesday, January 28 2015 07:00 AM - 06:00 PM Registration The Roof Westin Oaks- 21st Level I II Consort I I The Roof Westin Oaks- 21st Level II 07:00 AM - 08:00 AM BPV Committee on NDE Executive Session (BPV V) 06:00 PM - 08:00 PM BPV III Executive Meeting 07:30 AM - 10:00 AM SG Elevated Temperature Design (SC-D, BPV III)

08:00 AM - 12:00 PM SG General Requirements & Piping (BPV I) II 08:00 AM - 04:00 PM SG Design Methods (SC-D, BPV III) 08:00 AM - 04:00 PM SG Component Design (SC-D, BPV III) I 08:00 AM - 04:00 PM SG Materials, Fabrication & Examination (BPV III) 08:00 AM - 04:00 PM SG General Requirements (BPV VIII) 08:00 AM - 04:00 PM SG Heat Transfer Equipment (BPV VIII) 08:00 AM - 04:00 PM SG Fabrication & Inspection (BPV VIII) 08:00 AM - 04:00 PM SG RRA 08:00 AM - 04:30 PM SG Materials (BPV VIII) 08:30 AM - 11:30 AM SG Surface Examination Methods (BPV V) 08:30 AM - 01:00 PM SG Evaluation Standards 08:30 AM - 04:00 PM SG General Requirements (BPV III) 08:30 AM - 04:00 PM SG Water Cooled Systems 08:30 AM - 04:30 PM SG Non-Destructive Examination I 08:30 AM - 05:00 PM SWG Computational Modeling for Explicit Dynamics Regal Westin Galleria - 24th Level 09:00 AM - 05:00 PM BPV Committee on Heating Boilers (BPV IV) 10:00 AM - 12:30 PM SG High Temperature Reactors (BPV III) 10:00 AM - 03:00 PM WG Elevated Temperature Construction (SG-ETD, BPV III) 12:30 PM - 04:00 PM SG Volumetric Methods (BPV V) 01:00 PM - 04:00 PM SG Materials (BPV I) II 01:00 PM - 04:00 PM JSME/ASME Joint TG for System Based Code 01:00 PM - 04:30 PM TG Crack Growth Reference Curves 01:00 PM - 05:00 PM TG on Subsea Applications (SC VII Div 3) 03:30 PM - 5:30 PM Welding Residual Stresses International Round Phase 2B 04:00 PM - 06:00 PM SG Solar Boilers (BPV I) 04:00 PM - 07:00 PM SG General Requirements/Personnel Qualifications & Inquiries (BPV V)

04:15 PM - 06:00 PM Special Committee on Interpretations (BPV III) I 04:30 PM - 06:00 PM TG Common Rules (BPV VIII) 04:30 PM - 06:30 PM Special Committee on Interpretations 06:00 PM - 07:00 PM Special Committee on Interpretations (BPV VIII) Thursday, January 29 2015 07:00 AM - 12:00 PM Registration BPV Committee on Nuclear Inservice Inspection Administrative Session 08:00 AM - 08:20 AM BPV Committee on Pressure Vessels Administrative Session (BPV VIII) 02:00 PM - 03:00 PM V 02:00 PM - 04:00 PM 07:00 AM - 01:00 PM 08:00 AM - 02:00 PM BPV Committee on Construction of Nuclear Facility Components Administrative Session (BPV III) BPV Committee on Nondestructive Examination (BPV V) BPV Committee on Construction of Nuclear Facility Components (BPV III) 08:00 AM - 02:00 PM BPV Committee on Pressure Vessels (BPV VIII) 08:00 AM - 04:00 PM BPV Committee on Power Boilers (BPV I) SWG General Requirement Consolidation 08:00 AM - 05:00 PM BPV Committee on Nuclear Inservice Inspection 08:30 AM - 04:30 PM SWG Computational Modeling for Explicit Dynamics 08:30 AM - 05:00 PM 02:00 PM - 08:00 PM SWG Editing and Review Friday, January 30 2015 BPV Technical Oversight Management Committee 07:30 AM - 11:30 AM (TOMC) SWG General Requirement Consolidation 08:00 AM - 05:00 PM 01:00 PM - 05:00 PM Board on Codes & Standards Operation (BCO) Saturday, January 31, 2015 I I II V Sage I

07:00 AM - 12:00 PM ASME Office SWG General Requirement Consolidation 08:00 AM - 05:00 PM *Please note meeting rooms are subject to change, please check Agenda while onsite*