MINUTES. International Kootenay Lake Board of Control Public Meeting. Kootenai River Inn 7169 Plaza Street Bonners Ferry, Idaho

Similar documents
The International Joint Commission Kootenay Lake Board of Control

RECORD OF MEETING OF THE INTERNATIONAL KOOTENAY LAKE BOARD OF CONTROL ANNUAL MEETING AT BONNERS FERRY, IDAHO

Presented to Idaho Washington Aquifer Collaborative February 11, Spokane River Project License

Adopted Regulation Strategy LWCB Regulation Meeting - March 22, 2010

Adopted Regulation Strategy Lake of the Woods Control Board Regulation Meeting March 12, 2013

Utility Debt Securitization Authority 2013 T/TE Billed Revenues Tracking Report

Hydrological Condition Report including the issues of High Flow Fluctuation in Chiang Saen

Albeni Falls Dam Downstream Water Temperature Study Interim Results

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Drought! When Do We Know It s Over?

Great Lakes Commission Semiannual Meeting

Table 1. Monthly precipitation totals from the on-site rain gage and from the Dulles weather station and their differences.

Drought or Not? Nolan J. Doesken Colorado Climate Center Colorado State University

Tuesday, January 11, :11 AM (CST)

CUPSIM Water Supply Variability Study All information subject to change.

PUBLIC MEETINGS. Please see the City of Geneva Public Meeting Guide for more information regarding City Council and Committee of the Whole meetings.

Mutton Snapper Public Workshops February Florida Fish and Wildlife Conservation Commission Division of Marine Fisheries Management

Enclosure 16. Memorandum for Record Informal Consultation Telecon 12 March 2004

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report

APPENDIX H LAKE OKEECHOBEE FLOOD ROUTINES

CLAIBORNE LOCK AND DAM PERTINENT DATA

Coquitlam/Buntzen Project Water Use Plan

Drought: What is the Status?

Colorado River Drought Response and System Sustainability. Chuck Cullom July 16, 2014

Annual Meeting June 17, Research Stewardship Education

CoCoRaHS goes to the Colorado Farm Show

The State of the Climate Address

GAZIFÈRE INC. Prime Rate Forecasting Process 2015 Rate Case

Kootenai River Burbot Restoration. Presented to KVRI 10/15/2018 by Kootenai Tribe of Idaho Idaho Department of Fish and Game


Order No. 55/18 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, April 26, 2018

Manitoba Water Stewardship. Coping with Drought. Drought Research Initiative Workshop. Inn at the Forks, Winnipeg. A.A. Warkentin. January 11-13, 2007

TESTIMONY OF THE COLUMBIA RIVER TREATY TRIBES BEFORE PACIFIC FISHERIES MANAGEMENT COUNCIL April 12, 2010 Portland, OR

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Morrisville Water & Light FERC No. P-2629 Morrisville Project Green River Development

First Foods. Salmon. Berries Water Game. Roots

SWISS Traffic Figures May 2004

Drought and the Climate of the Ogallala Aquifer

Nolan Doesken Colorado Climate Center

Eulachon: State of the Science and Science to Policy Forum

IWRM of Ganges-Brahmaputra-Meghna Basin

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in 2010

Environmental Protection The answer my friend is blowing in the wind

JULY 2013 RIDERSHIP REPORT MTA METRO-NORTH RAILROAD EXECUTIVE SUMMARY

Interlake Tunnel WRA Board Workshop. August 25, 2014

INTER-STATE BASIN MANAGEMENT IN FEDERAL COUNTRIES- INDIAN SCENARIO. By Radha Singh Additional Secretary GOVERNMENT OF INDIA

2018 HR & PAYROLL Deadlines

Properties. terc.ucdavis.edu 8

Water budgets of the two Olentangy River experimental wetlands in 2001

2017 Adult Returns and 2018 Expectations Columbia River Updated Draft January 11, 2018

LIFE HISTORY DIVERSITY AND RESILIENCE

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

The Executive Committee of the International Fund for saving the Aral Sea (EC IFAS)

Nolan Doesken. Colorado Climate Center.

CPS Attachment 1. Calgary Combative Sports Commission Year in Review 2015 ISC: UNRESTRICTED

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR

The Effects of Seasonal Stream Dewatering on Bull Trout, Salvelinus confluentus

MAR DASHBOARD MAR. Compliant % Breakdown Mar % Late % On-time MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

PROFILE OF SACRAMENTO RIVER, FREEPORT TO VERONA, CALIFORNIA,

PUBLIC AGENDA STREET ACTIVITY STEERING COMMITTEE

Aspects and Case Studies of the Effects of Climate Change on Water Resources. Part II (Case Studies)

Weather and Climate Impacts on Water Supply

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

MPTS Committee meeting, 19 September Annex A: MPTS Performance Dashboard

JAN DASHBOARD. Positive Response Compliance JAN. Compliant Tickets : On-Time Performance Analysis. January % Late.

TROUT CREEK WATERSHED (Second Year of Snowline Data)

Initial Study Report Whitewater Boating

Air Quality Analysis for Ozone

Lake mead current water level

Have You Ever Heard the Phrase

Rebalancing Global Crude Flows

Inner Harbor Navigation Canal (IHNC) Basin 1% (100-yr) and 0.2% (500-yr) Surge and Wave Event Water Levels

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

AcquaTailings: A Tool for Streamlining Mining Water Budget

Wilshire Boulevard Bus Rapid Transit Project

Appendix G Whitewater Recreation Flow Study Plan

FINAL Caples Lake Fisheries Management Plan. Version 4.0

Alton Perrie, Environmental Science Department. Jo Beaglehole, Environmental Policy Department Juliet Milne, Environmental Science Department

WHEREAS, the ordinance will not create excessive additional requirements for public facilities and services at public cost.

UK/JAPAN SEASON OF CULTURE

2015 Adult Returns and 2016 Expectations Columbia River Preliminary Draft December 14, 2015

Staying in Tune with South Florida s Water Cycle for Scientists, Managers, and Policy Makers in 5 Minutes per Week

March 6, SUBJECT: Briefing on Columbia River Basin salmon and steelhead returns for 2017 and run forecasts for 2018

Colorado Weather and Climate Update

University of Guam Water and Environmental Research Institute of the Western Pacific GUAM S WATER ISSUES

REVIEW OF USDA FOREST SERVICE COMMUNITY-BASED WATERSHED RESTORATION PARTNERSHIPS APPENDIX J

Justification for Rainbow Trout stocking reduction in Lake Taneycomo. Shane Bush Fisheries Management Biologist Missouri Department of Conservation

Wisconsin 511 Traveler Information Annual Usage Summary January 3, Wisconsin 511 Phone Usage ( )

M A N I T O B A ) Order No. 123/13 ) THE PUBLIC UTILITIES BOARD ACT ) October 22, 2013

DEC DASHBOARD. Positive Response Compliance DEC. Compliant Tickets : On-Time Performance Analysis. December % Late.

Merger of the UKFast Cheshire Cricket League and the Cheshire Cricket Alliance

NCC Cable System Order

Figure 1 Location Map

FREEDOM OF INFORMATION REQUEST

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

Plan B Dam Breach Assessment

Current Hawaii Economic Conditions. Eugene Tian

2009 Forecast for the Chicago CBD

Response of a Newly Created Marsh-Wetland Affected by Tidal Forcing, Upland Discharge, and Groundwater Interaction

Attachment 1. Agenda Item Summary BACKGROUND

Pacific Northwest Ski Association A Division of USSA

Transcription:

MINUTES Public Meeting Kootenai River Inn 7169 Plaza Street Bonners Ferry, Idaho Wednesday, September 26, 2012 7:30-9:30 PM Attendance United States Canada Chairs Col. Bruce Estok (host) Kirk Johnstone Members Michael Lewis Glen Davidson Secretary Amy Reese Gwyn Graham Guests Commissioner, Rich Moy, Dr. Mark Colosimo (IJC, U.S.), Ted Yuzyk (IJC, Can.), Kelvin Ketchum, BCHydro, Martin Jasek, BCHydro, Ron Malmgren, Corps of Engrs., Marko Aaltomaa, Network Services Manager (FortisBC), Jamie King, Power Supply Operations Manager (FortisBC), Jarret Leason, Senior Engineer, Operations (FortisBC, Larry Merkle (Technical Advisor) 27 public guests. Total of about 40 (public + officials). Minutes 1. Welcome and Introductions Col Estok welcomed and led introduction of the Board members and guests. 2. Review of the Agenda Col Estok led a review of the agenda which was adopted without change. 3. IJC and Kootenay Order context Col Estok provided a brief overview presentation (attached) describing the IJC and the Kootenay Board including their membership and functions and the provisions of the 1938 IJC Order. 3.1 System Operation 2012

Amy Reese gave a presentation (attached) describing the record rainfall that was superimposed on the slightly above average snowmelt runoff volume during the spring and summer 2012. She presented hydrographs for Libby and Duncan projects to provide context for the inflows to Kootenay Lake and a Bonners Ferry stage hydrograph. Finally, she presented a hydrograph for Kootenay Lake illustrating the lake inflow and outflow and the lake elevation which peaked at elevation 1753.78 on July 3 rd. 3.2 Kootenay Lake Levels 2012 and Order Compliance. Gwyn Graham reviewed the Kootenay Lake hydrograph (attached) showing the lake was below the rule curve elevation in 2012 except for the period from March 28 th until April 20 th, the date for declaration of spring rise. During the period of exceedence, the hydraulic control on lake discharge was at Grohman Narrows; therefore, FortisBC did not violate the Order. The lake was primarily above the rule curve because of higher inflows caused by drafting at Libby and Duncan projects. 4. Questions and comments from the public Col Estok invited questions and comments from guests. (Questions and comments from guests are in plain text. Responses follow in italics. Both are paraphrased.) Bob Olson, President of the Kootenai Valley Reclamation Association, commented on the high Kootenay Lake elevations and asked if the lake was operated in compliance with the Order? Gwyn Graham reiterated that the lake discharge control was at Grohman Narrows during the period of maximum lake elevation and briefly explained the lowering formula and stated that after the declaration of spring rise, the lake was consistently below the rule curve. FortisBC was in compliance with the Order and did all reasonably possible to minimize high lake elevation. Mr. Olson asked if there is any plan to dredge at Grohman Narrows. Glen Davidson stated that the potential for increasing lake discharge and lowering lake elevations by increasing discharge capacity at Grohman Narrows is being studied. Dan Dinning, Boundary County Commissioner, and Brad Richy stated that local residents believe that system operation could be improved if there were more snowtel sites. Glen Davidson stated that there are approximately 130 Snowtel sites in British Columbia; about 1/3 in the Kootenay area. A primary issue for increased numbers of snowtel sites is agency funding of the required operating budget. This issue will be addressed in more detail at the Corps October 22 nd, public meeting on Libby Operation for the past spring and summer. Mr. Dinning asked if sedimentation at Libby reservoir has reduced the Libby Project s capability for flood risk reduction. Col Estok said he did not know of recent sedimentation measurements and said he would get back to Mr. Dinning at the upcoming October 22nd meeting on Libby operation. Chris Amos asked if more storage could be reserved at Libby project to provide a factor of safety for flood risk reduction in years like this one (2012)? Col Estok responded that such an increase is unlikely because increasing the space reserved for flood risk reduction would have adverse impact on other project purposes including recreation, hydropower, and environmental mitigation. Bob Olson asked La Nina conditions are considered in runoff forecasts? Amy Reese responded that La Nina and El Nino are considered in the forecasting. Bob Graham (Boundary County) and Patty Perry (Kootenai Valley Resource Initiative) stated that they had heard that Libby drawdown this year (2012) was less than last year (2011). Amy Reese responded that reservoir drawdown is based on the runoff volume forecast for the year. Therefore, year-to-year comparisons are only meaningful relative to the annual runoff forecast.

Roger Morter asked if Corra Linn Dam was limiting lake outflow during the period of peak inflow. Col Estok said; no, discharge control was at Grohman Narrows. Roger Morter and Dan Dinning asked: Would the effect of Libby operation been significantly different under non-varq as compared to VARQ operation. Amy Reese responded that the effect would not have been significantly different. The Corps will present more information on this comparison at the October 22 public meeting on Libby Operation for the past spring and summer. Adjourn Col Estok thanked the audience for attending and participating and declared the meeting adjourned.

Agenda Welcome and introductions International Joint Commission context Kootenay Lake Orders System Operation 2012 Kootenay Lake levels 2012 Questions from the public concerning the Kootenay Order and operation of Kootenay Lake in 2012 Adjourn

IJC Context Treaty Between the United States and Great Britain Relating to Boundary Waters, and Questions Arising Between the United States and Canada, 1909 Boundary Waters Treaty International Joint Commission Kootenay Lake Order, 1938 International Kootenay Lake Board of Control

International Joint Commission Lana Pollack U.S., Chair Joseph Comuzzi Canada, Chair Dereth Glance, U.S. Rich Moy, U.S. Lyall Knott, Canada Canadian Position (Vacant)

International Joint Commission To prevent and resolve issues, the Commission Undertakes investigations Holds hearings Issues Orders----For example, the 1938 IJC Order for Kootenay Lake The Commission appoints Boards of Control to monitor its Orders

Kootenay Lake Board of Control Col. Bruce Estok, Chair, U.S. Kirk Johnstone, Chair, Canada Michael Lewis, U.S. Glen Davidson, Canada

Kootenay Lake Board of Control Duties of the Kootenay Lake Board of Control Monitor FortisBC s operation of Corra Linn Dam Assure all other provisions of the 1938 IJC Order are followed Provide general advice and assistance to the IJC on issues relating to the 1938 IJC Order

1938 Kootenay Lake Order Directs FortisBC to help pay increased pumping costs for land drainage incurred by Idaho farmers

1938 Kootenay Lake Order Directed FortisBC s predecessor to dredge Grohman Narrows (completed in the early 1940s)

Kootenay Lake Control Corra Linn Control Lake level depends on inflow and outflow Kootenay Lake (West Arm) Corra Linn dam does not have exclusive control of lake outflow Corra Linn Grohman Narrows Control Grohman Narrows Nelson Queens Bay When the Corra Linn forebay is kept low, control moves upstream to the natural constriction at Grohman Narrows

1938 Kootenay Lake Order Directs FortisBC to take advantage of the dredging to keep Kootenay flood levels lower

1938 Kootenay Lake Order Directs FortisBC s operation of Corra Linn Dam with respect to maximum water levels in Kootenay Lake

Maximum Water Elevations Ordered 1745.32 1745.32 @ Queens Bay 1739.32 Calculated 1743.32 @ Nelson @ Queens Bay Jan Apr Aug Sep Dec

Kootenai(y) Basin 13

500% June 2012 Precipitation as Percent of Average 450% 440% 400% Station % of Average Precipitation 350% 300% 250% 200% 150% 157% 183% 241% 254% 266% 267% 278% 314% 321% 347% 100% MEAN PRECIPITATION 50% 0% Fernie Cranbrook Golden Libby Dam Coeur D'Alene Eureka Nelson Bonners Ferry Station Boundary Dam Castlegar Sandpoint

Kootenay Lake-Inflow-Outflow-Lake Elevation Inflow Outflow Res Elev 140 1,768. Discharge~KCFS 120 100 80 60 40 Maximum Lake Elev. 1753.78 3 July 1,763. 1,758. 1,753. 1,748. Reservoir Elevation~Feet.. 20 1,743. 0 1,738. 1-Jan 1-Feb 1-Mar KootenayLPlotData(A)2012 1-Apr 1-May 2 0 12 1-Jun 1-Jul 1-Aug 1-Sep

Duncan Reservoir-Inflow-Outflow-Reservoir Elevation Inflow Outflow Res Elev 30000 Maximum Reservoir Elev~1892.64~23 July 1,890. 25000 Discharge~CFS 20000 15000 10000 5000 Maximum Discharge 13,000 CFS~24 July 1,870. 1,850. 1,830. 1,810. Reservoir Elevation~Feet.. 0 1,790. 1-Jan 1-Feb Duncan-PlotData2012 1-Mar 1-Apr 1-May 2 0 12 1-Jun 1-Jul 1-Aug 1-Sep 16

Libby Reservoir-Inflow-Outflow-Reservoir Elevation Inflow Outflow Res Elev 90 80 70 Maximum Reservoir Elev~2459.94~15July 2,470. 2,460. 2,450. Discharge~KCFS 60 50 40 30 20 10 Maximum Discharge 48,000 CFS~4,5,&6 JUL 2,440. 2,430. 2,420. 2,410. 2,400. 2,390. 2,380. Reservoir Elevation~Feet.. 0 2,370. 1-Jan 1-Feb Libby-PlotData2012 1-Mar 1-Apr 1-May 2 0 12 1-Jun 1-Jul 1-Aug 1-Sep

Kootenai River At Bonners Ferry Stage Bonners Ferry Stage 70 65 60 55 50 45 40 1-Jan 1-Feb 1-Mar 1-Apr 1-May 1-Jun 1-Jul 1-Aug 1-Sep Bonners Ferrry Stage~Feet.. Maximum Elevation 1766.61~4 July BonnersFStage-2012.xls 2 0 12

2012 Water Levels Elevation (feet) 1,758 1,756 1,754 1,752 1,750 1,748 1,746 Kootenay Lake Hydrograph 2012 Maximum Lake, Elev. 1753.78, 3 July Corra Linn control Grohman Narrows control 0 1,744 1,742 1,740 1,738 Rule Curve Queens Bay Nelson Lake level control Balanced control Commencement of spring rise, 20 April 2012 J F M A M J J A S O N D Month