BVM CORPORATION TYPE AAX TONG 55,000 FT/LBS. TORQUE Part number: Serial Number:

Similar documents
Blohm + Voss Oil Tools

WHEATLEY Series 500 Swing Check Valve

WHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual

M S I C R A N E S C A L E

High Pressure Iron (HPI) Recertification Guidelines & Procedures

User Instructions 1789 Parapet Wall Anchor

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP75H-10 HYDRAULIC WINCH.

Right-Angle Tube Roller Model

CHAPTER 2 MAINTENANCE

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP50-H-14 HYDRAULIC WINCH.

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5

User Instructions 1790 Rail Anchor

Product Bulletin No.: D99-RRV2015-PIB-001

Model 7989T Steel Pipe Squeezer Sch. 40 & Sch. 80. Operations Manual

HP-104 & HP-106 Tapping Machine OPERATIONS MANUAL

BC Shackle. Made in the China. Alloy Steel Anchor Shackle. Instructions for handling and use - Please read in full before using this device

Operating Procedures for GripTight 15.5 SDR & IPS Test Plugs

OPERATIONS MANUAL RIGHT ANGLE CAPSTAN

35 TON HYDRAULIC PUNCH WARNING

AR-15 Rifle Operator Maintenance

PJD Connection. . TenarisHydril Running Manual.. Recommended guidelines for the field inspection of TenarisHydril connections, FSOG

MANUAL SEALLESS STEEL STRAPPING TOOL MODEL A

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30.

User Instruction Manual Fixed Beam Anchor

MECH-TECH SYSTEMS CCU MODEL FOR GLOCK PISTOLS

MANUFACTURING PROCEDURE SPECIFICATION INSPECTION TEST PLAN

INSTRUCTIONS FOR USE

Triple Tine Mechanical Grapple

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

GM-121: Container End Lock Anchor Wand Page 1 WINSAFE CORP. GM 121 CONTAINER END LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

OPERATIONS/PARTS MANUAL FOR PATTERSON'S MODEL # WWP40M-LPS-6 LOW-PROFILE BARGE CONNECTOR WINCH

Instructions for Use Wire Rope Hoist SAT 08 / SAT 16 / SAT 32

Standard Operating Procedures

IMPORTANT: RECEIVING INSTRUCTIONS:

LIFTING MAGNETS ERIEZ MAGNETICS

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

AR STYLE FIREARMS OWNER'S MANUAL: OPERATION, HANDLING, DISASSEMBLY / REASSEMBLY & SAFETY INSTRUCTIONS

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP40BC BARGE CONNECTOR WINCH

Index Table. Model 794. Installation, Operating and Maintenance Instructions

LIQUIP DRYBREAK COUPLER. API800 Series MAINTENANCE INSTRUCTIONS

INDUSTRIAL VALVES MODELS: C62-A; C62-D. INSTRUCTION MANUAL Installation Operation Parts Service DIAPHRAGM BYPASS PRESSURE REGULATING VALVES

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP40M-12 and all WIDE DRUM variations of this HAND OPERATED WINCH.

MUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.

GEMTOR. ... when your life is on the line OWNER'S MANUAL. FLW Series Self-Retracting Lanyard/Fall Limiter

OPERATIONS/PARTS MANUAL FOR PATTERSON'S HAND OPERATED WINCH

1.2 LIMITATIONS: Consider the following application limitations before using this equipment:

NAVSEA STANDARD ITEM. 2.2 T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

3/8" Dr. Air Butterfly Impact Wrench

User Instruction Manual Fixed Beam Anchor

Holden Grip-Lock TM Chock Inspection and Repair Standards: Procedure and Examples (April 2016)

USER INSTRUCTION MANUAL CONCRETE BOLT ANCHORAGE CONNECTOR

KIRBY MORGAN DEEP SEA DIVING HELMETS ALL MODELS OVERHAUL, MAINTENANCE, AND INSPECTION CHECKLIST APPENDIX A

Manual Actuated Boiler Blowdown Valves

U.S. Patent No. 7,922,246. Patents Pending

PR4 Installation, Operation & Maintenance Instructions (DOT Certification Included)

Specifications Testing & Adjusting Disassembly & Assembly

KIRBY MORGAN DEEP SEA DIVING HELMETS ALL MODELS OVERHAUL, MAINTENANCE, AND INSPECTION CHECKLIST APPENDIX A

Figure 1 - Parts Identification. Copyright 2002, DB Industries, Inc.

OPERATIONS MANUAL IMPORTANT SAFETY INFORMATION

MUD 1. Vent check valves. Instruction and maintenance manual.

Coiling Tube with Twist-Proof Fitting

! WARNING. Model PFC-1-G (direct acting) PFC-1-GR (reverse acting) Modulating Pneumatic Liquid Level Controls INSTRUCTION MANUAL MM-110B

REL-46 WARNING NOTICE 15 TON SINGLE ACTING REMOTE HYDRAULIC CRIMPING HEAD. Compatible with RELIABLE R15 and P Style dies. REL-46 Manual

Installation Instructions For Flat Seated Bolted Type RAH Series Disk Holders

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

Installation, Operation and Maintenance Manual for Back Pressure Regulator

OPERATIONS/PARTS MANUAL FOR PATTERSON'S STRAP WINCH

Bray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual

Parts List. 7. Handlebars 8. Grips 9. Handlebar Stem 10. Front Brake 11. Front Wheel 12. Crank 13. Chain

USER INSTRUCTIONS. Complies with ANSI Z359.1, ANSI Z359.4 standards and OSHA 29 CFR 1910 and 1926 regulations.

CS150 CAP STAPLER OWNER S MANUAL

Holden Grate-Lock Chock Inspection and Repair Standards: Procedure and Examples (April 2016)

INSTALLATION & MAINTENANCE INSTRUCTION

INSTRUCTIONS FOR USE

Hoist Ring Forged Hoist Ring Machined Hoist Ring (Metric) Hoist Ring Swivel Shoulder Eyebolts JD Weld-On Alloy Lifting

// ADapters GUIDelines

OWNER S MANUAL. Read the instructions and warnings in this manual carefully before using this firearm; do not discard this manual.

Installation, Operation & Maintenance Manual for Flo-Max Coupler Bracket Model FM150

REL-510H WARNING NOTICE 12 TON SINGLE ACTING REMOTE HYDRAULIC CRIMPING HEAD

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

Load Ring bolted > VWBG < in pink

Hot Tapping Machine. OPERATIONS MANUAL and OPERATING INSTRUCTIONS

Type BBS-03, BBS-05, BBS-06, BBS-25

User Instruction Manual For Davit Rescue System

USER S INSTRUCTION MANUAL FOR THE INSTALLATION, OPERATION & MAINTENANCE OF THE GUARDIAN TEMPORARY HORIZONTAL LIFELINE SYSTEM

Repair instructions. Pivot bushing replacement. XL-AS10001RM-en-DE Rev B

WHEATLEY Series 822/820 Swing Check Valve

Model 23H Hand Crank Seamer

THE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)

Name of product: Gripper for vertical façade FTV panels Types: PVF (60, 80, 100, 120, 133, 150, 172, 200 and 240 mm) INSTRUCTIONS FOR USE

Atmospheric relief valve type 1100 Installation and maintenance instructions

Insert Ring. Protection Ring from Tube Deformation. Protect tubes from deformation. Ultra soft tube is connectable to Fitting.

Installation and Operation Instruction Manual

15ME-014 INSTRUCTION MANUAL OF STERN TUBE SEALING TYPE EVK2RV. URL

Grip-Lock Chock Repair Decision Instructions: Procedure and Examples (June 2013)

IMPORTANT: Record the product identification information from the ID label in the inspection and maintenance log in section 9.0 of this manual.

Ground Release Shackle

Product Name: Angel Anchor

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD

Transcription:

BVM CORPORTION TYPE X TONG 55,000 FT/LBS. TORQUE Part number: Serial Number: WRNING: Manual tongs which have experienced excessive wear or are found to have cracks should be replaced or repaired by BVM Corp. or designated BVM service station. Failure to do so can result in serious bodily harm or property damage. WRNING: To avoid injury do not place hands or any part of your body between pitch point areas like jaws and pipe, between jaws, between latch and latch jaw and between lever and jaws can cause severe injury. WRNING: Only BVM parts should be used. Manual tongs are cast alloy heat treated steel and should not be welded in the field. Improper welding can cause cracks and brittleness in heat-affected areas which can result in drastic weakening of the part and possible failure. Repairs involving welding and/or machining should be performed only by an authorized BVM repair facility. Using a manual tong that has been improperly welded or repaired can cause failure which may result in serious bodily injury or property damage. BVM Type X Tong is ideal for light drilling and tubing work. lso used for seismographic, shot hole and exploration drilling. Like all other BVM Tongs a 3 Jaw design

permits the jaws a uniform contact around the pipe. Jaw sizes range from 2 3/8 through 10 3/4 OD. ll Steel specification are certified. 1. PURPOSE This technical manual provides operation of and maintenance instructions to the BVM Type X Manual Tongs, with assembly drawings and parts breakdown. It provides a guide for proper field use, disassembly and repairs. 2. DESCRIPTION BVM Type X Manual Tongs are designed in accordance with industry standards and can handle all kinds of pipe torque from light tubing to heavy wall pipe and drill collars. ll BVM Type X manual tongs are precision machined from heat treated alloy steel, with hinge pins made from a special heat treated alloy steel. Interchangeable lug jaw design permits each tong to handle different sizes of pipe safely and conveniently. 3. INSTLLTION BVM Type X manual tongs are designed for quick installation and easy operation. To install the manual tong, the tong support line should be connected to the suspension ring. To prepare the tong for the job at hand, install the right lug jaw to cover the correct size range. Make sure the tong is capable of handling the torque required. For easy tong operation, freely suspend tong up to the tong support line as close to the center of the rotary table as is convenient. This reduces the arc of swing and the distance that the tong must travel to the table. The pull up line must then be connected to the end of the lever. back up line, sized to safely withstand the tong torque rating, should in all cases be connected to secure safe operation. BVM tong pull back can be installed to save rig time as it automatically repositions the tong for another take up. 4. OPERTION With the tong positioned and balanced properly, follow four simple steps outlined below: Grasp safety handle on lug jaw and safety handle on hanger to move the tong into position about the pipe. Press the short jaw firmly around and against the pipe. Pushing both safety handles simultaneously the manual tong will latch automatically. Pull both safety handles to break-over the tong and grip the pipe. 5. MINTENNCE: 1.1 ROUTINE FUNCTIONL TEST The functional test should be done prior to use or on a regular basis when in use. Visually inspect the manual tong for loose, worn and missing parts. Check for worn hinge pins and hinge pin holes by trying to vertically move jaws from lever. Check if all pins are properly locked.

Check for the proper latch engagement on steps of lug jaw. The latch must not contact any part of the tong when latched and under torque except the step on lug jaw. Brush dies clean and check for wear. 1.2 ROUTINE LUBRICTION The below lubrication should be done prior to use or on a regular basis when in use: Grease hinge pins through grease nipples. Lubricate regularly during usage and storage to prevent corrosion from attacking any part of the manual tong operating mechanism. 1.3 LUBRICTION SPECIFICTION Use extreme pressure lithium based, multi-purpose grease of no. 1 or 2 consistency and 10 W 30 or 10 W 40 multi-grade motor oil to lubricate BVM Manual Tongs. 1.4 TORQUE TEST BVM Type X manual tongs are torque tested after manufacture or repair to 1 ½ times their torque rating. Inspection Daily Inspection (when tool is in use) Category I. This category involves observing the equipment during operation for indications of inadequate performance. When in use, equipment shall be visually inspected on a daily basis for cracks, loose fits or connections, elongation of parts, and other signs of wear, corrosion or overloading. ny equipment found to show cracks, excessive wear, etc., shall be removed from service for further examination. The equipment shall be visually inspected by a person knowledgeable in that equipment and its function. Category II. This is Category I inspection plus further inspection for corrosion, deformation, loose or missing components, deterioration, proper lubrication, visible external cracks, and adjustment. Procedure Observe and repair when needed (cat I + II) Observe the functioning of the tong as follows: 1) Check for proper latch engagement on lugs of lug jaw. The latch must not contact any part of the tong when latched and under torque except the lug on lug jaw. OK 2) Check for worn hinge pins and hinge pin bores by trying to vertically move jaws from lever OK Procedure Visually inspect and repair when needed (cat I + II) 1. Check for worn and damaged parts OK 2. Check for loose and missing parts OK 3. Check all pins are properly locked OK 4. Brush dies clean and check for wear OK 5. Check the proper locking of: Bolts and nuts OK Slotted nuts & cotter pins OK Lock tabs & lock bars OK

Roll pins and dowel pins Snap rings OK Cotter pins OK OK 6 Monthly Inspection (when tool is in use) Category III This is Category II inspection plus further inspection, which should include NDT of critical areas and may involve some disassembly to access specific components and to identify wear that exceeds the manufacturer's allowable tolerances. nnual (1 year) Inspection (when tool is in use) Category IV This is Category III inspection plus further inspection for which the equipment is disassembled to the extent necessary to conduct NDT of all primary-load-carrying components as defined by manufacturer. Equipment shall be: Disassembled in a suitably-equipped facility to the extent necessary to permit full inspection of all primary-load-carrying components and other components that are critical to the equipment & Inspected for excessive wear, cracks, flaws and deformations. Corrections shall be made in accordance with the manufacturer's recommendations. Prior to Category III and Category IV inspections, all foreign material such as dirt, paint, grease, oil, scale, etc. shall be removed from the concerned parts by a suitable method (e.g. paint-stripping, steam-cleaning, gritblasting). Procedure 6 Monthly Inspection Procedure on rig (cat III) ; Disassemble the following parts of the tong for dimensional check according to max. allowable wear (see this chapter): Hinge pins Latch pins Hinge pin holes Latch pin holes Jaws/Latches Procedure nnual (1 year) Inspection nnual (1 year) Inspection (cat IV) MPI tong major load bearing components critical areas as per MPI-procedure, using the Critical rea Drawings. Major load bearing components are: Latch lug jaw (C-222) Latch jaw (C-223) Short jaw (C-224) Lever & Tubing tong lever (C-225) Long jaw (C-226) Manual tong hinge jaw (C-227) Latch (C-228) Hinge

Magnetic Particle Inspection The BMV critical area drawings will indicate which areas are considered as to be critical or noncritical. In general; for load bearing components, in case no critical area drawing exists, the complete component is considered critical. Carry out MPI according to SME BPVC sub section V, subsection, article 7 and subsection B, article 25 or STM E709 or an equivalent standard. Machined surfaces shall be examined by the wet fluorescent method, other surfaces shall be examined by wet or dry method. In case of inspecting a used product the only types of indications one need to consider are cracks with size bigger as 1.6 mm (1/16 inch). ll other types of indications have been reviewed when the part was produced and found to be acceptable. In case the defect was not acceptable it must have developed a crack during use and shall be considered relevant. Evaluations of indications Qualifications and certification ll personnel performing and interpreting MPI shall be qualified in accordance with the guidelines of SNT SNT-TC-1 (latest edition) or an equivalent standard and shall be trained in the use of the reference photographs and the interpretation of the MPI with regard to the acceptance criteria and STM E125 reference photographs. Examination BVM tongs should be MPI examined according to the maintenance procedures. The areas subject to inspection shall be inspected according to the procedures developed by the user or, alternatively, as per PI RP 8B. Table 1: cceptance criteria for PI 7k equipment Grey area NOT applicable for MPI for equipment in service. NOTE: If any relevant indications are found, contact BVM to determine the next course of action. Preferably an inspection report (with photograph or sketch) detailing the serial number of the equipment and the type, length and location of the indication should be presented. BVM will be able to advise the proper and most efficient repair. Linear indication: n indication, revealed by NDE, having a length at least three times its width Rounded indication: n indication, revealed by NDE, with a circular or elliptical shape and having a length less than three times its width. (pay special attention to the weld joint area Grey area NOT applicable for MPI for equipment in service. NOTE: If any relevant indications are found, contact BVM to determine the next course of action. Preferably an inspection report (with photograph or sketch) detailing the serial number of the equipment and the type, length and location of the indication should be presented. BVM will be able to advise the proper and most efficient repair. Linear indication: n indication, revealed by NDE, having a length at least three times its width Rounded indication: n indication, revealed by NDE, with a circular or elliptical shape and having a length less than three times its width.

Type Discontinuity description Max. permitted Max. permitted degree degree critical areas non-critical areas Linear discontinuities (hot tears, cracks) None, see note Degree Degree I II Shrinkage Degree II Degree II III Inclusions Degree II Degree II IV Internal chills and chaplets Degree I Degree I V Porosity Degree I Degree II Table 2: cceptance criteria for welds No relevant linear indications ( 1.6 mm (1/16 ) No rounded indications with a major dimension 3.2 mm ( 1/8 inch) for welds whose depth is 16 mm ( 5/8 inch) or less No rounded indications with major dimension greater than 5 mm ( 3/16 ) for welds whose depth is greater than 16 mm ( 5/8 inch) No more than 3 relevant indications in a line separated by less than 1.6mm (1/16 inch) Table 3: cceptance Criteria for wrought material No relevant indications with a major dimension equal or greater than 3/16 No more than ten relevant indications in any continuous 6 in² No more than 3 relevant indications in a line separated by less than 1/16 edge to edge No relevant indications in pressure sealing areas, in the root area of rotary threads or in stress-relief features of threaded joints. Tests BVM Manual tongs are torque tested after manufacture or repair to 1.5 times their torque rating. NOTE: Only a BVM authorized repair facility is allowed to remanufacture BVM Manual tongs which have indications outside the acceptance criteria. WRNING: BVM Manual tongs which have experienced wear or are found to have cracks must be replaced or repaired by a BVM authorized repair facility. WRNING: Only original BVM-OEM parts must be used. BVM Manual tongs are produced from cast alloy heat treated steel and must not be welded in the field. Improper welding can cause cracks and brittleness in heat-affected areas which can result in dramatic weakening of the part and possible failure. Repairs involving welding and/or machining should be performed only by an BVM authorized repair facility. Using a HT tong that has been improperly welded or repaired is dangerous.

Maximum allowable wear to maintain 100% torque rating B Tong Type Dimension Dimension B Maximum Maximum clearance (inch) clearance (inch) X 0.035 0.035 H 0.035 0.035 Shop repairs Changing dies/inserts 1. Remove the cotter pin and take out the retaining pin 2. fter replacing the inserts, the retaining pins with the cotter pins shall be reinstalled. CUTION: Wear eye protection when removing or replacing inserts to protect against chip fragments