WELCOME. to the meeting for the. Westside Avenue Action Plan Gateway to Revitalization

Similar documents
TRANSPORTATION & MOBILITY

GARLAND ROAD/GASTON AVENUE/ GRAND AVENUE INTERSECTION IMPROVEMENT STUDY

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Omaha s Complete Streets Policy

Road Diets FDOT Process

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

MARTIN LUTHER KING JR. WAY

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

122 Avenue: 107 Street to Fort Road

TRANSPORTATION COMMISSION Agenda Staff Report

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Transportation Corridor Studies: Summary of Recommendations

STONY PLAIN ROAD STREETSCAPE

What Is a Complete Street?

NEWMARKET UPHAM S CORNER

COMMUNITY MEETING #1 Summary

Prince George s County plans, policies, and projects

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

Safe Streets. City of Lake Forest Park. March 21, 2017

Complete Streets. Designing Streets for Everyone. Sarnia

Perryville TOD and Greenway Plan

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Public Workshop #2. September 14, 2016

City of Waterloo Complete Streets Policy

Chapter 5 Future Transportation

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Central Avenue Corridor Study FPID Number:

Appendix D: Planning Level Cost Calculator

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

CONNECTING PEOPLE TO PLACES

Major Bike Routes 102 Avenue Workshop April 21, 2015

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

C C C

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Tonight is for you. Learn everything you can. Share all your ideas.

Welcome to the Quebec Alternatives Analysis Public Meeting

LANCASTER CITY BICYCLE NETWORK

Land Use Bicycle Spaces Required Type Residential

Advanced Transit Oriented Developments (ATODs) - Defined

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Reams Road RCA Study. Board of County Commissioners Public Hearing

Solana Beach Comprehensive Active Transportation Strategy (CATS)

City of Seattle Edward B. Murray, Mayor

ACTIVE TRANSPORTATION

PEDESTRIAN ACTION PLAN

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Station Plan: Penn & 43rd Avenue

Executive Summary Route 30 Corridor Master Plan

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

Columbia Pike Implementation Team (CPIT) Meeting

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Bicycle and Pedestrian Connectivity Study Phase 2

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

10.0 CURB EXTENSIONS GUIDELINE

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA

7 Complete Streets & Roadway Aesthetics

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

PROJECT FACT SHEET March 21, 2018

Safe Routes to School Action Plan Aberdeen, Idaho

Introduction. North 12 th Complete Street Project Overview

Richmond Connects Visioning Update

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Enhancing Downtown

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

Everyone is a Pedestrian

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

Route 7 Corridor Study

Town of Ashland. Downtown Planning Initiative 2 nd Community Workshop. March 29, Presented by:

Non-Motorized Transportation 7-1

El Paso County 2040 Major Transportation Corridors Plan

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

MARK MESSIER TRAIL LONG-RANGE PLANNING STUDY WELCOME. Mark Messier Trail Planning Study 137 Avenue to Anthony Henday Drive.

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Presentation Starts at 5:30 PM

East Burke Transportation, Safety and Capacity Improvements

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

Building Great Neighbourhoods BONNIE DOON

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015

PROJECT FACT SHEET May 25, 2018

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

ACTION TRANSMITTAL No

San Jose Transportation Policy

Engineering - Bicycle and Pedestrian

Transcription:

WELCOME to the meeting for the

Columbia Road - Before and After

Ridge Road - Before and After

Before and After

WAAP Bridge Sections

Fountain Creek Before Retaining Wall for Roadway 30' Existing Fountain Creek Midland Trail Qnormal After Retaining Wall for Roadway 60' Q100 Midland Trail 8' 2' Qnormal

Safety Focus on public safety Efficient public safety movement of all users Accommodate emergency response agencies/responders Provide street lighting where appropriate User Mobility Comfortable pedestrian environment Segregate pedestrians, cyclists from vehicle traffic A seamless connection and transportation modes between Old Colorado City and Manitou Springs Provide for, or don t preclude option to add, several forms of mobility Slow traffic speeds Americans with Disabilities Act (ADA)compliant Accessibility to transit Livability Landscaping/trees Public gathering places Bikeway/Trail enhancements Aesthetically beautiful Variety of housing options Arts Community Values Creek District / Parks /Greenways Mixed-use zoning along the creek to accommodate a variety of uses Public gathering places Parks Water amenities A walkway/path to enable interaction with Fountain Creek Emphasize creek front Economic Vitality Ensure good access to businesses Repurpose existing facilities vs. building new Mixed-use as the market allows Infill/higher density/compact Transit-Oriented Development Lay the foundation to attract businesses similar to those in Old Colorado City and Manitou Springs Focus on quality hotels, restaurants and shops Collaboration between Old Colorado City and Manitou Springs A support corridor as well as a destination Positive community image Parking Maintain historic significance of corridor These community values were vetted by the public during the design process

Segment Issues Segment 1 Issues Too many curb cuts Little separation between parking areas and road Inadequate transit facilities Speeds too high Lack of drainage infrastructure Lack of landscaping 1. Lack of sidewalks and crosswalks Buildings close to road Too many signs Lack of on-street bicycle lanes RV traffic needs wider lanes Beckers Lane Colorado Avenue Midland Expressway Columbine Rd. Ridge Rd. 33rd St. 40 32nd St. 31st St. 30th St. Segment 2 Issues 2. Creek erosion Bridge at Columbia too narrow Inadequate traffic control at intersections Confusing intersection at Columbia St. Ridge Road intersection needs improvements Inadequate transit facilities Historic structures near road Missing trail connections Narrow right-of-way Sewer lines across creek Too many curb cuts Speeds too high Lack of drainage infrastructure Lack of landscaping Lack of sidewalks and crosswalks Lack of on-street bicycle lanes RV traffic needs wider lanes Beckers Lane Colorado Avenue Midland Expressway Columbine Rd. Ridge Rd. 33rd St. 40 32nd St. 31st St. 30th St. Segment 3 Issues Lack of on-street bicycle lanes Need to coordinate improvements with other bridge/drainage projects RV traffic needs wider lanes Sidewalks obstructed by utilities Too many curb cuts Beckers Lane Colorado Avenue Midland Expressway Columbine Rd. Ridge Rd. 33rd St. 40 3. 32nd St. 31st St. 30th St. These segment issues were vetted by the public during the design process

Schedule 2016 2017 2018 Seg 1 Construction from US 24 to Becker s Lane Seg 2 Construction to Ridge Road Seg 3 Construction to 31st Street Property Acquisition Utility Design and Relocation Public Communication PROJECT START DATE: January, 2017 PROJECT END DATE: December, 2018

Stay Connected Email: Msprings@PublicInfoTeam.com Call: 719-301-3801 Visit: www.westsideavenueplan.com Sign up for traffic advisories and project e-newsletters by sending an email to: Msprings@PublicInfoTeam.com