Highway 111 Corridor Study

Similar documents
Traffic Impact Analysis Chatham County Grocery Chatham County, NC

TRAFFIC IMPACT STUDY CRITERIA

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

TRAFFIC IMPACT ANALYSIS

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC ASSESSMENT River Edge Colorado

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

APPENDIXB. Traffic Operations Technical Memorandum

DUNBOW ROAD FUNCTIONAL PLANNING

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

Waterford Lakes Small Area Study

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

Chapter 4 Traffic Analysis

Glenn Avenue Corridor Traffic Operational Evaluation

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

THIS PAGE LEFT BLANK INTENTIONALLY

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

City of Homewood Transportation Plan

ALLEY 24 TRAFFIC STUDY

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Donahue Drive Corridor Traffic Operational Evaluation

Executive Summary June 2015

Harrah s Station Square Casino

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

SECTION 1 - TRAFFIC PLANNING

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

5.3 TRAFFIC, CIRCULATION AND PARKING

SELECTED ROADWAY CAPACITY ANALYSIS

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

EXECUTIVE SUMMARY. Page 1 of 6

Road Conversion Study Plumas Street

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

Shockoe Bottom Preliminary Traffic and Parking Analysis

7 th Street Bike Lane Traffic Impact Study

5.0 Roadway System Plan

Chapter 16: Traffic and Parking A. INTRODUCTION

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Clackamas County Comprehensive Plan

3.9 - Transportation and Traffic

Frequently Asked Questions

Walton Acres at Riverwood Athletic Club Clayton, North Carolina

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Simons Run Corridor Study

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

Route 7 Corridor Study

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Grant Avenue Streetscape

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

#!! "$% ##! &! # '#! % $ #!

Angie Silva Kitsap County Commissioners Office Stef Herzstein, PE, PTOE Transpo Group Jessica Lambert Transpo Group

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

USA Parkway Traffic Operations Analysis, Roundabout Option. Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy Travis, NDOT

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Traffic Impact Analysis (TIA) Process and Procedures Manual. September 2017

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

Transportation Impact Study for Abington Terrace

Traffic Academy: IJS & IMS FAQ/RULES OF THUMB

TAKOMA METRO STATION

The current document is revised based on the comments received on:

Planning Guidance in the 2012 AASHTO Bike Guide

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

TRAFFIC IMPACT STUDY

Low Level Road Improvements Traffic Analysis. Report

Intersection Traffic Control Feasibility Study

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Bridge Street Corridor Study Report

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

MEMORANDUM. Our project study area included the following locations:

Traffic Study North Shore School District 112

This page intentionally left blank.

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Sixth Line Development - Transit Facilities Plan

Access Management Regulations and Standards

Gateway Transportation Study

FINAL Albertville Business Park AUAR Update Traffic Study

Design Traffic Technical Memorandum

Transcription:

Highway 111 Corridor Study June, 2009

LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering, Inc. JUNE 2009

TABLE OF CONTENTS CHAPTER 1: INTRODUCTION... 1 1.1 STUDY PURPOSE... 1 1.2 STUDY METHODOLOGY... 1 CHAPTER 2: EXISTING CONDITIONS... 3 2.1 EXISTING ROADWAY NETWORK... 3 LC 111/First Street... 3 LC 111/Kevin Drive... 3 LC 111/Brian Street.3 LC 111/27st Street...3 2.2 EXISTING TRAFFIC VOLUMES... 3 CHAPTER 3: TRAFFIC PROJECTIONS... 6 3.1 TEA COMPREHENSIVE PLAN... 6 3.2 FUTURE TRAFFIC VOLUMES (2035)... 6 CHAPTER 4: OPERATIONAL ANALYSIS... 10 4.1 ANALYSIS DESCRIPTION... 10 4.2 2009 EXISTING CONDITIONS ANALYSIS... 11 4.3 2035 CONDITIONS ANALYSIS, with no improvements... 11 4.4 2035 CONDITIONS ANALYSIS, with improvements... 11 CHAPTER 5: FINDINGS AND RECOMMENDATIONS... 12 5.1 GENERAL FINDINGS... 12 5.2 SPECIFIC FINDINGS & RECOMMENDATIONS... 12 CHAPTER 6: ACCESS MANAGEMENT...15 6.1 EXISTING ACCESS POINTS...15 6.2 LAND OWNERSHIP.15 6.3 ACCESS CRITERIA..15 6.4 PHYSICAL CONSTRAINTS 17 6.5 RECOMMENDED DISPOSITION OF ACCESS POINTS..17 APPENDIX..22 Lincoln Co. Highway 111 Corridor Study i

LIST OF TABLES TABLE 1. LEVEL OF SERVICE DESCRIPTION... 10 TABLE 2. SOUTH DAKOTA ACCESS CRITERIA..16 TABLE 3. ACCESS INVENTORY....18 LIST OF FIGURES FIGURE 1 STUDY AREA...... 2 FIGURE 2. 2009 LANE GEOMETRY... 4 FIGURE 3. 2009 EXISTING VOLUMES AND LEVEL OF SERVICE... 5 FIGURE 4. FUTURE LAND USE... 7 FIGURE 5. 2035 LINK VOLUMES... 8 FIGURE 6. 2035 VOLUMES AND LEVEL OF SERVICE... 9 FIGURE 7. 2035 RECOMMENDED LAND GEOMETRY AND INTERSECTION CONTROL... 14 FIGURE 8A. ACCESS LAYOUT.......19 FIGURE 8B. ACCESS LAYOUT......20 FIGURE 8C. ACCESS LAYOUT.....21 Lincoln Co. Highway 111 Corridor Study ii

Tea Highway 111 Corridor Study CHAPTER 1: INTRODUCTION 1.1 STUDY PURPOSE Tea, South Dakota, one of the fastest growing cities in the state, is actively planning for the infrastructure necessary to serve its population growth. The portion of Lincoln Co. Highway 111 that traverses the City has evolved into the main commercial corridor; with stores, restaurants, banks, retail services, and light industries lining much of the street. Additional development is also planned within and adjacent to the corridor. These changes have the potential to affect traffic operations on Highway 111. This study will evaluate the potential traffic effects and propose changes to accommodate those effects. The study area is shown in Figure 1 and includes the following study intersections. Intersections highlighted with a red circle are intersections that may be impacted due to the planned growth: LC 111/First Street LC 111/Kevin Drive LC 111/Brian Street LC 111/271 st Street 1.2 STUDY METHODOLOGY The main objective of this study is to determine the traffic impacts within the Highway 111 corridor. A traffic analysis was performed to determine any mitigation measures necessary to maintain adequate traffic flow at each of the study area intersections. In order to determine these impacts, the following tasks were performed: 2009 Existing A.M. and P.M. peak hour turning movement counts and a geometric inventory for the study area intersections were gathered by HDR. Future traffic volumes (for year 2035) were forecast based on future land uses Capacity analyses were performed for three volume scenarios: o Existing traffic volumes. o Future traffic volumes (year 2035) with existing road system. o Future traffic volumes with an improved road system necessary to efficiently serve future traffic needs. Mitigation measures were identified to provide acceptable operations at the study area intersections, if possible. Existing access points were inventoried and compared to industry-accepted standards for access location and spacing. An access plan was prepared for inclusion in this report. Lincoln Co. Highway 111 Corridor Study 1

271st Street Lincoln County Highway 111 Brian Street Kevin Drive First Street 272nd Street FIGURE 1 STUDY AREA MAP N

Tea Highway 111 Corridor Study CHAPTER 2: EXISTING CONDITIONS 2.1 EXISTING ROADWAY NETWORK The study area is located in east-central Tea, South Dakota. The primary roadway facilities in the study area are Lincoln County Highway 111, First Street, Kevin Drive, Brian Street and 271 st Street. The southern half of the study area is developed and bounded by agricultural property on most of the north half. All existing roadways in the study area are hard surfaced. The existing lane geometry for all study area intersections is shown in Figure 2, and a description of each intersection follows: LC 111/First Street The intersection of LC 111/First Street is a four-leg intersection with all-way stop-sign control. One lane serves all movements on each of the north, east and south approaches to the intersection, while the west approach contains one left-turn lane and one combination throughright lane. LC 111/Kevin Drive The intersection of LC 111/Kevin Drive is a four-leg intersection with stop-sign control on the east and west approaches. The east, west and south approaches have one lane for all movements. The north approach contains one right-turn lane and one combination through-left lane. LC 111/Brian Street The intersection of LC 111/Brian Street is a three-leg intersection with stop-sign control on the west approach. The west approach is served by a left-turn lane and a right-turn lane. The south approach is served by one lane for all movements. The north approach is served by a right-turn lane and a through lane. LC 111/271 st Street The intersection of LC 111/271 st Street is a four-leg intersection with signal control. The west and north approaches are each served by one lane. The south approach contains one right-turn lane and one through-left lane. The west approach contains one left-turn lane and one throughright lane. 2.2 EXISTING TRAFFIC VOLUMES All existing turning movement volumes were collected by HDR. All volumes were collected in May of 2009. The existing A.M. and P.M. peak hour volumes and Level of Service (LOS) are shown in Figure 3. The 2009 existing conditions analysis is further discussed in section 4.2. Lincoln Co. Highway 111 Corridor Study 3

LEGEND EXISTING LANE GEOMETRY N EXISTING STOP SIGN CONTROL EXISTING SIGNAL CONTROL 271ST STREET EXISTING ROADWAYS LC 111 BRIAN STREET KEVIN DRIVE FIRST STREET FIGURE 2 2009 LANE GEOMETRY Jun 09

LEGEND XX (XXX) AM (PM) TRAFFIC VOLUMES LC 111 N B (B) AM LEVEL OF SERVICE (PM) LEVEL OF SERVICE B (B) 271ST STREET EXISTING SIGNAL CONTROL EXISTING STOP CONTROL (42) (120) (38) 33 91 62 (74) 116 (42) 20 (102) (509) 56 137 (35) 35 (114) 284 (23) 16 41 (65) 101 (264) 129 (483) 8 405 (44) (233) 10 75 462 (22) (110) (199) BRIAN STREET C (C) (100) (428) (10) 22 164 7 (51) 91 (0) 0 (14) 6 13 (9) 2 (1) 4 (7) KEVIN DRIVE C (C) 8 349 3 (10) (259) (3) (276) (89) (4) 94 36 9 B (B) FIRST STREET (144) 221 (11) 10 (28) 35 6 (5) 2 (22) 0 (4) 38 84 3 (44) (64) (1) FIGURE 3 Jun 09 2009 VOLUME AND LEVEL OF SERVICE

Tea Highway 111 Corridor Study CHAPTER 3: TRAFFIC PROJECTIONS 3.1 TEA COMPREHENSIVE PLAN The future land uses for property that will likely become part of the City of Tea has been planned through the Tea Comprehensive Plan. The future land use is shown in Figure 4. 3.2 FUTURE TRAFFIC VOLUMES (2035) Based on projected growth trends and planned land use in the study area, future year 2035 volumes were developed by HDR using forecast information supplied by the City of Sioux Falls. The City of Sioux Falls planning staff provided output from the regional traffic forecasting model for each scenario. The link volumes for the existing and future base condition are shown in Figure 5. Forecast turning movements and Level of Service for the study area intersections are shown in Figure 6. The levels of service shown in Figure 6 are based on the current lane configurations under 2035 traffic conditions. Levels of Service are covered in more detail in Chapter 4. Lincoln Co. Highway 111 Corridor Study 6

FIGURE 4

LC 111 N 271ST STREET 2009 VOLUME *24 HOUR = 10016 *AM = 749 *PM = 1272 2035 VOLUME *24 HOUR = 14000 *AM = 1120 *PM = 1540 BRIAN STREET 2009 VOLUME *24 HOUR = 7378 *AM = 545 *PM = 839 2035 VOLUME *24 HOUR = 10300 *AM = 800 *PM = 1400 KEVIN DRIVE 2009 VOLUME *24 HOUR = 6431 *AM = 403 *PM = 683 2035 VOLUME *24 HOUR = 9000 *AM = 700 *PM = 1285 FIRST STREET FIGURE 5 2009 AND 2035 LINK VOLUMES Jun 09

LEGEND XX (XXX) AM (PM) TRAFFIC VOLUMES LC 111 N B (B) AM LEVEL OF SERVICE (PM) LEVEL OF SERVICE SIGNAL CONTROL STOP CONTROL C (D) (80) (250) (80) 70 120 85 (90) 190 (20) 15 (40) 20 (90) 80 110 (100) (270) 400 270 (290) (120) 50 330 (480) 60 90 470 (70) (200) (420) 271ST STREET (130) (640) (80) 100 350 50 110 (65) 20 (55) 25 (50) 45 320 40 (100) (535) (35) BRIAN STREET F (F) (120) (580) (30) 50 320 25 (80) 70 (20) 5 (65) 15 15 (30) 5 (5) 5 (25) KEVIN DRIVE D (F) 20 320 20 (30) (560) (30) (400) (170) (100) 220 85 35 C (F) FIRST STREET (270) 180 (40) 30 (50) 30 30 (10) 10 (55) 5 (10) 100 150 20 (120) (340) (30) FIGURE 6 Jun 09 2035 VOLUME AND LEVEL OF SERVICE WITH EXISTING LANES

Tea Highway 111 Corridor Study CHAPTER 4: OPERATIONAL ANALYSIS 4.1 ANALYSIS DESCRIPTION Observations of traffic volumes provide an understanding of the general nature of traffic, but are insufficient to indicate either the ability of the street network to carry additional traffic or the quality of service provided by the street system. For this reason the concept of level of service (LOS) was developed to correlate numerical traffic operational data to subjective descriptions of traffic performance at intersections. Each lane of traffic has delay associated with it and therefore a correlating LOS. The weighted average delay for each of these lanes of traffic for a signalized intersection is the intersection LOS. LOS categories range from LOS A (best) to F (worst) as shown in Table 2. TABLE 1. Level of Service Description Level of Service SIGNALIZED Intersection Control Delay (sec) UNSIGNALIZED Intersection Control Delay (sec) Intersection LOS Description A 10.0 10.0 Free flow, insignificant delays. B 10.1-20.0 10.1-15.0 Stable operation, minimal delays. C 20.1-35.0 15.1-25.0 Stable operation, acceptable delays. D 35.1-55.0 25.1-35.0 Restricted flow, regular delays. E 55.1-80.0 35.1-50.0 Maximum capacity, extended delays. Volumes at or near capacity. Long queues form upstream from intersection. F > 80.0 > 50.0 Forced flow, excessive delays. Represents jammed conditions. Intersection operates below capacity with low volumes. Queues may block upstream intersections. Source: Highway Capacity Manual, Transportation Research Board, 2000 The intersection capacity analyses were completed with Synchro 7.0 software. Synchro replicates the analysis procedures defined in the latest version of the Highway Capacity Manual. This manual provides procedures for the analysis of both signalized and unsignalized intersections. It should be noted that stop-controlled intersections are analyzed by identifying the amount of delay at each approach that conflict with other intersection movements (i.e. all movements except the free flow thru lanes), thus approach LOS is reported for unsignalized intersections. LOS C has generally been established as the standard for planning of transportation facilities for peak hour traffic conditions. However, LOS D is often accepted in urbanized areas where the cost or impacts to provide LOS C is prohibitive. For this study, LOS D for the overall intersection was used as the minimum standard. A review of the analyses for each volume scenario is provided below. Summary LOS output reports of the analyses are included in the Appendix. Lincoln Co. Highway 111 Corridor Study 10

Tea Highway 111 Corridor Study 4.2 2009 EXISTING CONDITIONS ANALYSIS A capacity analysis was performed using the existing A.M. and P.M. peak hour traffic volumes on the existing roadway network. The intersection of LC 111/First Street operates at LOS B during both peak hours. The intersection of LC 111/Kevin Drive operates at LOS C during both peak hours. The intersection of LC 111/Brian Street operates at LOS C during both peak hours. The intersection of LC 111/271 st Street operates at LOS B during both peak hours. The existing peak hour traffic volumes, pedestrian volumes, and levels of service are shown in Figure 3. 4.3 2035 CONDITIONS ANALYSIS, with no improvements A capacity analysis was performed for the 2035 traffic volumes on the roadway network without any additional roadway improvements. The intersection of LC 111/First Street operates at LOS C in the AM peak hour and LOS F in the PM peak hour. The intersection of LC 111/Kevin Drive operates at LOS D in the AM peak hour and LOS F in the PM peak hour. The intersection of LC 111/Brian Street operates at LOS F in both peak periods. The intersection of LC 111/271 st Street operates at LOS C in the AM peak and LOS D in the PM peak. All study area arterial intersections appear to need improvement to avoid future congestion problems. The 2035 volumes and levels of service are shown in Figure 6. 4.4 2035 CONDITIONS ANALYSIS, with improvements Capacity analyses were performed using the year 2035 traffic volumes for a network including various lane additions and intersection controls, with the goal of achieving acceptable levels of service. Those analyses were used to prepare the recommended improvements described in Chapter 5. The 2035 recommended improvements are shown in Figure 7. Lincoln Co. Highway 111 Corridor Study 11

CHAPTER 5: FINDINGS AND RECOMMENDATIONS Tea Highway 111 Corridor Study This section summarizes the findings and recommendations based upon analysis of future development and traffic conditions. 5.1 GENERAL FINDINGS The general findings and recommendations are as follows: Under the 2009 existing volume scenario all the intersections in the study area operate well during both the A.M. and P.M. peak hours. Under the 2035 volume scenarios, without improvements, all study area intersections appear to need additional lanes or traffic control to operate at acceptable levels. The 2035 link volumes have reached a level that will likely require two through lanes in each direction. The density of development along the corridor and access spacing appears to call for a continuous left-turn lane, resulting in a future 5-lane roadway crosssection. A 4-lane divided cross-section may also be appropriate for portions of the corridor that have remained mostly undeveloped. Traffic control at the study area intersections will need to transition to traffic signal control, with the most likely candidates for signal control being LC 111/First Street and LC 111/Brian Street. Traffic conditions should be monitored and plans should be made for signalization when the intersections meet the traffic signal warrant conditions, as described in the Manual on Uniform Traffic Control Devices (MUTCD). Demand for pedestrian and bicycle service in the corridor is growing due to traveler desire to reach the businesses along the corridor. Federal regulations require that pedestrians and bicyclists be accommodated on all routes that receive Federal funding. 5.2 SPECIFIC FINDINGS & RECOMMENDATIONS The recommendations to mitigate each intersection to LOS C or better in 2035 are listed below. Refer to Figure 7 for a graphic illustration, including needed lane layouts. LC 111/First Street provide additional lanes and underground infrastructure for a future traffic signal. LC 111/Kevin Drive provide additional lanes and underground infrastructure for a future traffic signal. LC 111/Brian Street provide additional lanes and underground infrastructure for a future traffic signal. LC 111/271 st Street provide additional lanes and a permanent traffic signal installation with mast arms and provisions for coordination throughout the corridor. Provisions should be made for pedestrians and bicyclists in the design of improvements on LC 111, within the City of Tea. Options include sidewalks along both sides of the street, widened pedestrian and bicycle side-paths instead of sidewalks, and a combination of sidewalks and on-street bicycle lanes. The City of Brandon recently installed side-paths during reconstruction of Holly Boulevard. Those side-paths appear to be well-accepted by the community. Other similar installations in other states have resulted in safety problems at street intersections. Experienced bicyclists tend to shun side-paths in favor of riding Lincoln Co. Highway 111 Corridor Study 12

Tea Highway 111 Corridor Study on the street and prefer bicycle lanes. The type of pedestrian and bicycle improvements designed for LC 111 in Tea should be the subject of community discussion prior to implementation. Lincoln Co. Highway 111 Corridor Study 13

LEGEND RECOMMENDED LANE CONFIGURATION LC 111 N SIGNAL CONTROL 271ST STREET BRIAN STREET KEVIN DRIVE FIRST STREET FIGURE 7 2035 RECOMMEND LANES Jun 09