Street resurfacing 45WARD

Similar documents
Streetscape: Core Shopping District

Chicago Department of Transportation Bikeways - Year in Review

Monument Elementary School Trenton, NJ School Travel Plan

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

S T A T I O N A R E A P L A N

Polk Streetscape Project

WALKABILITY CHECKLIST How walkable is your community?

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

PROJECT EXPO 2018 Alderman Joe Moore 49th Ward

Fill in the rating for each section. Total up the ratings to see how your neighbourhood scores overall for walkability.

SAFE ROUTES TO SCHOOL (SR2S)

SPEED MANAGEMENT FOR VISION ZERO

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

FUNDING OPTIONS FOR COMPLETE STREETS PROJECTS. Dean Ledbetter, PE Senior Planning Engineer NCDOT Division Eleven

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

Improvements Infrastructure Gap Assessment and Improvements Street Striping

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

9/21/2016 VIA . RE: The Knot (DR16-270)

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

Hedgepeth Williams Middle School and Paul Robeson Elementary School Trenton, NJ. School Travel Plan

What Is a Complete Street?

Northeast 65 th Street Vision Zero Project Proposals From A Roosevelt High School Student Joe Mangan

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

Option W: N. Washington Street Project

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Why invest in the 1 Street S.W. Corridor?

Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

5 CIRCULATION AND STREET DESIGN

Safe Routes to School: Munroe Elementary Walk Audit Report. Image: Drexel, Barrell & Co.

4 GENERIC COST ESTIMATING TOOL

Irondale on the Move Public Outreach Summary to Date. July 8, 2015

Chicago Safe Routes to High School (SRHS) Kelly High School Recommended Improvements

Streets. Safe for Pedestrians 20% 2nd 5,000. Are We People-Friendly?

Complete Streets Funding Program Project Prioritization Plan

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Sidewalk Accessibility Checklist

Complete Streets Chicago: Data Driven Design. Luann Hamilton Deputy Commissioner

This page intentionally left blank.

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

A. Pedestrian Facility Design

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

Use this guide to learn more about walkability and how you can make your community safer to walk

Improve sidewalk/sewer drainage so it doesn't flood the streets. Improve the street lights far from each other

Active Transportation Facility Glossary

Forest Hills Improvement Initiative

Forest Grove Neighbourhood Traffic Review Minutes

TRANSPORTATION STANDARDS

11/28/2016 VIA

Tonight is for you. Learn everything you can. Share all your ideas.

Mayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017

HYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018

NAPIER AVENUE PEDESTRIAN AND BICYCLE PLAN

Complete Streets. Designing Streets for Everyone. Sarnia

City of Davis East Covell Corridor Plan

10/30/2012 VIA

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Safe Routes to School: Valverde Elementary Walk Audit Report. Image: CPLIVE, SkyscraperPage.com

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

Lawrence Safe Routes to School. Community Meeting January 14, 2015

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

Chapter 5: Crossing the Street

Ballston Station Multimodal Study WMATA and Arlington County. Meeting Minutes

43 rd Avenue, Skillman Avenue Protected Bike Lanes

122 Avenue: 107 Street to Fort Road

About the Active Transportation Alliance

2018 Transportation Survey October 17, Prepared by:

The Wiggle Route in Context

WALKSacrame nto. Welcomes you to the 2009 Sacramento County Safe Routes to School Conference

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

PROJECT SUMMARY ALBERTA STREETSCAPE PROJECT

PEDESTRIAN ACTION PLAN

414 E GOLF RD DES PLAINES, IL

Exhibit B: Proposed amendments to the Transportation Element of the Oakland Comprehensive Plan

Project Status Update

Bay to Bay Boulevard Complete Streets Project

Dec 2, Dear Tri Ong, Sam Woods, and Scott Kubly,

Legislative Update Williamsburg Residency

Figure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

3/20/2015 VIA . Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811

Lawrence Avenue Streetscape Concepts August 30, 2011

Clay Street Bridge Replacement Project

County of Greenville South Carolina. Traffic Calming Program Neighborhood Traffic Education Program and Speed Hump Program

Bicycle and Pedestrian Recommendations for MarketFair Mall

Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

Orange Center Elementary School

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

February 11, 2016 TPO Board Presentation

COMPLETE STREETS PLANNER S PORTFOLIO

Chapter 6: Along the Street

Transcription:

45 WARD Street Resurfacing Resurfacing is necessary to address streets that have deteriorated, are safety hazards and are generally in poor condition. Residents, businesses and visitors to the 45th Ward will benefit from improved safety when driving. Menu money is the only available funding for residential street resurfacing in Chicago s wards. Thanks to a federal subsidy, the cost for the first five blocks of resurfaced streets is $42,000 per block. The average cost for each street resurfaced in addition to the initial five is $70,500. The 45th Ward staff, along with Chicago Department of Transportation engineers, identified streets most in need of resurfacing. Streets are not listed in any particular order. All streets submitted for resurfacing are subject to approval by the Chicago Department of Transportation. Streets in Poor Condition: Kilpatrick - Pensacola to Berteau Berteau - Kilpatrick to the tracks Seminole - Moody to Mason Neenah - Foster to Higgins Byron - Keeler to Kildare Seminole - Mobile to Moody Leland - Central to Milwaukee

VIADUCT LIGHTING ON MILWAUKEE 1$30,000 LOCATION: MILWAUKEE AND THE UNION PACIFIC NORTHWEST RAILROAD To improve lighting on the roadway section of the viaduct. Although the viaduct lights on the sidewalks were upgraded a few years ago through PB, the traffic lane lights were not. This project is to increase the wattage of the roadway lights, which requires the installation of new sockets and improved wiring.

NEW SIDEWALKS AND CURBS AT JEFFERSON MEMORIAL PARK 2$230,000 LOCATION: 5400 W. LAWRENCE To replace the sidewalk and curb along the south side of Jefferson Memorial Park, and to add two benches in the parkway near the park field house. The heavily traveled sidewalk on the south side of Jefferson Memorial Park is in disrepair, and the adjoining curb also is broken and out of plumb in places. This would replace the curb and sidewalk. Additionally, this would add two benches to the parkway near the field house, an amenity for those waiting to pick up kids from park programs as well as for those attending the Jefferson Park Sunday Market.

TREES! 3$81,000 - $243,00 LOCATIONS: THROUGHOUT THE WARD To plant trees throughout the ward, focusing on two parks, a school, and Milwaukee north of Foster. The city continues to suffer the effects of the emerald ash borer, decimating our urban forest. This project would help replace trees lost to the invasive pest. At least 15 trees each would be allocated to the parkway around Farnsworth School, Robert Square Park, Independence Park, and along Milwaukee Ave. north of Foster. In other locations, trees would be planted as requested by the adjoining property owner. $81,000 for 150 Trees $162,000 for 300 Trees $243,000 for 450 Trees

4 STOP LITTER WITH TRASH CANS $ 3 2,200 LOCATIONS: THROUGHOUT THE WARD To place decorative trash cans at various locations to discourage litter. Litter is an unsightly and reoccurring issue at several spots in the ward. The old fashioned wire basket cans are hard to come by and often become damaged or stolen. This project would install decrorative trash cans bolted to the ground at several locations to encourage people to properly dispose of their trash. Final locations are subject to Streets and Sanitation and Department of Transportation approvals. Suggested locations include: Kostner and Berteau (1), Kostner and Irving Park (2), Irving Park at the Blue Line (2), Pulaski at the Blue Line (2), Milwaukee and Gale (1), Avondale southeast of McVicker (1), Northwest Highway at Austin (2), Cicero and Montrose (2), and 5100 N. Milwaukee (1)

AUSTIN AVENUE NEIGHBORHOOD GREENWAY 5$60,000 LOCATION: AUSTIN FROM ELSTON TO NORTHWEST HIGHWAY To build a neighborhood greenway on Austin from Elston to Northwest Highway. A frequent route for children heading to Hitch and St Tars schools and parks, the Austin Greenway is eligible for 80% matching funds from a federal grant program. Neighborhood greenways involve bike lanes, painted green for extra visibility, along with slightly raised crosswalks. They provide extra protection for people biking and people walking. Austin Avenue was selected because the street is wide, has low vehicle traffic, crosses bike lanes at Northwest Highway, Milwaukee, and Elston; and is frequented by children walking and biking to Hitch Elementary and St. Tarcissus School (soon to be the Pope Francis Global Academy). It also connects with a pedestrian bridge over the Kennedy to the south and, just north of Elston, Indian Road Park. This project is contingent on federal funds, as the $60,000 would be only the local matching funds. If federal funds were not available, a standard bike lane would be installed.

FENCING AND LIGHTING NEAR GLADSTONE PARK METRA 6$70,000 LOCATION: GLADSTONE PARK METRA STATION To replace fencing and improve lighting on the path connecting the Gladstone Park Metra to the pedestrian bridge over the Kennedy. The pedestrian bridge over the Kennedy at the Gladstone Park Metra Station is frequently used by pedestrians walking to the Metra and to Hitch Elementary School. However, the lighting and fencing do not appear to have been replaced since the Kennedy was built. This project would replace the fencing with a wrought iron style fence and would replace the streetlight with a newer and brighter light, making the area more appealing for pedestrians and less appealing to troublemakers.

A NEW 4800 NORTH AVONDALE 7$335,000 LOCATION: 4800 N. AVONDALE To add a sidewalk and better street lighting to the 4800-block of North Avondale, and to repave the street. The 4800-block of North Avondale, behind the Copernicus Center, is frequently mistaken as an alley. The pot holes are deep and there are no curbs or sidewalks. Additionally, the little lighting on the street makes it appear to be an alley. This project would upgrade the street to make it look like an actual street, providing pedestrians with better and safer access to the Jefferson Park Transit Center, and improving the general appearance of the business district.

8 NEW ORNAMENTAL STREET LIGHTS ON LAWRENCE $390,000 LOCATION: 5200-BLOCK OF WEST LAWRENCE To replace the very old street lights on Lawrence with lights similar to those nearby on Milwaukee. Visitors to Jefferson Park frequently enter the community from the east on Lawrence. Despite this stretch providing their first impression of the community, the street lights are very old, rusted, and generally unattractive. This project would replace those old lights with light poles very similar to the ones on the Milwaukee near Lawrence.

9 $200,000 CURBS AND SIDEWALKS LOCATION: VARIOUS LOCATIONS THROUGHOUT THE WARD Small curb and sidewalk repairs throughout the ward until money is expended with priority given to those in most disrepair. In several places throughout the ward, curbs and sidewalks have deteriorated. However, due to the expense of curb replacement, very few have been replaced in recent years. This would provide for a large curb replacement in two spots including: Belle Plaine from Laporte to Milwaukee and Manila from Menard to Milwaukee. Smaller curb and sidewalk replacements will also occur at various locations throughout the ward.

10 CROSSWALKS ACROSS MILWAUKEE $80,000 LOCATION: MILWAUKEE AT WINDSOR, WILSON, AND LELAND To install crosswalks across Milwaukee at bus stop locations. Milwaukee from Lawrence to Sunnyside has very few painted crosswalks with wheelchair ramps, making it hard for anyone, and especially those in wheelchairs or pushing strollers, to cross the street. This project would install four crosswalks (2 at Windsor due to the staggered intersection) in locations where there are also bus stops. Subject to Chicago Department of Transportation approval.

11 PEDESTRIAN REFUGE ISLAND ACROSS LAWRENCE AT LAVERGNE $60,000 LOCATION: LAWRENCE AT LAVERGNE To install a protected area in the middle of Lawrence at Lavergne Crossing Lawrence is difficult between the Kennedy and Cicero. Drivers frequently speed down this stretch and traffic is heavy. Drivers also fail to stop for pedestrians in the crosswalk and at least 4 Stop for Pedestrians signs have been hit by drivers. Despite this, the crossing is used frequently by children going to Beaubien Elementary and Grace Zwiefka Park. This project would allow for the installation of a pedestrian refuge island on Lawrence at Lavergne, making it easier for pedestrians to cross Lawrence. It would require making Lavergne one way northbound.

12 PEDESTRIAN BUMP OUTS NEAR HITCH $150,000 LOCATION: BRYN MAWR AND AUSTIN To install curb extensions across Bryn Mawr at Austin. Even with the four-way stop and the crossing guard, crossing Bryn Mawr to get to Hitch Elementary School is often difficult. Drivers from throughout the North Side use the street as a short cut to the Kennedy Expressway and they often drive impatiently in the mornings at the same time children are going to school. Last year, a crossing guard was hit and injured by such a driver at this intersection. This project would provide for pedestrian bump outs (curb extensions that come into the parking lane and shorten the distance pedestrians are in the street) for those crossing Bryn Mawr. Subject to Chicago Department of Transportation approval. Costs could significantly decrease if drainage doesn t need to be moved.