July 9 Mom's the Bomb at Waseca Waterpark th Ave NE (Mom's get in free with a paid child's admission.)

Similar documents
MEMORANDUM. DATE: October 6, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report

MEMORANDUM. DATE: September 28, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report.

IL Route 71 Construction Update

MEMORANDUM. DATE: July 8 th, 2016 MAYOR & COUNCIL MEMBERS DANNY LENZ, CITY MANAGER CITY MANAGER S REPORT

MEMORANDUM. DATE: February 16, Mayor & Council Members. Mike Anderson, Assistant to the City Manager. City Manager s Report

Project Update May 2018

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

MEMORANDUM. DATE: April 1 st, 2016 MAYOR & COUNCIL MEMBERS DANNY LENZ, CITY MANAGER CITY MANAGER S REPORT

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

Work Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager

Duwamish Way-finding and CTR Report

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Water Street Promenade Engineering and Design Services

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CONNECTING PEOPLE TO PLACES

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND:

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

CITY OF EPHRATA NAT WASHINGTON WAY OVERLAY TIB NO.: 3-E-164(003)-1 CITY OFFICIALS. Bruce Reim. Mayor. Tony Mora, Jr. City Council

UPDATES 11/14/2018: 10/25/2018: CLOSED 10/22/2018: 10/12/2018: 10/05/2018: 09/27/2018:

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Northeast Park Construction Update Construction is well underway on the Northeast Park bathrooms and pavilion area. Pictures are attached below.

Doug s Corner. City of Phoenix installing traffic signal cabling on the span wire at 19th Ave and Butler Drive

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Inspector MUST Sign and Date Each Inspection

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Hospital Link Project Project Update September 2017

Le Sueur County, MN Tuesday, December 13, 2016 Board Meeting

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

^ Lee County So^mst <T:[oV1]^ Lee County

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

^Lee County Jt Sotft^West T:foH^a Lee County

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #2

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

Downtown Redevelopment Project Update

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR

Memorandum Office of the City Clerk

Markings Technical Committee Chapter 3H: Roundabout Markings APPROVED IN NCUTCD COUNCIL ON JANUARY 20, 2006

This chapter describes the proposed circulation system and transportation alternatives associated with

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Sign Design Manual (TEM 295-2)

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Fields of St. Croix HOA Meeting. October 27, 2016

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Living Streets Policy

TRAFFIC STUDY. Birch Bluff Road / Pleasant Avenue 01/15/2018. City of Tonka Bay 4901 Manitou Road Tonka Bay, MN WSB PROJECT NO.

Welcome 78 Ave S.E. Underpass and Road Widening Project Update

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

Upcoming Events. August 30, 4:15 pm Library Board Library

Southeast-1 Stations: ALIGNMENT OVERVIEW

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Item No. 14 Town of Atherton

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

Meadow Woods Elementary School

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Why invest in the 1 Street S.W. Corridor?

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

CHAPTER 6H. TYPICAL APPLICATIONS

Welcome! San Jose Avenue Open House August 25, 2015

Building Great Neighbourhoods LANSDOWNE

Traffic Control & Road Closures for Special Events

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Legislative Update Williamsburg Residency

UPCOMING WASECA LIBRARY EVENTS

STAFF REPORT TO THE PLANNING COMMISSION December 12,2016. Schuler Shoes PUD Concept and Development Stage Plan And Rezoning

Accommodating Pedestrians in the Work Zone

CITY OF COCONUT CREEK IMPLEMENTATION GUIDELINES FOR TRAFFIC CALMING

TENW Transportation Engineering NorthWest

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

August 1, 2016 Agenda 7:00 PM - City Commission Room, City Hall

Traffic Impact Memorandum. May 22, 2018

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

Moving Ahead. (Community Engagement) Chapter Three

Chapter 5 Future Transportation

Doug s Corner. Contractor s Weekly Update. In this issue: NORTHWEST EXTENSION-19TH AVENUE-BETHANY HOME TO DUNLAP SSWJV SAFETY QUALITY COURTEOUS

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

ARBYS FAST FOOD NNN Winter Haven, FL

Comments EXECUTIVE SUMMARY

COMMITTEE RECOMMENDATIONS. That Council approve:

Transcription:

MEMORANDUM DATE: July 7, 2017 TO: FROM: SUBJECT: Mayor & Council Members Mike Anderson, Assistant to the City Manager City Manager s Report Old TH HWY 14/Elm Ave Update *Please see attached document* Waseca Area Events July 8 Farmamerica Ice Cream Social - 1:00 PM - 4:00 PM - 7367 360 th Ave. ($5 admission) July 9 Mom's the Bomb at Waseca Waterpark - 200 26th Ave NE (Mom's get in free with a paid child's admission.) July 12-16 Waseca County Free Fair Waseca County Fair Grounds: www.wasecacountyfreefair.com July 14-15 Waseca Crazy Days 2017 - Waseca retail and specialty shops July 15 SMILES Canoeing Trip - 12:00 PM - 4:00 PM at Clear Lake Park: This activity is accessible for individuals with disabilities and is open to the public. (Free admission) Events courtesy of Waseca Area Chamber of Commerce http://www.wasecachamber.com/events/ Waseca Library Events Color Art: Get creative with a variety of art projects bursting with color, including a collaborative book butterfly project at Waseca Public Library on July 17th from 10-11 am. Geared for ages 6-12. Learn to Draw Cartoons with Gary Harbo!: Kids will learn how to draw bulldozers, tractors, airplanes, trains, schools, city buildings, and skyscrapers, and more at this cartooning workshop. Gary Harbo has written and illustrated 25 books, including How to Draw 104 Cartoons with Gary Harbo. The workshops will be held at the Waseca Public Library on Wednesday, July 19th @ 3 pm Waseca Writing Circle: The Waseca Writing Circle is open to teens and adults who are writers or want to write. We will share our work, explore writing exercises, and help each other grow as writers. Come write with us at Waseca Public Library on Tuesday, July 18 th at 6 pm.

508 South State Street Waseca, Minnesota 56093-3033 507-835-9700 FAX 507-835-8871 www.ci.waseca.mn.us July 7, 2017 Old TH 14/Elm Avenue Weekly Construction Updates Week 4 The City of Waseca and its project partners intend to send out and publish a weekly construction update on the Old TH 14/Elm Avenue Reconstruction Project. This weekly update will be issued through the weekly City of Waseca City Manager s City Limits report available at the City s website www.ci.waseca.mn.us, the Project website http://ci.waseca.mn.us/old-trunk-hwy-14elm-avenue-updates/ and is published online via the Waseca County News. Questions about the contents of the weekly updates or about the project in general can be directed to the City s contracted consulting engineer Joe Palen, Project Manager with Stantec at either 507.529.6036 or joseph.palen@stantec.com or Mark DuChene, Waseca City Engineer at either 507.835.9716 or markd@ci.waseca.mn.us Additionally, project representatives have set aside time every Thursday from 12:30-1:30 pm to be available at Waseca City Hall, 508 South State St, Waseca, MN 56093 to answer questions. No appointment is necessary and if this time doesn t work please contact either Mr. Palen or Mr. DuChene to set up a meeting at a mutually convenient time. If there is an emergency within the construction limits outside of normal business hours please call 507.835.9718 and the 24 hour answering service will contact the appropriate parties. Previous Week Review 7/1/17-7/7/17 Work on the eastern phase of the project between 13 th St SE and 8 th St SE/NE continued with the installation of sanitary sewer between 11 th St and 9 th St SE. Storm Sewer work also continued in this area from the new outlet into Clear Lake progressing west towards 11 th St SE. Watermain installation also started from Clear Lake progressing west towards 11 th St SE. Work on the western phase included the near completion of storm sewer work between Loon Lake and Lake Street/Experiment Station Road. Watermain construction at the intersection of Old TH 14 and Lake Street/Experiment Station Road started as well. This required the closure of this intersection which will continue into the next week. Next Week Look Ahead 7/8/17-7/15/17 On the eastern part of the project construction crews will continue to install storm sewer progressing to the west from Clear Lake towards 9 th St. These are deep utilities and will require the use of trench boxes to facilitate construction. Crews will also continue to install watermain following behind the storm sewer and may begin reconnecting private sanitary sewer and water services as the watermain is installed block by block. The reconnection of private services is the last utility work before crews can start building the road section with sand and gravel. This work should start in a couple weeks.

On the western part of the project there will be watermain installation continuing at Lake Street and progressing east and storm sewer installation from the entrance of Vista Villa progressing east to Lake Street. The pavement remaining between Vista Villa Ct and Lake Street will also be removed and this section of road will be closed to all traffic for the foreseeable future. There will also be sanitary sewer installation between 8 th St NW and 10 th St NW which includes digging the main in the center of the road and directionally drilling the sewer service connections to private properties. Work will also begin on the deep sanitary sewer crossing under the railroad tracks near the SROC property. Traffic Control/Detour Notes During the duration of the entire project and through the entire project limits which extend from the western City limits west of Brown Avenue to the eastern City limits east of Clear Lake Drive, thru traffic (traffic traveling to/from Mankato and Owatonna directions) will be detoured off Old TH 14 on the east side at NW 92 nd Ave/CSAH 18 near Meriden and on the west side at 110 th St/CSAH 27. Portions of Old TH 14 within the project limits may be signed Road Open to Local Traffic or something similar. Please keep in mind that local traffic/access is defined as having direct access on Old TH 14, or having business with someone or a business who has direct access on Old TH 14. If you do not fall into either of these two categories, you should not be on Old TH 14 within the project limits at any time. Travel on Old TH 14 within the project limits should take place only when there is no other possible alternative. An updated local alternative access map is attached showing proposed access routes based on the following week s proposed construction activities. Note this map is intended to be updated weekly as construction progresses and every effort will be made to keep this map updated and as accurate as possible, but construction activities may require alterations to access routes before a new map is sent out. An interactive copy of this map is also available at: https://wasecacity.maps.arcgis.com/apps/publicinformation/index.html?appid=56178b878ee64926be6fd7be5f6e4460 Project Area West of TH 13 Old TH 14 will have a road closure from 10 th St NW to Brown Avenue; however, access to the Vista Villa Mobile Home Community; Veterans Landing and impacted residential properties will be maintained via temporary roadway configurations. The intersection of Old TH 14 and Lake St/Experiment Station Road will remain closed starting until at least Tuesday July 11 th to all traffic. It is anticipated that this intersection will reopen to only traffic crossing Old TH 14 on Tuesday, July 11 th. The portion of Old TH 14 from Vista Villa Ct to Lake Street will remain closed to all traffic during July until at least the road is constructed up through a gravel surface. There will also be only one way traffic on Old TH 14 between 10 th St NW and 8 th St NW while the centerline sanitary sewer is being installed. During working hours there will be flaggers on site directing traffic. During non-working hours two-way traffic will be accommodated on the north and south sides of the road. Please pay attention to the flaggers and drive slowly with extra caution in this area for the safety of all. Two-Way access to HWY 14W Mini-Storage, Deml Ford, Waseca Chrysler, Rent N Save and Vista Villa will remain open from the west project limits and from the Brown Avenue intersection on existing pavement on the north half of Old TH 14. See attached maps for alternative access routes to/from town as well as business access routes. The interactive traffic map indicated above will be updated with the road closures when they occur. Two-way access to Veteran s Landing will remain via Old TH 14 at 10 th St. NW. Only traffic heading to Veteran s Landing or adjacent residential homes should enter the construction area west of 10 th St NW. Project Area East of TH 13 Old TH 14 will remain a hard road closure from 8 th St NE/SE to 13 th St SE. Residents may access their properties through the road closure as construction activities and site conditions allow. The contractor will make reasonable efforts to

provide access to residential driveways between the hours of 7pm and 7am. A reminder that the road sections under construction are closed to non-local traffic and local traffic may enter the closed road sections to access their properties at the property owner s risk. If a property owner has questions about whether or not they should drive in the construction area or needs accommodations for /service work/etc., the property owner should make contact with the project team or onsite construction worker to discuss their access needs. The intersection of 8th St and Old TH 14 will remain open to traffic crossing Old TH 14. Access to Barney s Drive In, Lodging at Lake Aire, Memorial Park, Maplewood and Kiesler s Campground is open from the east on Old TH 14 or from the west via 13th St SE to Old TH 14. Lastly, City staff have installed a temporary traffic calming measure near the intersection of 4th Ave SE and 12th St SE (see picture below). This traffic control setup is primarily intended to slow traffic down within the affected residential neighborhood that has seen an increase in traffic seeking alternate routes with the road closures associated with the construction project. The secondary intent of this traffic control setup is to deter large commercial through traffic that is ignoring the designated detour routes from utilizing residential areas. City staff may install similar traffic control measures at other intersections as needed.

10th St 2nd St NW N State St MINNE SO S State T ªA 8th St NE 11th St SE 375th Ave To / From Waterville 4th St NE Old TH 14/Elm Ave Project 360th Ave Deml Deml Ford Ford Quad/Graphics Lake St Intersection Closed To All Traffic Anticipated To Open By July 12 110th St Brown Ave Waseca Waseca Chrysler Chrysler Rent Rent 'N Save Save DDD D ROAD CLOSED see West Elm Detail Map 350th Ave Two Way Traffic North Side of Old TH 14 / Elm Ave Between CSAH 27 & Vista Villa Vista Vista Villa SROC No Access Via Railroad Underpass via CSAH 27, 40 / University Ave & 4th St SW 14 120th St 340th Ave 123rd St 362nd Ave NW W Elm Ave 7th Ave NW 128th St 4th St SW University Dr ß13 3rd St NE 5th St SE St 8th Ave NE!. 8th St SE Clear Lake Dr via 7th Ave NE, 3rd St NE, 8th Ave NE, Clear Lake Dr ROAD CLOSED Boat Ramp Barney's Park Kiesler's via 8th St SE, 5th Ave SE, 355th Ave & 150th St - OR - 8th St SE, 4th Ave SE, 13th St SE 145th St 345th Ave Non-Posted Local Access Alternative Routes Week of July 10 D!. ± Current Construction Area Non-Posted Local Access Alternative Route Road Open for Resident and Business Access Road Closed to All Traffic Intersection Open to Traffic Crossing Old TH 14 / Elm Ave 0 0.25 0.5 Miles To / From New Richland 150th St Disclaimer: The data represented on this document is neither a legally recorded map nor a survey, and is intended for reference purposes only. The information presented has not been verified and neither the City of Waseca, nor its employees or agents makes any representation to the accuracy of the features and data presented here within. This map was created through the use of several city, county, state and federal data sources. For specific information regarding this map, or to report errors or omissions, contact the City of Waseca Engineering Department. Map #20170601-1 Date Printed: 7/7/2017

110th St 4th St SW 2nd St NW S State St N State St MINNE SO T ªA 4th St NE 375th Ave Old TH 14/Elm Ave Project 123rd St ß13 3rd St NE West Elm Ave Area Residential / Business Access Week of July 10 360th Ave Brown Ave Two Way Traffic North Side of Elm Ave Between CSAH 27 and Vista Villa Lake St Intersection Closed To All Traffic Anticipated to open By July 12 DDDD 120th St 362nd Ave 10th St NW 10th Ave NW Veteran's Landing Two Way Traffic North Side of Elm Ave Up To Veteran's Landing 10th St NW W Elm Ave 7th Ave NW Lakeshore inn Alternating One-Way Traffic With Flaggers During Working Hours Two-Way Traffic On N & S Shoulders During Non-Working Hours 5th 2nd St SW A ve SW 8th Ave NE E Elm Ave D!. Current Construction Area Non-Posted Local Access Alternative Route Road Open for Resident and Business Access Road Closed to All Traffic Intersection Open To Traffic Crossing Old TH 14 / Elm Ave 350th Ave University Dr 128th St 10th Ave SE 5th St SE ± 0 0.125 0.25 Miles Disclaimer: The data represented on this document is neither a legally recorded map nor a survey, and is intended for reference purposes only. The information presented has not been verified and neither the City of Waseca, nor its employees or agents makes any representation to the accuracy of the features and data presented here within. This map was created through the use of several city, county, state and federal data sources. For specific information regarding this map, or to report errors or omissions, contact the City of Waseca Engineering Department. Map #20170601-3 Date Printed: 7/7/2017