PASSENGER RAIL STATION LOCATION AND DESIGN WORKING GROUP MEETING STOCKBRIDGE

Similar documents
AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

TRANSPORTATION NEEDS ASSESSMENT

Plant City Walk-Bike Plan

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Classification Criteria

WELCOME TO OPEN HOUSE # 1 June 14, 2017

Appendix A-K Public Information Centre 2 Materials

Welcome and Introductions Overview of the Study to Date Community Involvement Intersection Improvement Concepts Bike-Ped Recommendations ITS

Welcome to the Open House

6.0 PEDESTRIAN AND BICYCLE FACILITIES 6.1 INTRODUCTION 6.2 BICYCLE DEMAND AND SUITABILITY Bicycle Demand

Decision on North Waterloo Routing

3.9 Recreational Trails and Natural Areas

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Outer Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

SIDEWALK GUIDELINES April 14, 2008

East Burke Transportation, Safety and Capacity Improvements

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

MASTER BICYCLE AND PEDESTRIAN PLAN

Chapter 5 Future Transportation

CONNECTING PEOPLE TO PLACES

Appendix B - Street Sections

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

RICHMOND BICYCLE AND PEDESTRIAN PLAN. September 2014 Prepared by the Midcoast Council of Governments

TRAFFIC IMPACT ANALYSIS

SNCC Demographic Trends

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Non-Motorized Transportation 7-1

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

US287 Asset Inventory Fort Collins. Figure 5-1 Fort Collins Bridges and Traffic Signals

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Physical Implications of Complete Streets Policies

ACCESSIBLE LOADING ZONES AND PROTECTED BIKE LANES: A UNIVERSAL DESIGN APPROACH. Accessibility Coalition Dec. 2016

Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

The Leadville Bikeway Design Recommendations DRAFT January 2018

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

Transportation Master Plan Advisory Task Force

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

DRAFT. Memo. Range of the Alternatives Considered in the EIS

Appendix 3 Roadway and Bike/Ped Design Standards

10.0 CURB EXTENSIONS GUIDELINE

Cranberry Area Transit Study Steering Committee Meeting

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

Chapter 3: Multi-Modal Circulation and Streetscapes

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

Sixth Line Development - Transit Facilities Plan

PEDESTRIAN NETWORK PLAN

PRICE TAGS. Issue 36. July 7, Vanishing

connections 2040 the waco metropolitan transportation plan amendment 2

Philip Schaffner Minnesota Department of Transportation October 22, 2013

Lake to Sound Trail FEASIBILITY STUDY. February 2009

Corvallis-Albany Bikeway Advisory Group Community Open House. April 5, 2017

Speed Limits Study and Proposal. Public Input Session: 8/14/13

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

Living Streets Policy

Overview. Existing Conditions. Corridor Description. Assessment

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

2018 WILDLIFE MANAGEMENT PLAN

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

NORTH DOWNTOWN N EAST WEST

Mumford Terminal Replacement Opportunities Neighbourhood Open House. we are here. PHASE 2 Identifying and Evaluating Candidate Sites

Roanoke Valley TRANSIT VISION PLAN

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Highway 111 Corridor Study

General Design Factors

The study area for this project is the entire County of Oxford including both the urban centres and rural areas.

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

DON MILLS-EGLINTON Mobility Hub Profile

Highway 56 Traffic Study Rymal Road to Cemetery Road

Central Jersey Transportation Forum. March 2007

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

El Paso County 2040 Major Transportation Corridors Plan


Stakeholders Advisory Working Groups (SAWGs) Bridge and Bike / Pedestrian SAWG (#15)

BERKSHIRE PASSENGER RAIL STATION LOCATION AND DESIGN ANALYSIS, DRAFT FOR PUBLIC COMMENT AUGUST 2014

Appendix H RESPONSES TO PUBLIC COMMENTS

The five potential solutions and some of their benefits and costs are listed in the following table: Ferry Patron Bike Parking Alternatives

ACTIVE TRANSPORTATION

Multimodal Through Corridors and Placemaking Corridors

Complete Streets: Planning, Policy & Performance

Bike/Multipurpose Trail Study for Glynn County, Georgia MAY 16, 2016

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

Westgate/Belvedere Homes Community Redevelopment Agency. Belvedere Heights. Streetlights & Sidewalks Improvements Project.

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

Exit 13/Golden Triangle Study FREQUENTLY ASKED QUESTIONS

Comments The Plan for Port Whitby

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Creating walkable, bikeable and transit-supportive communities in Halton

Transcription:

PASSENGER RAIL STATION LOCATION AND DESIGN WORKING GROUP MEETING STOCKBRIDGE Criteria for Passenger Rail Station Location Municipal Level To objectively compare Target Areas in all communities along the Housatonic rail line, a set of criteria were selected to evaluate the extent to which a passenger rail station would maximize economic impact to the community, maximize access and connectivity to and from the community, complement ongoing community development efforts, fit with community character, avoid and minimize operational difficulties while avoiding and/or mitigating adverse impacts. The list below demonstrates how these criteria were measured.. Maximize economic impact to the community a. Number of major employers within or near Target Area b. Extent of existing commercial use in Target Area c. Number of places of accommodation and dining establishments within or near Target Area d. Number of cultural and/or recreational opportunities within or near Target Area. Maximize access and connectivity to and from the community a. Population density b. Presence or proximity to major arterial road c. Capacity and condition of roads in Target Area d. Public transportation service e. Pedestrian and cycling access. Complement community development efforts a. Identification of area in community planning documents b. Identification of area in state or federal planning or economic development documents. Fit with the character of the community a. Surrounding land use and character. Avoid and/or minimize operational difficulties (TBD) a. Favorable track geometry b. At least of frontage along the tracks 6. Avoid and/or mitigate adverse impacts a. Presence of FEMA yr. flood plains b. Presence of habitat for rare or endangered species c. Presence of Priority Conservation Area d. Presence of Areas of Critical Environmental Concern e. Presence of wetland resource area or river protection area f. Number of brown fields Ranking for Passenger Rail Station Target Areas Stockbridge By applying the above criteria, Target Areas in Stockbridge were evaluated and ranked.. Cherry Street, East of South Street. South Street to East Main Street. Housatonic Village. Glendale. Cherry Street to South Street 6. Glendale Middle Road

PASSENGER RAIL STATION LOCATION AND DESIGN WORKING GROUP MEETING STOCKBRIDGE Target Area Strengths and Opportunities Challenges. Cherry Street, East of South Street Second most densely populated target area Adjacent to Town Center Second largest number of accommodations and a majority of food establishments Most commercial land use in this area Three major employers located near the rail corridor (Red Lion Inn, Theatre Festival, Austin Riggs) Zoned residential and business Proximity to a top tourist destination Close proximity to Route 7, BRTA Route serves this area and stops in Stockbridge Center Sidewalks present on Main Street; bike lane. South Street to East Main Street Close proximity to Town Center Largest number of accommodations and a majority of food establishments Zoned residential and business Proximity to Route 7, BRTA Route serves this area and stops in Stockbridge Center Riverfront Protection Area Habitat for Rare/Endangered Species Not densely populated. Housatonic Village Most densely populated target area Close proximity to Route 8 BRTA Route passes along the rail corridor and stops in Housatonic Far from Stockbridge Town Center Few or no food establishment or accommodations directly adjacent Road is narrow in some places; may be difficult for cyclists Riverfront Protection Area

PASSENGER RAIL STATION LOCATION AND DESIGN WORKING GROUP MEETING STOCKBRIDGE Target Area Strengths and Opportunities Challenges. Glendale Area is somewhat densely populated Glendale Road is Route 8, the major road in this area BRTA Route passes along the rail corridor and stops in Glendale No known environmental constraints Far from Town Center Zoned residential (one and four acre) Not in close proximity to commercial businesses, food establishments, or accommodations Road shoulders are narrow in some place and there are no sidewalks. Cherry Street to South Street Adjacent to Town Center Some accommodations nearby; relatively close to some commercial businesses Proximity to, 8 BRTA Route serves this area and stops in Stockbridge Center Not densely populated Zoned residential 6. Glendale Middle Road Close to a top tourist destination Nearby roads rated Excellent, Good in Close proximity to Route 8, BRTA Route serves this area Not densely populated Zoned residential Not in close proximity to commercial businesses, food establishments, or accommodations Road shoulders are narrow in places and there are few/no sidewalks Riverfront Protection Area Additional information can be found on the BRPC website: http://berkshireplanning.org/projects/passenger-rail-station-location-and-design-project/

PARK STREET Cherry Street, East of South Street Í...8 Miles

ICE GLEN ROAD PROSPECT HILL ROAD GLENDALE MIDDLE ROAD CHURCH STREET PINE STREET WEST MAIN STREET SERGEANT STREET MAIN STREET CHERRY STREET ELM STREET MAPLE STREET LAUREL HILL ROAD PARK STREET SOUTH STREET ICE GLEN ROAD GOODRICH STREET GREAT BARRINGTON ROAD CHERRY HILL ROAD South Street to Main Street Í... Miles

BUTLER ROAD GLENDALE MIDDLE ROAD CHERRY STREET CHERRY HILL ROAD Cherry Street to South Street Í... Miles

WEST DALE ROAD BUTLER ROAD RoadInventory GLENDALE ROAD Municipal Boundary CHRISTIAN HILL ROAD GLENDALE MIDDLE ROAD Glendale Middle Road CHERRY HILL ROAD Í... Miles This map was created by the and is intended for general planning purposes only. This map shall not be used for engineering, survey, legal, or regulatory purposes. MassGIS, MassDOT, BRPC or the municipalities may have supplied portions of this data. Prepared in cooperation with the Massachusetts Department of Transportation and the U. S. Department of Transportation. The views and opinions of the express herein do not necessarily state or reflect those of the Massachusetts Department of Transportation or the U. S. Department of Transportation.

DUGWAY ROAD OLD GLENDALE ROAD GLENDALE ROAD PIXLEY HILL ROAD HOUSATONIC COURT W E S T FURNACE ROAD APPLE STREET HIGH STREET ROBIN ROAD Glendale Í... Miles

GLENDALE ROAD G R E A T B A R R I N G T O N Housatonic Í... Miles