FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project

Similar documents
FM 471. Open House Public Meeting FM 471

I-10 AT SCENIC LOOP RD. Open House

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

Access Management Benefits & Techniques. Access Management Workshop June 2, 2006

Proposed Action, Purpose and Need Technical Memorandum

RAISED MEDIAN EFFECTIVENESS

Access Location, Spacing, Turn Lanes, and Medians

SUPERSTREETS IN TEXAS. ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011

Access Management in the Vicinity of Intersections

Frequently Asked Questions

MASTER THOROUGHFARE PLAN

INNOVATIVE INTERSECTION DESIGN

Moving Together Conference Complete Streets from the MassDOT District 5 Perspective

Performance-Based Planning for Safety in a Vision Zero World. AMPO September 27, 2018

Executive Summary June 2015

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

Superstreet Concepts & Application. Prepared by: PAPE-DAWSON ENGINEERS, INC. October 16, 2012

WELCOME. FM 2818 (Harvey Mitchell Parkway) Open House. Tuesday, Nov. 14, 2017

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

Safety Impacts: Presentation Overview

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

Access Management Regulations and Standards

Southcote Road Improvements Class Environmental Assessment Study

Road Diets FDOT Process

Public Information Meeting

Application of a Complete Street

Characteristics of Fatal Pedestrian Crashes on Freeways. Kay Fitzpatrick Texas A&M Transportation Institute

City of Homewood Transportation Plan

Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay

Welcome. Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to:

RM 620 FEASIBILITY STUDY

Figure 1: Vicinity Map of the Study Area

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

APPENDIX L: COST ESTIMATING TOOLS

Superstreets. A Tool for Safely and Efficiently Managing Congestion

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Long Island Rail Road Expansion Project Floral Park to Hicksville

Transportation Advisory Board

CITY OF SASKATOON COUNCIL POLICY

Project Description Form 6V

Innovative Intersections

Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report

Driveway Design Criteria

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate

PennDOT Access Management Model Ordinances Training

Improving Pedestrian Safety at Unsignalized Crossings. Shawn Turner, P.E. Texas A&M Transportation Institute

Update to DOTD Roundabout Design Policy

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

IH 20 RANGER HILL PUBLIC MEETING

HSM PREDICTIVE METHODS IN PRELIMINARY ENGINEERING

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Preliminary Engineering Study

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

a 20 year period. separate phases of development with staggered years)

Washington St. Corridor Study

Road Diets and Roundabouts

HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

Access requests to County streets and roadways are processed through one of the following methods:

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

Multimodal Transportation Plan

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

Alamo RMA VRF Project Update June 2016

Creating Complete Streets to Accommodate All Users

Central Arkansas Regional Transportation Study Area ROADWAY DESIGN STANDARDS And Implementation Procedures

Bay to Bay Boulevard Complete Streets Project

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

The Case for Roundabouts:

Broadway Complete Streets Project

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

5. RUNNINGWAY GUIDELINES

Iowa Corridor Management Pilot Project Overview. Recommendations For A Corridor Management Program August 2004

PROJECT PURPOSE & NEED

SH 68. Meeting with Affected Property Owners September 9, 2014

Traffic Impact Memorandum. May 22, 2018

Route 29 Corridor Assessment Update. Development of Possible Solutions

Engineering Countermeasures for Transportation Safety. Adam Larsen Safety Engineer Federal Highway Administration

FM 1110 (Clint Cutoff Road) Widening & Realignment I-10 to SH 20 (Alameda Avenue)

What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety

Transportation Impacts: Toronto York Spadina Subway Extension

Geometric Design Tables

Information on display. Inside this handout. Triangle Area revisions. Project need displays. Preferred alternative on aerial maps

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

HIGHWAY CAPACITY MANUAL

Background on the Revisions to VDOT s Access Management Spacing Standards

RE: Natomas Landing (P99-091)

Roundabout Feasibility Memorandum

SELECTED ROADWAY CAPACITY ANALYSIS

Transportation Corridor Studies: Summary of Recommendations

US 69 RELIEF ROUTE STUDY

Public Meeting. I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 6:00pm Edmond Community Center Auditorium

WHAT CAN WE DO? SECTION 6

Austell Road Access Management Plan Public Meeting February 17, 2009

Transcription:

FM 471 PROJECT OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties January 24, 2018

Project Location 2

Proposed Improvements Improvements include: Expansion of FM 471 from a 2-lane roadway to a 4-lane roadway with raised medians and left turn lanes Bike and pedestrian accommodations An overpass at SH 211 over FM 471 3

Existing FM 471 Typical Section *Rendering not to scale 4

Proposed FM 471 Typical Section *Rendering not to scale 5

Proposed FM 471 & SH 211 Interchange Looking East *Rendering not to scale 6

Proposed Improvements Raised Medians What are raised medians? Raised medians are a curbed section that safely separate traffic traveling in opposite directions. 7

Proposed Improvements Why Raised Medians? Why raised medians? The current and future planned development along FM 471 will increase traffic utilizing the roadway. Raised medians reduce traffic conflict points by eliminating opposing left turns into and out of driveways. 8

Proposed Improvements Why Raised Medians? How do raised medians improve SAFETY? A significant reduction in the number and severity of crashes after installation of raised medians Separate opposing traffic flows Eliminate opposing left-turns at closely spaced driveways and busy signalized intersections Roadways with a non-traversable median have an average crash rate about 30 percent less than roadways with a two-way left-turn lane. (ref: Texas Department of Transportation (TxDOT), Roadway Design Manual, 2002.) 9

Proposed Improvements Why Raised Medians? How do raised medians improve MOBILITY? Reduce traffic delay and congestion Restrict left turns to intersection median openings The National Highway Institute reports that inadequate access management can increase travel time and delay by as much as 40 to 60 percent. (ref: Reilly, W., et al.,.capacity and Service Procedures for Multi-lane Rural and Suburban Highways,. Final Report NCHRP Project 3-33, JHK & Associates and Midwest Research Institute, May 1989). 10

AVERAGE ANNUAL DAILY TRAFFIC (AADT) PROJECTED PROJECTED PROJECTED Traffic Trend - (FM 471) 60000 50000 44600 49100 40000 30000 20000 23285 30700 10000 8400 11770 12400 0 2000 2005 2010 2015 2023 2043 2053 YEAR 11

Environmental Studies Studies are underway to evaluate potential impacts of the proposed project on social and environmental resources, including: Historic-age Resources Archeological Resources Parks Cemeteries Threatened and Endangered Species Vegetation Water Resources 12

Environmental Studies, continued Commercial and Residential Properties Socioeconomics and Community Cohesion Air Quality Traffic Noise Hazardous Materials Section 4(f) Properties 13

Project Schedule and Funding Current Estimated Construction Cost: Approximately $29 million Project Funding: Federal, State, Bexar County, and Alamo RMA Earliest Anticipated Construction : Late 2021 Anticipated Construction Duration: 2.5 years 14

Project Timeline * Depending upon funding availability, utility, and ROW coordination. 15

Provide Your Comments Options for Commenting 1. Complete written comment card and leave in comment box 2. Provide verbal comments to on-site court reporter 3. Email comments to: FM471Project@hntb.com 4. Mail comments to: Open House Comment Attn: Stacey Sinclair 9601 McAllister Freeway, Suite 1001 San Antonio, TX 78216 Deadline for Comments: February 8, 2018 Meeting materials and project information will be posted online: Visit txdot.gov and enter FM 471 from SH 211 in the search bar 16

Closing Remarks Thank You for Your Participation! 17