AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

Similar documents
PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

Wellwork Chronological Regulatory Report

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

ENDEAVOR ENERGY RESOURCES

Drilling Morning Report

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

FORGE Energy UL 21 Freedom 1 API Number:

Wellwork Chronological Regulatory Report

BP SIT Testing Franks Facility Lafayette

Casing Design. Casing Design. By Dr. Khaled El-shreef

Deepwater Horizon Incident Internal Investigation

BLACK HILLS PLATEAU PRODUCTION COMPANY

Float Equipment TYPE 925/926

Daily Drilling Report

1. The well has been shut in on a kick and the kill operation has not started.

FORGE Energy UL 21 Pahaska 1H API Number:

SUBSEA KILL SHEET EXERCISE No. 5

Chapter 5 HORIZONTAL DRILLING

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Study Guide IADC WellSharp Driller and Supervisor

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

PHE KE30-A8 WORKOVER PROGRAM

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

OCEAN DRILLING PROGRAM

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe

Rig Math. Page 1.

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Zarvona DAILY WORKOVER / COMPLETION REPORT

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

Horizontal Marmaton Wells in Beaver County, OK

Air and Gas Drilling

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

Zarvona Energy LLC DAILY OPERATIONS

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

IWCF Equipment Sample Questions (Surface Stack)

W I L D W E L L C O N T R O L AIR DRILLING

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

Shell Castor & Pollux Rig Equipment Primary Items

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Practice Exam IADC WellSharp Driller and Supervisor

RIH intermediate section casing in Bazian-1 exploration oil well

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

Abandonment Program for Paramount Fort Liard F 36

JULY AUG 2010 INNOVATING WHILE DRILLING REGIONAL FOCUS: EUROPE & THE NORTH SEA

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

EP WELLS DAILY OPERATIONS REPORT Report 29 04/21/2017

EP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

HydroPull. Extended-Reach Tool. Applications

Performance and Value of the invision System : Offshore in Coiled Tubing Operations

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 02/02/2017

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE

Engineered solutions for complex pressure situations

Extended leak off testing

Why Do Not Disturb Is a Safety Message for Well Integrity

Worked Questions and Answers

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

and and Norton J. Lapeyrouse CONTENTS

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

RIG CAPABILITIES For Multi Well/Pad Development

Hydro-Mech Bridge Plug

Chapter 5 Drilling and Well Testing Practices

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

E NGINEERED C EMENTING S OLUTIONS

Investigation of Blowout and Fire Eugene Island Block 284 OCS-G 0991 Well A-13 March 1, 2001

RPSEA UDW Forum June 22 & 23, Secure Energy for America

August 21, Deepwater MPD / PMCD

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800

Top Drive System. 1. AC VFD Top Drive System. Technical characters

Faculty of Science and Technology MASTER S THESIS

HPHT Annular Casing Packer. Obex Annular Casing Packer

IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011

STYLE 3414/3416 & 3421/3423 Apollo Monitor with Foldaway Legs OPERATING & MAINTENANCE INSTRUCTIONS

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Casing! 07 An Overview!

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

BaraBlend -665 LCM Standard Field Application Procedure

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Proper Pump Installation Practices

Standard Operating Procedures

SPE/IADC Abstract

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Commentary on the book by Andrew Hopkins. By Graham Dalzell

Understanding pressure and pressure

Index Table. Model 794. Installation, Operating and Maintenance Instructions

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

Transcription:

AEPB WELL NO. Report End Date: Report Number: 1 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 70 : 0 Planned VS (ft): Current VS (ft): 42383383570000 MIRU MIRU INTEGRITY 3. 70 Longitude Orig KB El$ RKB (ft) County 70 MIRU 0 19:00 22:00 3.00 30 30 RD AND MOB F/ WOODS 1 UNIT 1 RE 21027HA SURF VERT DRILL RIG UP/RIG DOWN 22:00 05:00 7.00 30 30 MIRU UNIVERSITY 12 RE 029HS SURF VERT DRILL RIG UP/RIG DOWN

AEPB WELL NO. Report End Date: 8/31/2015 Report Number: 2 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 1,038 : 968 Planned VS (ft): Current VS (ft): 42383383570000 TOOH FINISH MIRU, DRILL F/ 70ft TO 1038ft. PUMP SWEEP AND TOOH. 70 Longitude Orig KB El$ RKB (ft) County 1,038 RUN 133/8 CASING AND CEMENT. RUN GYRO 968 13.00 05:00 08:00 3.00 30 30 MIRU SURF VERT DRILL RIG UP/RIG DOWN 08:00 09:00 1.00 30 30 PICK UP BHA 1. SURF VERT DRILL P/U & L/D BHA 09:00 22:00 13.00 30 1,038 SPUDDED WELL AT 08:00hrs ON 0. ROTATE DRILL FROM 70ft - 1038ft, 968ft AT 74.46fph ROTATE DRILL: 968' IN 13 HOURS, 74.46 FPH AVERAGE ROP 100% ROTATE, 0% SLIDE FULL RETURNS SURF VERT DRILL DRILL W/ AIR 22:00 22:30 0.50 1,038 1,038 PUMP SWEEP SURF VERT DRILL COND MUD & CIRC 22:30 00:00 1.50 1,038 1,038 TOOH SURF VERT DRILL TRIPS 74.5

AEPB WELL NO. Report End Date: 8/31/2015 Report Number: 3 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 1,038 : 0 Planned VS (ft): Current VS (ft): 42383383570000 WAIT ON BIG RIG LD DRILL PIPE AND BHA. RIG UP AND RUN 24 jts. 133/8 54.5# J-55 BTC CASING. LANDED AT 1038ft KB. RAN SURFACE CEMENT. CUTOFF 133/8in CASING AT GROUND LEVEL, RELEASED RIG AT 1830 hrs 8-31-15 1,038 Longitude Orig KB El$ RKB (ft) County 1,038 WAIT ON BIG RIG 0 05:00 06:00 1.00 1,038 1,038 TOOH SURF VERT DRILL TRIPS 06:00 07:00 1.00 1,038 1,038 LD BHA SURF VERT DRILL P/U & L/D BHA 07:00 08:00 1.00 1,038 1,038 RIG UP CASING CREW SURF VERT CSG/CEMENT RIG UP/RIG DOWN 08:00 11:00 3.00 1,038 1,038 RAN 1008ft (24jts) OF 13.375in J-55 54.5ppf BTC SURFACE CASING. TAGGED BOTTOM AT 1038ft. ANTELOPE BOW SPRING CENTRALIZERS INSTALLED ON EVERY 4TH JOINT. ANTELOPE SHOE AT 1037.5ft. ANTELOPE FLOAT COLLAR AT 998.3ft SURF VERT CSG/CEMENT RUN CASING 11:00 11:30 0.50 1,038 1,038 RU CREST CEMENTERS SURF VERT CSG/CEMENT RIG UP/RIG DOWN 11:30 14:30 3.00 1,038 1,038 R/U CREST CEMENT HEAD. MIXED AND PUMPED 133/8in SURFACE CASING PRIMARY CEMENT JOB AS FOLLOWS: 275bbls OF WATER AHEAD, 50bbls GEL SPACER, 20bbls FRESH WATER SPACER, 214bbls OF 12.8ppg LEAD SLURRY AT 5bpm, 100.6bbls OF 14.8ppg TAIL SLURRY AT 5bpm. DROPPED UNIVERSAL TOP PLUG AND DISPLACED CEMENT WITH 150bbls OF WATER AT 5bpm. BUMPED PLUG WITH 890psi FCP. OBSERVED 100bbls OF GOOD CEMENT TO SURFACE. RIGGED DOWN CEMENT HEAD AND CREST CEMENTERS. LEAD SLURRY: 214bbls (650sx) 35/65 POZ CLASS C WITH 3% CaCl, 0.25lb/bbl POLY-E-FLAKE, TAIL SLURRY: 100.6bbls (425sx) CLASS C WITH 2% CaCl, 0.25lb/bbl POLY-E- FLAKE SURF VERT CSG/CEMENT RUN CEMENT 14:30 18:30 4.00 1,038 1,038 RUN GYRO WHILE WOC. RELEASED RIG 08/31/15 AT 18:30 SURF VERT CSG/CEMENT WAIT ON CEMENT

Report End Date: 9/24/2015 Report Number: 5 Drilling Days: : 1,038 : 0 Planned VS (ft): Current VS (ft): RIGGING UP TRANSPORT RIG FROM WOODS RE 1 210 27HA TO THE, SET IN PITS, PUMPS AND GEN PACKAGE Longitude Orig KB El RKB (ft) 31.1261700000-101.4964000000 2,783.00 CONTINUE SETTING IN RIG AND RIGGING UP County REAGAN 100% RIG DOWN & MOVED, 50% SET IN, 20% RIGGED UP 48 HOURS SINCE RIG RELEASE 1ST WELL ON 1 WELL PAD ESTIMATED SPUD DATE: 9/26/2015 1,038 1,038 0 05:00 08:00 3.00 1,038 1,038 CONTINUE RIGGING DOWN AND PREPAIRING RIG FOR TRUCKS WHILE WAITING ON DAY LIGHT TO START TRANSPORTING RIG MOB MOB MOB RIG UP/RIG DOWN 08:00 05:00 21.00 1,038 1,038 HOLD PJSM WITH RIG CREW AND LIGHTENING TRUCKING, TRANSPORT RIG FROM THE WOODS RE 1 210 27HA TO THE UNIVERSITY RE 0209HS AND SET IN MUD PITS, SCR, FESTOON, GENERATOR PACKAGE, MUD PUMPS, WATER TANK, DIESEL TANKS: TRUCKING COMPANY SHUT DOWN AT 19:30, RIG CREW CONTINUED TO RIG UP. 100% MOVED, 50% SET IN, 20% RIGGED UP MOB MOB MOB RIG UP/RIG DOWN

Report End Date: 9/25/2015 Report Number: 6 Drilling Days: : 1,038 : 0 Planned VS (ft): Current VS (ft): RIGGING UP CONTINUE SETTING IN RIG AND RIGGING UP RIG EQUIPMENT Longitude Orig KB El RKB (ft) 31.1261700000-101.4964000000 2,783.00 CONTINUE RIGGING UP RIG EQUIPMENT County REAGAN 100% MOVED, 100% SET IN, 85% RIGGED UP 72 HOURS SINCE RIG RELEASE NEXT WELL COPE 79-80 02HA ( MOVE ) ESTIMATED SPUD DATE: 9/26/2015 1,038 1,038 0 05:00 07:00 2.00 1,038 1,038 RIG UP WITH NIGHT CREW WHILE WAITING ON LIGHTENING TRUCKING OPERATORS MOB MOB MOB RIG UP/RIG DOWN 07:00 18:00 11.00 1,038 1,038 HOLD PJSM WITH RIG CREW AND LIGHTENING TRUCKING, SET IN AND STACK SUBS, CENTER STEEL, TROLLEY BEAMS,WINCHES, DRAWWORKS. PIN STRONGBACK TO A-LEGS. SET ODS HOUSE, DRILLERS CABIN, STAIRS, DERRICK, MONKEY BOARD. PRE DERRICK TO RAISE. ( HELD PRE-JOB SAFITY MEETING ON RAISING THE DERRICK ) THE DERRICK WAS RAISED AND SECURED @ 17:45 PM. 100% MOVED, 100% SET IN, 80% RIGGED UP 18:00 05:00 11.00 1,038 1,038 HUNG THE BOP'S, FLOW LINE. SET IRON ROUGHNECK AND ALL FLOOR PLATES, HYDRAULIC CATWALK. TRUCKING COMPANY SHUT DOWN AT 19:30, RIG CREW CONTINUED TO RIG UP. HOOK UP LIGHTS ON OFF D/S, RIG TONGS, GAS BUSTER, PORCH ON D/S, SPOOL UP DRAWWORKS,AIR HOIST'S, UNPIN BLOCKS, HOOK UP TO TOP DRIVE.RIG UP :MAKE UP KELLY HOSE TO TOPDRIVE MOB MOB MOB RIG UP/RIG DOWN MOB MOB MOB RIG UP/RIG DOWN

Report End Date: 9/27/2015 Report Number: 8 Drilling Days: 1 : 1,173 : 135 Current VS (ft): 2 DRILLING TANGENT AT @ 1,173 ft INSTALL WEAR BUSHING, P/U DIRECTIONAL BHA, ORIENT AND TEST SAME, P/U 6' DRILL COLLARS, HEAVY WEIGHT DRILL PIPE AND 4 1/2" DRILL PIPE, TAG CEMENT AT 976ft, DRILL OUT & DRILL TANGENT Longitude Orig KB El RKB (ft) 31.1261700000-101.4964000000 2,783.00 County REAGAN CONTINUE DRILLING TANGENT TO PROJECTED CASING POINT 6,195 ft NEXT WELL COPE 79-80 02HA ( MOVE ) ESTIMATED SPUD DATE: 9/26/2015 1,038 1,173 135 1.50 05:00 09:00 4.00 1,038 1,038 INSTALL WEAR BUSHING, FILL UP LINES, CATCH PAN, DRAIN HOSES, BLEED OFF LINE, RIG UP TURN BUCKLES, CENTER STACK, INSTALL TRIP NIPPLE (LAY OUT, STRAP AND CALIPER BHA ) MOB MOB MOB BOP/OTHER 09:00 12:00 3.00 1,038 1,038 P/U DIRECTIONAL BHA AND ORIENT SAME, TEST MOTOR, M/U BIT No. 3, HALLIBURTON MM65D 11in SN: 12462146, 6-6 12/in DRILL COLLARS, 18 JOINTS HEAVY WEIGHT DRILL PIPE MOB MOB MOB DIRECTIONAL WORK 12:00 14:30 2.50 1,038 1,038 PICK UP 2 JOINTS 4 1/2in 16.60 IEU DRILL PIPE, TAGGED CEMENT AT 976ft MOB MOB MOB TRIPS 90.0 14:30 21:00 6.50 1,038 1,038 BUILD STANDS AND RACK BACK IN THE DERRICK ( WHILE WAITING ON SAVER SUB, GRABBER DIES AND STABBING GUIDE FOR TOP DRIVE) 21:00 22:30 1.50 1,038 1,038 C/O TOP DRIVE SAVER SUB, GRABBER DIES AND STABBING GUIDE. TEST SAVER SUB TO 250 LOW 5,000 HIGH WITH YELLO JACKET TESTERS MOB MOB MOB TRIPS MOB MOB MOB TEST B.O.P 22:30 23:30 1.00 1,038 1,038 DISPLACE FRESH WATER WITH 8.9 PPG. OIL BASE MUD MOB MOB MOB COND MUD & CIRC 23:30 01:30 2.00 1,038 1,038 PULL TRIP NIPPLE AND INSTALL ROTATING HEAD MOB MOB MOB BOP/OTHER 01:30 03:30 2.00 1,038 1,038 DRILL CEMENT AND FLOAT EQUIPMENT FROM 976 ft. to 1,038 ft MOB MOB MOB REAMING 03:30 05:00 1.50 1,038 1,173 ROTATE/SLIDE FROM 1,038 ft TO 1,173 ft, 135 ft AT 90 FPH ROTATE 135 ft IN 1.5 HOURS, 90 FPH AVERAGE ROP SLIDE: 0 ft IN 0 HOUR, 0 FPH AVERAGE ROP 100% ROTATE, 0% SLIDE FULL RETURNS 20 MIN. CONNECTIONS DO TO NEW DRILLER INT DIR DRILL DRILL W/ MUD

Report End Date: 9/28/2015 Report Number: 9 Drilling Days: 2 : 3,650 : 2,477 Current VS (ft): -128 DRILLING TANGENT AT @ 3,650 ft DRILLING AHEAD FROM 1,173ft TO 3,650 ft LAST SURVEY AT: 3,521 ft,inc: 2.9, Azm: 160,TVD: 3,515 ft VS: -127.89 ft, DLS: 1.05, 4 ft A, 4 ft R CONTINUE DRILLING TANGENT TO PROJECTED CASING POINT 6,195 ft SPUD DATE: 9/27/15 AT 3:00 PM 1,173 3,650 2,477 23.50 05:00 12:30 7.50 1,173 2,061 ROTATE/SLIDE FROM 1,173ft TO 2,061ft, 888ft AT 118.4fph ROTATE 873ft IN 7 HOURS, 124.7fph AVERAGE ROP SLIDE: 15ft IN 0.5 HOUR, 30fph AVERAGE ROP 93% ROTATE, 7% SLIDE FULL RETURNS INT DIR DRILL DRILL W/ MUD 12:30 13:00 0.50 2,061 2,061 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE AND DERRICK FOR LOOSE KEEPERS AND BOLTS, (ALL GOOD) 13:00 05:00 16.00 2,061 3,650 ROTATE/SLIDE FROM 2,061ft TO 3,650 ft, 1,589 ft AT 99 fph ROTATE 1,458 ft IN 11 HOURS, 133 fph AVERAGE ROP SLIDE: 140 ft IN 5 HOUR, 28 fph AVERAGE ROP 91% ROTATE, 9% SLIDE FULL RETURNS INT DIR DRILL LUBRICATE RIG INT DIR DRILL DRILL W/ MUD 105.4

Report End Date: 9/29/2015 Report Number: 10 Drilling Days: 3 : 6,201 : 2,551 Current VS (ft): -159 CIRCULATE DRILLING AHEAD FROM 3,650ft TO 6,201 ft,circulate FINISH CIRCULATING, POOH,PICK UP CURVE BHA LAST SURVEY AT: 6,137 ft,inc: 0.6, Azm: 203.8,TVD: 6,131.10 ft VS: -159.32 ft, DLS:.18, 9 ft B, 3 ft R 3,650 6,201 2,551 21.50 05:00 13:00 8.00 3,650 4,816 ROTATE/SLIDE FROM 3,650ft TO 4,816ft,1166ft AT 145.8fph ROTATE 1,136ft IN 7 HOURS, 162.3 fph AVERAGE ROP SLIDE: 10 ft IN 1 HOUR, 30 fph AVERAGE ROP 90% ROTATE, 10% SLIDE FULL RETURNS INT DIR DRILL DRILL W/ MUD 13:00 13:30 0.50 4,816 4,816 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE AND DERRICK FOR LOOSE KEEPERS AND BOLTS, (ALL GOOD) 13:30 03:00 13.50 4,816 6,201 ROTATE/SLIDE FROM 4,816ft TO 6,201 ft, 1,385 ft AT 103 fph ROTATE 1,358 ft IN 12.5 HOURS, 109 fph AVERAGE ROP SLIDE: 27 ft IN 1 HOUR, 27 fph AVERAGE ROP 98% ROTATE, 2% SLIDE FULL RETURNS INT DIR DRILL LUBRICATE RIG INT DIR DRILL DRILL W/ MUD 03:00 05:00 2.00 6,201 6,201 CIRCULATE TWO SWEEP AROUND AND CLEAN THE HOLE INT DIR DRILL COND MUD & CIRC 118.7

Report End Date: 9/30/2015 Report Number: 11 Drilling Days: 4 : 6,475 : 274 Current VS (ft): -158 BUILDING CURVE AT 6,475 ft FINISH CIRCULATING, POOH TO BHA, L/O SAME, PICK UP 7 7/8 CURVE BHA AND DRILL TO KOP AT 6,307 ft, DRILL CURVE AS PER APPROVED DIRECTIONAL PLAN # 2 CONTINUE TO DRILL AND LAND CURVE, DRILL LATERAL AS PER DIRECTIONAL PLAN #2 TO PROPOSED TD @ + - ft LAST SURVEY AT: 6,346 ft,inc: 6.3, Azm: 353.5,TVD: 6,340.01 ft VS: -158.41 ft, DLS: 15.12, DLN: 8.6, 3 ft B, 1 ft R 6,201 6,475 274 4.50 05:00 08:00 3.00 6,201 6,201 CIRCULATE AND DUST MUD WEIGHT UP TO 9.05, WELL BORE STABLE INT DIR DRILL COND MUD & CIRC 08:00 08:30 0.50 6,201 6,201 CHECK FLOW, WELL STATIC, PUMP SLUG INT DIR DRILL TRIPS 08:30 13:00 4.50 6,201 6,201 TRIP OUT FROM 6,201 TO 362ft ( SLM, DRILLERS TALLEY 5315.13, STRAP 5318.50 ) 13:00 16:00 3.00 6,201 6,201 LAID OUT BHA No. 2 FROM 362ft TO SURFACE. GRADED 11 in BIT No.2, HALLIBURTON MM65D 1-1-CT-S-1-1-CT-BHA. 16:00 16:30 0.50 6,201 6,201 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE 16:30 19:30 3.00 6,201 6,201 P/U DIRECTIONAL BHA, ORIENT AND TEST SAME, M/U BIT No. 3, HALLIBURTON MMD54DM SN# 12504757 INT DIR DRILL TRIPS INT DIR DRILL TRIPS INT DIR DRILL LUBRICATE RIG INT DIR DRILL P/U & L/D BHA 19:30 00:30 5.00 6,201 6,201 T.I.H. FROM 171 ft TO 6,201 ft, NO HOLE PROBLEMS, NO FILL INT DIR DRILL TRIPS 00:30 02:00 1.50 6,201 6,307 ROTATE/SLIDE FROM 6,201 ft TO 6,307 ft,106 ft AT 71 fph ROTATE 106 ft IN 1.5 HOURS, 71 fph AVERAGE ROP SLIDE: 0 ft IN 0 HOUR, 0 fph AVERAGE ROP 100% ROTATE, 0% SLIDE FULL RETURNS 02:00 05:00 3.00 6,307 6,475 ROTATE/SLIDE DRILLED, BUILDING CURVE FROM 6,307 ft TO 6,475 ft, 168 ft AT 56 FPH ROTATE 168 ft IN 3 HOURS, 56 FPH AVERAGE ROP SLIDE: 0 ft IN 0 HOURS, 0 FPH AVERAGE ROP 100 % ROTATE, 0% SLIDE FULL RETURNS INT DIR DRILL DRILL W/ MUD PROD CURVE DRILL DRILL W/ MUD 60.9

Report End Date: 10/1/2015 Report Number: 12 Drilling Days: 5 : 8,525 : 2,050 Current VS (ft): 1,466 DRILL LATERAL TO 8,525 ft DRILL CURVE FROM 6,475 ft TO 7,289 ft,drill LATERAL 7,289 ft TO 8,525 ft LAST SURVEY AT: 8,375 ft,inc: 90.3, Azm: 1.9,TVD: 6,933.6 ft VS: 1,561.06 ft, DLS:.53, 6 ft A, 1 ft L 6,475 8,525 CONTINUE TO DRILL LATERAL AS PER DIRECTIONAL PLAN #2 TO PROPOSED TD @ + - ft 2,050 23.00 05:00 13:00 8.00 6,475 6,528 ROTATE/SLIDE DRILLED FROM 6,475 ft TO 6,814 ft 339 ft AT 42 FPH ROTATE 12 ft IN.5 HOURS, 24 FPH AVERAGE ROP SLIDE: 327 ft IN 7.5 HOURS, 44 FPH AVERAGE ROP 3% ROTATE, 97% SLIDE FULL RETURNS PROD CURVE DRILL DRILL W/ MUD 13:00 13:30 0.50 6,528 6,528 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE 13:30 18:30 5.00 6,528 7,194 ROTATE/SLIDE DRILLED FROM 6,814 ft TO 7,194 ft 380 ft AT 76 FPH ROTATE 0 ft IN 0 HOURS, 0 FPH AVERAGE ROP SLIDE: 380 ft IN 5 HOURS, 76 FPH AVERAGE ROP 0% ROTATE, 100% SLIDE FULL RETURNS PROD CURVE DRILL LUBRICATE RIG PROD CURVE DRILL DRILL W/ MUD 18:30 19:00 0.50 7,194 7,194 CHANGE OUT LEAKING ROTATING HEAD WITH NEW ONE PROD CURVE DRILL BOP/OTHER Yes 19:00 20:30 1.50 7,194 7,289 ROTATE/SLIDE DRILLED FROM 7,194 ft TO 7,289 ft 95 ft AT 63 FPH ROTATE 0 ft IN 0 HOURS, 0 FPH AVERAGE ROP SLIDE: 95 ft IN 1.5 HOURS, 63 FPH AVERAGE ROP 0% ROTATE, 100% SLIDE FULL RETURNS 20:30 05:00 8.50 7,289 8,525 ROTATE/SLIDE DRILLED FROM 7,289 ft TO 8,525 ft 1,236 ft AT 145 FPH ROTATE 1,198 ft IN 7 HOURS, 171 FPH AVERAGE ROP SLIDE: 38 ft IN 1.5 HOURS, 25 FPH AVERAGE ROP 97 % ROTATE, 3 % SLIDE FULL RETURNS PROD CURVE DRILL DRILL W/ MUD 89.1

Report End Date: 10/2/2015 Report Number: 13 Drilling Days: 6 : 11,823 : 3,298 Current VS (ft): 4,859 DRILL LATERAL TO 11,823 ft DRILL LATERAL 8,525 ft TO 11,823 ft LAST SURVEY AT: 11,674 ft,inc: 91.1, Azm: 2.1,TVD: 6,965.18 ft VS: 4,858.89 ft, DLS:.2.5, 2 ft B, 18 ft R 8,525 11,823 CONTINUE TO DRILL LATERAL AS PER DIRECTIONAL PLAN #2 TO PROPOSED TD @ + - ft 3,298 23.00 05:00 16:00 11.00 8,525 10,139 ROTATE/SLIDE FROM 8,525 ft TO 10,139 ft 1,614 ft AT 147 FPH ROTATE 1,567 ft IN 9.5 HOURS, 165 FPH AVERAGE ROP SLIDE: 48 ft IN 1.5 HOURS, 32 FPH AVERAGE ROP 97 % ROTATE, 3 % SLIDE FULL RETURNS 16:00 16:30 0.50 10,139 10,139 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE 16:30 21:00 4.50 10,139 10,886 ROTATE/SLIDE FROM 10,139 ft TO 10,886 ft 747 ft AT 166 FPH ROTATE 725 ft IN 3.5 HOURS, 207 FPH AVERAGE ROP SLIDE: 22 ft IN 1 HOURS, 22 FPH AVERAGE ROP 97 % ROTATE, 3 % SLIDE FULL RETURNS PROD LAT DRILL LUBRICATE RIG 21:00 22:00 1.00 10,886 10,886 CHANGE OUT HYDR. LINE ON TOP DRIVE PROD LAT DRILL REPAIR RIG Yes 22:00 05:00 7.00 10,886 11,823 ROTATE/SLIDE FROM 10,886 ft TO 11,823 ft 937 ft AT 134 FPH ROTATE 925 ft IN 6.5 HOURS, 142 FPH AVERAGE ROP SLIDE: 12 ft IN.5 HOURS, 24 FPH AVERAGE ROP 99 % ROTATE, 1 % SLIDE FULL RETURNS 143.4

Report End Date: 10/3/2015 Report Number: 14 Drilling Days: 7 : 15,050 : 3,227 Current VS (ft): 8,083 DRILL LATERAL TO 15,050 ft DRILL LATERAL 11,823 ft TO 15,050 ft LAST SURVEY AT: 14,900 ft,inc: 88.4, Azm: 1.6,TVD: 6,987.69 ft VS: 8,083.46 ft, DLS:.2.2, 0 ft A/B, 3 ft L 11,823 15,050 CONTINUE TO DRILL LATERAL AS PER DIRECTIONAL PLAN #2 TO PROPOSED TD @ + - ft 3,227 23.00 05:00 12:00 7.00 11,823 12,767 ROTATE/SLIDE FROM 11,823ft TO 12,767 ft 944 ft AT 135 FPH ROTATE 907 ft IN 5 HOURS, 181 FPH AVERAGE ROP SLIDE: 35 ft IN 2 HOURS, 18 FPH AVERAGE ROP 99 % ROTATE, 1 % SLIDE FULL RETURNS 12:00 12:30 0.50 12,767 12,767 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE 12:30 15:00 2.50 12,767 13,289 ROTATE/SLIDE FROM 12,767 ft TO 13,289 ft 522 ft AT 209 FPH ROTATE 522 ft IN 2.5 HOURS, 209 FPH AVERAGE ROP SLIDE: 0 ft IN 0 HOURS, 0 FPH AVERAGE ROP 100% ROTATE, 0% SLIDE FULL RETURNS PROD LAT DRILL LUBRICATE RIG 15:00 15:30 0.50 13,289 13,289 CHANGE OUT SUCTION GASKET ON #2 MUD PUMP PROD LAT DRILL COND MUD & CIRC Yes 15:30 05:00 13.50 13,289 15,050 ROTATE/SLIDE FROM 13,289 ft TO 15,050 ft 1,761 ft AT 130 FPH ROTATE 1,699 ft IN 10.5 HOURS, 162 FPH AVERAGE ROP SLIDE: 62 ft IN 3 HOURS, 21 FPH AVERAGE ROP 96% ROTATE, 4% SLIDE FULL RETURNS 140.3

Report End Date: 10/4/2015 Report Number: 15 Drilling Days: 8 : : 2,078 Current VS (ft): 10,255 Total Depth Date 10/4/2015 CIRC. CLEAN UP CYCLE DRILL LATERAL 15,050 ft TO ft TD, CIRC. CLEAN UP CYCLE Rig Release Date Target Formation CONTINUE CIRC. CLEAN UP CYCLE, LAY DOWN DRILL PIPE LAST SURVEY AT: 17,073 ft,inc: 89.7, Azm: 356.5,TVD: 7,000.90 ft VS: 10,254.67 ft, DLS:.2.07, 3 ft A, 4 ft R 15,050 2,078 19.50 05:00 13:00 8.00 15,050 16,162 ROTATE/SLIDE FROM 15,050 ft TO 16,162 ft 1,112 ft AT 139 FPH ROTATE 1,057 ft IN 6 HOURS, 176 FPH AVERAGE ROP SLIDE: 45 ft IN 2 HOURS, 23 FPH AVERAGE ROP 95% ROTATE, 5% SLIDE FULL RETURNS 13:00 13:30 0.50 16,162 16,162 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE 13:30 14:00 0.50 16,162 16,192 ROTATE/SLIDE FROM 16,162 ft TO 16,192 ft 30 ft AT 60 FPH ROTATE 30 ft IN.5 HOURS, 60 FPH AVERAGE ROP SLIDE: 45 ft IN 2 HOURS, 0 FPH AVERAGE ROP 100% ROTATE, 0% SLIDE FULL RETURNS 14:00 15:30 1.50 16,192 16,192 CHANGE OUT SUCTION GASKET ON #2 MUD PUMP & TROUBLE SHOOT #1 MP FOUND MODULE BODY WASHED OUT 15:30 02:30 11.00 16,192 ROTATE/SLIDE FROM 16,192 ft TO ft 936 ft AT 85 FPH ROTATE 845 ft IN 6 HOURS, 141 FPH AVERAGE ROP SLIDE: 91 ft IN 5 HOURS, 18 FPH AVERAGE ROP 90% ROTATE, 10% SLIDE FULL RETURNS 02:30 05:00 2.50 CLEAN UP CYCLE: PUMP SWEEP BOTTOMS UP : 80% SHAKER SCREEN COVERAGE, STARTING TQ 10, ENDING TQ 9 PROD LAT DRILL LUBRICATE RIG PROD LAT DRILL COND MUD & CIRC Yes PROD LAT DRILL COND MUD & CIRC 106.6

Report End Date: 10/5/2015 Report Number: 16 Drilling Days: 9 : : 0 Current VS (ft): 10,255 Total Depth Date 10/4/2015 Rig Release Date PULL WEAR BUSHING FINISH CIRCULATING CLEAN UP CYCLE & LAY DOWN DRILL STRING FROM ft TO SURFACE, PULL WEAR BUSHING Target Formation INSTALL WELL HEAD BUSHING, R/U CASING EQUIPMENT & BEGIN RUNNING 5.5" CASING LAST SURVEY AT: 17,073 ft,inc: 89.7, Azm: 356.5,TVD: 7,000.90 ft VS: 10,254.67 ft, DLS:.2.07, 3 ft A, 4 ft R 0 05:00 11:00 6.00 FINISH CIRCULATING CLEAN CYCLE, CHECK FLOW AND PUMP SLUG 3RD CIRCULATION: 50% SHAKER SCREEN COVERAGE, STARTING TQ 6, ENDING TQ 5 4TH CIRCULATION: 30% SHAKER SCREEN COVERAGE, STARTING TQ 5, ENDING TQ 5 5TH CIRCULATION:15% SHAKER SCREEN COVERAGE, STARTING TQ 5, ENDING TQ 4 6TH CIRCULATION:SHAKERS CLEAN, STARTING TQ 4, ENDING TQ 4 CONTINUOUS 80 RPM'S, 550 GPM'S PROD LAT DRILL COND MUD & CIRC 11:00 02:00 15.00 LAY DOWN DRILL PIPE FROM ft TO 170 ft (INITIAL P/U WEIGHT 230K OFF BOTTOM, HOLE TAKING PROPER FILL) 02:00 04:30 2.50 LAID OUT BHA No. 2 FROM 170 ft TO SURFACE. GRADED 7.875in BIT No.3, HALLIBURTON MMD54DM 1-1-NO-G-1-1-NO-TD 04:30 05:00 0.50 PULL WEAR BUSHING & INSTALL WELL HEAD BUSHING S# J4009-145 (WASH OFF RIG FLOOR OF OBM) PROD LAT DRILL TRIPS PROD LAT DRILL P/U & L/D BHA PROD LAT DRILL BOP/OTHER

Report End Date: 10/6/2015 Report Number: 17 Drilling Days: 10 : : 0 Current VS (ft): 10,255 Total Depth Date 10/4/2015 Rig Release Date PERCULATE CASING SET 13 5/8 in BUSHING, R/U AND RAN 5.5 in CASING TO ft,perculate CASING LAST SURVEY AT: 17,073 ft,inc: 89.7, Azm: 356.5,TVD: 7,000.90 ft VS: 10,254.67 ft, DLS:.2.07, 3 ft A, 4 ft R Target Formation FINISH PERCULATE CASING, CIRCULATE 1 1/2 TIMES INNER CAPACITY & SWAP LINES TO CEMENT TRUCK 0 05:00 08:00 3.00 FINISH PULLING WEAR BUSHING, INSTALL 13 5/8 in WELL HEAD BUSHING TEST TO 5000 PSI GOOD TEST PROD LAT DRILL BOP/OTHER 08:00 09:00 1.00 SAFETY MEETING WITH EXPRESS CASING CREW & RIG HANDS; RIG UP EXPRESS CASING EQUIPMENT. 09:00 04:00 19.00 MAKE UP SHOETRACK, CHECK FLOATS (GOOD) AND RAN ft (389 jnts) OF 5.5 in PRODUCTION CASING AS FOLLOWS, FROM TOP TO BOTTOM 834.4 ft (20 jts) TO OF 5.5 in 17# RYS-110 LTC SOUR SERVICE. 5,387 ft (121 jts) OF 5.5 in 17# RYS SOUR SERVICE BOND COATED 1324.5 ft (29 jts) OF 5.5 in 17# HCP-110 LTC 1,209.9 ft (27 jts) OF 5.5 in RYS-110 SOUR SERVICE 8,316.11 ft (185 jts) OF 5.5 in 17# HCP-110 LTC TAGGED BOTTOM AT ft. CENTEK SOLID BODY CENTRALIZER PLACEMENT: EVERY JOINT FROM ft TO 7,276 ft, DAVIVS LYNCH BOWSPRING CENTRALIZERS 5.5 in x 7 7/8 in 3 PER 2 JOINTS FROM 7,276 ftto 6,311 ft, 1 PER 3 JOINTS FROM 6,129 ft TO 199 ft, HALLIBURTON BOW SPRING CENTRALIZERS 5.75 in x 12 in BOW SPRING CENTRALIZERS TRICAN SHOE AT ft TRICAN FLOAT COLLAR AT 17,080 ft. CALLED TRRC @ 10:OO PM TALKED TO PAM PROD PROD CSG/CEMENT RUN CASING PROD PROD CSG/CEMENT RUN CASING 04:00 05:00 1.00 INSTALL CREST CIRCULATING IRON, FILL PIPE, RUPTURED TRICAN FLOTATION DISK AT 2,800 PSI, PERCULATE CASING PROD PROD CSG/CEMENT COND MUD & CIRC

Report End Date: 10/7/2015 Report Number: 18 Drilling Days: 11 : : 0 Current VS (ft): 10,255 Total Depth Date 10/4/2015 Rig Release Date 10/7/2015 RIG RELEASED FINISH PERCULATING CASING, CIRCULATE 1.5 TIMES ANNULAR CAPACITY, CEMENT 5.5 in PRODUCTION CASING, RAISE STACK, CSET 5.5" CASING SLIPS, CUT CASING, NIPPLE DOWN BOPS & NIPPLE UP WELL CAP. LAST SURVEY AT: 17,073 ft,inc: 89.7, Azm: 356.5,TVD: 7,000.90 ft VS: 10,254.67 ft, DLS:.2.07, 3 ft A, 4 ft R Target Formation RELEASE RIG ON 10/7/15 AT 0500 HRS FROM TO COPE 79-80 02HA 0 05:00 10:00 5.00 FINISH PERCULATING CASING & CIRCULTE 1.5 TIMES ANNULAR CAPACITY PROD PROD CSG/CEMENT COND MUD & CIRC 10:00 11:30 1.50 HELD SAFETY MEETING WITH CREST CEMENTING & RIG PERSONNEL; RIG UP CEMENT HEAD AND CIRCULATING IRON 11:30 18:00 6.50 HELD PJSM, RIG UP CREST CEMENTING: TEST LINES TO 7,500 psi & BEGIN 5.5 in PRODUCTION CASING CEMENT JOB, 300 bbsl FRESH WATER SPACER WITH BIOCIDE + COR INHIBITOR, 100 bbls WEIGHTED SPACER AT 9.4 ppg, LEAD = 1395 SACK (732 bbls) 50/50 POZ-H AT 11.2 ppg, 2.95 YIELD & TAIL= 1580 SACKS (397 bbls) 50/50 POZ-H AT 14.4 ppg, 1.28 YIELD, PUMP RATE 8.4 bbls/min. PUMPED 50 bbls SUGAR & BIOCIDE WATER, 347 bbls TREATED WATER W/BIOCIDE + INHIBITOR DISPLACEMENT, PUMP RATE 8.5 bbls/min, SLOWED PUMP RATE TO 4.5 bbls/min FOR LAST 20 bbls BUMP PLUG, PRESSURE BEFORE BUMPING PLUG WAS 1900, psi, BUMP PLUG WITH 900 psi OVER FCP AS PER TRICAN TECH INSTRUCTION, BUMPED WITH 2,800 psi HELD FOR 3 min, BLED OFF PRESSURE, BLED BACK 4 bbls, FLOATS HELD. ESTIMATED TOP OF LEAD AT 37 ft, ESTIMATED TOP OF TAIL AT 5941 ft, TOTAL CEMENT BACK TO SURFACE: 205 bbls, ESTIMATED SPACER BACK TO SURFACE: 400 bbls (FULL RETURNS THRU OUT CEMENT JOB) R/D CEMENTERS SAME PROD PROD CSG/CEMENT RUN CASING PROD PROD CSG/CEMENT RUN CASING 18:00 21:00 3.00 WASH THRU BOP STACKS, PUMPS, TDS & CHOKE, FLOW LINE. DRAIN STACK, REMOVE DRIP PAN, HOOK UP BOP HANDELER, REMOVE FLOW LINE & TURN BUCKLES (BEGIN WASHING MUD TANKS AT 17:30 HRS ON 10/6/15) 21:00 03:00 6.00 SAFETY MEETING WITH YELLOW JACKET, SWECO TECH & RIG CREW. BREAK AND RAISE STACK, SET 5.5" SWECO SLIPS (SN: PT14-10-611) 108kips FULL VERTICLE TENSION OF CSG TO KOP (6,300 ft). CUT CASING, LAY DOWN CUT OFF, MOVE OVER AND TIE DOWN BOP STACK 03:00 05:00 2.00 FINAL CUT 5.5" CASING. INSTALLED AND TORQUE DOWN WELLHEAD CAP (SN: MC-04-1070). PREP RIG FOR MOVE (FINISH WASHING MUD TANKS AND OPEN TOPS AT 05:00 HRS ON 10/7/15) RELEASE RIG FROM AT 05:00 ON 10/7/2015 PROD PROD CSG/CEMENT NIPPLE UP B.O.P./WELLHEAD PROD PROD CSG/CEMENT NIPPLE UP B.O.P./WELLHEAD PROD PROD CSG/CEMENT NIPPLE UP B.O.P./WELLHEAD